30
APPENDIX 2-2 Geological Survey Results

APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

APPENDIX 2-2

Geological Survey Results

Page 2: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report

JICA NK-YEC-JEC

1. List of Boreholes

Rig

htL

eft

From

To

KC

R/B

H-1

RC-

001

021

.53

15.5

3-

38.2

020

.00

3107

3627

5369

929

2.18

Drig

h R

oad

Stat

ion B

uild

ing

Via

duct

Drig

h Ro

adD

epot

Hill

10.0

/8.0

Bet

wee

n Fo

ot O

ver B

ridge

& P

olic

e St

atio

n at

Drig

h R

oad

Stat

ion.

stat

ion

Drig

hroa

d

KC

R/B

H-2

RC-

009

048

0.83

13.8

6-

25.8

020

.00

3111

9527

5371

645

9.30

On

Gro

und

Viad

uct

Drig

h R

oad

Dep

ot H

ill10

.5/8

.0A

t the

end

of P

R b

ound

ry w

all a

t Drig

h R

oad

Stat

ion,

nea

r und

er p

ass f

or D

righ

Roa

d Ca

nt A

rea,

bet

wee

n PR

Km

mar

ker 1

9/4

& 1

9/5

KC

R/B

H-3

RC-

015

084

0.83

14.8

3-

2.70

20.0

031

1549

2753

724

360.

00O

n G

roun

dGr

ound

Drig

h R

oad

Dep

ot H

ill26

.0/1

9.0

Prop

osed

Und

er P

ass f

or S

hah

Faisa

l Col

ony,

Bet

wee

n PR

Km

mar

ker 1

9/9

&19

/10

unde

rpas

sK

CR

/BH

-4R

C-02

61

501.

3916

.39

-29

.40

20.0

031

1729

2754

314

660.

56O

n Gr

ound

Gro

und

Drig

h Ro

adD

epot

Hill

19.0

/ lef

t sid

eB

etw

een

hom

e an

d ou

ter s

ignal

of D

epot

Hill,

nea

r CO

D B

ridge

.K

CR

/BH

-5R

C-03

42

2.66

17.6

6-

29.8

020

.00

3117

4727

5480

550

1.27

On

Gro

und

Gro

und

Dep

ot H

illU

niver

sity

19.0

/CO

D le

ft sid

eK

CR

Cul

vert

No.

2 (S

tn. 2

+040

), C

OD

Are

a

KC

R/B

H-6

RC-

042

248

3.60

18.6

0-

33.2

015

.00

3117

2027

5528

748

0.94

On

Gro

und

Grou

ndD

epot

Hill

Uni

vers

ity19

.0/9

.0 L

T. S

ide

CO

DO

ppos

ite "e

nd o

f Air

Port

fenc

e", C

OD

are

a.

KC

R/B

H-7

RC-

050

296

2.32

22.3

2-

17.6

015

.00

3116

5127

5574

347

8.72

On

Gro

und

Grou

ndD

epot

Hill

Uni

vers

ity19

.6/9

.3 C

OD

Wal

lSi

deO

ppos

ite R

abia

City

, CO

D a

rea.

KC

R/B

H-8

RC-

057

338

2.81

25.8

119

.50

-15

.00

3113

4727

5602

142

0.49

On

Grou

ndG

roun

dD

epot

Hill

Univ

ersit

y15

/10.

6 C

OD

Wall

Insid

e R

ufi B

angl

ows,

at e

mpt

y pl

ot, G

ulist

an-e

- Joh

ar -

19

KC

R/B

H-9

RC-

066

390

3.76

26.7

6-

9.40

15.0

031

0833

2756

069

520.

95O

n G

roun

dGr

ound

Dep

ot H

illU

nive

rsity

21.3

/L-x

ing

leve

lcr

ossin

gK

CR

Old

leve

l - X

No.

2, B

EHIN

D W

atch

man

Roo

m, G

ulisa

tn-e

- Joh

ar -

19

KC

R/B

H-1

0R

C-0

744

382.

4629

.46

-9.

5015

.00

3103

7527

5593

547

8.70

On

Gro

und

Gro

und

Dep

ot H

illU

niver

sity

8.6/

7.7

Soci

ty R

oad

Bet

wee

n Jo

uhar

Brid

ge a

nd le

vel -

X N

o.2,

Guli

satn

e-e-

Joh

ar -

19

KC

R/B

H-1

1R

C-0

834

921.

6032

.60

-0.

5015

.00

3098

5027

5596

753

9.14

Gul

istan

-e-J

ohar

Stat

ion B

uild

ing

culv

ert

Dep

ot H

illU

nive

rsity

Insid

e cu

tting

/32.

7w

idth

Infro

nt o

f Sam

ama

Cor

ner A

partm

ent N

ear G

ulist

an-e

- Joh

ar R

oad

Ove

r Brid

ge(U

nder

wat

er).

stat

ion

Joha

r

KC

R/B

H-1

2R

C-0

905

361.

5233

.52

-1.

2015

.00

3095

6027

5629

043

9.92

Tunn

elcu

lver

tD

epot

Hill

Uni

vers

ityIn

side

cutti

ng/1

5.0

Wid

thLt

. Sid

e of

trac

k, in

fron

t of a

bdul

lah

hous

e, E-

84, P

RECH

S B

lock

-10A

, Gul

shan

-e-

Iqba

l.B

-5(2

011)

KC

R/B

H-1

3R

C-0

995

880.

7935

.80

1.50

-15

.00

3092

8427

5673

051

9.27

Alla

din

Stn.

Bui

lding

, Tun

nel

culv

ert

Dep

ot H

illU

nive

rsity

Insid

e cu

tting

/15.

0W

idth

Bac

k Si

de o

f Tel

enor

Par

king

end

of (

Rad

o H

ill A

ppar

tmen

t), M

oon

Buil

ders

App

artm

ents

(Acr

oss

the

Chan

nal).

stat

ion

Ara

dinK

CR

/BH

-14

RC

-115

684

1.02

38.0

22.

30-

15.0

030

8493

2757

130

960.

23Tu

nnel

culve

rtD

epot

Hill

Univ

ersit

y6.

0/15

.0 B

enaz

ir B

asti

Jum

ma

Got

h (N

IPA

), O

ppos

ite w

hite

Mos

que,

STn

-22+

800

at R

ight

sid

e of

trac

k.B

-6(2

011)

KC

R/B

H-1

5R

C-1

247

381.

4035

.40

-9.

0615

.00

3079

7327

5698

454

0.38

Nip

a St

ation

Bui

lding

Gro

und

Uni

vers

ityU

rdu

Coll

ege

7.7/

15.0

Bac

k Si

de o

f PR

Qua

rter a

t NIP

A, L

eft S

ide

of T

rack

,Nea

r Nip

a B

ridge

stat

ion

Nip

aK

CR

/BH

-16

RC

-133

794

1.75

32.7

514

.67

-15

.00

3074

2427

5686

856

0.35

On

Gro

und

Gro

und

Uni

vers

ityU

rdu

Col

lege

Und

er B

ridge

/9.0

In F

ront

of C

usto

m C

lub

Can

tene

, Und

er A

ziz B

hatti

Par

k Ro

adO

ver B

ridge

KC

R/B

H-1

7R

C-1

398

281.

2031

.20

8.05

-15

.00

3070

9727

5677

633

9.45

On

Gro

und

Via

duct

Uni

vers

ityU

rdu

Col

lege

6.0/

7.6

New

L-x

ing

Nea

r Aqs

a M

osqu

e,A

t Lev

el C

ross

ing

,Beh

ind

PTC

L Ex

chan

ge B

uild

ing,

Gul

Shan

-e-I

qbal

KC

R/B

H-1

8R

C-1

438

541.

3229

.32

8.30

-15

.00

3068

4527

5671

126

0.12

On

Gro

und

Viad

uct

Urd

u C

olleg

eGila

ni13

.0/2

5.0

Urd

u C

olleg

e St

atio

n Pl

atFo

rm,G

illani

Sta

tion

side,

Rig

ht S

ide o

f Tra

ck,N

ear

Ban

glow

No.

L-2

1/3/

1/1,

Gul

shan

-e-I

qbal

Blo

ck -1

3K

CR

/BH

-19

RC

-152

961

.48

27.4

8-

10.0

015

.00

3063

8827

5646

652

0.16

Elev

ated

Viad

uct

Urd

u C

olleg

eGila

ni12

.3/1

5.0

Soci

ety

In F

ront

of B

anglo

w N

o. B

-36

Gul

shan

-e-I

qbal

13-

C, O

ppos

ite M

obilin

k To

wer

KC

R/B

H-2

0R

C-1

619

601.

1426

.14

-28

.80

15.0

030

5924

2756

189

539.

66G

ilani

Stat

ion

Bui

lding

Via

duct

Urd

u C

olleg

eGila

ni20

.0/1

5.0

Stat

ion

Nea

r Gila

ni S

tatio

n ,B

uildi

ng S

tairs

, Rig

ht s

ide

stat

ion

Gila

ni

KC

R/B

H-2

1R

C-1

7610

501.

0724

.07

4.76

-15

.00

3051

0427

5583

089

9.93

Elev

ated

Viad

uct

Gila

niLi

aqua

taba

d7.

7/7.

7 La

khan

iH

eigh

tsSa

hba

Akh

tar L

evel

Cro

ssing

, Lef

t end

of G

ilani

Sta

tioni

on S

ide

, Nea

r Mos

que,

L-xi

ng #

7

KC

R/B

H-2

2R

C-1

8611

141.

6015

.60

6.75

-15

.00

3045

3527

5607

164

0.53

Elev

ated

Viad

uct

Gila

niLi

aqua

taba

d7.

7/15

.0 W

all

In L

yari

Rive

r Bed

, Rig

ht si

de o

f Tra

ck N

ear 2

nd P

ier o

f KC

R B

ridge

, Ins

ide

Lyar

iR

iver

.

KC

R/B

H-2

3R

C-1

8811

225.

3319

.33

-36

.00

15.0

030

4443

2756

087

83.7

3El

evat

edV

iaduc

tG

ilani

Liaq

uata

bad

16.5

/6.0

Und

erex

pres

sway

Und

er L

iyar

i Exp

ress

Way

,Yas

inab

ad (L

iaqua

tabd

) Int

erch

ange

, Und

er L

yari

Expr

essw

aybr

idge

KC

R/B

H-2

4R

C-1

9111

422.

0122

.01

21.7

0-

20.0

030

4319

2756

250

196.

68Y

asin

abad

Stat

ion B

uild

ing

Via

duct

Gila

niLi

aqua

taba

d15

/7.7

Prop

ose

Yas

inab

ad S

tatio

n ,N

ear L

evel-

X an

d U

-Fon

e To

wer

,Rig

ht e

nd o

fLi

aqua

taba

d St

atio

n Si

de, a

fter L

-Xin

g #

8st

atio

npr

opos

edK

CR

/BH

-25

RC

-199

1190

0.41

20.4

112

.00

-20

.00

3039

3027

5652

847

8.40

Elev

ated

Viad

uct

Gila

niLi

aqua

taba

d15

.0/6

.0St

ation

17+

740

Ghar

iaba

d, R

ight

Sid

e

KC

R/B

H-2

6R

C-2

0812

440.

4020

.40

-22

.90

20.0

030

3476

2756

821

539.

99Li

aqua

taba

dSt

ation

Bui

ldin

gG

roun

dG

ilani

Liaq

uata

bad

15.0

/7.7

Stn

. Bld

g.Li

aqua

taba

d St

atio

n B

uild

ing, N

ear B

ilding

Sta

irs

KC

R/B

H-2

7R

C-2

1913

120.

9021

.90

10.6

0-

20.0

030

2949

2757

254

680.

50El

evat

edG

roun

dLi

aqua

taba

dN

orth

Naz

imab

ad15

.0/6

.0N

ear M

osa

Col

ony,

PM

T, (S

tn.1

6+54

0) ,

near

L-x

ing#9

stat

ion

Liaq

uatb

adK

CR

/BH

-28

RC

-229

1372

1.43

21.4

310

.50

-20

.00

3024

1827

5752

260

0.53

Elev

ated

Via

duct

Liaq

uata

bad

Nor

th N

azim

abad

6.0/

15.0

Guj

ar N

ala

, Moo

sa C

olon

y En

d , R

ight

Sid

e, (G

ujjar

Nal

a)K

CR

/BH

-29

RC

-230

1376

3.51

22.5

12.

60-

20.0

030

2375

2757

523

42.0

8El

evat

edV

iaduc

tLi

aqua

taba

dN

orth

Naz

imab

ad6.

0/15

.0G

ujar

Nal

a , M

ujah

id C

olon

y En

d , L

eft S

ide, a

fter G

ujjar

Nala

brid

ge

KC

R/B

H-3

0R

C-2

4214

501.

8523

.85

-18

.90

20.0

030

1652

2757

671

738.

34N

.N S

tatio

nB

uildi

ngG

roun

dLi

aqua

taba

dN

orth

Naz

imab

ad16

.5/7

.7N

ear N

orth

Naz

imab

ad R

aiw

ay S

tatio

n B

uildi

ng, a

t Naz

imab

ad S

tatio

n

KC

R/B

H-3

1R

C-2

4914

920.

5025

.50

12.1

0-

20.0

030

1260

2757

832

418.

65O

n G

roun

dGr

ound

Nor

th N

azim

abad

Ora

ngi

6.0/

18.6

Nea

r Naz

imab

d N

o.07

Brid

ge B

enea

th B

oard

Off

ice B

ridge

N.N

azim

abad

Sta

tion

Side

(Stn

. 14+

700)

, bef

ore

Naz

imab

ad b

ridge

.K

CR

/BH

-32

RC

-255

1528

1.80

26.2

87.

70-

20.0

030

0931

2757

702

361.

30El

evat

edG

roun

dN

orth

Naz

imab

adO

rang

i7.

7/7.

7 N

ear A

bbas

i Rai

way

Cro

ssin

g , R

ight

sid

e

KC

R/B

H-3

3R

C-2

6215

701.

3225

.32

4.00

-20

.00

3006

5927

5738

341

9.52

Elev

ated

Viad

uct

Nor

th N

azim

abad

Ora

ngi

7.7/

7.7

Bet

wee

n O

rang

i Sta

tion

and

Abb

asi S

hahe

ed L

evel

Cro

ssing

, A

fter S

igna

l, R

ight

Side

of T

rack

KC

R/B

H-3

4R

C-2

7216

301.

3724

.37

12.4

5-

20.0

030

0126

2757

129

600.

05O

rang

i Sta

tion

Bui

lding

Via

duct

Nor

th N

azim

abad

Ora

ngi

18.6

/47.

0 PR

Wal

lO

rang

i Sta

tion,

Nea

r Woo

d B

ox F

acto

ry, a

t ora

ngi S

tn Y

ard.

Dis

tanc

e fro

mne

ares

t Tra

ck /

Stru

ctur

e (m

)Ea

stin

gR

emar

ksTy

pe o

fSt

ruct

re/

Foun

datio

n

Prop

osed

Stru

ctur

e on

KC

R R

oute

BH

Loc

atio

n B

etw

een

Stat

ions

(Old

)C

hain

-age

Land

Mar

ks

Bet

wee

n bo

reto

bore

(m)

Dis

tanc

e fro

m K

CR

Lin

eB

oreh

ole

No.

Nor

thin

g

Prof

ileC

ross

Sect

ion

File

Num

ber

Elevation(m)

Dep

th(m

)

APP-2-2-1

Page 3: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report

JICA N

K-YEC

-JEC

Right Left From To

KCR/BH-35 RC-285 17 41.62 23.62 - 6.40 20.00 299422 2756909740.25

HBL StationBuilding

Ground Orangi Manghopir 7.7/7.7HBL Station near Pepsi Factory, Stn. 12+640 Right side ,Manghopir Bridge,Adjacent to Hino Pak Health Community

KCR/BH-36 RC-294 17 583.10 23.10 7.20 - 20.00 298984 2756597541.48

Elevated Ground Orangi Manghopir 7.7/7.7Stn. 12+080,Near Railway Crossing Road,Near RAH GUZAR Masjid, ManghopirStation Side

KCR/BH-37 RC-300 17 942.76 20.76 - 4.45 20.00 298711 2756361 359.66 Elevated Viaduct Orangi Manghopir 7.7/7.7 Stn.11+700

KCR/BH-38 RC-308 18 460.48 19.48 - 8.93 20.00 298312 2756032517.72

ManghopirStation Building

Viaduct Orangi Manghopir 15.0/16.5Near Padestarian Bridge at Manghopir Station, at Manghopir Stn near food overbridge

KCR/BH-39 RC-320 19 141.27 18.27 4.00 - 20.00 297775 2755613680.79

Elevated Viaduct Manghopir SITE 7.7/6.0Station 10+500,Siemens Starting Point,Site station End ,Left Side Near RailwayCrossing

KCR/BH-40 RC-331 19 782.34 15.34 2.26 - 20.00 297277 2755209641.07

Elevated Viaduct Manghopir SITE 6.0/14.0Near Level Crossing No. 19,Right Side of Track, SITE Side Near U-fone Mobiletower

KCR/BH-41 RC-340 20 341.36 14.36 4.46 - 20.00 296841 2754860559.02

Elevated Viaduct Manghopir SITE 6.0/7.7Between Site Station and Level Crossing ,Under KCR Padestarin Bridge of SITEStn

KCR/BH-42 RC-351 20 982.14 12.14 7.40 - 20.00 296341 2754458640.78

SITE StationBuilding

Viaduct Manghopir SITE 15.0/6.0 Between Northren ByPass,ShairShah Bridge and Site Station

KCR/BH-43 RC-361 21 601.45 10.45 4.00 - 20.00 295862 2754066 619.31 Elevated Viaduct SITE Shah Abdul Latif 4.6/4.6 Back Side of Isuzu Factory, Shah Latif Station, Left side

KCR/BH-44 RC-370 22 161.29 9.29 7.90 - 20.00 295428 2753712559.84

S.A.Latif StationBuilding

Viaduct SITE Shah Abdul Latif 6.0/6.0SITE End of Shah Latif Station Platform, Near Bridge N0.33 (Stn. 22+00), at ShahLatif Stn.

KCR/BH-45 RC-377 22 540.77 8.77 6.70 - 20.00 295133 2753474 379.48 Elevated Viaduct Shah Abdul LatifBaldia 7.7/7.3 Near Level Crosing No.22, Right Side

KCR/BH-46 RC-384 23 0.84 6.84 2.10 - 20.00 294776 2753184460.07

Elevated Viaduct Shah Abdul LatifBaldia 8.6/6.6Infront of PR Shed-No.02,Behind Brooke Bond Tea Factory,Near level CrossingNo-23, near Brook Bond L-xing

KCR/BH-47 RC-392 23 441.80 5.80 - 1.50 20.00 294587 2752818 440.96 Elevated Viaduct Shah Abdul LatifBaldia 6.0/8.3 Behind Shell Petrol Pump at Gul Bai, near L-xing # 24.KCR/BH-48 RC-394 23 602.90 5.90 13.50 - 30.00 294652 2752669 161.10 Elevated Viaduct Shah Abdul LatifBaldia 7.7/33.0 PR Boundary Near Level-X No.24, In Front of PR Quarter, Gul Bai, near Weigh Bridge at Gulbai bridge

KCR/BH-49 RC-397 23 783.71 6.71 - 7.40 30.00 294816 2752586180.81

Baldia StationBuilding

Viaduct Shah Abdul LatifBaldia 6.0/9.0 Centre of existing Baldia Station Plat Form.station

KCR/BH-50 RC-408 24 442.05 2.05 5.90 - 30.00 295377 2752243658.34

Bridge(Elevated)

Viaduct Baldia Lyari 9.0/6.0 PR Bridge pier No. 2 Baldia end, Sea Side

KCR/BH-51 RC-420 25 121.55 3.55 6.40 - 30.00 295932 2751850679.50

Lyari StationBuilding

Viaduct Baldia Lyari 9.6/32.4 At Lyari Station infront of community, Therapy Centre,B-1(2011)

KCR/BH-52 RC-425 25 461.74 3.74 - 2.10 30.00 296214 2751660 340.19 Elevated Viaduct Lyari Wazir Mansion 6.0/9.0 Opposite KESC Grid Station, Machar Colony.KCR/BH-53 RC-435 26 60.89 2.89 11.90 - 30.00 296569 2751206 599.15 Track Viaduct Lyari Wazir Mansion 8.0/48.0 Near Pedistrian Bridge, opposite TCF School.

KCR/BH-54 RC-443 26 520.74 2.74 48.10 - 30.00 296529 2750753459.85

Wazir MansionStation Building

Ground Lyari Wazir Mansion 12.3/37.0 Opposite Peoples Sports complex Near the Ramp, near Wazir Mansion.station Wazirmansion

KCR/BH-55 RC-450 26 941.33 2.33 - 7.20 30.00 296543 2750332 420.59 On Ground Ground Wazir MansionKPT 7.7/18.6 Between Navy Fence AND ICI Bridge, near ICI Bridge before Wazir Mansion Stn.KCR/BH-56 RC-459 27 482.36 3.36 - 7.30 30.00 296764 2749849 541.03 On Ground Viaduct Wazir MansionKPT 7.7/7.7 Near PR level -X No. 29, Near Ufone Tpwer, West Wharf, near L-xing # 29.KCR/BH-57 RC-468 27 982.00 3.00 - 11.90 30.00 297040 2749446 499.64 On Ground Ground KPT City 6.0/7.7 Under KPT Bridge (Jinnah) chainage- 91863 (EMC).

KCR/BH-58 RC-477 28 541.51 3.51 - 19.00 30.00 297585 2749449559.51

Tower StationBuilding

Ground KPT City 9.0/36.0 KBX shed End of LPO Shed , opposite Bahria Comlex -2B-2(2011)

KCR/BH-59 RC-482 28 861.55 3.55 - 16.80 30.00 297899 2749512 320.04 Elevated Viaduct KPT City 6.0/9.0 MT Khan Level -X

KCR/BH-60 RC-493 29 560.75 2.75 34.00 - 30.00 298602 2749536699.20

City StationBuilding

Ground City Cantt 12.3/10.9City Station, oppsite KTL Building, Near Watch Tower. City STN Yard, TowardsHTXR Office B-3(2011) City

KCR/BH-61 RC-500 29 948.79 2.80 47.20 - 30.00 298985 2749602388.04

Elevated Ground City Cantt 18.6/9.6Between Sick line and KYC Goods Yard, mosque at right side, Down side, CityYard. station City

KCR/BH-62 RC-509 30 529.74 3.74 25.60 - 30.00 299539 2749679 580.95 Track Ground City Cantt 15.0/10.9 Near Jang Press Foot over Bridge, down side.KCR/BH-63 RC-521 31 229.45 3.45 17.50 - 30.00 300119 2749317 699.71 Track Ground City Cantt 7.3/6.0 Bridge Near PIDC Bridge KYC and Down side, PR Km marker 6/14 & 7.

KCR/BH-64 RC-527 31 589.74 3.74 - 9.20 30.00 300414 2749108360.29

DCOS StationBuilding

Ground City Cantt 9.0/6.0DCOS Station Between PR Km marker 7/2 & 7/3, behind Shaikh Zaid Building, upside.

KCR/BH-65 RC-535 32 89.49 3.49 - 5.00 30.00 300828 2748838 499.75 Track Ground City Cantt 9.0/6.0 Between PR Km marker 7/8 & 7/9, Kashmir Mujahid Colony, up side.KCR/BH-66 RC-542 32 489.15 5.15 - 7.40 30.00 301218 2748768 399.66 Track Ground City Cantt 7.7/7.7 Between PR Km marker 7/14 & 8, Near Clifton Bridge, up side.

KCR/BH-67 RC-554 33 228.17 7.17 - 37.70 30.00 301893 2749007739.02

Cantt StationBuilding

Viaduct City Cantt 18.6/9.6Between Police Station and Telecom building at Cant Station, Near Gate (Out), upside, backside of Parcel office.(KC) B-4(2011)

KCR/BH-68 RC-561 33 649.84 9.84 - 27.00 30.00 302266 2749205 421.67 Elevated Viaduct Cantt Chanesar Halt 12.2/10.7 End of Goods Store, Near PWI KC Store at Cant Station, Up Side.

Type ofStructre/

Foundation

ProposedStructure onKCR Route

BH Location BetweenStations (Old) Distance from

nearest Track /Structure (m)

Land Marks

Between bore

tobore(m)

Sheet 2 of 3

Distance from KCRLine

RemarksBorehole

No. Northing

ProfileCross

Section FileNumber El

evat

ion

(m) Depth

(m) EastingChain-age

APP-2-2-2

Page 4: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report

JICA N

K-YEC

-JEC

Right Left From To

KCR/BH-69 RC-571 34 232.82 14.82 - 34.20 20.00 302769 2749499 582.98 Elevated Viaduct Cantt Chanesar Halt 12.2/6.0 Near Sultan shah Bhukari Sharine, Up Side.

KCR/BH-70 RC-577 34 569.77 12.77 19.00 - 15.00 303093 2749610336.95

Naval StationBuilding

Viaduct Cantt Chanesar Halt15.0/6.0 Enchroached Sammo Bridge, Drig Road End, Down Side, Shifa Clinic Dr Shamim.(right side)

KCR/BH-71 RC-587 35 210.39 12.39 25.70 - 15.00 303653 2749919 640.62 Track Viaduct Cantt Chanesar Halt 18.3/12.2 Between PR Km marker 10/12 & 10/13, Masoom Shah Colony , Down Side.KCR/BH-72 RC-597 35 810.42 7.42 16.10 - 15.00 304174 2750220 600.03 Elevated Viaduct Cantt Chanesar Halt 18.3/12.2 Between PR Km marker 11/5 & 11/6, near signal Down Side.KCR/BH-73 RC-605 36 270.27 8.27 - 10.40 20.00 304561 2750469 459.85 Elevated Viaduct Cantt Chanesar Halt 10.7/7.6 Chanesar Level Crossing KC End Up Side.

KCR/BH-74 RC-607 36 389.45 7.45 - 40.40 20.00 304650 2750554119.18

ChanesarStation Building

Viaduct Cantt Chanesar Halt 27.4/10.7Back Side of existing Chanesar Halt Station Building, up side.(Access way forpassengers) station

ChanesarHalt

KCR/BH-75 RC-617 36 988.14 7.14 - 6.00 20.00 305188 2750819 598.69 On Ground Viaduct Chanesar HaltDeparture Yard 7.6/7.6 PR Km marker 12/8, near Baithak School (New Sindhi Muslim colony) up side.KCR/BH-76 RC-625 37 469.53 6.53 - 6.30 20.00 305606 2751057 481.39 On Ground Ground Chanesar HaltDeparture Yard 9.0/7.6 Between PR Km marker 12/14 & 13, Bridge No. 12, up Side.

KCR/BH-77 RC-636 38 129.52 8.52 14.30 - 20.00 306190 2751365659.99

On Ground Ground Chanesar HaltDeparture Yard 9.0/7.3PR Km marker 13/9, Omer Colony, Opposite Amun State Building down side, UmarColony # 2, Down Side.

KCR/BH-78 RC-640 38 348.58 9.58 - 22.40 20.00 306363 2751505219.06

Shaheed-e-Millat StationBuilding

Ground Chanesar HaltDeparture Yard 12.2/18.3 Between PR Km marker 12/14 & 13 , Near Shaheed Millat Bridge, KYC Up Side.

KCR/BH-79 RC-651 39 10.55 12.55 - 15.40 20.00 306944 2751822 661.97 On Ground Ground Departure YardKarsaz Halt 12.2/7.6 Between PR Km marker 14/8 & 14/9 Departure yard.

KCR/BH-80 RC-658 39 492.87 15.87 - 68.70 20.00 307337 2752106482.32

On Ground Ground Departure YardKarsaz Halt 24.3/7.6Inside KW&SB Premises, (previous SP Location for KCR), Inside MD KW&SBoffice KW&SB

KCR/BH-81 RC-664 39 869.90 12.90 - 25.20 20.00 307686 2752254377.03

On Ground Ground Departure YardKarsaz Halt 27.4/8.5Behind Karsaz Bridge, KW&SB Primeses , between PR Km marker 15/6 & 15/7.,Inside KW&SB Colony.

KCR/BH-82 RC-673 40 373.32 15.72 - 61.50 20.00 308107 2752534503.42

Karsaz StationBuilding

Ground Karsaz Halt PAF Halt 33.5/19.8Between PR Km marker 15/14 & 16, Karsaz Halt, at Karsaz Stn. Shahrah-e-FaisalSide. PAF

KCR/BH-83 RC-682 40 909.00 14.00 - 10.00 20.00 308599 2752752535.68

On Ground Ground Karsaz Halt PAF Halt 9.0/25.9 RoadBetween PR Km marker 16/7 & 16/8, oppsite Saber Fighter monument, PAF watchtower, up side.

KCR/BH-84 RC-691 41 409.03 15.03 - 11.70 20.00 309033 2753000 500.03 On Ground Ground Karsaz Halt PAF Halt 9.8/19.8 Near PR Km marker 16/14, up side.KCR/BH-85 RC-702 42 89.57 14.57 - 10.10 20.00 309628 2753330 680.54 On Ground Ground Karsaz Halt PAF Halt 9.0/6.0 PAF Halt Station Plate Form KYC and under electric pole, up side.KCR/BH-86 RC-713 42 729.35 15.35 - 8.80 20.00 310225 2753563 639.78 On Ground Ground PAF Halt Drigh Road 12.2/9.0 Petrol Pump Back Side of Shell Pump Between PR Km marker 18/3 & 18/4, up side.

KCR/BH-87 RC-103 6 146.52 42.52 - 55.90 15.00 309089 2756908 Elec. Sub-Sta. Depot Hill University 48.8/7.3Beside Aladin Park, Johar Side, Near Car Penter Shop R/36 PREH Society(PrivateLand)

KCR/BH-88 RC-405 24 220.00 2.62 198.50 - 30.00 295097 2752195 Elec. Sub-Sta. Baldia Lyari 38.1/24.4 FactoryInfront of gate of 3rd factory from PR Bridge at liyari river towards Sea , near LyariRiver.(Revenue Dept. Land)

KCR/BH-89 RC-670 40 189.68 12.68 - 58.60 15.00 307949 2752441 Elec. Sub-Sta. Departure YardKarsaz Halt 25.9/10.7 KW&SB Work Shop, Karsaz, inside KW&SB workshop, for SP Post.

KCR/BH-90 RC-275 16 440.50 23.50 - 56.26 15.00 300014 2757021 Elec. Sub-Sta. North NazimabadOrangi 24.4/15.0Inside Block Factory, Near Water Pump , beside Police Station, Orangi Station,Electric SP Post, Paposh Police Post.

BP-01 RC-412 24 641.58 2.59 5.00 - 40.00 295538 2752131BP-02 RC-471 28 181.60 2.87 - 9.00 40.00 297229 2749416BP-03 RC-492 29 422.14 3.14 - 15.20 40.00 298457 2749566BP-04 - 33 35.80 7.53 - 25.40 40.00 301732 2748902BP-05 - 4 982.50 38.06 16.20 - 20.00 309812 2756011BP-06 - 6 485.90 39.87 35.50 - 20.00 308854 2757157

Legend:

km = Kilo MeterKW&SB = Karachi Water & Sewarage BoardKYC = Karachi City

Stn. = Station(Railway/Chainage)

L-X = Intersection of Road & Railway Track

Type ofStructre/

Foundation

ProposedStructure onKCR Route

BH Location BetweenStations (Old) Distance from

nearest Track /Structure (m)

Land Marks

Between bore

tobore(m)

Sheet 3 of 3

Distance from KCRLine

PR = Pakistan Railway

RemarksBorehole

No. Northing

ProfileCross

Section FileNumber E

leva

tion

(m) Depth

(m) EastingChain-age

APP-2-2-3

Page 5: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

From

To

From

to

Depth(m)

Sample No.

Core Recovery(Cm)

R.Q.D(%)

N Blows 30cm

Thickness of Layer(m)

Lithology

APP2 - 2 - 1

2.Drill Logs

APP-2-2-4

Page 6: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

toThi

ckne

ss o

f Lay

er(m

)

Lith

olog

y

Dep

th(m

)

Sam

ple

No.

Cor

e R

ecov

ery

(Cm

)

R.Q

.D(%

)

N B

low

s 30

cm

AP

P2

-2

-2

APP-2-2-5

Page 7: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

to

Lith

olog

y

Thi

ckne

ss o

f Lay

er(m

)

Cor

e R

ecov

ery

(Cm

)

R.Q

.D(%

)Dep

th(m

)

Sam

ple

No.

N B

low

s 30

cm

APP-2-2-6

Page 8: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

toThi

ckne

ss o

f Lay

er(m

)

Dep

th(m

)

Sam

ple

No.

Lith

olog

y

N B

low

s 30

cm

Cor

e R

ecov

ery

(Cm

)

R.Q

.D(%

)

AP

P2

-2

-4

APP-2-2-7

Page 9: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

to

R.Q

.D(%

)

Cor

e R

ecov

ery

(Cm

)

Lith

olog

y

Dep

th(m

)

Sam

ple

No.

Thi

ckne

ss o

f Lay

er(m

)

N B

low

s 30

cm

AP

P2

-2

-5

APP-2-2-8

Page 10: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

to

Cor

e R

ecov

ery

(Cm

)

R.Q

.D(%

)

N B

low

s 30

cm

Lith

olog

y

Dep

th(m

)

Sam

ple

No.

Thi

ckne

ss o

f Lay

er(m

)

AP

P2

-2

-6

APP-2-2-9

Page 11: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

toThi

ckne

ss o

f Lay

er(m

)

Lith

olog

y

Cor

e R

ecov

ery

(Cm

)

R.Q

.D(%

)Dep

th(m

)

N B

low

s 30

cm

Sam

ple

No.

AP

P2

-2

-7

APP-2-2-10

Page 12: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

to

Dep

th(m

)

Sam

ple

No.

Cor

e R

ecov

ery

(Cm

)

R.Q

.D(%

)

Thi

ckne

ss o

f Lay

er(m

)

Lith

olog

y

N B

low

s 30

cm

AP

P2

-2

-8

APP-2-2-11

Page 13: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

to

Sam

ple

No.

Thi

ckne

ss o

f Lay

er(m

)

Dep

th(m

)

Lith

olog

y

Cor

e R

ecov

ery

(Cm

)

R.Q

.D(%

)

N B

low

s 30

cm

AP

P2

-2

-9

APP-2-2-12

Page 14: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

to

Cor

e R

ecov

ery

(Cm

)

R.Q

.D(%

)Dep

th(m

)

Sam

ple

No.

Thi

ckne

ss o

f Lay

er(m

)

Lith

olog

y

N B

low

s 30

cm

AP

P2

-2

-1

0

APP-2-2-13

Page 15: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

to

Cor

e R

ecov

ery

(Cm

)

R.Q

.D(%

)

Sam

ple

No.

N B

low

s 30

cm

Dep

th(m

)

Thi

ckne

ss o

f Lay

er(m

)

Lith

olog

y

AP

P2

-2

-1

1

APP-2-2-14

Page 16: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

to

Cor

e R

ecov

ery

(Cm

)

R.Q

.D(%

)

N B

low

s 30

cm

Dep

th(m

)

Sam

ple

No.

Thi

ckne

ss o

f Lay

er(m

)

Lith

olog

y

AP

P2

-2

-1

2

APP-2-2-15

Page 17: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

toThi

ckne

ss o

f Lay

er(m

)

Lith

olog

y

Cor

e R

ecov

ery

(Cm

)

R.Q

.D(%

)Dep

th(m

)

Sam

ple

No.

N B

low

s 30

cm

AP

P2

-2

-1

3

APP-2-2-16

Page 18: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

to

Dep

th(m

)

Sam

ple

No.

Thi

ckne

ss o

f Lay

er(m

)

Lith

olog

y

N B

low

s 30

cm

Cor

e R

ecov

ery

(Cm

)

R.Q

.D(%

)

AP

P2

-2

-1

4

APP-2-2-17

Page 19: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

toThi

ckne

ss o

f Lay

er(m

)

Sam

ple

No.

N B

low

s 30

cm

Lith

olog

y

Cor

e R

ecov

ery

(Cm

)

R.Q

.D(%

)Dep

th(m

)

AP

P2

-2

-1

5

APP-2-2-18

Page 20: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

to

Lith

olog

y

Thi

ckne

ss o

f Lay

er(m

)

Dep

th(m

)

Sam

ple

No.

Cor

e R

ecov

ery

(Cm

)

R.Q

.D(%

)

N B

low

s 30

cm

AP

P2

-2

-1

6

APP-2-2-19

Page 21: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

toThi

ckne

ss o

f Lay

er(m

)

N B

low

s 30

cm

Lith

olog

y

Sam

ple

No.

Dep

th(m

)

Cor

e R

ecov

ery

(Cm

)

R.Q

.D(%

)

AP

P2

-2

-1

7

APP-2-2-20

Page 22: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

to

Cor

e R

ecov

ery

(Cm

)

R.Q

.D(%

)

N B

low

s 30

cm

Dep

th(m

)

Sam

ple

No.

Thi

ckne

ss o

f Lay

er(m

)

Lith

olog

y

AP

P2

-2

-1

8

APP-2-2-21

Page 23: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

to

Sam

ple

No.

Thi

ckne

ss o

f Lay

er(m

)

Lith

olog

y

N B

low

s 30

cm

Cor

e R

ecov

ery

(Cm

)

R.Q

.D(%

)Dep

th(m

)

AP

P2

-2

-1

9

APP-2-2-22

Page 24: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

toN B

low

s 30

cm

Cor

e R

ecov

ery

(Cm

)

R.Q

.D(%

)Dep

th(m

)

Sam

ple

No.

Thi

ckne

ss o

f Lay

er(m

)

Lith

olog

y

AP

P2

-2

-2

0

APP-2-2-23

Page 25: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

to

Dep

th(m

)

R.Q

.D(%

)

Thi

ckne

ss o

f Lay

er(m

)

Lith

olog

y

N B

low

s 30

cm

Sam

ple

No.

Cor

e R

ecov

ery

(Cm

)

AP

P2

-2

-2

1

APP-2-2-24

Page 26: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

to

Sam

ple

No.

Cor

e R

ecov

ery

(Cm

)

Thi

ckne

ss o

f Lay

er(m

)

N B

low

s 30

cm

R.Q

.D(%

)Dep

th(m

)

Lith

olog

y

AP

P2

-2

-2

2

APP-2-2-25

Page 27: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

to

R.Q

.D(%

)

N B

low

s 30

cm

Cor

e R

ecov

ery

(Cm

)Dep

th(m

)

Sam

ple

No.

Lith

olog

y

Thi

ckne

ss o

f Lay

er(m

)

AP

P2

-2

-2

3

APP-2-2-26

Page 28: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

to

Cor

e R

ecov

ery

(Cm

)Dep

th(m

)

Sam

ple

No.

Thi

ckne

ss o

f Lay

er(m

)

Lith

olog

y

N B

low

s 30

cm

R.Q

.D(%

)

AP

P2

-2

-2

4

APP-2-2-27

Page 29: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

to

Cor

e R

ecov

ery

(Cm

)

R.Q

.D(%

)Dep

th(m

)

N B

low

s 30

cm

Thi

ckne

ss o

f Lay

er(m

)

Lith

olog

y

Sam

ple

No.

AP

P2

-2

-2

5

APP-2-2-28

Page 30: APPENDIX 2-2 Geological Survey Results · Preparatory Survey (II) on Karachi Circular Railway Revival Project Final Report JICA NK-YEC-JEC Right Left From To KCR/BH-35 RC-285 17 41.62

Fro

m

To

Fro

m

to

Lith

olog

y

Dep

th(m

)

Sam

ple

No.

Thi

ckne

ss o

f Lay

er(m

)

N B

low

s 30

cm

R.Q

.D(%

)

Cor

e R

ecov

ery

(Cm

)

AP

P2

-2

-2

6

APP-2-2-29