Upload
bridget-cranshaw
View
215
Download
0
Embed Size (px)
Citation preview
AIDA @ RIBF
Team@RIBF: P. Coleman-Smith, T. Davinson, A. Estrade, C. Griffins, L. Harkness-Brennan, G. Lorusso, K. Matsui, P. Morrall, S. Nishimura, V. Pucknell, P. Woods, et al.
AIDA @ RIBF
PID detectors(TOF?)
beam
movabledegrader
EURICAdegrader
vetoscintillator AIDA
beam stop for EURICA
AIDA: - only one DSSD - Signal from beamline detectors to test input of 2 FEE64 cards: + Time-to-amplitude converter (TAC) with TOF information + Logic signal from veto scintillator
Houston, we have a problem: noise when DSSD connected
Houston, we have a problem: noise when DSSD connected
rates of 100s kHz/FEE64 DAQ pause/resume observed
RI beam on AIDA (78Ni)
- AIDA setup mounted and running at F11 area.- Stable operation of AIDA.- Functional online analysis code with event building (beta version).
… but unlikely we can observe implant-decay correlations in this data (?).
1GeV
rang
e20
MeV
rang
e
A look ahead:
There is a chance to run experiments in the fall of 2014, to do beta-decay spectroscopy measurements with AIDA+EURICA: 170Dy region, neutron-rich Ca isotopes, 90Se region. RIKEN beamtime for Fall 2014 (if any) will be decided in August.
BRIKEN campaign (with BELEN-like neutron detector) expected in 2015. Two proposals submitted to next PAC (end of June).
Official to-do list in the hands of Tom…
- Resolve noise issues.- Coupling AIDA DAQ with RIBF DAQ.- Frame to fit AIDA with EURICA.- A team of experience AIDA users: RIBF@ $ 5000 per hour!