  • AED-SICAD and ArcFM™ UT Product Suite:

    Two Case Studies: Brabant Water, Netherlands and VSE, Slovak Republic

    German Software Engineering by AED-SICAD

    Florian Brandi-Dohrn, AED-SICAD

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    ß One of the leading GIS application development companies in Europe ß We focus on 3 primary market segments

    • Utilities • Cadastre • Local Governments

    ß Geographical • Europe, Middle East, Rest of World

    ß We develop on the leading GIS platform - ESRI‘s ArcGIS Technology ß Our offering

    • COTS Software: □ State-of-the-art and ready-to-use GIS applications

    • Professional Services: Specification, installation, customizing, data migration, training

    Who are we?

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    ß Our company • German Company (Offices Sites in Bonn, Munich, Berlin) • More then 200 employees in AED-SICAD AG • Three subsidiaries

    ß More than 10.000 licenses and

    >2000 customers all over the world • > 40 000 GByte of data

    are managed by AED-SICAD software

    ß Financial situation

    • Debt-free • High liquidity • Profitable

    AED-SICAD: Key Facts

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    Web

    CODI WMPS URM

    Process Templates

    UT Web Silverlight/ JavaScript

    Web Client

    ArcFM UT and ESRI

    UT Server AGS Extensions

    Serv

    er

    Enterprise GDB

    Local GDB

    File GDB

    ArcGIS Server

    Full Desktop

    ArcFM UT View

    ArcFM UT Editor

    ArcEditor ArcView

    Desktop Client

    Smart Desktop

    ArcGIS Engine

    ArcFM UT Asset Manager

    Mobile Planner

    Mobile Client

    Integration

    ArcFM UT Integrator EAI

    CRM, SAP, SCADA

    SOAP

    Integration EAI

    (SOAP)

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    ArcFM UT: Product Structure

    UT Base

    Extensions

    UT Integrator

    UT Designer

    UT Reader

    UT Mobile

    UT Web

    UT View

    UT Asset Mgr

    UT Editor

    Elec

    tric

    ity

    Gas

    Wat

    er

    Hea

    ting

    Sew

    age

    Telc

    o

  • Successes 2008 / 2012: Overview

    ¸ 86 ArcFM UT implementations

    ¸ From top 5 German electricity companies: Three use ArcFM UT

    ¸ Nearly all customers full Enterprise GIS implementation

    Case Studies: • Brabant Water, Netherlands • VSE, Slovak Republic (Electricity)

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    ß Main pipeline system 18.000 km ß House connections 1.100.000 ß Inhabitants 2.4 million

    ß GIS ArcFM UT users

    • 20 data editors • 120 field employees: mobile users • 175 geo data viewers in office • 30 spatial analysts

    Brabant Water, Netherlands

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    Brabant Water: Software Architecture

    Mobile: 120 Desktop: 20 / 30

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    Brabant Water: Screenshot

    Brabant Water: Editing • Data conversion done by

    ATOS Origin • Customizable data model

    / alpha masks

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    Brabant Water: Tracing

    Brabant Water: Tracing • Isolate network • Find affected customers

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    Brabant Water: Tracing

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    Brabant Water: Tracing

    Brabant Water: Tracing • Customer addresses:

    Integrated with ArcFM UT Integrator EAI with the CRM

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    Brabant Water: Importing DXF

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    Brabant Water: Importing DXF

    Brabant Water: DXF • Cut & paste • Adapt alpha-numerical

    data

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    Brabant Water: ArcFM UT Web

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    ß Objectives • Migration : All data migrated • System open and adaptable • IT integration (CRM) big success • Standard COTS application software

    (ArcFM UT – no specific developments): First System update cycle without problems passed

    ß Experiences • Extensive user training reflects in excellent data quality • Inclusion of users in design decisions • Keep „time boxes“ for unforseen tasks • Involve and benefit from AED-SICAD and ESRI experts

    Conclusions – ArcFM UT Implementation

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    ß Brabant Water is currently on ArcFM UT V9.3.1

    ß Brabant Water is currently planning the migration to ArcFM UT V10.0.1

    ß Brabant Water asked and will receive from AED-SICAD a number of change requests as product enhancements • Automatic determination of cut-off clients • Default values configuration • Configuration of sort order for numbers in text format

    Current Situation

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    Company Profile ß Energy utility company

    ß Member of the RWE Group since 2003

    ß More than 605.000 points of delivery

    ß Mission = provide reliable and complex services which correspond to the needs of customers

    ß Sold more than 3,2 TWh in 2010

    ß Average number of employees = 1.575

    Shareholders National Property Fund: 51 % RWE: 49 %

    Východoslovenská Energetika a.s. (VSE)

    ß Distribution area 16 221 km2

    ß HV Lines: 1 274 km ß MV Lines: 8 276 km ß LV Lines:11 160 km ß MV / LV Distribution

    stations: 5 108

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    1. Technical architecture (HW,SW) 2. Data Model (ArcFM UT+VSE) configuration 3. Migration tools MV, HV = ArcGEO

    v Specific tool for each data source v DGN+DB ‡ UT MDB ‡ UT SDE

    4. Data migration = VSE v Preparing data v Using / extending migration tools v Correcting / post-processing data

    MV migration = 04/2009 – 09/2009 HV migration = 02/2010 – 05/2010

    Project Phase I: GIS and Data

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    Data Migration – Example MV

    SAP: Source of organizational

    data

    Source of technical data

    9 sources of geographic data

    Automated tool for Generating Station ISP

    (using tabular data only)

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    MV + elevation MV + aerial imaging basemap

    MV + 1:10 000

    basemap

    Data Migration – Result - MV

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    Estimation:

    ß 3 500 km cables

    ß 10 500 km overhead lines

    ß Overview:

    • Start = 07/2009 • Duration = 5 years • Accuracy = submetric 3rd class • Internal and external forces

    ß Results:

    Low Voltage (0.4 kV): Digitalization / Data Collection

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    GIS became a master source of the distribution network of VSE:

    ß Geographic data

    ß Detailed technical records of electricity distribution devices (HV, MV, LV)

    ß Data update process (distribution network) = managed by the GIS department

    Project Phase II: GIS Integration

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    GIS – SCADA (offline export)

    > Initial & Incremental scheduled export

    > Input = MV data (divided into tiles)

    > Output = DXF+CSV files (SCADA FTP upload)

    > In operation since 9/2008

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    GIS – SAP PM, ETRA, Maximo (online integration)

    > TR (Transformer) – MV/LV

    > Create TR in GIS

    > Update TR in ETRA

    > In operation since 3/2010

    > All HV and MV objects

    > Data handling in GIS („image“ to SAP PM)

    > SAP ID back to GIS

    > In operation since 3/2010

    > All HV and MV objects

    > Data handling in GIS („image“ to Maximo)

    > State of equipment back to GIS

    > 6/2010 (pilot), since 6/2011 (sequential roll-out)

    Maximo

    ETRA

    SAP PM

    GIS (user edits)

    External systems

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    ß Customer data (source SAP IS-U)

    ß Service point (based on the current grid configuration) + coordinates of customer (source GIS)

    ß Consumption data mirrored to the GIS

    ß In operation since 9/2009

    GIS – SAP IS-U (Online Integration + Scheduled „Pull“ Export)

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    n Ownership information of equipment (source SAP FI-AA)

    n Asset accounting number mirrored to GIS

    n All MV objects

    n Much faster report generation for Regulatory Authority

    n In operation since 3/2010

    GIS – SAP FI-AA Integration

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    Prepared environment for implementation of a very important project = HIFFI (MAXIMO - grid maintenance management)

    ß Storing data in a single „primary“ system (GIS)

    ß Reducing data management workload

    ß Removing old isolated legacy applications for technical data management

    ß Reducing number of SAP clients in VSE

    ß Solving online communication of SAP IS-U with GIS

    ß Much faster reports for regulatory authority

    GIS – SAP Integration: Benefits

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    GIS – Network Calculation System (Offline Export)

    n All HV, MV, LV objects

    n Off-line export directly from GIS

    n In operation since 11/2011

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    GIS Integration at VSE - Evolution

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    GIS / IT Landscape

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    ß External systems require new attributes / objects / relations • VSE DM changes drive the process – make projects sequential • VSE data model: DM v1 ‡ v22d • Large coordination effort

    ß Stringent deployment plan & coordination of projects is essential

    • Up to six projects running simultaneously at VSE • Dev AG ‡ Dev VSE ‡ Test ‡ Prod ‡ Bugfix (Test) • Align activities with 3rd parties – impl., testing, deployment

    Project Aspects

  • ESRI Europe UC 2012 Oct 15 - 16, 2012

    ß Upgrade to ArcFM UT V10 □ ArcFM UT V10.0.1

    ß GIS data providing for external use (outside company) □ Portal solution

    ß ArcGIS Schematics v10 □ Implement solution for generating diagrams (othogonal schemes of

    distribution power network for all voltage levels)

    VSE – Future Plans

  • Thank you for your attention

    Florian Brandi-Dohrn AED-SICAD Aktiengesellschaft

    Carl-Wery-Str. 22 D - 81739 Munich

    Germany

    Tel.: +49 (0) 45026 - 100 [email protected]

    www.aed-sicad.com

    mailto:[email protected]://www.aed-sicad.com/

    AED-SICAD and ArcFM™ UT Product Suite:� �Two Case Studies: Brabant Water, Netherlands and VSE, Slovak Republic�� German Software Engineering by AED-SICADWho are we?AED-SICAD: Key FactsArcFM UT and ESRIArcFM UT: Product StructureSuccesses 2008 / 2012: Overview Brabant Water, NetherlandsBrabant Water: Software ArchitectureBrabant Water: ScreenshotBrabant Water: TracingBrabant Water: TracingBrabant Water: TracingBrabant Water: Importing DXFBrabant Water: Importing DXFBrabant Water: ArcFM UT WebConclusions – ArcFM UT ImplementationCurrent SituationVýchodoslovenská Energetika a.s. (VSE)Project Phase I: GIS and DataData Migration – Example MVData Migration – Result - MVLow Voltage (0.4 kV): Digitalization / Data CollectionProject Phase II: GIS IntegrationGIS – SCADA (offline export)GIS – SAP PM, ETRA, Maximo (online integration)GIS – SAP IS-U (Online Integration + Scheduled „Pull“ Export)GIS – SAP FI-AA IntegrationGIS – SAP Integration: BenefitsGIS – Network Calculation System (Offline Export)GIS Integration at VSE - EvolutionGIS / IT LandscapeProject AspectsVSE – Future PlansThank you for your attention