21
Curriculum vitae Proposed position in assignment: M&E Senior Expert 1. Family Name: Al-Labadi 2. First Names: Ali Mubadda 3. Date of birth: 1949 4. Passport holder: Jordanian Citizen 5. Education: Institution VITUKI / Budapest / Hungary Date: from (month / year): to (month / year): 15/01 – 30/07/1970 Degree(s) or Diploma(s) obtained: Doctorate Degree / UNESCO- Post Graduate Course (Water Resources Development and Management) (UNESCO Scholarship) Institution Stanford University, Stanford, California, USA Date: from (month / year): to (month / year): 15/09/1964 – 30/01/1967 Degree(s) or Diploma(s) obtained: 1. M.Sc. Civil Engineering (Water Resources and Environment); 2. M. Sc. Engineering Hydrology & Hydrogeology (USAID Scholarship) Institution Assiut University – Assiut, Egypt Date: from (month / year): to (month / year): 15 /09 / 1958 – 15 / 06 /1962 Degree(s) or Diploma(s) obtained: B.Sc. Geology & Physics 6. Language skills: (Mark 1 to 5 for competence, 5 being the highest) Language Reading Speaking Writing Arabic Mother tongue English 5 5 5 7. Membership of professional bodies: Member - Jordan Engineering Association, 1967 to Date; Member - Jordan Environment Society, 1990 – Date; Member - USArmy Corps of Engineers, 1978 to 1981; Member - International Water Society, Urbana, Illinois, USA, 1981 to Date; Member – Jordan Society of Arbitration, 1995- Date; Member – Jordan Association of Construction Contractors, 1981 to 1990; Member - Jordan Association of Consulting Engineering Companies, 1995 to 2000 8. Other skills: Windows-based software, MS office, word processing, database work, spread sheets, Power Point Presentation, internet searching. 10. Present Position: Freelance International Development Consultant / Senior Advisor – Team Leader 11. Years With the Firm: Universal Professionals Dar / Amman – Jordan, since 1996 12. Key Qualifications and Experience :

Ali Allabadi CV-Environmental Monitoring-Team Leader (2)

Embed Size (px)

Citation preview

Page 1: Ali Allabadi CV-Environmental Monitoring-Team Leader (2)

Curriculum vitae

Proposed position in assignment: M&E Senior Expert

1. Family Name: Al-Labadi2. First Names: Ali Mubadda3. Date of birth: 19494. Passport holder: Jordanian Citizen5. Education:Institution VITUKI / Budapest / Hungary

Date: from (month / year): to (month / year): 15/01 – 30/07/1970Degree(s) or Diploma(s) obtained: Doctorate Degree / UNESCO- Post Graduate Course

(Water Resources Development and Management) (UNESCO Scholarship)

Institution Stanford University, Stanford, California, USADate: from (month / year): to (month / year): 15/09/1964 – 30/01/1967Degree(s) or Diploma(s) obtained: 1. M.Sc. Civil Engineering (Water Resources and

Environment);2. M. Sc. Engineering Hydrology & Hydrogeology (USAID Scholarship)

Institution Assiut University – Assiut, Egypt Date: from (month / year): to (month / year): 15 /09 / 1958 – 15 / 06 /1962 Degree(s) or Diploma(s) obtained: B.Sc. Geology & Physics

6. Language skills: (Mark 1 to 5 for competence, 5 being the highest)Language Reading Speaking WritingArabic Mother tongueEnglish 5 5 5

7. Membership of professional bodies: Member - Jordan Engineering Association, 1967 to Date; Member - Jordan Environment Society, 1990 – Date; Member - USArmy Corps of Engineers, 1978 to 1981; Member - International Water Society, Urbana, Illinois, USA, 1981 to Date; Member – Jordan Society of Arbitration, 1995- Date; Member – Jordan Association of Construction Contractors, 1981 to 1990; Member - Jordan Association of Consulting Engineering Companies, 1995 to 2000

8. Other skills: Windows-based software, MS office, word processing, database work, spread sheets, Power Point Presentation, internet searching.

10. Present Position: Freelance International Development Consultant / Senior Advisor – Team Leader 11. Years With the Firm: Universal Professionals Dar / Amman – Jordan, since 199612. Key Qualifications and Experience :

Civil Engineer: 35 years of professional experience in National Water Resources Planning, Watershed Management, and Governance for Integrated Water Resources Management Aiming at Sustainable Development (IWRM), Management of Water Supply & Wastewater Systems, Monitoring & Evaluation of Projects, Quality Management / Public Administration per ISO 9001 - Change Management, Institutional Development, Capacity Building, Twinning Arrangements, and EIA / ISO 14000.

Public Awareness Campaigns through Focus Groups for Water Shortage Problems. Environment and Water Supply & Wastewater Systems Including Quality Monitoring and Testing,

International Laws, Water Rights and Ownership of International / Shared Water Resources. As mentioned here below in Table 14, for more than 20 years participated in drafting water management

policies, strategies and action plans in Jordan, Palestine, Yemen, Syria, Qatar, Afghanistan, Iraq (more than 5 years) and Lebanon.

Conducted 2 training courses / missions sponsored by the EU as shown in Table 14 here below on “Negotiation of International Treaties Related to Shared River Basins / Water Resources” for participants / High Ranking Officials of Iraq Ministry of Foreign Affairs and International Cooperation, Ministry of

Page 2: Ali Allabadi CV-Environmental Monitoring-Team Leader (2)

Planning, Ministry of Water Resources, and Ministry of Municipalities and Public Works in Baghdad and Erbil-Kurdistan – Iraq.

Good knowledge of the challenges of post-conflict state building and program evaluation in Palestine, Afghanistan, and Iraq.

Experience in the design (identification, formulation, implementation methods, contracting rules and procedures /methods) and implementation of EC funded programs. Lessons Learned from Implementation of Public Awareness Campaigns for Water Supply Shortage, Public-Private Partnership (PPP’s), Youth Organizations, Cultural Organizations, Community –Based Organizations(CBO’s), Committees for Water Supply and Sanitation (WSSC’s), Water Users Associations (WUA’s) for Irrigated Agriculture and Privatization of SWM.

Drafting Strategies and Action Plans for Communication and Public Awareness Campaigns related to Water Supply Shortage and Management of Water Supply and Wastewater Systems Water Supply & Wastewater Systems Including Quality Monitoring and Testing.

Change Management, Quality Public Management per (ISO9001:2008), Anti - Corruption and Governance in Public Administration.

Monitoring and Evaluation (M&E) by Logical Framework Analysis and Approach, USAID-PMP for Review of Program / Project Implementation, knowledge of EU - M&E Manual, and EC- Project Cycle Management Guidelines (PCM), and EC- Manual of Procedures (PRAG).

Prepared TOR’s for project design and implementation and trained local staff in various international consultancy missions as listed in Table 14 here below. Project Formulation and Implementation (Identification, Formulation, Pre-Feasibility and Feasibility Studies, Implementation Supervision, and Handing over / Completion).

Twinning Arrangements between Jordan Ministry of Water and Irrigation and the UK – Thames River Authority.

Institutional Development, Capacity Building in Public Administration Including Reform of Public Policies (Laws-By laws, Rules, Regulations, Orders, Instructions, etc.)

Author of a book titled:”Public Policy Making and Implementation in Jordan”, published on 15 September 2013 by Jordan Political Party (Al – Resalah), Amman – Jordan, Registered in Jordan National Library under No. 2013 / 10 / 3718. This book covers: Integrated Public Management, Governance, Anticipated Governance, Decentralization, Human Rights, Rule of Law, transitional justice and Reconciliation, Anti-Corruption, and Drafting and Implementation of Public Policies including Stakeholder Analyses.

Experience in International Development, Environment, M&E, Watershed Management,Water Supply & Wastewater Systems Including Quality Monitoring and Testing, Solid Waste Management– Urban Planning with Emphasis on Governance – Policies - Strategies- Action Plans - Master Plans for Integrated Water Resources Management Aiming at Sustainable National Development, Preparation of Project Proposals by Logical Framework Analysis, EIA and ISO 14000, Construction Contracting per FIDIC – Negotiation Skills – Quality Project Management per ISO 9001:2008, and ISO 10006 - Construction Supervision – Claims and Arbitration – M&E – QC, QA, Third Party Inspection (TPI).

13. Specific experience in the region:Country Date: from (month / year) to (month / year)Egypt 06– 08 / 2004Iraq (Erbil and Baghdad) 01/2007 - 11/2010, 01/2011 – 08/2011; 04 / 2013Jordan 09/ 1962 – 2/1971, 1982-1988, 12/1988 – 11/1999, 01/1999 – 02/2000,

11/2004 – 04/2005, 02/2012 – 08/2012Palestine 02 – 08/1997, 04 – 11/1998Oman 06/1976 – 01/1982Qatar 07/2005 – 01/2006Saudi Arabia 03/1971 – 05/1976, 06/1976 – 01/1982, 07/2005 – 01/2006Syria 15/12 – 30/1, 1992; 26/07 – 04/09, 1993, 15/12 – 30/12, 1992, UAE 01/2013 – 03/2013Yemen 06/2002 – 12/2002, 03/2001 – 06/2001, 20/ 09 – 20/11, 1992, 01 – 30 /12,

1993Lebanon March 3 – September 15, 2014Afghanistan 05/2003 – 11/2003

Page 3: Ali Allabadi CV-Environmental Monitoring-Team Leader (2)

14. Professional experienceDate: from (month / year) to (month / year) Nov.1, 2015 – Date Location: BaghdadCompany: SICI DominusPosition: Team LeaderDescription: EU-Funded Project: “Water Monitoring Task Force for Iraq”

consisting of the following components: (i)Water Monitoring Plan (Quality & Quantity), (ii) GIS and installation of new automatic / remote control gauging stations for transfer of data by satellite including integration with existing stations, (iii) IT, (iv) Establishing National Data Center, and (v) Capacity Building. 5 international and 6 national senior advisors implemented the project.

Date: from (month / year) to (month / year) 03/2014 – 12 / 09 / 2014Location: Beirut-Lebanon-Ministry of EnvironmentCompany: European Union, GFA Consultants of Germany Position: KE2 – Key Expert for Quality ManagementDescription: Strengthening Reform – Environmental Governance.

Strengthening the administration system of the Ministry of Environment by reviewing and simplifying existing procedures and / or drafting new procedures according to ISO 9001 Standards taking into consideration the existing laws, decrees, and public policies; review existing policies and draft new policies and strategies.

Establish Regional Departments and Environmental Police / Rangers in the governorates of Lebanon including responsibilities and job descriptions.

Prepare policies, strategies and semi-annual and annual work plans and progress reports.

Preparing specifications and tender documents for supply and installation of air quality monitoring stations.

Date: from (month / year) to (month / year) Dec.1 – 12, 2013 Location: Erbil Kurdistan - IraqCompany: TRANSTEC/BelgiumPosition: EU TrainerDescription: EU-Funded Project “Negotiation of International Treaties

Related to Shared River Basins / Water Resources”Conducted Training Course on “Negotiation of International Treaties Related to Shared River Basin Water Resources”For participants / High Ranking Officials of the Ministry of Foreign Affairs and International Cooperation, Ministry of Planning, Ministry of Water Resources, and Ministry of Municipalities and Public Works in Erbil-Kurdistan - Iraq

Date: from (month / year) to (month / year) 01/05 – 30/10, 2013 Location: Amman-JordanCompany: MANAR Consulting Engineers Position: Quality Management

Consultant

Page 4: Ali Allabadi CV-Environmental Monitoring-Team Leader (2)

Description: “Quality Management Manual for “Manar Consulting Engineering Company” Prepared and delivered QM Manual (QC/QA) per

(ISO9001:2008), including Monitoring and Evaluation (M&E) by Logical Framework Analysis and Approach, USAID-PMP for Review of Program / Project Implementation, knowledge of EU - M&E Manual, and EC- Project Cycle Management Guidelines (PCM), and EC- Manual of Procedures (PRAG),

Project Formulation and Implementation (Identification, Formulation, Pre-Feasibility and Feasibility Studies, Implementation Supervision, and Handing over / Completion) formed a major component of the QM Manual, including

Date: from (month / year) to (month / year) 04 – 12/04/2013Location: Baghdad /IraqCompany: TRANSTEC/Belgium Position: EU TrainerDescription: EU-Funded Project: “Negotiation Skills for International

Shared River Basins / Water Resources in Iraq”Conducted Training Course on “Negotiation of International Shared River Basins / Water Resources”For participants / High Ranking Officials of the Ministry of Foreign Affairs and International Cooperation, Ministry of Planning, Ministry of Water Resources, and Ministry of Municipalities and Public Works in Baghdad – Iraq.

Date: from (month / year) to (month / year) 01/11/2012 – 28/2/2013 Location: Ruwais – U.A.ECompany: Vincotte International Middle East, Mr. Wael KamalPosition: Third Party Inspector (TPI)Description: Conducted third party inspection activities throughout the

construction of a seawater basin (100. meters length x 100. meters width x 6 meters depth) to ensure compliance with BS8007. This basin is used to retain seawater for the cooling system of a very large industrial complex / gas & oil plants for production of plastic material at Borouge 2 – AlRuwais – United Arab Emirates (UAE).

Date: from (month / year) to (month / year) 02/2012 – 08/2012 Location: Amman – JordanCompany: USAID /AECOMPosition: Senior Advisor / ConsultantDescription: “Water Reuse and Environmental Conservation-Jordan

Ministry of Environment”Project for Water Re-Use and Environmental Conservation Project, the following activities were conducted: Drafting an organization chart for institutional development

of Jordan’s Ministry of Environment. Drafted new policies and revised existing policies related to

environmental law of Jordan. Drafting Strategies and Action Plans for Communication

and Public Awareness Campaigns related to Water Resources and Management of Water Supply and

Page 5: Ali Allabadi CV-Environmental Monitoring-Team Leader (2)

Wastewater Systems including Quality Monitoring and Testing, and Solid Waste Management (SWM).

A Baseline of the current situation of the water sector in the process towards a Program Based Approach was established.

Date: from (month / year) to (month / year) 01/2011 – 08/2011 Location: Erbil & Baghdad – IraqCompany: UNHABITATPosition: Senior Advisor / ConsultantDescription: “Public Sector Modernization Program for Water &

Sanitation in Iraq” Support was provided to the Iraqi Ministry of Municipalities

and Public Works to efficiently plan and manage the implementation of the Water & Sanitation Program including SWM as a Public Utility.

Developing organizational charts, process mapping, development of procedures, and M&E tools (incl. indicators) for effective implementation of Water Supply Quality Monitoring and Testing.

Advising and supporting policy development and commercialization (of Water Supply ).

Drafting Strategies and Action Plans for Communication and Public Awareness Campaigns related to Water Supply and Wastewater Systems Including Quality Monitoring and Testing.

Water sector reform including regulatory framework development for Water Supply Monitoring and Testing.

Establishing quality control and assurance mechanisms in internal workflows and procedures to continuously improve operations of monitoring and testing.

Developing Standard Operating Procedures (SOPs) and provide guidance to staff in daily work.

Capacity building of staff to transfer knowledge and apply the SOPs and established QMS, incl. coaching of top management.

Introduce PPP regulations and policies for Water Supply Systems.

Preparation of TOR’s for Services and Technical Annexes for Works and Evaluation of Offers.

“Program Based Approach” is the main theme of the subject project rather than fragmented and uncoordinated / isolated projects not taking into consideration “Integrated Water Resources Management / IWRM” aiming at sustainable development for which water governance is essential.

Date: from (month / year) to (month / year) 02/2007 – 11/2010

Location: Iraq – Baghdad and ErbilCompany: Joint Venture of EMG / CARDNO and MSI both of the USA in

USAID-Financed Project (TATWEER)Position: Team Leader / Senior AdvisorDescription: “Capacity Building in Public Administration for Ministry

of Water Resources - Iraq”.

Page 6: Ali Allabadi CV-Environmental Monitoring-Team Leader (2)

Support the QM Unit in mapping processes and work flows, developing procedures as well as documentation requirements for Water Supply Systems including quality monitoring and testing.

Support in conducting internal audits to check compliance with QMS and identify possibilities of improvement.

Drafting Strategies and Action Plans for Communication and Public Awareness Campaigns related to Water Resources Management including Water Supply and Wastewater Systems.

Capacity Building of staff to manage Ministry PPP programs and compliance with the established QMS.

Design and implementation of an internal M&E system to measure performance and achievements by indicators, especially with respect to planning and implementation of Water Supply Systems including quality monitoring and testing.

Implementation of a Training of Trainers scheme and establishing independent training centre within the Ministry.

Coaching of management staff on the implementation of the PPP and its QMS.

M&E, Preparation of TOR’s for Services and Technical Annexes for Works and Evaluation of Offers.

Water Supply and Irrigation Water – Policy Analysis and Reforms, Institutional Development, and Public Awareness Raising for Shortage of Water.

Prepared training Course Material and Conducted Training Courses on River Basin Negotiation

Conducted “Needs Assessment Study” of the damaged Infrastructure (irrigation canals, water pumping stations, dams, water supply networks and monitoring stations, educational facilities, and roads) and also related systems and practices.

Prepared a “Capacity Development Plan” for the MOWR using Logical Framework Analysis.

The following results were achieved: (1) Individual Skills Development: More than 13000 persons

were trained in various functions of public administration for water resources development and management including stream flow gauging stations,

(2) Organizational Skills Development: Assisted the Ministry in institutionalizing well trained Capacity Development Unit (CDU) and Self Assessment Unit (SAU) established in the Ministry,

Date: from (month / year) to (month / year) 07/2005 – 01/2006 Location: QatarCompany: United Management Consultancy Co.(UMC) / UAE

Qatar National Authority for Water and Electricity. Position: Team LeaderDescription: “Quality Management Manual of Qatar National Authority

for Electricity and Water Supply Per ISO9001:2001”Leading of a team of certified QMS experts to develop and

Page 7: Ali Allabadi CV-Environmental Monitoring-Team Leader (2)

implement a QMS per ISO 9001-2001 in Qatar National Authority for Water and Electricity. The team was responsible for the following tasks: Mapping of internal processes, identifying and improving

internal work flow and developing SOPs for Water Supply Systems Including Quality Monitoring and Testing.

Advising and supporting policy development and commercialization of water.

Water sector reform, regulatory framework development. Drafting Strategies and Action Plans for Communication and

Public Awareness Campaigns related to Water Resources Management including Water Supply and Wastewater Systems.

Drafting of the Quality Management Manual and definition of Key Performance Indicators for M&E of PPP for Water Supply Systems.

Establishment of quality control and assurance systems to continuously improve operations and ensure effective implementation of projects, programs and plans for delivery of water supply including Quality Monitoring and Testing.

Implementation of the PPP by training staff and knowledge transfer.

Coaching of the top management to implement QMS procedures and effectively .

Date: from (month / year) to (month / year) 1998 – 2005 Location: Amman – Jordan, Sanaa-YemenCompany: Komex International Co. Of Canada / financed by CIDA and

Sanaa / Yemen financed by the UNDPPosition: Project ManagerDescription: Support in improving capacity of Sanaa Municipality

Staff to plan, implement, and manage annual budgets for water supply including Quality Monitoring and Testing.

Provision of: (i) Particular advice to develop tools for M&E of annual plans, (ii) Construction Projects / QC & QA, (iii) Design and provision of training to local counterparts and coaching of management to prepare TOR’s, (iv) Similar deliverables(M&E, SOP’s, and training) were provided in several assignments related water supply systems in many cities of Yemen.

Drafting Strategies and Action Plans for Communication and Public Awareness Campaigns related to Water Resources Management including Water Supply and Wastewater Systems.

Date: from (month / year) to (month / year) 09/2004 – 01/2005 Location: JordanCompany: Academy for Educational Development (AED), USA / USAIDPosition: Senior Water Policy ExpertDescription: Support to the Ministry of Agriculture in improving

planning and implementation of water policies and agricultural at national level by introducing work flows and procedures; development of M&E system for the implementation of established annual work plans within public authorities.

Page 8: Ali Allabadi CV-Environmental Monitoring-Team Leader (2)

Design and implementation of trainings to manage programmes and the associated implementation instruments at both, national and local level, incl. coaching of management staff. The following results were achieved: (i) A Baseline of the current situation of irrigated agriculture and water sector in the process towards a Program Based Approach was established, (ii) Comprehensive sector policy and strategy documents were drafted (through the review and update of the existing documents, (iii) A sector budget and its medium term 5 years expenditure framework were established, (iv) A (sector and donors) coordination framework was in place and operational, and (v) A sector performance monitoring system was set up and operational,

Drafting Strategies and Action Plans for Communication and Public Awareness Campaigns related to Water Resources Management including Water Supply, Wastewater Systems, and agricultural SWM

Date: from (month / year) to (month / year) 06 – 08/2004 Location: Suez, EgyptCompany: EcoNomics & Sustainability

Worley Parsons Services, Pty Ltd. Position: Consultant HydrologistDescription: As Arid zone Hydrologist, conducted a Flood Risk and

Protection Study for Ammonia Plant Site in Suez - Egypt

Date: from (month / year) to (month / year) 05/2003 – 11/2003 Location: AfghanistanCompany: UN - FAOPosition: Chief Technical Advisor and Sub-Program ManagerDescription: “Institutional Development and Capacity Building of the

Ministry of Irrigation, Water Resources and Environment in Afghanistan for Rehabilitation of Infrastructure”Consultant to” Afghanistan Ministry of Irrigation, Water Resources and Environment” for rehabilitation of irrigation infrastructures, design and implement development planning and manage processes:

Watershed Management Support to the institutional development of the newly

established Ministry by developing the organizational chart, identifying core processes with respect to annual programmes planning and its implementation as well as in M&E of performance in accordance with the QMS approach.

Establishment of quality control and quality assurance mechanisms for the rehabilitated water supply systems.

Provision of training to staff and management to effectively manage programs in accordance with developed SOPs.

Support in conducting internal audits to check compliance with established QMS procedures and identify possibilities of improvement by introducing PPP for Water Supply Systems including Quality Monitoring and Testing.

Public Finance Management for Water Resources Development and Management.

Inland water infrastructures, Buildings (for education, healthcare, administrative and industrial use), Water supply

Page 9: Ali Allabadi CV-Environmental Monitoring-Team Leader (2)

and sanitation networks. Drafting Policies, Strategies and Action Plans for

Communication and Public Awareness Campaigns related to Water Resources Management including Watershed Management

Date: from (month / year) to (month / year) 06/2002 – 12/2002 Location: Sana’a – YemenCompany: Joint Venture of Komex Co. and Hydrosult Co. Both from

CanadaPosition: Team LeaderDescription: Realization of a feasibility study of 40 wadies for the

selection of sites for groundwater recharge dams for water supply system of Sana’a the Capital of Yemen M&E, Preparation of TOR’s for Services and Technical

Annexes for Works and Evaluation of Offers. Water Supply Policy Analysis and Reforms, Institutional

Development, and Raising Awareness of water shortage including Quality Monitoring and Testing.

Public Finance for Water Supply and Wastewater Systems

Date: from (month / year) to (month / year) 03/1996 – 08/1999

Location: Jordan and Palestinian TerritoriesCompany: Universal Engineering Consulting CoPosition: Founder and General ManagerDescription: Consultancy to various government agencies and public

institutions in Jordan among others to the Jordan Ministry of Water and Irrigation, the Central Water Authority of Jordan and Palestine, in drafting water policies and strategies and TOR’s for implementing studies, designs, and construction supervision of water supply systems and wastewater treatment plants including the following projects:(1) Public Awareness Campaigns Study for Jordan Ministry of Water and Irrigation with DAI of the USA. (2) Water Saving Devices Study for Jordan Ministry of Water and Irrigation with DAI of the USA under a contract with DAI Co. of the USA financed by the USAID. (3) Hydraulic Analysis of Greater Amman / Jordan Water Supply System including Quality Monitoring and Testing.(4) Design and construction of Wastewater Treatment Plant for the town of Shoubak / Agriculture College / Ministry of Education / Jordan. (5)Surface Water Monitoring in Amman – Zerqa Basin for Jordan Ministry of Water and Irrigation with DAI of the USA.(6) Wastewater Collection, treatment, disposal and / or reuse systems Project for the Catchment Areas of Yarmouk and Jordan River / Central Water Authority of Jordan (7)Participated in World Bank – Project (METAB) for Integrated Solid Waste Management of Zerqa Town as a consultant.(8) In joint venture with DORCH Consulting Engineering company of Germany, financed by the EU, prepared the

Page 10: Ali Allabadi CV-Environmental Monitoring-Team Leader (2)

National Master Plan for Water Supply and Sanitation in the Palestinian Territories.

Date: from (month / year) to (month / year) 1991 -1995

Location: Jordan, Syria, Yemen and other countriesCompany: Self EmployedPosition: Free Lance ConsultantDescription: Assignments and missions (appraisal, supervision or expert

missions) in various countries (Jordan, Syria, Yemen, Sudan, Zambia, Bangladesh) sponsored by FAO, IFAD, World Bank, UNDP in the field of: M&E, Institutional Development, Capacity Building and Training of municipalities staff on management of water supply & wastewater systems.

A Baseline of the current situation of the water sector / water supply and sanitation including public utilities in the process towards a Program Based Approach was established in Sudan, Afghanistan, Zambia. Other activities carried out in those countries include the following:

Comprehensive water-sector policy and strategy documents were drafted and / or evaluated.

Water sector budgets and its expenditure framework were established and / or reviewed.

Water sector performance monitoring system was set up and operational,

All necessary contractual documents / TOR’s were prepared and approved by the concerned Ministries including, among others, project formulation studies, technical designs, tender dossiers and contractual documents, Sample of international consultancy missions and assignments for monitoring and evaluation of projects implementation. the details of these projects are as shown here below:(1) Mission : M&E Mission (April 22 - June 21, 1991), Organization :Office for Project Services, OPS-

UNDP, New York - U.S.A., Project Title and Number : Bangladesh Flood Action Plan, FAP, (BGD / 90 / 004).(2) Assignment: M&E Assignment (August 1-November 30, 1991). Organization: Jordan Ministry of Water and Irrigation, MOWI, Amman- Jordan. Project Title: National Water Resources Strategy, (3) Mission: M&E Mission (January 1-31,1992), Organization: The Islamic Development Bank, IDB, Jeddah - Saudi Arabia. Project Title:

Sudan / Northern Province Irrigation Development Project - Four Irrigation Schemes (17000 ha). (4) Mission: M&E Mission (March 1 to April 30, 1992), Organization: PRIDE/Chemonics International, Water Management Consulting Services, Arizona - U.S.A., Project Title: Jordan Water Management Strategy, (5) Mission: M&E Mission (July 1 - 30, 1992), Organization: International Fund for Agricultural Development, IFAD / Rome - Italy. Project Title: Sudan / Western Savannah Project - Phase II / Improvement of Rural Water Supply in South Darfur,

Page 11: Ali Allabadi CV-Environmental Monitoring-Team Leader (2)

(6) Mission: M&E Mission (September 20 - November 15, 1992), Organization: International Fund for Agricultural Development, IFAD / Rome – Italy, Project Tittle: Republic of Yemen - Tihama Environmental Protection Project. (7) Mission: M&E Mission (December 15 - 30, 1992).Organization: FAO / Italy,

Project Title: Improved Management of Water Resources for Agricultural Use. / Syria. (8) Mission: M&E Mission (January 20 - March 22, 1993).Organization: International Fund for Agricultural Development (IFAD / Rome - Italy). Project Title:

Identification Mission for Improving Food Security in Zambia. (9) Mission: M&E mission for Hargeisa – North western Somalia / Pesticides Spill Control (25 March – 25 May1993). Organization: OSRO / FAO - Rome – Italy. Project Title: Hargeisa Pesticides Spill Control. (10) Mission: M&E Mission (July 26 - September 4, 1993). Organization: International Fund for Agricultural Development IFAD / Rome - Italy. Project Title: Syria / Jebel Al-Hoss Project. (11) Mission: M&E Expert Mission (September 6 - December 30, 1993). Organization:

Joint Venture of GITEC CONSULT / Duessoldorf - Federal Republic of Germany (FRG) And Consulting Engineering Center / Amman - Jordan. Project Title: Study for the Recovery of Operation and Maintenance Cost of Irrigation Water in Jordan / Ministry of Water and Irrigation / Amman - Jordan. (12) Mission: M&E mission (1 December - 31 January, 1993). Organization: FAO / Rome / Italy. Project Title: Institutional Building - Water Sector Administration / Ministry of Agriculture and Water Recourses / Republic of Yemen. (13) Mission: M&E mission - Water Resources Management and Environment (1 August 1994 to January 1995). Organization: GTZ / Amman / Jordan. Project Title: Updating the National Water Master plan of 1976 for Jordan / Ministry of Water and Irrigation / Amman - Jordan.

Date: from (month / year) to (month / year) 1981-1988

Location: Amman – JordanCompany: Allabadi and Debas General Contracting CoPosition: Partner and General ManagerDescription: Implementation of civil works and electro-mechanical works

related to buildings, housing projects, water supply and sanitation systems including construction of Water Supply Quality Monitoring and Testing, etc.

In various locations of Jordan. The activities included the implementation of quality control and quality assurance systems and construction material testing per American Standards for Testing Materials (ASTM)

Page 12: Ali Allabadi CV-Environmental Monitoring-Team Leader (2)

Date: from (month / year) to (month / year) 01/1976 – 01/1981

Location: Saudi Arabia and OmanCompany: U.S Army Corps of EngineersPosition: Senior Hydro - GeologistDescription: Responsible for groundwater investigations and

development, water well design, drilling supervision, pumping tests including Quality Monitoring and Testing of about 100 wells the average depth of each about 4500 feet below ground level.

These wells were serving water supply systems in many military cities in many locations of Saudi Arabia. The duties included providing technical assistance to Sultanate of Oman in the form of investigations, feasibility studies, and design of Groundwater Recharge Dams for water supply systems in different towns and cities.

Date: from (month / year) to (month / year) 1971-1976

Location: Saudi ArabiaCompany: Mander, Raikes, and Marshal Co. – Consulting Engineers and

Hydrologists of the UKPosition: Deputy Project Manager, Training Hydrologist/Hydro-GeologistDescription: As consultants to the Saudi Ministry of Water and

Agriculture, Riyadh, Saudi Arabia. Established National Hydro-Meteorological Network for assessment of surface water and groundwater resources

Prepared National Water Master Plan for Saudi Arabia based on field investigations and feasibility studies.

Water and Sanitation Policy profiles were prepared and instructions, permits and licenses, rules, standards, specifications and guidelines for water supply and sanitation projects were produced

Date: from (month / year) to (month / year) 1962-1971

Location: Amman – JordanCompany: Natural Resources AuthorityPosition: HydrologistDescription: As a counterpart to an FAO expert, responsible for

Construction of a National Hydro –Meteorological Network for assessment of Surface water and groundwater resources for the whole country of Jordan.

15. Others:List of Environmental Impact Assessment Studies in Which I was a Member of a Team

1) “EIA Study including Cultural Resources and Ecological Assessment, Environmental Monitoring Program and Environmental Management Plan for Jordan Valley Integrated Waste Management Project”, submitted to the Canadian International Development Agency / CIDA and Jordan Ministry of Water and Irrigation, Amman – Jordan, October 2000.

2) “EIA Study for “TAIS / Yemen - Water Supply and Sanitation Project”, submitted to IDA / World Bank and the Yemeni Ministry of Electricity and Water – National Water and Sanitation Authority / TAIS Water and Sanitation Local Corporation, July 2001.

Page 13: Ali Allabadi CV-Environmental Monitoring-Team Leader (2)

3) “EIA Study for “Wadi Mousa Water Supply and Wastewater Project”, submitted to the USAID and Jordan Ministry of Water and Irrigation / Water Authority of Jordan, August 1996.

4) “EIA Study for Irbid – North Shouna (SectionIII) Feasibility Study”, submitted to Jordan Ministry of Public Works and Housing, Amman – Jordan, January 1997.

5) “Study of Environmental Impact of Fertilization for Agriculture on Surface Water and Groundwater”, submitted in cooperation with Professor Van Boheemen of the International Institute for Aerospace Survey and Earth Sciences, the Netherland, December 1991.

6) “EIA Study for Water and Wastewater Regional Plan for the West Bank Governorates of Palestine”, DORCH Consult – Munich-Germany, submitted to the Palestinian Ministry of Planning and International Cooperation / Palestinian National Authority, May 1998.

7) “EIS Study for the Industrial Park of Jordan Gateway Projects Company at the Jordan Valley”, prepared for the International Finance Corporation / member of the World Bank Group, Washington, D.C. –USA, September 2000.

8) “EIA Study for Tourism Development Project of the East Coast of the Dead Sea”, submitted to Jordan Ministry of Water and Irrigation – Jordan Valley Authority, Amman – Jordan, June 1996.

9) “EIA Study for Allajoun Oil Shale Feasibility Study, Phase I, in association with Bundesanstalt Fur Geowissenschaften Und Rohstoffe / Hanover – Germany, submitted to Jordan Central Water Authority, June 1987.

10) “EIA Study for the Master Plan and Feasibility Study for Rehabilitation, Expansion, and Development of Existing Wastewater Systems in Amman – Serqa River Basin”, in association with Harsa – Metcalf and Eddy Int., and CC Johnson and Malhotra, P.C. / USA, prepared for the USAID and Jordan Ministry of Water and Irrigation, Amman – Jordan, July 1997.

11) “EIA Study for Qa’a Disi Groundwater Aquifer Study in association with Haisti Int. and Scott Wilson Kirkpatrick Consulting Engineers / UK, prepared for ODA Technical Cooperation Programme and Jordan Ministry of Water and Irrigation, Amman – Jordan, May 1994

12) “Report on Environmental Resources Protection in Jordan”, for GTS – Germany, for Wuppertal Institute for Climate, Environment and Energy, Science Center- North Rhine / West Phalia –Germany, March 1995.

13) “ Study on Industrial Pollution Control in Jordan”, in association with COWI Consult – Denmark and Jordan Royal Scientific Society (RSS), prepared for Jordan Ministry of Planning, November 1994.

14) “Technical Proposal for Preparation of EIA Study for Usage of Pet-Coke in Cement Factories in Jordan and Environmental Auditing Study”, in association with Komex Consulting Engineers of Canada for Jordan Ministry of Public Works and Housing, May 1997.

Other International Activities / Awards(1) Secretary, Jordan National Committee for the International Hydrological Decade (IHD / UNESCO), Amman - Jordan (1967 - 1971).(2) Chief of the Jordanian Delegate for the IHD / UNESCO Mid-Decade Conference of Paris / France, 1969.(3) Member of Jordanian Delegate for the FAO Regional Commission on Land and Water Use in the Middle East, conference of Amman - Jordan. 1969.(4) U.S. Army Corps of Engineers "Outstanding Award" for Exceptional Performance (1978 - 1979) in the field of hydrology and water resources in Saudi Arabia and Oman.(5) Consultant Hydrologist, lecturer in training courses for hydrologists and hydrologists from Least Developed Arab Countries (LDAC). These courses were sponsored by the Department for Technical Cooperation and Development (DTCD) / UNDP and held at :-a- Arab centre for studies of Arid Zones and Dry Lands (ACSAD) Damascus / Syria, 1988.b- Ministry of water and Electricity, Water and Sewage Authority, Sanaa / Yemen, 1990.(6) At the request of the Department of Science / Arab League Education, Culture, and Science Organization (ALECSO) / Tunis, a study of "Unconventional Water Resources - Water Desalination and Waste water Reuse in the Arab World" was prepared in 1989.(7) At the request of His Royal Highness Crown Prince Hasan Bin Talal, the following tasks were performed:

Page 14: Ali Allabadi CV-Environmental Monitoring-Team Leader (2)

a- Preparation of an Organization Chart (Functions, Objectives and Job Descriptions) for the Jordanian Ministry of Water and Irrigation , 1987.b- Preparation of an Organization Chart for "Al-Badiya Development Authority" 1990.

Publications1. Allabadi, A. “Manual for EIA Studies”, USAID –financed Project / TATWEER, Iraq Ministry of Water

Resources, November 2007.2. Allabadi, A. “Formation and Drafting Public Policies”, USAID –financed Project / TATWEER, Iraq Ministry of

Water Resources, June, 2008.3. Allabadi, A. “Governance for Integrated Water Resources Management Aiming at Sustainable Developemnt”,

Proceedings of First Scientific Conference for Iraq Water Resources Management, Sulaimaniyya – Kurdistan – Iraq, April 2009.

4. Allabadi, A. “The Art of Negotiation for International Shared Water Resources” USAID –financed Project / TATWEER, Iraq Ministry of Water Resources, January 2009.

5. Allabadi, A. “Use of Logical Framework Approach and Analysis for M&E and for Preparation of Project Proposals”, USAID –financed Project / TATWEER, Iraq Ministry of Water Resources, November 2010.

6. Allabadi, A. “ Formulation of Water Users Associations (WUA’s) for Irrigated Agriculture, Ministry of Water Resources, Baghdad, Iraq, 2010.

7. A good number of old publications presented in international conferences and seminars which date back to the nineties.

8. Allabadi, A. “Public Policy Making and Implementation in Jordan”, published by Jordan Al – Resaleh Party, Amman – Jordan.

Experience as a trainer(i) “Project Management and ISO 10006”,(ii) “Strategic Planning”.(iii) “Studies of Environmental Impact Assessment”,(iv)“M&E of Environmental Project Progress and Implementation”,(v) “Preparation of Project Proposals by Log-frame Approach”,(vi) “Drafting and Formation of Public Policies”,(vii) “Participatory Rapid Appraisal of Project Design and Evaluation”,(viii) “Public Awareness Campaigns”(ix) “Negotiations Skills for for Shared River Basin / International Water Resources”, (x) “Negotiations Skills for Arbitration, Contracting and Procurement”, (xi) “Public – Private Partnerships for Solid Waste Management / SWM” (xii) “Formation of Community Based Organization (WUA’s, WSSC’s).

Additional Training and Courses Attended1964: Surface Water and Groundwater, USGS, Menlo Park California / USA. 1965: Design of Small dams, US Bureau of Reclamation Denver, Colorado, USA.1965: Water Supply Quality Testing and Analysis Laboratory, Lincoln, Nebraska, USA.1976: Geophysical Investigations-US Army Corps of Engineers-Riyadh, Saudi Arabia1977: Construction Quality Management - US Army Corps of Engineers-Riyadh, Saudi Arabia 1980: Construction Negotiation - US Army Corps of Engineers-Riyadh, Saudi Arabia

I, the undersigned, certify that to the best of my knowledge, these data correctly describe me, my qualifications and my experience.

Ali M. Al – Labadi 20 January, 2016 Name of expert Signature Date

Page 15: Ali Allabadi CV-Environmental Monitoring-Team Leader (2)