1 ARM Mining Indaba Presentation Mike Schmidt - CEO 10 February 2015

ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

Embed Size (px)

Citation preview

Page 1: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

1

ARM Mining Indaba PresentationMike Schmidt - CEO

10 February 2015

Page 2: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

2

Dealing with the current commodity cycle.

Page 3: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

3

Certain statements in this report constitute forward looking statements that are neither reported financial results nor other historical information.

They include but are not limited to statements that are predictions of or indicate future earnings, savings, synergies, events, trends, plans or

objectives. Such forward looking statements may or may not take into account and may or may not be affected by known and unknown risks,

uncertainties and other important factors that could cause the actual results, performance or achievements of the Company to be materially

different from the future results, performance or achievements expressed or implied by such forward looking statements. Such risks,

uncertainties and other important factors include among others: economic, business and political conditions in South Africa; decreases in the

market price of commodities; hazards associated with underground and surface mining; labour disruptions; changes in government regulations,

particularly environmental regulations; changes in exchange rates; currency devaluations; inflation and other macro-economic factors; and the

impact of the AIDS crisis in South Africa. These forward looking statements speak only as of the date of publication of these pages. The

Company undertakes no obligation to update publicly or release any revisions to these forward looking statements to reflect events or

circumstances after the date of publication of these pages or to reflect the occurrence of unanticipated events.

Disclaimer

Page 4: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

4

ARM group structure

PGM Exploration

46% Kalplats3

Nickel, PGMs & Chrome

50% Nkomati

Platinum

PGMs

41.5% Modikwa1

55% Two Rivers2

100%

Charge Chrome

50% Machadodorp

Chrome Ore

50% Dwarsrivier

Manganese Alloys50% Cato Ridge25% Cato Ridge Alloys50% Machadodorp27% Sakura

Iron Ore

50% Khumani50% Beeshoek

Manganese Ore

50% Nchwaning50% Gloria

Ferrous

100% 10%

Coal

20% Participating CoalBusiness

Coal

51%

Coal

51% Goedgevonden

Copper

100%

Copper

40% Lubambe andLubambe Extension

Copper Exploration

50% Lusaka & Kabwe

Gold:Harmony

14.6%

Exploration

100%

Base metals

Coal

Manganese Ore

PGMs

Page 5: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

5

ARM strategy

Operational efficiencies

Quality growth continues in

ARM’s portfolio of commodities

Acquisitions and partnerships Africa

Owner operator Entrepreneurial management Profit focused Partner of choice

Employer of choice World-class management team

Partnering with communities, workers and other stakeholders

Page 6: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

6

Headline earnings and dividends per share (cents per share)

Headline earnings and dividends history

1 906

1 094

807

1 585 1 615 1 735

1 900

400

175 200

450 475 510 600

0

500

1 000

1 500

2 000

2 500

F2008 F2009 F2010 F2011 F2012 F2013 F2014Headline earnings per share Dividends per share

Page 7: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

7

EBITDA split by commodity

ARM’s diversified portfolio

-10%

10%

30%

50%

70%

90%

F2007 F2008 F2009 F2010 F2011 F2012 F2013 F2014

Copper Coal Chrome Manganese Iron Ore Nickel PGM

PGMs

Mn

Fe

Page 8: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

8

4.00 4.20 4.40 4.60 4.80 5.005.20

Jan 14 Apr 14 Jul 14 Oct 14 Jan 15

60.00

65.00

70.00

75.00

80.00

85.00

90.00

Jan 14 Apr 14 Jul 14 Oct 14 Jan 15 3.00

3.20

3.40

3.60

3.80

4.00

Jan 14 Apr 14 Jul 14 Oct 14 Jan 15

Manganese ore 44% CIF China (US$/mtu)

Thermal coal FOB Richards Bay (US$/t)

Commodity markets have become challenging

Source INet Bridge

Iron ore 62% fines CIF China (US$/t)

Manganese ore 38% FOB Port Elizabeth (US$/t)

60

80

100

120

140

Jan 14 Apr 14 Jul 14 Oct 14 Jan 15

Most commodity prices have come under pressure in recent months

Page 9: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

9

Palladium (US$/oz)

Copper (US$/t)

Commodity markets have become challenging

Source INet Bridge

Platinum (US$/oz)

Nickel (US$/t)

1 000 1 100 1 200 1 300 1 400 1 500 1 600

Jan 14 Apr 14 Jul 14 Oct 14 Jan 15650700750800850900950

Jan 14 Apr 14 Jul 14 Oct 14 Jan 15

10 000 12 000 14 000 16 000 18 000 20 000 22 000

Jan 14 Apr 14 Jul 14 Oct 14 Jan 15 5 500

6 000

6 500

7 000

7 500

8 000

Jan 14 Apr 14 Jul 14 Oct 14 Jan 15

Most commodity prices have come under pressure in recent months

Page 10: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

10

Exchange rateThe Rand/ US Dollar exchange rate has offset some of the decline in US Dollar commodity prices.

9.50

10.00

10.50

11.00

11.50

12.00

Jan 14 Apr 14 Jul 14 Oct 14 Jan 15Source INet Bridge

Page 11: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

11

Operational efficienciesARM’s objective is that all operations to be below the 50th percentile

Two Rivers PlatinumGoedgevonden Coal

Khumani Iron OreManganese Ore

Modikwa Platinum

ManganeseSmelters

Lubambe Copper(2016)

Nkomati Nickel

DwarsrivierChrome Ore

CommodityUnit cash

cost

Percentile on cost curve (based on cumulative production)

25% 50% 75% 100%

Beeshoek Iron Ore

Page 12: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

12

Efficiencies through technology

Mining

• Mechanisation.

• Dilution control.

• Sorting.

• Automation.

Page 13: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

13

Efficiencies through technology

Logistics

• Trucking to conveyor belts.

• Equipment size optimisation.

• Optimising the availability and utilisation of all mining

equipment.

• Use of train rapid load-out system which has reduced loading

times as follows:

– Iron ore from 24 hours to 6 hours per train.

– Manganese ore from 24 hours to less than 6 hours

per train.

– Coal from 10 hours to 4 hours per train.

Page 14: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

14

Efficiencies through technology

Beneficiation

ARM Platinum

• Plant upgrades at Nkomati Mine - recoveries improved from 60% to 76% in 3 years.

• Plant upgrades at Two Rivers Mine - recoveries improved from 72% to 85% in 5 years.

• Chrome recovery plant and tertiary milling circuit installed at Two Rivers Mine.

• Mainstream Inert Grinding (MIG) plant installed at Modikwa Mine –2% improvement in recoveries is expected.

Page 15: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

15

Efficiencies through technology

Beneficiation

ARM Ferrous• Wet High Intensity Magnetic Separation (WHIMS) plant installed

at Khumani Mine – 2% improvement in yield.

• Improved smelter technology at the Sakura Ferroalloys Project.

• Optical sorting being implemented at Black Rock Mine - allows the reprocessing of lower grade dumps.

ARM Coal• Replacement of three smaller and old Coal Handling Processing

Plants (CHPP) with one larger and more efficient CHPP at Tweefontein.

Page 16: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

16

GrowthQuality growth in ARM’s portfolio of commodities

Rovuma Resources Exploration

4

23

56

1KalplatsLubambe Extension Area

Beeshoek Village PitManganese Ore Expansion beyond 3 mtpa

Sakura Ferroalloys Project

Exploration/feasibility

Project development and ramp-up

Steady state(>15 years life-of-mine)

Decliningoperations

23

5 6

1

Lubambe Copper Mine

Modikwa Platinum Mine Expansion

Beeshoek Iron Ore MineThermal coal mines

Manganese smeltersManganese ore mines

Two Rivers Platinum MineModikwa Platinum Mine

Nkomati Nickel MineGoedgevonden Thermal Coal Mine

Dwarsrivier Chrome MineKhumani Iron Ore Mine

Stage of development

4

Page 17: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

17

ExplorationAfrica

Exploration expenditure is being curtailed.

Expenditure at Rovuma is currently being reviewed.

Emphasis on brownfields studies.

Page 18: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

18

Acquisition and partnershipsContinuing to assess acquisitions and joint venture opportunities

The current environment presents opportunities for consolidation.

ARM continues to assess value accretive mergers and acquisition opportunities.

Page 19: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

19

What is ARM doing to address the current environment?

Focusing on improving efficiencies at all operations. Improved efficiencies are being achieved through technology and productivity enhancement initiatives.

Optimising energy usage at all operations.

Controlling operational and overhead costs.

Page 20: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

20

What is ARM doing to address the current environment?

Focusing on high quality resources to ensure that ARM consistently supplies high grade, low impurity product to its customers.

Investigating the potential to lock-in reduced input costs associated with lower oil prices.

Research and development into earlier beneficiation of waste streams.

Page 21: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

21

What is ARM doing to address the current environment?

All non-performing assets are being reassessed.

The smelter operations are being reviewed.

Detailed plans for Modikwa and Lubambe mines are being updated.

Page 22: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

22

What is ARM doing to address the current environment?

Revisiting the capital allocation process to focus on high return opportunities and brownfields projects.

Reviewing all capital expenditure.

Optimising working capital management to improve cash flow.

Page 23: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

23

What is ARM doing to address the current environment?

Synchronizing development of the Black Rock Manganese Ore Expansion Project with Transnet’s expansion of the manganese ore export channel.

Reducing exploration expenditure.

Non-core assets are being considered for disposal.

Page 24: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

24

Concluding remarks

ARM has quality assets.

In the current environment productivity will be one of the main drivers to ensuring on-going sustainability. Productivity improvements are being achieved through technology, labour and equipment optimisation.

ARM is reviewing all its operations and is focusing on profitability and cash flow.

Page 25: ARM Mining Indaba Presentation Mike Schmidt - · PDF fileARM Mining Indaba Presentation ... the reprocessing of lower grade dumps. ARM Coal ... Project with Transnet’s expansion

25

Thank you