Advanced Implantation Detector Array (AIDA):Project Summary & Status

Tom DavinsonSchool of Physics & AstronomyThe University of Edinburgh

presented byTom Davinson

on behalf of the AIDA collaboration(Edinburgh – Liverpool – STFC DL & RAL)

Page 2: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

AIDA Project

Project web site

http://www.ph.ed.ac.uk/~td/AIDA/welcome.html

The University of Edinburgh (lead RO)Phil Woods et al.

The University of LiverpoolRob Page et al.

STFC DL & RALJohn Simpson et al.

Project Manager: Tom Davinson

Project commenced: September 2006

Page 3: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

DESPEC: Implantation DSSD Concept

• SuperFRS, Low Energy Branch (LEB)• Exotic nuclei – energies ~ 50 – 200MeV/u• Implanted into multi-plane, highly segmented DSSD array• Implant – decay correlations• Multi-GeV DSSD implantation events• Observe subsequent p, 2p, , , , p, n … decays• Measure half lives, branching ratios, decay energies …• Tag interesting events for gamma and neutron detector arrays

Page 4: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

Implantation DSSD Configurations

Two configurations proposed:

a) 8cm x 24cm “cocktail” mode many isotopes measured simultaneously

b) 8cm x 8cm high efficiency mode concentrate on particular isotope(s)

Page 5: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

AIDA: DSSD Array Design

• 8cm x 8cm DSSDscommon wafer design for 8cm x 24cm and 8cm x 8cm configurations

• 8cm x 24cm3 adjacent wafers – horizontal strips series bonded

• 128 p+n junction strips, 128 n+n ohmic strips per wafer• strip pitch 625m• wafer thickness 1mm• E, Veto and up to 6 intermediate planes

4096 channels (8cm x 24cm)• overall package sizes (silicon, PCB, connectors, enclosure … )

~ 10cm x 26cm x 4cm or ~ 10cm x 10cm x 4cm

courtesy B.R

ubio

Page 6: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

ASIC Design Requirements

Selectable gain 20 1000 20000 MeV FSRLow noise 12 600 50000 keV FWHM

energy measurement of implantation and decay events

Selectable threshold < 0.25 – 10% FSRobserve and measure low energy detection efficiency

Integral non-linearity < 0.1% and differential non-linearity < 2% for > 95% FSRspectrum analysis, calibration, threshold determination

Autonomous overload detection & recovery ~ sobserve and measure fast implantation – decay correlations

Nominal signal processing time < 10sobserve and measure fast decay – decay correlations

Receive (transmit) timestamp datacorrelate events with data from other detector systems

Timing trigger for coincidences with other detector systemsDAQ rate management, neutron ToF

Page 7: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

Schematic of Prototype ASIC Functionality

Note – prototype ASIC will also evaluate use of digital signal processing

Potential advantages• decay – decay correlations to ~ 200ns• pulse shape analysis• ballistic deficit correction

Page 8: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

• High (20MeV FSR), intermediate (1GeV FSR) and low gain (20GeV FSR) channels in parallel

• Blocks are sequenced to follow signal’s flow (“left to right”)

• Shaper and peak hold at back end to minimize noise

• 400m x 6mm

400m

~6mm

Preamplifiers + feedback

700pF feedback capacitor

High speed buffer

Fast comparators

Slow comparator

Shapers

Peak Holds + MUX

Prototype AIDA ASIC: Channel Layout

Page 9: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

• Analogue inputs left edge

• Control/outputs right edge

• Power/bias top and bottom

• 16 channels per ASIC

• Prototypes delivered May 2009MPW run100 dies delivered

• Functional tests at STFC RAL OK

Prototype AIDA ASIC: Top level design

Page 10: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

Prototype AIDA ASIC: Analogue input and bias reference

Page 11: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

Prototype AIDA ASIC: Analogue outputs

Page 12: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

Prototype AIDA ASIC

Page 13: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

Input signals (voltage step capacitive-coupled)

Preamp buffered output(Low-Medium Energy Channel)

Trigger output

“Data Ready” signal

Variable medium-energy (ME) event followed after 5us by a second fixed ME event: the energy of the first event (11.75pC, 23.5pC, 35.25pC) does not affect the response to the second (11.75pC).

1: Medium Energy (ME) + ME

Page 14: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

Input signals (voltage step capacitive-coupled)

Analog output (peak-hold multiplexed output)

Trigger output

“Data Ready” signal

When the data ready signal is active, the correct value is present at the analogue output (after the hit has been detected and the correct address been fed into the output multiplexer).NB: the test environment is very noisy and that affects the measurements.

1: Medium Energy (ME) + ME

Page 15: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

Three high-energy (HE) events (610pC, 430pC, 250pC) followed by a ME event (28.8pC): the initial HE event does not affect the response to the second.[The roll-of of the L-ME channel preamplifier is due to the HE channel amplifier becoming active: the two are effectively in parallel. Note the Range signal changing status after the HE event]

Input signals (voltage step capacitive-coupled)

Preamp buffered output(Low-Medium Energy Channel)

“Range” signalHigh = high-energy channel active

“Data Ready” signal

2: High Energy (HE) + ME

Page 16: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

Analog output (peak-hold multiplexed output)

“Data Ready” signal

Although the low-medium energy channel preamp saturates, the correct value is stored and multiplexed to the Analog Output when the “Data Ready” signal is active.

Preamp buffered output(Low-Medium Energy Channel)

2: High Energy (HE) + ME

Page 17: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

Fixed high-energy (HE) event (610pC) followed by three ME events (15pC, 30pC, 45pC): the ASIC recovers autonomously from the overload of the L-ME channel and the second event is read correctly.

Input signals (voltage step capacitive-coupled)

Preamp buffered output(Low-Medium Energy Channel)

“Range” signalHigh = high-energy channel active

“Data Ready” signal

3: High Energy (HE) + ME

Page 18: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

Fixed high-energy (HE) event (610pC) followed by three ME events (15pC, 30pC, 45pC): the ASIC recovers autonomously from the overload of the L-ME channel and the second event is read correctly.

Input signals (voltage step capacitive-coupled)

Preamp buffered output(Low-Medium Energy Channel)

“Range” signalHigh = high-energy channel active

“Data Ready” signal

3: High Energy (HE) + ME

Page 19: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

First value (constant) given by the High-Energy channel, second by the Medium-Energy channel.

Input signals (voltage step capacitive-coupled)

“Range” signalHigh = high-energy channel active

“Data Ready” signal

Analog output (peak-hold multiplexed output)

3: High Energy (HE) + ME

Page 20: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

• 4x AIDA ASICs

64 channels• Design complete• Delivery November 9

20 units

Prototype AIDA Mezzanine

Page 21: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

Prototype AIDA FEEM

ult

iple

x

read

out

Digital readout

FPGA, Memory, Gbit

Clock distribution Power SuppliesMezzanine

• Design complete• Production complete

8 units (4x AIDA, 2x DL DDG, 2x LYCCA)• Delivered week commencing 21.9.09

Page 22: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

Prototype FEE card• Initial tests underway (STFC DL DDG)

- FPGA Virtex 5 configuration- PowerPC with internal memory & terminal- DDR2 memory tests- Gbit ethernet- ASIC comms and discriminator timing- Analog buffers & ADCs- etc

Page 23: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

FEE Assembly Sequence

Page 24: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

Prototype AIDA Enclosure

• Prototype mechanical design• Based on 8cm x 8cm DSSSD

evaluate prior to design for 24cm x 8cm DSSSD• Compatible with RISING, TAS, 4 neutron detector

• 12x 8cm x 8cm DSSSDs 24x AIDA FEE cards

• 3072 channels

• Design complete

• Mechanical assembly in progress

Page 25: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

Prototype AIDA Enclosure

- Design drawings (PDF) available http://www.eng.dl.ac.uk/secure/np-work/AIDA/

Page 26: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

AIDA Project Timeline

• November/December 2009Systems integration (ASIC+Mezzanine+FEE)Bench tests

• February 2010In-beam tests

• March 2010Design revisions

• April 2010 ASIC engineering runFEE production run

• June 2010Production delivery complete

Page 27: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

Acknowledgements

My thanks to:

STFC DL Ian Lazarus, Patrick Coleman-Smith,Jonathan Strachan & Paul Morrall

STFC RAL Steve Thomas & Davide BragaEdinburgh Zhong LiuLiverpool Dave Seddon, Sami Rinta-Antila & Rob Page

Page 28: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented
Page 29: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

Prototype AIDA FEE:

Page 30: Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented

Design Study Conclusions

• 4’’ or 6” Si wafer technology?- integrated polysilicon bias resistors (15M)- separate coupling capacitors (require 22nF/200V+)

• Radiation damage mitigation measures essential- detector cooling required

• Noise specification (12keV FWHM) … “not unreasonable”

• Discriminator - low threshold (<50keV) – slow, compromised for ID > 100nA- separate timing discriminator – higher threshold

• x1000 overload recovery ~ s achievable- depends on input pulse shape- optimisation requires more information