A North American View of REEand a Canadian Supply Solution
for the Heavy REEyPierre Neatby, Marketing & Sales Advisor
Asian Metal Conference, Beijing, A il 23 2010April 23, 2010
…advancing green technology
www.avalonraremetals.com March 2010
Safe Harbour Statement
Forward looking information
Certain statements contained in or incorporated by reference into thispresentation constitute forward-looking statements. Such statementsreflect the current views of Avalon Rare Metals Inc with respect to futurereflect the current views of Avalon Rare Metals Inc. with respect to futureevents and are subject to certain risks, uncertainties and assumptions.Many factors could cause the actual results, performance or achievementsof Avalon Rare Metals Inc. that may be expressed or implied by suchy p p yforward-looking statements to vary from those described herein shouldone or more of these risks or uncertainties materialize. Avalon Rare MetalsInc. does not intend, and does not assume any obligation, to update theseforward-looking statements.
2…advancing green technology
Overview
Demand drivers for REE in North America
Recent activities in the North American REEmarkets
North American REE supply chain concerns and political reactionpolitical reaction
Avalon’s Nechalacho heavy REE deposit
A l ’ d l t lAvalon’s development plans
3…advancing green technology
Growing Recognition of Importance of Rare Earth
Application Rare Earth T h l
REE Required
pElements in Green Technology
Technology
Hybrid, Electric and Plug-in Cars
REE permanent magnets
Nd, Pr, Dy, Tb
Wind and tidal power generation
REE permanent magnets
Nd, Pr, Dy, Tb
Flat screen displays and monitors
REE phosphors create the colors blue, green and red
Y, Eu, Tb, Gd, Pr, Ce
LED lights REE phosphors Y Eu TbLED lights REE phosphors enable light to match brightness and color with substantially less energy usage
Y, Eu, Tb
4…advancing green technology
less energy usage
Key Application of REE Magnets PMG’s for Wind TurbinesPMG s for Wind Turbines
The illustration to the right of a new GE 4 MW wind turbine uses a 90-ton generator with a 20-foot ring
f d iof permanent neodymium magnets to eliminate the need for a gearbox, reducing breakage andreducing breakage and energy loss.
PMGs make the whole assembly (nacelle) lighter weight allowing higher tower
PMG = permanent magnet generator Red stickman (approx. 6’ tall) shown to demonstrate scale. The wind
5…advancing green technology
turbine blades on this 4MW model are 176 foot long. Photo: Popular Science / GE
Growing Demand for REEMagnets in Power Generation Magnets in Power Generation
PMGs for Run of the River:
Currently four - 4MW units being installed on Canada’s Trent Rapids River system; The first to be installed in North America and largest that have been manufactured to dateAmerica and largest that have been manufactured to date
PMG’s Capturing Tidal Power:
Canada’s Nova Scotia Power Corporation (NSPC) andCanada s Nova Scotia Power Corporation (NSPC), and Ireland’s OpenHydro testing PMG units in Canada’s Bay of Fundy, home of the world's highest tides
PMG tidal units comprised of 10-metre,12 runner blade turbine with magnets on the rotor blades
6…advancing green technology
PMG - Run of the River Projectsj
Generator being loweredGenerator being lowered into the turbine pit
Cylindrical rotor, to which the NdFeB permanent magnets are glued and b lt d t it t fbolted to its outer surface4MW generator contains 1tonne of magnets
7…advancing green technology
PMG Capturing Tidal Power
Bay of Fundy in Nova Scotia Canada has the highest tides in the world with an estimated 100MW power generation potential
8…advancing green technology
p g p
Recent Developments in REE MarketsMarkets
A number of nations announce plans to stockpile REE
C dCanada: Dacha Capital Inc. buying physical rare metals focusing on heavy rare earths as investment opportunityon heavy rare earths as investment opportunity
Avalon advances Nechalacho HREE project, defines process flowsheet and set to release prefeasibility study.p p y y
Many new early-stage exploration projects started
China: Announcement of reductions in REE export quotas and potential ban on future exports of unprocessed HREE(notably dysprosium and terbium); stimulates international concern over security of supply of critical metals
9…advancing green technology
concern over security of supply of critical metals
Recent Developments in REE MarketsMarkets
United States:
Molycorp Mountain Pass Mine planning to re-start primary production of LREE and build p y pmagnet alloy business. Announces intent to do $350million IPO in 2010.US Government gets involved in REE
US Government Accountability Office (GAO)
US Department of Defence (DOD)
US Department of Energy (DOE)
C t bl RESTART l i l ti
10…advancing green technology
Congress tables RESTART legislation
U.S. GAO, DOD, DOE & Congressional Initiatives Congressional Initiatives … 1
US Government Accountability Office (GAO)y ( )
Independent body provided report at the request of Department of Defence
US could rebuild its domestic supply chain for REEin 10-15 years, with several mining, production and
i i iti ti ithi th t 2 3processing initiatives within the next 2 – 3 years
US Department of Defence (DOD)
DOD plans to complete a study on national security risks related to REE shortage by September 2010
11…advancing green technology
September, 2010
U.S. GAO, DOD, DOE & Congressional InitiativesCongressional Initiatives… 2
US Department of Energy (DOE)p gy ( )
DOE developing its first-ever strategic plan toaddress the role of rare earth and other strategicmaterials in clean energy technologies.
DOE to solicit broad public input from stakeholdersDOE to solicit broad public input from stakeholdersand experts
12…advancing green technology
U.S. GAO, DOD, DOE & Congressional InitiativesCongressional Initiatives… 3
RESTART (Rare Earths Supply-Chain Technology( pp y gyand Resources Transformation Act of 2010)
Proposed United States legislation intended toProposed United States legislation intended to
"take any and all actions necessary to ensure thereintroduction of a competitive domestic rare earthpsupply chain, to include the reintroduction of thecapacity to conduct mining, refining / processing,alloying and manufacturing operations using domesticy g g p gsuppliers to provide a secure source of rare earthmaterials as a vital component of national security andeconomic policy."
13…advancing green technology
RESTART’s Seven-Point I iti ti I l dInitiative Includes:
Establishing a Federal government rare earths workinggroup
Assessing the domestic REE supply-chain to determine which REEs are critical to US’s national economic securitywhich REEs are critical to US s national economic security
Creating a national stockpile for important rare earth materials
Evaluating international trade practices in the REE markets
Providing government-backed loan guarantees for domestic rare earths supply-chain development
Supporting innovation and training of the entire domestic rare earth supply chain
14…advancing green technology
rare earth supply-chain.
NECHALACHO HEAVY RARE EARTHS DEPOSITEARTHS DEPOSIT
THOR LAKE NWT CANADA
15…advancing green technology
THOR LAKE, NWT, CANADA
Thor Lake: Project Locationj
Proximity to yGreat Slave Lake provides access toaccess to railhead at Hay River by barge in summer and ice road in winter. Current access is fly-in.
17…advancing green technology
Nechalacho HREE Deposit:Development ProgressDevelopment Progress
2005: Acquisition of property for $300,000 in sharesRecognized heavy rare earth potential
2007: Scoping study, expln. drilling & $16 million financing
2008: Delineation drilling programs 16 640 metres 85 holes2008: Delineation drilling programs 16,640 metres, 85 holes and 43-101 resource estimate, community engagement
2009: Definition drilling 14,575 metres, 70 holes, metallurgical, environmental and market studies & $17 5 million financingenvironmental and market studies & $17.5 million financing
2010: Pre-feasibility Study, Begin Env. Impact Assessment, MOU with First Nations, project engineering
2010 11 Pil t Pl t k2010-11: Pilot Plant work
Expenditures to date total over $16.0 million
$10 million in planned expenditures CY2010
18…advancing green technology
$10 million in planned expenditures CY2010
Nechalacho HREE Deposit: Drill Hole Location MapHole Location Map
N-S Section line
cc KeyccE-WSection Line
Key Area
19…advancing green technology
156156
Nechalacho HREE Deposit:Key CharacteristicsKey Characteristics
Very large size: Basal Zone contains 9.0mt indicated and 37.5mt inferred resources at 1 9%TREO (open for expansion)inferred resources at 1.9%TREO (open for expansion)
Exceptional enrichment in valuable heavy rare earths (20-30%)
Near-surface, flat-lying deposit geometry, good continuity
A bl l d d i i h dAmenable to low cost underground mining methods
REE amenable to economic recovery, valuable by-products identified
Pre-feasibility Study nearing completion: May, 2010
In situ ore value nearly double projected operating costs of $200-250/tonne
Environmental assessment and permitting process underwayprocess underway
Initial production forecast for 2014-2015
$400-500 million estimated capital cost
20…advancing green technology
Nechalacho HREE Deposit Mineral Resources @ 1.60% TREO Cut-off Grade Jan. 14, 2010
Zo ne Mill io ns to nne s % T REO % HREO HREO/T REO
INDICAT ED MINERAL RESOURCES
Basal Zone 9.00 1.86 0.43 23%
INFERRED MINERAL RESOURCES
Upper Zone 22.44 2.00 0.16 8%
Basal Zone 37.56 1.94 0.40 21%
Sufficient Indicated to support PFS. Good continuity confirmed in Basal Zone.I di t d Mi l R d t d b H d t C lt t f i i l ti t b W d
Basal Zone 37.56 1.94 0.40 21%
T o ta l 60.00 1.96 0.31 16%
Indicated Mineral Resources updated by Hudgtec Consultants from original estimate by Wardrop Engineering Ltd (A Tetratech Company) and subject to final audit for PFSDefining Indicated Resources is a function of drill hole spacing being reduced to average of 50 metres.
21…advancing green technology
TREO = total rare earth oxides, HREO = heavy rare earth oxides (europium to lutetium + yttrium)
TREO Production Forecast vs. 2014 Demand Forecast2014 Demand Forecast
Nechalacho 2014Nechalacho 2014 production forecast at 5,000 or 10,000 tonnes of total rare
th idearth oxides per annum
2014 Demand forecast after Kingsnorth, 2009
49 4% La + Ce49.4% La + Ce25% Nd+Pr+Sm
25.6% Heavies +Y
22…advancing green technology
REE Distribution in the Basal Zone Ore Compared with Other pREE Deposits & Avg. Value/kg
100%
70%
80%
90%
40%
50%
60% HREE
Samarium
Neodymium
Praesodymium
10%
20%
30%
y
Cerium
Lanthanum
0%Mt Pass
Molycorp$9.90
Baiyun Obo Baotou$11.40
Mt WeldLynas$13.60
NolansArafura$14.20
NechalachoAvalon$22.10 Value US$/kg
23…advancing green technology
Nechalacho HREE Deposit Conceptual Development PlanConceptual Development Plan
Barren Rock D mp
VentMine Portal
Barren Rock Dump
Tailings PondLong Lake
Underground MiningUpper Zone
g g
Basal Zone
Tailings Storage
Mining underground room & pillar/long-hole stopingMining underground room & pillar/long hole stoping1,000 tonnes per day (tpd), ramping to 2,000 tpd by year 4
Flotation processing to produce mineral concentrate (80% recovery)Hydrometallurgical treatment of mineral con in plant south of GSLy g p
Average of 12,500 tpy TREO in chemical concentrate over first 10 yearsMixed REE carbonates shipped to third party for separation
Market capture 6.5% (est. 2014 TREO demand ), 16% of HREOO i C $250/ i l i i ill & h d
24…advancing green technology
Operating Costs: up to $250/tonne inclusive mine, mill & hydromet
Basal Zone HREE Mineralization in Zircon and Fergusonite: gMetallurgical Recovery Process
82-85% REE Recovery in on-site plant82-85% REE Recovery in on-site plantFine-grinding (40 micron)
Froth Flotation
H d t ll i l l t l t d ff it
20μm
Hydrometallurgical plant located off-site Caustic cracking of REE con followed by acid leaching (HCl or H2SO4) will put 90% of REE plus Zr and Nb into solution90% of REE plus Zr and Nb into solution
Solvent extraction then precipitation of two mixed REE carbonates (one mainly LREE, second mainly HREE)Fergusonite
ZiLREE, second mainly HREE)
Separation of REE oxides (Asia?)
REE Y La Ce Pr Nd Sm Eu Gd Tb Dy Ho Er Tm Yb Lu
REE distribution in fergusonite:
Zircon
25…advancing green technology
Oxide % 29.0 0.30 4.40 1.70 15.6 10.4 1.60 14.3 1.80 9.80 1.20 4.10 0.70 4.40 0.70
Metallurgical Progressg g
Mine Site Flotation Process Testwork CompleteFlo sheet De eloped optimi ation contin ingFlowsheet Developed, optimization continuing
Confirmation testing in progress with Xstrata Process Control
Hydrometallurgical Testwork OngoingCaustic cracking with NaOH followed by leaching mainly with H2SO4
Excellent progress to deliver 4-6 products:HREE mixed carbonate
LREE mixed carbonateLREE mixed carbonate
Niobium Pentoxide & Zirconium Oxychloride by-products
Gallium and tantalum (possibly)
2010 PlansUtilize existing 5 MT of core stored in Yellowknife
Mini-pilot plant at Xstrata facility to produce 600 kg concentrate
HydroMet pilot run using 20kg per day for 30 days
26…advancing green technology
Schedule to Production in 2014Capital Costs at +$400 millionCapital Costs at +$400 million
Thor Lake P j t S h d l
2010 2011 2012 2013 2014 2015
Aboriginal Engagement
Pre-feasibility Draft Document
Draft HydroMet Flowsheet
Project Schedule Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4Q3 Q4 Q1 Q2 Q3 Q4Q1 Q2 Q3 Q4 Q1 Q2 Q1 Q2 Q3 Q4
Final Pre-feasibility Report
Project Description Report
MVLWB Prescreening Process
MVEIRB EA ProcessMVEIRB EA Process
Ministerial Approval
MVLWB LUP/Water Licensing
Bankable Feasibility
Final Designs & Financing
Project Construction
Project Start-up
S &
27…advancing green technology
Sales & Market Development
Avalon’s Competitive Advantages: NechalachoAdvantages: Nechalacho
Basal Zone has exceptionally high proportion of heavy p y g p p yrare earths ( >20%)
Implies a high value ore and higher operating margins
Viable metallurgical process defined
Valuable by-products (zirconium, niobium, gallium)
Low thorium, no significant contaminants
Relatively advanced compared to new entrantsAlready 5 years along the “10 year journey”
Well-financed ($15 million), no debt
28…advancing green technology
Experienced management, technical experts
A Leader in Environmental & Social Responsibility: Winner of p yPDAC’s 2010 e3 Plus Award
Naming ceremony
Community meetings and site visits
March 2010 PDAC Awards CeremonyAccepting award
from Jon Baird, PDAC
President
First Nations training
Employment at site
President
p y40% aboriginal
Business development
Wind power evaluation with YKDFN
Sept 2009 naming ceremony
Chiefs Ed Sangris and Ted Tsetta with Don
Bubar
29…advancing green technology
with YKDFN
Thor Lake Project Consultants j
David Trueman, Ph.D., P.Geo, Rare Metals Geologist
Chris Pedersen, P.Geo, Rare Metals Geologist
Bruce Hudgins, P.Geo. Resource database management
John Goode, P.Eng. Metallurgical Consultant
SGS Lakefield Research, Metallurgy & Mineralogy
Scott Wilson RPA Inc., Pre-Feasibility Study Independent Consultants
Ian M. London, P. Eng. Energy and Market Development Consultantg gy p
Jacques Whitford Stantec, Permitting, Environmental Studies
Pierre Neatby, Market Development/ Marketing & Sales
Kaz Machida KAY Investment REE Market Dev AsiaKaz Machida, KAY Investment, REE Market Dev. Asia
McGill University, (Dr. A.E. Williams-Jones) Geological Research
Fasken, Martineau Dumoulin, Aboriginal Law
CIBC World Markets Investment Bankers
30…advancing green technology
CIBC World Markets, Investment Bankers
Capital Structureas at April 1 2010as at April 1, 2010
Canada - TSX: AVLCanada TSX: AVL
United States - OTCQX: AVARF SEC 12g3-2(b) # 82-4427
Shares Outstanding 78,801,698
Fully Diluted 87 483 198Fully Diluted 87,483,198
Market Capitalization C $201 million (S/O @ $2.55)
Recent Price Range C $2.40 - $2.80
52 Week High / Low C $4.24 - $0.51
Cash Reserves C $15.0 million
Insider Share Position 3.4 million shares (4.3%)( )
Institutional holdings (25%) CPP, TDAM, Front St., Excalibur, NatCan, MFC
Global, Faircourt, Cantara, Seamans, Fuchs Glbl
Balance Sheet Assets C $42 5 million (Nov 30/09)
31…advancing green technology
Balance Sheet Assets C $42.5 million (Nov. 30/09)
Management, Directors& Strategic Advisors& Strategic Advisors
ManagementD ld S B b P G
DirectorsAl F CFADonald S. Bubar, P.Geo,
President, CEO & Director
Jim Andersen, C.A., C.P.A., V P Finance & CFO
Alan Ferry, CFANon-Executive Chairman
Brian D. MacEachen, C.A. Audit Committee ChairV.P. Finance & CFO
Bill Mercer, Ph.D., P.Geo., V.P. Exploration
David Swisher B S Min Eng
Hari Panday, C.A.
Peter McCarter, B.A., LL.B., M.B.A. Chair Governance/Compensation ctte David Swisher, B.S. Min.Eng.
V.P. Operations
Charlotte May, Corporate Secretary
Cindy Hu CA CPA CGA Controller
Phil Fontaine, B.A., LL.D.
Strategic Advisors F Dale Corman P EngCindy Hu, CA, CPA, CGA, Controller
Virginia Morgan, B.Com, Manager, Investor Relations
F. Dale Corman, P.Eng.
Gerald Prosalendis, Communications
David Connelly, Community Relations
Joe Monteith Business development
32…advancing green technology
Joe Monteith, Business development
Corporate Informationp
Avalon Rare Metals Inc. 130 Adelaide St. W, Suite 1901Toronto, ON Canada M5H 3P5
T: (416) 364 4938 ۰ F: (416) 364 5162T: (416) 364-4938 ۰ F: (416) 364-5162
www.avalonraremetals.comwww raremetalblog comwww.raremetalblog.com
Investor Relations: i @ l t [email protected]
33…advancing green technology