6
AIDA @ RIBF Team@RIBF : P. Coleman-Smith, T. Davinson, A. Estrade, C. Griffins, L. Harkness-Brennan, G. Lorusso, K. Matsui, P. Morrall, S. Nishimura, V. Pucknell, P. Woods, et al.

AIDA @ RIBF Team@RIBF: P. Coleman-Smith, T. Davinson, A. Estrade, C. Griffins, L. Harkness-Brennan, G. Lorusso, K. Matsui, P. Morrall, S. Nishimura, V

Embed Size (px)

Citation preview

Page 1: AIDA @ RIBF Team@RIBF: P. Coleman-Smith, T. Davinson, A. Estrade, C. Griffins, L. Harkness-Brennan, G. Lorusso, K. Matsui, P. Morrall, S. Nishimura, V

AIDA @ RIBF

Team@RIBF: P. Coleman-Smith, T. Davinson, A. Estrade, C. Griffins, L. Harkness-Brennan, G. Lorusso, K. Matsui, P. Morrall, S. Nishimura, V. Pucknell, P. Woods, et al.

Page 2: AIDA @ RIBF Team@RIBF: P. Coleman-Smith, T. Davinson, A. Estrade, C. Griffins, L. Harkness-Brennan, G. Lorusso, K. Matsui, P. Morrall, S. Nishimura, V

AIDA @ RIBF

PID detectors(TOF?)

beam

movabledegrader

EURICAdegrader

vetoscintillator AIDA

beam stop for EURICA

AIDA: - only one DSSD - Signal from beamline detectors to test input of 2 FEE64 cards: + Time-to-amplitude converter (TAC) with TOF information + Logic signal from veto scintillator

Page 3: AIDA @ RIBF Team@RIBF: P. Coleman-Smith, T. Davinson, A. Estrade, C. Griffins, L. Harkness-Brennan, G. Lorusso, K. Matsui, P. Morrall, S. Nishimura, V

Houston, we have a problem: noise when DSSD connected

Page 4: AIDA @ RIBF Team@RIBF: P. Coleman-Smith, T. Davinson, A. Estrade, C. Griffins, L. Harkness-Brennan, G. Lorusso, K. Matsui, P. Morrall, S. Nishimura, V

Houston, we have a problem: noise when DSSD connected

rates of 100s kHz/FEE64 DAQ pause/resume observed

Page 5: AIDA @ RIBF Team@RIBF: P. Coleman-Smith, T. Davinson, A. Estrade, C. Griffins, L. Harkness-Brennan, G. Lorusso, K. Matsui, P. Morrall, S. Nishimura, V

RI beam on AIDA (78Ni)

- AIDA setup mounted and running at F11 area.- Stable operation of AIDA.- Functional online analysis code with event building (beta version).

… but unlikely we can observe implant-decay correlations in this data (?).

1GeV

rang

e20

MeV

rang

e

Page 6: AIDA @ RIBF Team@RIBF: P. Coleman-Smith, T. Davinson, A. Estrade, C. Griffins, L. Harkness-Brennan, G. Lorusso, K. Matsui, P. Morrall, S. Nishimura, V

A look ahead:

There is a chance to run experiments in the fall of 2014, to do beta-decay spectroscopy measurements with AIDA+EURICA: 170Dy region, neutron-rich Ca isotopes, 90Se region. RIKEN beamtime for Fall 2014 (if any) will be decided in August.

BRIKEN campaign (with BELEN-like neutron detector) expected in 2015. Two proposals submitted to next PAC (end of June).

Official to-do list in the hands of Tom…

- Resolve noise issues.- Coupling AIDA DAQ with RIBF DAQ.- Frame to fit AIDA with EURICA.- A team of experience AIDA users: RIBF@ $ 5000 per hour!