Presentation By:
Executive Engineer, Hydrology Cell
H.P, I&P.H. Department
Achievements of a NewState Under HP-II
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
3/87
Location
North latitudes 30022- 33012
East longitudes 75045- 79004
Geographical Area: 55,673 sq.km Capital : Shimla No. of District : 12 Total Population : 68,64,602
(2011 census) Population Density: 123 person
/sq.km Bounded by
North : Jammu & Kashmir
Northeast : China(Tibet)
Southeast : Uttrakhand
South : HaryanaWest : Punjab
Himachal Pradesh at a Glance
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
4/87
Physiography
Outer Himalayas/Siwaliks(350 m to 1500 m amsl)
The Lesser Himalayan Range(1500-5000 m amsl)
The Great Himalayan Range(5000 6000 m amsl)
Zanskar Range(>6000 m amsl)
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
5/87
Hydrometerology
Climate:
Sub-humid tropical (450-900 m)
Warm and temperate (900 2400 m)
Cold alpine and glacial (>2400 m)
Average Annual Rainfall : 1100-1200 mm
Maximum Rainfall : Dharamshala
(3400mm) Average Annual Temperature: 19 C
Average Rainy Days/year : 62
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
6/87
Drainage System
The drainage system is composed of rivers and glaciers.The drainage systems of the region are the Chandra Bhaga or
the Chenab, the Ravi, the Beas, the Sutlej and the Yamuna.
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
7/87
Pre HP-II Position
No systematic mechanism for collection , processing,analysis, storage and dissemination of hydrological data.
Number of data collector agencies working in water tightcompartments, resulting in:
*
inadequate network* protocol not followed
* data available in piecemeal
* no validation
* less reliable thus of limited use* duplicity of stations
Adverse effect on planning of water resource sector projectsdue to lack of reliable and easily accessible data.
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
8/87
Data Collector/User Agencies In H.P
1. HP-IPH 13. HP AgricultureDeptt.2. HP-Horticulture University 14. HP Tourism Deptt.3. HP-Agriculture University 15. HP Town &
Country Planningdeptt.4. HP.PWD 16. HP Him Urjadeptt.5. HP-Science & Technology 17. HP Envir. & Pollution
council Control Board6. HP-Forest Department 18. HP RDD7. BBMB 19. CGWB8. HP Revenue deptt. 20. IMD9. HP Health deptt. 21. Professional
Institutes10. HP Fishery deptt. 22. NGOs / KVS/WUA
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
9/87
How It Began
Preparatory work Year 2004-2005
Series of interactive workshops, meetingsand seminars
Interaction with resource persons fromMoWR
Notification of HP,IPH Department as NodalAgency
Extensive interaction with other stakeholderorganizations in the State
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
10/87
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
11/87
Project Development Objective
To Improve and Develop an Integrated
and Comprehensive Hydrological Data
Collection and Information System forImproved Productivity and Cost
Effectiveness of Water Related
Investments in the Country.
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
12/87
Hydrology Project Phase-II
World Bank approved a credit of US$ 104.98 Million to
the Govt. of India for the Hydrology Project-II. (IBRD Ln.No 4749-IN). The total cost of the Project is US$ 135.01Million
Himachal Pradesh is one of the four new Statesparticipating in this Project.A/A & E/S was accorded by the Govt. of H.P. in March,2006 for Rs.49.5038 crore.The Project was originally proposed to be implementedover a period of six years starting April 5, 2006.Project period was extended by 23 months in 2012 andthe revised closing date of the project is May 31st, 2014.
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
13/87
Total sanctioned Cost of Project for Himachal Pradesh
was Rs.49.50 Crore. The Cost table was revised in Dec.,2013 forRs. 58.33 Crore .
Institutional Strengthening: Awareness Raising, Dissemination And Knowledge Sharing.
Implementation Support Horizontal Expansion: Upgrading/Establishment of Data Collection Network.
Establishment of Data Processing and Management Systems. Purpose-driven Studies. Training.
Recurrent Cost : Staff & Network O & M Cost.
The Project has three main components:
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
14/87
Project Implementation Mechanism
For overall administrative, financial andmanagement coordination:
State level Hydrological Information SystemSteering Committee
headed by Chief Secretary, GoHP
State level Hydrological Information SystemCoordination Committee
headed by Additional Chief Secretary/PrincipalSecretary(IPH), GoHP
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
15/87
Institutional Set Up
ExpertGroup
(PDS)
Project Coordinator
ExpertGroup
(SW)
ExpertGroup
(GW)
Expertgroup
(WQ)
Hydrology Cell
HydrologyC&M Divn.
ExpertGroup
(Met)
Expertgroup
(DC)
Sub Div.
Mandi
Sub Div.
Shimla
Sub Div.
Nahan
Sub Div.
Palampur
Sub Div.
santokgarh
Sub Div.
Nurpur
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
16/87
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
17/87
Physical Provisions andStatus
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
18/87
Ground Water Component
Activities Provision StatusDeep wells
(piezometers borewells)
80 80 borewells installed
Digital Water LevelRecorders (DWLRs)
80 10 DWLRs installed in 2010.
Installation work of balance 70nos. in progress & 65 have beeninstalled. Data being compiled inState Data Centre, Mandi.
Submersible pump/GW
Sampler pump
3 Procurement completed. Pumps
being used for GW sampling.
Field equipment (Vehiclemounted Bore hole logger)
1 Tender awarded .
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
19/87
L ti f Pi t
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
20/87
Location of Piezometersin District Kangra
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
21/87
Location of Piezometerin District Una
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
22/87
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
23/87
Data Retrieval from DWLR at Haroli & Amb
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
24/87
Ground Water Year Book
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
25/87
Hydrometeorological Component
Activities Provision Status RemarksStandard Rain Gauge
(SRG)101 Installation completed Data for 69 being
received .
Data flow started inNov., 2010
Automatic RG(Automatic &
Autographic)
85 13 Automatic RG (Tipping BucketType) and 22 Autographic RG installed
and commissioned in first phase.50 ARG with telemetry , approved byWorld bank as additional activity in
April, 2012 also installed andcommissioned .
Data being received.
Fully Climatic Stations
(Manual )
4 Commissioned Data being received
from Jan., 2011.
Automatic Weatherstation
4 2 stations installed . 2 additionalstations approved in April, 2012 under
installation.
Data for 2 stationsbeing received.
Standard snow gauge 16 Tender has been awarded and material likely to be received
in Feb,. 2014.
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
26/87
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
27/87
Location of Rain gauges installed underHydrology Project-II, Himachal Pradesh
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
28/87
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
29/87
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
30/87
Standard Rain Gauge SRG)
Autographic Rain GaugeARG)
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
31/87
ARG Sites At Nurpur & Banikhet
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
32/87
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
33/87
FCS Narkanda
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
34/87
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
35/87
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
36/87
FCS Rajgarh
AWS & ARG Demonstration
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
37/87
AWS & ARG Demonstration
Jogindernagar
Una
Surface Water Component
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
38/87
Surface Water Component
Activities Provision Status
New River Gauge stations
(Standard Gauge)
35 Work complete.
New RG stations (Automatic
Water Level RecorderCable
bubbler)
25 Installation completed. Work in progress
for additional work required to protect
bubbler tube of 25 nos. AWLR.
Bank Operated Cable way
(BOC)
8Installation Work in progress.
Site stores 17 16 completed and work is in progress for
remaining 1 store.
Current meter (propeller) 8 Procurement completed.
Current meter (standard) 70 Procurement completed.
Current meter (pigmy) 24 Procurement completed.
Frame winch Bridge outfit 9 Procurement completed.
Discharge measuring weirs 1 Work completed.
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
39/87
5
3
01
4 4
0 01
0 0 0
11
4
2
00
2
4
6
8
10
12
Beas
Basin
Satluj
Basin
Ravi
Basin
Chenab
Basin
Bridge outfits
Bank operated
Cableways
Head weirs
Manual sites
35 Gauge and Discharge (G&D) Sites including 25 sites with AutomaticCable bubbler have been proposed in the State except area coveredunder Yamuna Basin
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
40/87
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
41/87
G&D Site In Una Distt.
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
42/87
AWLR Sites
Nauti khad, Shimla Distt. Swan khad, Una Distt.
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
43/87
AWLR Sites
Surgan, Chamba Distt.
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
44/87
Head Weir Site At Patlikuhal, Kullu
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
45/87
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
46/87
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
47/87
Field demo of
Bridge outfits
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
48/87
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
49/87
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
50/87
Level II Lab at Mandi
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
51/87
Level II Lab at Dharamshala
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
52/87
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
53/87
State Data Centre, Mandi
Di i i l D t C t GWO U
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
54/87
Divisional Data Center, GWO, Una
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
55/87
DDC/SDDC Buildings
Purpose Driven Studies (PDS)
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
56/87
1. Impact of Sewerage Effluent on Drinking Water Sources of Shimla
City & Suggesting Ameliorative Measures. Study was conducted by NIH, Roorkee and IPH Deptt. jointly. Data collection, sampling, testing and analysis was done by NIH,
Roorkee. 2 trainings on Water Quality convened at HIPA under the study. The final report has been received and IPH Deptt. has initiated action on
its recommendation.
2. Study on Ground Water Quality Characteristic In Industrial
Predominant Areas Of H.P.
PEC, University of Technology engaged as consultant for carrying out
the study. 20 additional borewells were drilled to observe GW quality in study area. Testing of water samples and analysis has been completed and draft
final report is expected in first week of Feb., 2014
Purpose Driven Studies (PDS)
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
57/87
O t Of C l t d PDS
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
58/87
Outcome Of Completed PDS
NIH, Roorkee conducted PDS on Impact of Sewage Effluent on Drinking Water Sources ofShimla City and suggesting Ameliorative Measure's as some cases of Jaundice were
reported from parts of Shimla City in the year 2006-07.
Final report was received in May, 2013.
NIH recommended measures, like installation of ultra filtration membrane or ozonetreatment, to improve the performance of Water Treatment Plant
Performance study of Sewage Treatment Plant was also recommended.
Taking note of non seasonal jaundice cases, an Inter departmental Sub-Group wasconstituted in March, 2013 to investigate its cause.
The findings of this Sub Group were discussed in the meetings held under the
Chairmanship of Additional Chief Secretary (IPH) to the Govt. of H.P.
Considering the recommendations of NIH it was decided that Techno Commercial proposalbe prepared for installing Ultra filtration membrane and ozone treatment system at WTP. Italso decided to have the performance of STP validated by engaging appropriate agency.
The I&PH Department is accordingly working on there proposals and it is expected that the
study recommendation would soon transform into reality.
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
59/87
MoU for Data Sharing
Purpose.
Comprehensive data collection and information system
Synergy in system
Optimum utilization of resources
Uniform Protocol
One shop stop for Hydrological data
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
60/87
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
61/87
Tr i i g
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
62/87
Trainings
So far 650 officers/ officials have undergone various training underHydrology Project-II.
4 Officers have attended International training course at IHE Netherlands.
Institutes associated with the Trainings:
National Institute of Hydrology, Roorkee and Belgaum.
National Water academy, Pune.
Administrative Staff College of India, Hyderabad.
Engineering Staff College of India, Hyderabad.
IMD Training Institute New Delhi and Pune.
Rajiv Gandhi National Ground Water Training and Research Institute,Raipur, Chattisgarh.
CGWB Training Institute, Faridabad.
CPCB.
HIPA.
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
63/87
Major Training Initiatives
Courses on Water Quality organized at HIPA with NIH,Roorkee.
Programs on computer skill regarding data handling overinternet organized at HIPA.
Courses on GIS organized at HIPA. Courses on SWDES organized at HIPA with NIH,Roorkee.
Courses on Method of Measurement of Discharge on theG&D stations over rivers organized at HIPA and IPH
training Centre, Mandi with CWC. Course on Hydromet Observers organized at HIPA with
IMD.
Officers / Officials nominated to attend training courses at
NIH Roorkee, Kakinada, NWA Pune, IMD Delhi ,IMD Pune,
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
64/87
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
65/87
Study Tours
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
66/87
Study Tours
Study tour for Senior and Middle level officers forGujarat and Maharashtra organised in 2007.
Study tour for Middle & Junior level officers forKarnataka & Andhra Pradesh organised in 2008.
Study tour for Senior and Middle level officers forKarnataka, Goa and Kerela convened in 2009.
Study tour for Middle & Junior level officers for
Maharashtra & Goa organised in 2013.
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
67/87
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
68/87
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
69/87
Activities at State Data Centre
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
70/87
Activities at State Data Centre
Data Processing
Analysis & ReportingData Storage & Data Dissemination
Data Processing is a broad term covering all activities from
receiving observed records to making them available inusable form.The raw data is passed through series of operation, as:
Data entryMaking necessary validation checksIn-filling missing values in a data seriesProcessing of raw data to estimate required variablesCompilation of data in different forms andAnalysis of data for commonly required statistics etc.
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
71/87
Data recording / collection
Type Type of
measurement
Collection/
Recording
Form of
data
Receipt of
data
SRG Daily Daily
(Handwritten)
Hard &
soft
Fortnightly
ARG Hourly Daily (Graphs ) Hard &
soft
Fortnightly
TBR Hourly Monthly(Digital)
Digital Monthly
FCS Daily, twice daily,
Hourly
Daily
(Handwritten &
graphs)
Hard &
soft
Fortnightly
AWS Hourly Monthly(Digital)
Digital Monthly
Pieozometer
(Manual)
Pre & post
Monsoon
Manual in May
& November
Hard &
soft
In June &
Nov.
DWLR 6 Hourly Daily (Digital) Digital Telemetric
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
72/87
VALIDATION (SWDES)
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
73/87
Example :- Screening of single year ( 2011) SRG Stations daily
rainfall data
VALIDATION (SWDES)
VALIDATION (SWDES)
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
74/87
VALIDATION (SWDES)
Example :- Graphical Comparison of SRG daily rainfall data and
ARG hourly rainfall data of Chailchowk Station, Distt. Mandi ( Date
:- 07 July 2012)
VALIDATION (SWDES)
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
75/87
Example :- Graphical Comparison of 3 SRG Stations daily rainfall
data for the year 2011 in Distt. Mandi
( )
VALIDATION (SWDES)
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
76/87
Example :- Comparison of climatic data ( Temperature) of 4 FCS
stations
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
77/87
GROUND WATER ENTRY & MONITORING IN EXCEL
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2010 9.98 9.95 10.45 10.74 10.94 11.28 11.27 10.65 9.33 9.00 8.79 9.40
2011 8.97 8.92 9.44 9.93 10.56 10.61 11.10 10.40 9.68 9.09 9.18 9.57
2012 9.09 9.03 9.62 9.95 10.38 11.18 11.67 11.05 9.54 8.48 8.62 8.73
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
DepthtoWaterLevel(m)
GW Fluctuation at Dangoh in Distt. UnaGW Fluctuation at Surdwan in Distt. Kangra
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
78/87
GROUND WATER ENTRY & MONITORING IN EXCEL
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2010 17.13 17.40 17.86 18.23 18.47 18.27 17.86 17.00 15.90 15.13 15.51 16.07
2011 15.89 16.30 16.63 16.96 17.26 17.33 17.29 16.89 15.72 15.89 16.37 16.60
2012 16.48 16.79 17.32 17.59 18.01 18.46 18.28 17.38 16.49 16.25 16.61 16.82
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
18.00
20.00
DepthtoWaterLevel
(m)
GW Fluctuation at Baddi in Distt. Solan
HISTORICAL DATA ENTRY / AVAILABILITYSTATUS
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
79/87
STATUS
Sr. No. Agency Stations
Period
RemarksFrom To
1 REVENUE 130 1956 2005 Partly available
2 IMD 79 2008 2010Partly available
3 BBMB 12 1965 April 2013 Partly available
4 Forest 2 2006 2009Partly available
5 UHF Nauni 1 1-1-2011 31-12-2012
6CSKVHPKVPalampur 6 1970 March 2013
Partly available
Daily Rainfall Data:-
Surface Water Data:-
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
80/87
Surface Water Data:
Discharge data from BBMB,NHPC,SJVNL ,
HPPCL and other 13 private hydro developers
received in hard copies and is beingcomputerized
Sr. No. Agency Stations Period Remarks
From To
1 BBMB 12 1962 April 2013 Partly available
2 NHPC 6 July 2010 December
2012
3 HPPCL 8 1976 2011 Partly available
4 SJVNL 3 2005 July 2012 Partly available
CURRENT DATA ENTRY / AVAILABILITY STATUS
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
81/87
CURRENT DATA ENTRY / AVAILABILITY STATUS
FOR HP-II NETWORK
I &PH Department Stations
Daily Rainfall Data (SRG) 69 stations from Nov-2010 onwardsHourly Rainfall Data (ARG) 23 Stations from April- 2011 onwardsHourly Rainfall Data (ARG T.B.) 12 Stations from June -2012 onwardsClimatic Data (FCS) 04 stations from April-2011 onwardsWeather Data (AWS) 02 stations from June-2012 onwards
IMD Stations
Daily Rainfall Data 79 stations from June- 2012 onwards
A. HYDROMETEROLOGICAL DATA
I &PH Department
Piezometer Wells 70 stations from Jan- 2010 onwards10 stations from Jan-2011 onwards
Piezometer (DWLR Data) 10 stations from Jan- 2010 onwards
B. GROUND WATER DATA
Data Dissemination Policy
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
82/87
yAs decided in the State Level Steering Committee, Data DisseminationPolicy for ground water domain has been notified in July, 2011.Ground water data rates:
Details available on IPH website, Hydrology ProjectII link.Draft policy prepared for surface water(meteorological) data dissemination.
Item Rate in (Rs.)1. Water Level Data
a) 4 times data of one year of one Station- complete
record
500/ + Media & Postal Cost
a) High frequency water level data (6 Hourly data)- One
Station per month -
500/ + Media & Postal Cost
1. Water Quality Data
a) Base line Parameters
(Temp., EC,PH,NO2, NO3, Total P,K,Na,Ca,
Mg,CO3,HCO3,Cl, SO4,CoD,SiO2,F,B)
one complete record
500/ + Media & Postal Cost
a) Trend cum Surveillance
(F,Fe,As,Cd,Hg,Zn,Na,K,Ca,Mg,CO3,HC03, Cl,SO4,Total
& Faecal Coliforms)one complete record
500/ + Media & Postal Cost
Surface water data rates
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
83/87
Surface water data rates
Strength of Our System
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
84/87
Single agency for surface and ground water.
Keen Interest and quick decisions by State level Steeringand Coordination Committees.
Continuity of key officers.
Support from PCS, TAMC and Central Expert Agencies,
especially their Officers posted in State.
Guidance from World Bank.
Strong Liaison with other State Departments, Boards,
Corporations & Educational organizations
Weakness
8/12/2019 Achievement of New State Under HP-2 - Himachal Pradesh in Integrated Water Management
85/87
Weakness
Off the league with the routine departmental
works causes general apprehension.
Not many people interested for posting or
continuing.
On completion people eager to move out of the
project due to uncertainty of further postings.
Small works spread over the entire State lead to
higher operational difficulties.