August 7, 2003 Loss of Load / Generation Event in Rio Grande Valley. SIMPLIFIED ONELINE. MVEC GEN. SE Edinburg. HEC SS. CTG1. STG3. CTG2. 1400. 1425. North Edinburg. 1405. 1420. 4350. 5000. 4655. 5030. 5020. 1410. 1415. Aderhold. 4345. 5010. 5015. 5035. 5025. 1360. - PowerPoint PPT Presentation
Citation preview
August 7, 2003August 7, 2003Loss of Load / Generation EventLoss of Load / Generation Event
in Rio Grande Valley in Rio Grande Valley
North Edinburg
50204350
4345
5000
5010
4655
5015
5030
5035 5025
CTG1 STG3 CTG2
MVEC GEN
1400
1405
1425
1420
1415
CTG1STG3 CTG2
1410
1360
HEC GEN
HEC SS
SIMPLIFIED ONELINESIMPLIFIED ONELINE
SE Edinburg
Aderhold
SIMPLIFIED ONELINE – 14:23:15.00SIMPLIFIED ONELINE – 14:23:15.00
1) C Phase to Ground Fault – Surge Arrestor on Line Failed
North Edinburg
50204350
4345
5000
5010
4655
5015
5030
5035 5025
CTG1 STG3 CTG2
MVEC GEN
1400
1405
1425
1420
1415
CTG1STG3 CTG2
1410
1360
HEC GEN
HEC SS
37095 amps
4820 amps
18,447 amps
SE Edinburg
Aderhold
North Edinburg
50204350
4345
5000
5010
4655
5015
5030
5035 5025
CTG1 STG3 CTG2
MVEC GEN
1400
1405
1425
1420
1415
CTG1STG3 CTG2
1410
1360
HEC GEN
HEC SS
SIMPLIFIED ONELINE – 14:23:15.05SIMPLIFIED ONELINE – 14:23:15.05
1) 14:23:15.05 15:23:16N. Ed. To HEC Tripped (1)
SE Edinburg
Aderhold
SYSTEM ONELINE - 15:23:16SYSTEM ONELINE - 15:23:16
138 KV Load
138 KV LineUnit Trip
69 KV Line
69 KV Load
1) 14:23:15.05 15:23:16N. Ed. To HEC Tripped (1)
CTG2
SIMPLIFIED ONELINE – 14:23:15.59SIMPLIFIED ONELINE – 14:23:15.59
1) 14:23:15.59 15:23:18N. Ed. To HEC Closed
North Edinburg
50204350
4345
5000
5010
4655
5015
5030
5035 5025
CTG1 STG3 CTG2
MVEC GEN
1400
1405
1425
1420
1415
CTG1STG3
1410
1360
HEC GEN
HEC SS
41340 amps
12037 amps
SE Edinburg
Aderhold
North Edinburg
50204350
4345
5000
5010
4655
5015
5030
5035 5025
CTG1 STG3 CTG2
MVEC GEN
1400
1405
1425
1420
1415
CTG1STG3 CTG2
1410
1360
HEC GEN
HEC SS
SIMPLIFIED ONELINE – 14:23:15.66SIMPLIFIED ONELINE – 14:23:15.66
1) 14:23:15.66 15:23:18N Ed To HEC Tripped (2)
SE Edinburg
Aderhold
North Edinburg
50204350
4345
5000
5010
4655
5015
5030
5035 5025
CTG1 STG3 CTG2
MVEC GEN
1400
1405
1425
1420
1415
CTG1STG3 CTG2
1410
1360
HEC GEN
HEC SS
SIMPLIFIED ONELINE – 14:23:15.68SIMPLIFIED ONELINE – 14:23:15.68
1) 14:23:15.68 15:23:18 HEC STG #3 Tripped15:23:18Santa Rosa, Pharr, N. McAllen,
Polk Ave 12KV Load Tripped15:23:18Bates 69KV Tripped
SE Edinburg
Aderhold
SYSTEM ONELINE - 15:23:18SYSTEM ONELINE - 15:23:18
1) 14:23:15.68 15:23:18 HEC STG #3 Tripped15:23:18Santa Rosa, Pharr, N. McAllen,
Polk Ave 12KV Load Tripped15:23:18Bates 69KV Tripped
138 KV Load
138 KV LineUnit Trip
69 KV Line
69 KV Load
SYSTEM ONELINE - 15:23:20SYSTEM ONELINE - 15:23:20
138 KV Load
138 KV LineUnit Trip
69 KV Line
69 KV Load
1) 15:23:20Hall Acres 12KV Load Tripped
2) 15:23:20Bates 69KV Closed
SYSTEM ONELINE - 15:23:22 & 24SYSTEM ONELINE - 15:23:22 & 24
138 KV Load
138 KV LineUnit Trip
69 KV Line
69 KV Load
1) 15:23:22Bates 69KV Tripped
2) 15:23:24Pharr 12KV Load Tripped & Closed
SYSTEM ONELINE - 15:23:26SYSTEM ONELINE - 15:23:26
138 KV Load
138 KV LineUnit Trip
69 KV Line
69 KV Load
1) 15:23:26Bates 69KV Closed15:23:26S. McAllen To N. McAllen Tripped15:23:26S McAllen 12KV Load Tripped15:23:26N McAllen 12KV Load Tripped & Closed
SYSTEM ONELINE - 15:23:28SYSTEM ONELINE - 15:23:28
138 KV Load
138 KV LineUnit Trip
69 KV Line
69 KV Load
1) 15:23:28Hall Acres 12KV Load Tripped15:23:28S. McAllen To N. McAllen Closed
North Edinburg
50204350
4345
5000
5010
4655
5015
5030
5035 5025
CTG1 STG3 CTG2
MVEC GEN
1400
1405
1425
1420
1415
CTG1STG3 CTG2
1410
1360
HEC GEN
HEC SS
39813 amps
7170 amps
SIMPLIFIED ONELINE – 14:23:25.65SIMPLIFIED ONELINE – 14:23:25.65
1) 14:23:25.65 15:23:30N. Ed. To HEC Closed14:23:25.74 15:23:30N. Ed to HEC Tripped (3)14:23:25.76 15:23:30N. Ed. To MVEC Tripped (CTG1)
SE Edinburg
Aderhold
North Edinburg
50204350
4345
5000
5010
4655
5015
5030
5035 5025
CTG1 STG3 CTG2
MVEC GEN
1400
1405
1425
1420
1415
CTG1STG3 CTG2
1410
1360
HEC GEN
HEC SS
SIMPLIFIED ONELINE – 14:23:25.74SIMPLIFIED ONELINE – 14:23:25.74
1) 14:23:25.65 15:23:30N. Ed. To HEC Closed14:23:25.74 15:23:30N. Ed to HEC Tripped (3)14:23:25.76 15:23:30N. Ed. To MVEC Tripped (CTG1)
SE Edinburg
Aderhold
North Edinburg
50204350
4345
5000
5010
4655
5015
5030
5035 5025
CTG1 STG3 CTG2
MVEC GEN
1400
1405
1425
1420
1415
CTG1STG3 CTG2
1410
1360
HEC GEN
HEC SS
SIMPLIFIED ONELINE – 14:23:25.76SIMPLIFIED ONELINE – 14:23:25.76
1) 14:23:25.65 15:23:30N. Ed. To HEC Closed14:23:25.74 15:23:30N. Ed to HEC Tripped (3)14:23:25.76 15:23:30N. Ed. To MVEC Tripped (CTG1)
SE Edinburg
Aderhold
SYSTEM ONELINE - 15:23:30SYSTEM ONELINE - 15:23:30
1) 14:23:25.65 15:23:30N. Ed. To HEC Closed14:23:25.74 15:23:30N. Ed to HEC Tripped (3)14:23:25.76 15:23:30N. Ed. To MVEC Tripped (CTG1)
138 KV Load
138 KV LineUnit Trip
69 KV Line
69 KV Load
SYSTEM ONELINE - 15:23:38SYSTEM ONELINE - 15:23:38
1) 15:23:38Various 12KV Feeders Tripping &Closing over 15 Minute period.
138 KV Load
138 KV LineUnit Trip
69 KV Line
69 KV Load
North Edinburg
50204350
4345
5000
5010
4655
5015
5030
5035 5025
CTG1 STG3 CTG2
MVEC GEN
1400
1405
1425
1420
1415
CTG1STG3 CTG2
1410
1360
HEC GEN
HEC SS
SIMPLIFIED ONELINE – 14:37:21.97SIMPLIFIED ONELINE – 14:37:21.97
1) 14:37:21.97 15:37:30MVEC CTG2 Tripped
SE Edinburg
Aderhold
North Edinburg
50204350
4345
5000
5010
4655
5015
5030
5035 5025
CTG1 STG3 CTG2
MVEC GEN
1400
1405
1425
1420
1415
CTG1STG3 CTG2
1410
1360
HEC GEN
HEC SS
SIMPLIFIED ONELINE – 14:37:28.94SIMPLIFIED ONELINE – 14:37:28.94
1) 14:37:28.94 MVEC STG3 Tripped
SE Edinburg
Aderhold
SYSTEM ONELINE - 15:37:30 & 15:45SYSTEM ONELINE - 15:37:30 & 15:45
10) 14:37:21.97 15:37:30MVEC CTG2 Tripped16) 14:37:28.94 MVEC STG3 Tripped 17) 15:45 Found blown Surge Arrester
at North Edinburg
138 KV Load
138 KV LineUnit Trip
69 KV Line
69 KV Load
HEC GTG1 (1)HEC GTG1 (1)
-8.4 MVARS +135.9 MVARS
HEC GTG2 (1)HEC GTG2 (1)
+81 MVARS +190.5 MVARS
HEC STG3 (1)HEC STG3 (1)
+10.2 MVARS -109.7 MVARS
MVEC CTG1 (1)MVEC CTG1 (1)
+176 MVARS +370 MVARS
Total Load LossTotal Load Loss
Approximately 375 MW of load loss.
(From 4650 MW to 4275 MW.)
1) Two AEP Totalizers Tripped
Feeder Trip SummaryFeeder Trip Summary
300 amps
100 amps 100 amps 100 amps
2) 22 AEP Feeders Tripped across Valley
3) Sympathetic Tripping -most by ground over current, a few by under voltage relay
Transmission Issues FoundTransmission Issues Found
1) 138 KV N. Ed 1 reclosed one more time than design
Found wrong setting on SEL279 & Corrected
2) 138 KV N. McAllen to S. McAllen Overtripped
Found closed ground switch on carrier & Corrected
3) 69KV Bates to N. Ed Tripped
Blown PT fuse replaced.
4) North Alamo Totalizer Ground tripped due to Sypathetic Trip
Ground settings reviewed and increased
5) Polk Ave Totalizer Ground tripped due to Sypathetic Trip
Ground settings reviewed and increased