Route CR-107 ProjectDescription
PATCHING, RESURFACING AND STRIPING ON CR-107 (FRANK LARY ROAD) FROM CR-54 (MITT LARY ROAD) TO CR-98 (LARY LAKE ROAD)
Type of Work RESURFACING
Project Length in Miles 1.945 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100061864 ACOA61864 ATRP (017) CONSTRUCTION
Approved in a STIP Plan 2020 $705 $176 $882
TOTAL COST: $705 $176 $882
Route CR-115 ProjectDescription
BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION CREEK BIN# 12089
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100059617 ACBRZ59617 ATRP (007)
CONSTRUCTION
Approved in a STIP Plan 2019 $938 $235 $1,173
TOTAL COST: $938 $235 $1,173
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
1 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route CR-124 ProjectDescription
BRIDGE REPLACEMENT CR-124 (OLD FAYETTE ROAD) OVER BARBEE CREEK BIN# 14309
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100059618 ACBRZ59618 ATRP (010)
CONSTRUCTION
Approved in a STIP Plan 2019 $383 $96 $479
TOTAL COST: $383 $96 $479
Route CR-124 ProjectDescription
BRIDGE REPLACEMENT CR-124 (OLD FAYETTE ROAD) OVER AN UNNAMED TRIBUTARY TO BINION CREEK BIN#12282
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100059619 ACBRZ59619 ATRP (010)
CONSTRUCTION
Approved in a STIP Plan 2019 $241 $60 $302
TOTAL COST: $241 $60 $302
Route CR-1358 ProjectDescription
BRIDGE REPLACEMENT ON CR-1358 (HOLMAN CHURCH ROAD) OVER KANSAS CITY SOUTHERN RAILROAD
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100059621 ACBRZ59621 ATRP (007)
CONSTRUCTION
Approved in a STIP Plan 2019 $694 $173 $867
TOTAL COST: $694 $173 $867
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
2 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route CR-66 ProjectDescription
ADDITIONAL LANES ON BEAR CREEK ROAD AND BEAR CREEK CUTOFF ROAD FROM SR-69 TO SR-215
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066303 STPAA 6316 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $989 $247 $1,236
100066304 STPAA 6316 () RIGHT OF WAY
Approved in a STIP Plan 2019 $330 $82 $412
100066305 STPAA 6316 () UTILITIES
Approved in a STIP Plan 2019 $2,555 $639 $3,194
100066306 STPAA 6316 () CONSTRUCTION
Approved in a STIP Plan 2020 $4,995 $1,249 $6,244
TOTAL COST: $8,869 $2,217 $11,086
Route CR-NA ProjectDescription
RICE MINE RD FR SNOWS MILLS AV TO US-82 SPONSOR:CITY OF TUSCALOOSA.
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.640 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100008450 STPOA 7942 (005) CONSTRUCTION
Approved in a STIP Plan 2042 $7,954 $1,988 $9,942
TOTAL COST: $7,954 $1,988 $9,942
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
3 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route CR-NA ProjectDescription
MARTIN LUTHER KING BOULEVARD FROM SNOWS MILL AVENUE TO SR-69, ADD TURN LANES, REALIGNMENT OF INTERSECTIONS, SIDEWALKS, LIGHTING, AND BRIDGE REPLACEMENT OVER TWO MILE CREEK
Type of Work TURN LANES
Project Length in Miles 1.150 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100008464 STPOA 6317 (250) RIGHT OF WAY
Approved in a STIP Plan 2019 $901 $225 $1,127
100043870 STPOA 6317 (250) UTILITIES
Approved in a STIP Plan 2020 $455 $114 $569
100008460 STPOA 6317 () CONSTRUCTION
Approved in a STIP Plan 2020 $5,463 $1,366 $6,829
TOTAL COST: $6,820 $1,705 $8,524
Route CR-NA ProjectDescription
RESURFACE VARIOUS ELIGIBLE STREETS IN THE CITY OF TUSCALOOSA FY10
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100053859 STPAA 6314 () CONSTRUCTION
Approved in a STIP Plan 2020 $246 $61 $307
TOTAL COST: $246 $61 $307
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
4 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route CR-NA ProjectDescription
RESURFACING KENNEDY MILL ROAD FROM SR-216 TO HOLT-PETERSON ROAD
Type of Work RESURFACING
Project Length in Miles 0.760 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100061867 ACOA61867 ATRP (017) CONSTRUCTION
Approved in a STIP Plan 2020 $364 $91 $455
TOTAL COST: $364 $91 $455
Route CR-NA ProjectDescription
RESURFACING HOLT-PETERSON ROAD FROM KENNEDY MILL ROAD TO ALABAMA AVENUE
Type of Work RESURFACING
Project Length in Miles 2.020 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100061868 ACOA61868 ATRP (017) CONSTRUCTION
Approved in a STIP Plan 2020 $750 $188 $938
TOTAL COST: $750 $188 $938
Route CR-NA ProjectDescription
WIDENING OF FOSTERS FERRY ROAD FROM JOE MALISHAM PARKWAY TO 29TH STREET
Type of Work RESURFACING
Project Length in Miles 1.365 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100061873 ACOA61873 ATRP (017) CONSTRUCTION
Approved in a STIP Plan 2019 $1,491 $373 $1,864
TOTAL COST: $1,491 $373 $1,864
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
5 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route CR-NA ProjectDescription
RESURFACING SAND ROAD FROM ROMULUS ROAD TO FROG RIDGE ROAD.
Type of Work RESURFACING
Project Length in Miles 1.236 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100061874 ACOA61874 ATRP (017) CONSTRUCTION
Approved in a STIP Plan 2020 $378 $95 $473
TOTAL COST: $378 $95 $473
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS ON WATERMELON ROAD AT THE INTERSECTION OF UNION CHAPEL ROAD - CITY OF TUSCALOOSA
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100061875 ACOA61875 ATRP (017) CONSTRUCTION
Approved in a STIP Plan 2019 $642 $161 $803
TOTAL COST: $642 $161 $803
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
6 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route CR-NA ProjectDescription
WIDENING, STRIPING AND OTHER IMPROVEMENTS ON WATERMELON ROAD FROM SR-6 (US-82) TO SNOWS MILL AVENUE SPONSOR: CITY OF TUSCALOOSA
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.500 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067467 STPOA 6314 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $162 $40 $202
100008465 STPOA 6314 () RIGHT OF WAY
Approved in a STIP Plan 2019 $451 $113 $563
100043871 STPOA 6314 () UTILITIES
Approved in a STIP Plan 2020 $273 $68 $341
100008461 STPOA 6314 () CONSTRUCTION
Approved in a STIP Plan 2020 $455 $114 $569
TOTAL COST: $1,341 $335 $1,676
Route CR-NA ProjectDescription
INTERSECTION AND SAFETY IMPROVEMENTS, ROUNDABOUTS, ON 5TH STREET AT SR-13 (LURLEEN WALLACE BOULEVARD), ROBERT CARDINAL ROAD, KENTUCK PARK/WEST CIRCLE, AND BRIDGE AVENUE
Type of Work SAFETY IMPROVEMENTS
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064428 HSIPF 6315 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,892 $210 $2,102
TOTAL COST: $1,892 $210 $2,102
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
7 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route CR-NR ProjectDescription
RR XING IMPROVEMENTS; INSTALLATION OF ADVANCE WARNING SIGNS, MARKINGS, LEGENDS, STRIPING, SIGNALS, BELLS AND GATES AT INTERSECTION OF ABS RAILROAD AND 26TH AVENUE IN TUSCALOOSA; REF# 1318 (XVI-R); DOT# 306351X
Type of Work RR CROSSING IMPROVEMENTS
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066687 RHCH RR17 (911) CONSTRUCTION
Approved in a STIP Plan 2019 $229 $25 $255
TOTAL COST: $229 $25 $255
Route I -59 ProjectDescription
I20/59 ADDITIONAL LANES FROM APPROXIMATELY 1300FT SOUTH OF THE 3RD AVENUE OVERPASS TO APPROXIMATELY 1650FT SOUTH OF THE SR-6(US-82) (MCFARLAND BLVD) INTERCHANGE GRADE, DRAIN, BASE, PAVE, AND SIGNING
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 2.500 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100039473 IM-NH I059 (399) CONSTRUCTION
Approved in a STIP Plan 2019 $3,858 $923 $4,780
TOTAL COST: $3,858 $923 $4,780
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
8 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route I -59 ProjectDescription
GUIDE RAIL INSTALLATION ON I-59 FROM TUSCALOOSA COUNTY LINE TO .25 MI SOUTH OF SR-6 (US-82)(MCFARLAND BLVD)
Type of Work SAFETY IMPROVEMENTS
Project Length in Miles 17.651 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064197 HSIPF I059 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $224 $25 $249
100060977 HSIPF I059 () CONSTRUCTION
Approved in a STIP Plan 2019 $1,219 $135 $1,355
TOTAL COST: $1,443 $160 $1,604
Route I -59 ProjectDescription
ROUNDABOUTS, SIGNING AND STRIPING ON I-59/I-20 ON-RAMPS AND OFF-RAMPS AT EXIT 79 (SR-7/US-11 INTERSECTION)
Type of Work SAFETY IMPROVEMENTS
Project Length in Miles 0.100 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068078 HSIP I059 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $227 $25 $253
100068090 HSIP I059 () RIGHT OF WAY
Approved in a STIP Plan 2019 $91 $10 $101
100068091 HSIP I059 () UTILITIES
Approved in a STIP Plan 2019 $91 $10 $101
100068092 HSIP I059 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,454 $162 $1,616
TOTAL COST: $1,863 $207 $2,070
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
9 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route NA- ProjectDescription
NORTHBOUND AND SOUTHBOUND REST AREA RENOVATIONS ALONG I-59 AT BROOKWOOD
Type of Work REST AREA REHABILITATION
Project Length in Miles 0.100 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100049318 IM I059 () CONSTRUCTION
Approved in a STIP Plan 2024 $674 $75 $749
TOTAL COST: $674 $75 $749
Route NA- ProjectDescription
EXTEND THE DIVISION OFFICE SECURITY SYSTEM TO TWO PORTABLE OFFICE BUILDINGS SG062355 AND SG062356. TO INCLUDE POWER SUPPLY, CARD READER, RECORDER, MAGLOCK, CAMERA, MATERIAL AND LABOR.
Type of WorkCONSTRUCT BUILDING LAND AND BUILDING FUNDS ONLY
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100051067 LB-503-063-001 () LAND AND BUILDING PROJECT
Approved in a STIP Plan 2019 $0 $18 $18
TOTAL COST: $0 $18 $18
Route NA- ProjectDescription
WIDEN AND IMPROVE PEDESTRIAN ACCESS 10TH AVENUE FROM 31ST STREET TO 15TH STREET IN TUSCALOOSA TO BE FUNDED BY HOUSING AND URBAN DEVELOPMENT (HUD)
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100059446 HUD FUNDS & LOCAL FUNDS ()
CONSTRUCTION
Approved in a STIP Plan 2019 $5,440 $1,360 $6,800
TOTAL COST: $5,440 $1,360 $6,800
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
10 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route NA- ProjectDescription
CURB RAMP INSTALLATION ON STATE ROUTES AT VARIOUS LOCATIONS IN TUSCALOOSA COUNTY
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068201 STPAA NR18 () CONSTRUCTION
Approved in a STIP Plan 2020 $224 $56 $281
TOTAL COST: $224 $56 $281
Route NA- ProjectDescription
SR-7 (US-11) SIDEWALK PROJECT FROM WESTLEE DRIVE TO 21ST STREET IN TUSCALOOSA COUNTY
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064557 TAPAAF TA15 (942) CONSTRUCTION
Approved in a STIP Plan 2019 $400 $100 $500
TOTAL COST: $400 $100 $500
Route NA- ProjectDescription
SIDEWALK ALONG CYPRESS CREEK AVENUE FROM SOUTH OF RUNNING BROOK APARTMENTS TO SKYLAND BOULEVARD - PHASE III (SECTION D)
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068781 TAPAA TA18 (916) RIGHT OF WAY
Approved in a STIP Plan 2019 $101 $25 $126
100068372 TAPAA TA18 (916) CONSTRUCTION
Approved in a STIP Plan 2019 $194 $48 $242
TOTAL COST: $294 $74 $368
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
11 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route NA- ProjectDescription
CYPRESS CREEK AVENUE EAST SIDEWALK - PHASE II (SECTION C) IN THE CITY OF TUSCALOOSA
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067288 TAPAA TA17 (944) CONSTRUCTION
Approved in a STIP Plan 2019 $400 $100 $500
TOTAL COST: $400 $100 $500
Route SR-13 ProjectDescription
BR #13-63-46.4A ROCKY CREEK RELIEF BR ON US-43
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.010 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100003223 BR 0354 () RIGHT OF WAY
Approved in a STIP Plan 2022 $12 $3 $15
100003222 BR 0354 () CONSTRUCTION
Approved in a STIP Plan 2023 $413 $103 $517
TOTAL COST: $425 $106 $531
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
12 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-13 ProjectDescription
SR-13 (US-43) FROM 0.45 MILE SOUTH OF CR-38 TO 0.35 MILE NORTH OF CR-38; INTERSECTION IMPROVEMENTS AND VERTICAL REALIGNMENT
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.800 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100050153 NH 0013 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $115 $29 $144
100050154 NH 0013 () RIGHT OF WAY
Approved in a STIP Plan 2049 $23 $6 $29
100050155 NH 0013 () UTILITIES
Approved in a STIP Plan 2050 $39 $10 $49
100050156 NH 0013 () CONSTRUCTION
Approved in a STIP Plan 2051 $377 $94 $471
TOTAL COST: $554 $138 $692
Route SR-13 ProjectDescription
ADDITIONAL LANES ON SR-13 (US-43) FROM SOUTH OF CR-56 (MITT LARY RD) TO 0.4 MILE NORTH CR-22 (PAUL HOWELL RD)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.520 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100051558 NH 0013 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2048 $1,931 $483 $2,413
100051560 NH 0013 () CONSTRUCTION
Approved in a STIP Plan 2050 $13,145 $3,286 $16,432
TOTAL COST: $15,076 $3,769 $18,845
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
13 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-13 ProjectDescription
ADDITIONAL LANES ON SR-13 (US-43) FROM 0.4 MILE NORTH CR-22 (PAUL HOWELL RD) TO NORTH CR-266 (BONE CAMP RD)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.800 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100051562 NH 0013 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2048 $2,130 $532 $2,662
100051564 NH 0013 () CONSTRUCTION
Approved in a STIP Plan 2051 $14,626 $3,657 $18,283
TOTAL COST: $16,756 $4,189 $20,945
Route SR-13 ProjectDescription
ADDITIONAL LANES ON SR-13 (US-43) FROM NORTH CR-266 (BONE CAMP RD) TO SOUTH CR-124 (OLD FAYETTE RD)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.300 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100051566 NH 0013 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2048 $1,651 $413 $2,064
100051567 NH 0013 () CONSTRUCTION
Approved in a STIP Plan 2048 $11,011 $2,753 $13,764
TOTAL COST: $12,663 $3,166 $15,828
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
14 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-13 ProjectDescription
ADDITIONAL LANES ON SR-13 (US-43) FROM SOUTH CR-124 (OLD FAYETTE RD) TO SOUTH END LAKE TUSCALOOSA BRIDGE
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.480 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100051568 NH 0013 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2048 $1,881 $470 $2,351
100051569 NH 0013 () CONSTRUCTION
Approved in a STIP Plan 2051 $12,915 $3,229 $16,143
TOTAL COST: $14,796 $3,699 $18,495
Route SR-13 ProjectDescription
SR-13 (US-43) PAVEMENT REHABILITATION FROM NORTH END OF HUGH THOMAS BRIDGE TO SR-6 (US-82)
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 1.589 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100054474 NH 0013 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2048 $4,708 $1,177 $5,885
100054476 NH 0013 () UTILITIES
Approved in a STIP Plan 2053 $809 $202 $1,012
100054477 NH 0013 () CONSTRUCTION
Approved in a STIP Plan 2054 $14,011 $3,503 $17,514
TOTAL COST: $19,528 $4,882 $24,411
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
15 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-171 ProjectDescription
RELOCATION OF SR-171 FR CR-90 N TO BROWNVILLE RD
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 2.800 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100008970 STPAA 0347 (009) PRELIMINARY ENGINEERING
Approved in a STIP Plan 2048 $137 $34 $171
100008971 STPAA 347 () RIGHT OF WAY
Approved in a STIP Plan 2050 $544 $136 $680
100008969 STPAA 347 () CONSTRUCTION
Approved in a STIP Plan 2050 $6,213 $1,553 $7,766
TOTAL COST: $6,893 $1,723 $8,616
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
16 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-215 ProjectDescription
PAVEMENT REHAB AND DRAINAGE IMPROVEMENT ON SR-215 FROM SR-7 (US-11, SKYLAND BOULEVARD) TO HARGROVE ROAD
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 2.240 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100058101 STPAA 0215 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2048 $257 $64 $321
100058102 STPAA 0215 () UTILITIES
Approved in a STIP Plan 2049 $997 $249 $1,246
100058103 STPAA 0215 () CONSTRUCTION
Approved in a STIP Plan 2050 $15,620 $3,905 $19,526
TOTAL COST: $16,874 $4,219 $21,093
Route SR-215 ProjectDescription
ADD LANES ON SR-215 FROM SR-216 TO SR-7 (US-11) AND REALIGN INTERSECTION WITH SR-7 (US-11)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.400 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066568 NH 0215 (504) RIGHT OF WAY
Approved in a STIP Plan 2024 $962 $241 $1,203
100066569 NH 0215 (504) UTILITIES
Approved in a STIP Plan 2024 $945 $236 $1,181
100066570 NH 0215 (504) CONSTRUCTION
Approved in a STIP Plan 2025 $5,784 $1,446 $7,230
TOTAL COST: $7,691 $1,923 $9,614
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
17 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-297 ProjectDescription
TUSCALOOSA E BYPASS, FROM I-59/I-20 TO SR-7 (US-11) BRIDGES; INCLUDES RAMP D BRIDGE, TEB TO I-59/I20 FLYOVER RAMP BRIDGE, AND TEB DUAL BRIDGES OVER SOUTHERN RR
Type of Work BRIDGE
Project Length in Miles 1.645 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016457 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2045 $16,678 $4,170 $20,848
TOTAL COST: $16,678 $4,170 $20,848
Route SR-297 ProjectDescription
>TUSCALOOSA E BYPASS, FROM I-59 TO US-11 INCLUDES B AND P AT I-59 AND US-11 INTERCHANGES.
Type of Work BASE AND PAVE
Project Length in Miles 1.645 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016484 NHF 0297 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2046 $343 $86 $428
100016458 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2048 $6,845 $1,711 $8,557
TOTAL COST: $7,188 $1,797 $8,985
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
18 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-297 ProjectDescription
SR-297 (TUSCALOOSA E BYPASS) FROM I-59 TO SR-7 (US-11) GRADE AND DRAIN (PARTIAL BANDPAT X-ROADS) INCLUDESATI-59 AND US-11 INTERCHANGE
Type of Work GRADE AND DRAIN
Project Length in Miles 1.645 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100049034 NHF 0297 () UTILITIES
Approved in a STIP Plan 2046 $447 $112 $559
100016505 NCPD AL08 (902) RIGHT OF WAY
Approved in a STIP Plan 2047 $8,202 $2,050 $10,252
100016459 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2047 $9,232 $2,308 $11,541
TOTAL COST: $17,881 $4,470 $22,352
Route SR-297 ProjectDescription
SR-297 ROW CORRIDOR PRESERVATION TUSCALOOSA EAST BYPASS
Type of Work UNCLASSIFIED
Project Length in Miles 19.962 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100060575 DESTP-NCPD 0297 (907)
PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $6 $2 $8
TOTAL COST: $6 $2 $8
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
19 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-297 ProjectDescription
SR-297 (TUSCALOOSA EAST BYPASS) FROM SOUTH OF SR-7 (US-11) TO SR-216 BRIDGES; INCLUDES TEB DUAL BRIDGES OVER KEENS MILL ROAD, TEB DUAL BRIDGES OVER COTTONDALE CREEK, AND TEB DUAL BRIDGES OVER US-11
Type of Work BRIDGE
Project Length in Miles 1.417 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016461 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2046 $10,764 $2,691 $13,454
TOTAL COST: $10,764 $2,691 $13,454
Route SR-297 ProjectDescription
SR-297 (TUSCALOOSA EAST BYPASS), FROM SOUTH SR-7 (US-11) TO SOUTH OF SR-216; INCLUDES GRADE, DRAIN AND PART. BSP , BSP OF US-11
Type of Work BASE AND PAVE
Project Length in Miles 1.417 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016487 NHF 0297 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2048 $167 $42 $209
100016506 NHF 0297 () RIGHT OF WAY
Approved in a STIP Plan 2049 $6,936 $1,734 $8,670
100049933 NHF 0297 () UTILITIES
Approved in a STIP Plan 2051 $627 $157 $784
100016463 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2053 $14,509 $3,627 $18,137
100016462 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2054 $5,640 $1,410 $7,050
TOTAL COST: $27,879 $6,970 $34,849
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
20 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-297 ProjectDescription
SR-297 (TUSCALOOSA EAST BYPASS) FROM SR-216 TO (CR-45) CRESCENT RIDGE ROAD INTERCHANGE WITH MEDIAN BARRIERS AND INTERCHANGE RAMPS
Type of Work BASE AND PAVE
Project Length in Miles 2.156 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016490 NHF 0297 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2047 $300 $75 $375
100016466 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2049 $9,207 $2,302 $11,509
TOTAL COST: $9,507 $2,377 $11,884
Route SR-297 ProjectDescription
SR-297 (TUSCALOOSA EAST BYPASS) FROM SR-216 TO (CR-45) CRESCENT RIDGE ROAD INTERCHANGE WITH MEDIAN BARRIERS AND INTERCHANGE RAMPS
Type of Work GRADE AND DRAIN
Project Length in Miles 2.156 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016507 NHF 0297 () RIGHT OF WAY
Approved in a STIP Plan 2046 $13,115 $3,279 $16,394
100049033 NHF 0297 () UTILITIES
Approved in a STIP Plan 2047 $600 $150 $750
100016468 NHF 0297 (901) CONSTRUCTION
Approved in a STIP Plan 2047 $17,690 $4,422 $22,112
TOTAL COST: $31,405 $7,851 $39,256
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
21 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-297 ProjectDescription
SR-297 (TUSCALOOSA EAST BYPASS) FROM SR-216 TO (CR-45) CRESCENT RIDGE ROAD INTERCHANGE WITH MEDIAN BARRIERS AND INTERCHANGE RAMPS
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 2.160 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064125 NH 0297 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2042 $1,047 $262 $1,308
100016465 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2044 $9,648 $2,412 $12,061
TOTAL COST: $10,695 $2,674 $13,369
Route SR-297 ProjectDescription
SR-297 (TUSCALOOSA EAST BY-PASS) FROM (CR-45) CRESCENT RIDGE ROAD TO JACK WARNER PARKWAY WITH INTERCHANGE INCLUDED AT RIVER ROAD
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 1.166 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016509 DPI 0297 () RIGHT OF WAY
Approved in a STIP Plan 2042 $20,423 $5,106 $25,529
100049934 NHF 0297 () UTILITIES
Approved in a STIP Plan 2045 $1,184 $296 $1,480
100045124 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2045 $518 $129 $647
100016470 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2046 $19,077 $4,769 $23,846
100043784 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2046 $12,363 $3,091 $15,453
TOTAL COST: $53,565 $13,391
$66,956
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
22 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-297 ProjectDescription
SR-297 (TUSCALOOSA EAST BY-PASS) FROM (CR-45) CRESCENT RIDGE ROAD TO JACK WARNER PARKWAY WITH INTERCHANGE INCLUDED AT RIVER ROAD
Type of Work BASE AND PAVE
Project Length in Miles 1.166 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100043785 NHF 0297 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2046 $261 $65 $326
100043786 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2049 $6,138 $1,535 $7,673
TOTAL COST: $6,399 $1,600 $7,999
Route SR-297 ProjectDescription
SR-297 (TUSCALOOSA EAST BYPASS) INTERCHANGE AT RICE MINE ROAD DESIGN FOR INTERCHANGE
Type of Work INTERCHANGE
Project Length in Miles 0.020 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016495 NHF 0297 (900) PRELIMINARY ENGINEERING
Approved in a STIP Plan 2046 $545 $136 $681
100016473 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2047 $8,095 $2,024 $10,119
TOTAL COST: $8,640 $2,160 $10,800
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
23 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-297 ProjectDescription
SR-297 (TUSCALOOSA EAST BYPASS) FROM (CR-30) RICE MINE ROAD TO (CR-47) WATERMELON ROAD
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 2.920 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100061530 NHF 0297 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2050 $555 $139 $693
100016510 NHF 0297 () RIGHT OF WAY
Approved in a STIP Plan 2062 $13,151 $3,288 $16,439
100049035 NHF 0297 () UTILITIES
Approved in a STIP Plan 2066 $727 $182 $909
100016472 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2066 $20,358 $5,090 $25,448
TOTAL COST: $34,791 $8,698 $43,489
Route SR-297 ProjectDescription
SR-297 (TUSCALOOSA EAST BYPASS) FROM (CR-30) RICE MINE ROAD TO (CR-47) WATERMELON ROAD
Type of Work BASE AND PAVE
Project Length in Miles 2.917 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016493 NHF 0297 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2066 $636 $159 $795
100016471 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2068 $12,218 $3,055 $15,273
TOTAL COST: $12,854 $3,214 $16,068
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
24 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-297 ProjectDescription
SR-297 (TUSCALOOSA EAST BYPASS) FROM WATERMELON ROAD TO SR-69
Type of Work BASE AND PAVE
Project Length in Miles 2.382 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016496 NHF 0297 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2042 $373 $93 $467
100016474 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2043 $8,249 $2,062 $10,311
TOTAL COST: $8,622 $2,155 $10,777
Route SR-297 ProjectDescription
SR-297 (TUSCALOOSA EAST BYPASS) FROM WATERMELON ROAD TO SR-69
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 2.382 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016511 NHF 0297 () RIGHT OF WAY
Approved in a STIP Plan 2058 $2,546 $637 $3,183
100049036 NHF 0297 () UTILITIES
Approved in a STIP Plan 2058 $586 $147 $733
100016475 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2059 $12,550 $3,138 $15,688
TOTAL COST: $15,683 $3,921 $19,604
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
25 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-297 ProjectDescription
SR-297 (TUSCALOOSA EAST BYPASS) FROM SR-69 TO US-43
Type of Work BASE AND PAVE
Project Length in Miles 1.548 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016498 NHF 0297 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2052 $270 $67 $337
100016476 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2053 $6,936 $1,734 $8,669
TOTAL COST: $7,205 $1,801 $9,007
Route SR-297 ProjectDescription
SR-297 (TUSCALOOSA EAST BYPASS) FROM SR-69 TO US-43
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 1.548 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016499 NHF 0297 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2047 $630 $157 $787
100016512 NHF 0297 () RIGHT OF WAY
Approved in a STIP Plan 2049 $1,811 $453 $2,263
100016477 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2051 $6,253 $1,563 $7,816
TOTAL COST: $8,693 $2,173 $10,867
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
26 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-297 ProjectDescription
SR-297 (TUSCALOOSA EAST BYPASS) FROM US-43 TO SR-171
Type of Work BASE AND PAVE
Project Length in Miles 1.687 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016500 NHF 0297 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2050 $311 $78 $388
100016478 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2052 $7,046 $1,761 $8,807
TOTAL COST: $7,356 $1,839 $9,195
Route SR-297 ProjectDescription
SR-297 (TUSCALOOSA EAST BYPASS) FROM US-43 TO SR-171
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 1.687 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016501 NHF 0297 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2047 $735 $184 $919
100016513 NHF 0297 () RIGHT OF WAY
Approved in a STIP Plan 2049 $2,824 $706 $3,529
100016479 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2050 $8,900 $2,225 $11,124
TOTAL COST: $12,458 $3,115 $15,573
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
27 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-297 ProjectDescription
SR-297 (TUSCALOOSA EAST BYPASS FROM SR-171 TO US-82 SURVEY,GRADE,DRAIN AND BRIDGE.
Type of Work BASE AND PAVE
Project Length in Miles 3.895 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016502 NHF 0297 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2051 $752 $188 $940
100016480 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2053 $13,456 $3,364 $16,820
TOTAL COST: $14,208 $3,552 $17,760
Route SR-297 ProjectDescription
SR-297 (TUSCALOOSA EAST BYPASS FROM SR-171 TO US-82 SURVEY,GRADE,DRAIN AND BRIDGE.
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 3.895 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016503 NHF 0297 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2047 $1,814 $453 $2,267
100016514 NHF 0297 () RIGHT OF WAY
Approved in a STIP Plan 2049 $6,890 $1,723 $8,613
100016481 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2051 $27,697 $6,924 $34,621
TOTAL COST: $36,401 $9,100 $45,501
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
28 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-297 ProjectDescription
SR-297 (TUSCALOOSA EAST BYPASS) INTERCHANGE AT US-82 CONSTRUCTION OF INTERCHANGE
Type of Work INTERCHANGE
Project Length in Miles 0.030 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016504 NHF 0297 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2047 $649 $162 $811
100016482 NHF 0297 () CONSTRUCTION
Approved in a STIP Plan 2051 $9,967 $2,492 $12,459
TOTAL COST: $10,616 $2,654 $13,270
Route SR-5 ProjectDescription
SR-5 BRG REMOVAL 5-63-2.3 AANDB OVER L AND N RR (ABAND), BIN 005799 AND 005800
Type of Work OVERPASS REMOVAL
Project Length in Miles 0.880 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100057835 BR 0005 (540) UTILITIES
Approved in a STIP Plan 2019 $65 $16 $81
100038399 BR 0005 () CONSTRUCTION
Approved in a STIP Plan 2022 $764 $191 $955
TOTAL COST: $829 $207 $1,036
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
29 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-6 ProjectDescription
ADDITIONAL LANES, ACCESS MANAGEMENT, AND BICYCLE/PEDESTRIAN IMPROVEMENTS ALONG SR-6 (US-82/ MCFARLAND BLVD.) FROM WEST OF SR-69 TO RICE MINE ROAD
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 3.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067680 TRC-ST-063-006-016 () RIGHT OF WAY
Approved in a STIP Plan 2019 $0 $253 $253
100066242 NHF 0006 (564) UTILITIES
Approved in a STIP Plan 2040 $305 $76 $381
100004617 NHF 0006 (564) CONSTRUCTION
Approved in a STIP Plan 2040 $24,473 $6,118 $30,591
TOTAL COST: $24,778 $6,447 $31,225
Route SR-6 ProjectDescription
INTERSECTION IMPROVEMENTS ON SR-6 (US-82) ATCR-66 (BRADLEY RD)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 1.800 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100063661 NH 0006 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2046 $109 $27 $136
100046433 NH 0006 () RIGHT OF WAY
Approved in a STIP Plan 2047 $292 $73 $365
100047494 NH 0006 () UTILITIES
Approved in a STIP Plan 2047 $300 $75 $375
100046352 NH 0006 () CONSTRUCTION
Approved in a STIP Plan 2048 $441 $110 $551
TOTAL COST: $1,142 $286 $1,428
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
30 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-6 ProjectDescription
ACCESS MANAGEMENT ALONG SR-6 (US-82; MCFARLAND BLVD) FROM W. OF ROSE BLVD (MP 42.500) TO JUST EAST OF JUG FACTORY RD (MP 53.700)
Type of Work SIGNALIZATION
Project Length in Miles 11.200 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100062358 NHF 0006 (560) UTILITIES
Approved in a STIP Plan 2019 $5,656 $1,414 $7,070
TOTAL COST: $5,656 $1,414 $7,070
Route SR-6 ProjectDescription
WIDENING AND INTERCHANGE IMPROVEMENTS ON SR-6 (US-82; MCFARLAND BOULEVARD) AT UNIVERSITY BOULEVARD
Type of Work INTERCHANGE
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100065855 NH 0006 () RIGHT OF WAY
Approved in a STIP Plan 2019 $364 $91 $455
100065854 NH 0006 () UTILITIES
Approved in a STIP Plan 2019 $495 $124 $618
100064404 TRC-ACAA64404 ATRP (004)
CONSTRUCTION
Approved in a STIP Plan 2019 $7,257 $1,814 $9,072
TOTAL COST: $8,115 $2,029 $10,144
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
31 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-6 ProjectDescription
ACCESS MANAGEMENT AND BICYCLE/PEDESTRIAN IMPROVEMENTS ALONG SR-6 (US-82/MCFARLAND BLVD.) FROM ROSE BLVD. TO SR-69
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 4.282 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100065113 NH 0006 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $330 $82 $412
100065115 NH 0006 () UTILITIES
Approved in a STIP Plan 2022 $425 $106 $531
100065114 NH 0006 () CONSTRUCTION
Approved in a STIP Plan 2022 $5,756 $1,439 $7,195
TOTAL COST: $6,510 $1,628 $8,138
Route SR-6 ProjectDescription
SAFETY IMPROVEMENTS AT THE INTERSECTION OF SAM SUTTON ROAD AND SR-6 (US-82).
Type of Work SAFETY IMPROVEMENTS
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066455 HSIP 0006 () CONSTRUCTION
Approved in a STIP Plan 2019 $115 $13 $128
TOTAL COST: $115 $13 $128
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
32 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-6 ProjectDescription
ADDITIONAL LANES, ACCESS MANAGEMENT, AND BICYCLE/PEDESTRIAN IMPROVEMENTS ALONG SR-6 (US-82/MCFARLAND BLVD.) FROM WEST OF ROSE BLVD. TO JUST EAST OF JUG FACTORY ROAD
Type of Work CORRIDOR STUDY
Project Length in Miles 11.200 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066532 NH 0006 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $78 $19 $97
TOTAL COST: $78 $19 $97
Route SR-6 ProjectDescription
RESURFACING, PLANING, PATCHING AND VARIOUS SAFETY IMPROVEMENTS SR-6 (US-82) FROM EAST OF BEL AIRE ESTATES TO JUST EAST OF 5TH STREET
Type of Work PAVEMENT MINOR REHABILITATION
Project Length in Miles 3.932 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066961 NH-HSIP 0006 (572) FEDERAL MAINT CN
Approved in a STIP Plan 2019 $5,137 $1,128 $6,265
TOTAL COST: $5,137 $1,128 $6,265
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
33 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-6 ProjectDescription
INTERSECTION IMPROVEMENTS ON SR-6 (US-82 / MCFARLAND BOULEVARD) AT SR-69
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.410 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068588 NH 0006 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $121 $30 $152
100068733 NH 0006 () RIGHT OF WAY
Approved in a STIP Plan 2020 $408 $102 $510
100068734 NH 0006 () UTILITIES
Approved in a STIP Plan 2020 $612 $153 $765
100068735 NH 0006 () CONSTRUCTION
Approved in a STIP Plan 2020 $24,482 $6,121 $30,603
TOTAL COST: $25,624 $6,406 $32,030
Route SR-69 ProjectDescription
SR-69 ADDITIONAL LANES FROM SOUTH OF CR-95 (OLD GREENSBORO RD) TO JUST SOUTH CR-157 (MAXWELL LOOP RD.)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.158 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100051603 NHF 0069 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2048 $1,306 $327 $1,633
100051604 NHF 0069 () CONSTRUCTION
Approved in a STIP Plan 2050 $8,887 $2,222 $11,109
TOTAL COST: $10,193 $2,548 $12,741
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
34 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-69 ProjectDescription
SR-69 ADDITIONAL LANES FROM JUST SOUTH CR-157 (MAXWELL LOOP RD.) TO JUST SOUTH CR-1075 (PATRIOT PARKWAY)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.083 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100051605 NHF 0069 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2050 $1,168 $292 $1,460
100051606 NHF 0069 () CONSTRUCTION
Approved in a STIP Plan 2051 $7,851 $1,963 $9,814
TOTAL COST: $9,019 $2,255 $11,273
Route SR-69 ProjectDescription
SR-69 ADDITIONAL LANES FROM JUST SOUTH CR-1075 (PATRIOT PARKWAY) TO JUST SOUTH CR-65 (BEAR CREEK RD.)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.360 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100051607 NH 0069 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2045 $1,491 $373 $1,864
100051608 NH 0069 () CONSTRUCTION
Approved in a STIP Plan 2047 $10,074 $2,519 $12,593
TOTAL COST: $11,565 $2,891 $14,456
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
35 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-69 ProjectDescription
SR-69 ADDITIONAL LANES FROM JUST SOUTH CR-65 (BEAR CREEK RD.) TO OVERPASSATRAILROAD
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.299 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100051609 NHF 0069 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2046 $1,435 $359 $1,794
100051610 NHF 0069 () CONSTRUCTION
Approved in a STIP Plan 2048 $9,764 $2,441 $12,205
TOTAL COST: $11,199 $2,800 $13,998
Route SR-69 ProjectDescription
CORRIDOR STUDY ON SR-69 ADD LANES FROM SR-6 (US-82) TO CR-98 (LARY LAKE RD)
Type of Work CORRIDOR STUDY
Project Length in Miles 5.965 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100053304 NHF 0069 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2048 $301 $75 $376
TOTAL COST: $301 $75 $376
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
36 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-69 ProjectDescription
INTERSECTION IMPROVEMENT ON SR-69ATCR-84 (CHARLIE SHIRLEY RD)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.380 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100057493 NH 0069 (535) RIGHT OF WAY
Approved in a STIP Plan 2021 $84 $21 $105
100057494 NH 0069 (535) UTILITIES
Approved in a STIP Plan 2022 $193 $48 $241
100053306 NH 0069 (535) CONSTRUCTION
Approved in a STIP Plan 2022 $501 $125 $627
TOTAL COST: $778 $195 $973
Route SR-69 ProjectDescription
SR-69 INTERSECTION IMPROVEMENTS FROM PLANTATION ROAD TO THE I-59 OVERPASS (INCLUDING THE ALABAMA SOUTHERN RAILROAD OVERPASS)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 1.430 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100057985 STPAAF 0069 (540) RIGHT OF WAY
Approved in a STIP Plan 2019 $3,798 $949 $4,747
100057986 STPAAF 0069 (540) UTILITIES
Approved in a STIP Plan 2019 $1,648 $412 $2,061
100057987 STPAAF 0069 (540) CONSTRUCTION
Approved in a STIP Plan 2019 $41,091 $10,273
$51,364
TOTAL COST: $46,537 $11,634
$58,171
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
37 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-7 ProjectDescription
REPLACE WARRIOR RIVER REL(7-63-10.6)ON US-11ATMP 70.0
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.300 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100013141 BR 0007 () RIGHT OF WAY
Approved in a STIP Plan 2021 $29 $7 $36
100042253 BR 0007 () UTILITIES
Approved in a STIP Plan 2021 $117 $29 $146
100013137 BR 0007 () CONSTRUCTION
Approved in a STIP Plan 2022 $782 $196 $978
TOTAL COST: $928 $232 $1,160
Route SR-7 ProjectDescription
REPLACE WARRIOR RIVER REL(7-63-11.5)ON US-11ATMP 70.9
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.300 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100013142 BR 0007 () RIGHT OF WAY
Approved in a STIP Plan 2021 $29 $7 $36
100042254 BR 0007 () UTILITIES
Approved in a STIP Plan 2021 $117 $29 $146
100013138 BR 0007 () CONSTRUCTION
Approved in a STIP Plan 2022 $666 $166 $832
TOTAL COST: $812 $203 $1,014
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
38 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-7 ProjectDescription
REPLACE BRIDGE (BIN 005140) ON SR-7 (US-11) OVER NORFOLK SOUTHERN RAILROAD (SUFF =12.5, STAT= SD)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.262 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100055891 BR 0007 (546) RIGHT OF WAY
Approved in a STIP Plan 2019 $124 $31 $155
100055892 BR 0007 (546) UTILITIES
Approved in a STIP Plan 2019 $140 $35 $174
100055893 BR 0007 (546) CONSTRUCTION
Approved in a STIP Plan 2020 $1,214 $304 $1,518
TOTAL COST: $1,477 $369 $1,847
Route SR-7 ProjectDescription
SR-7 (US-11) ADD LANES FROM I-59 TO KEPPLE LOOP ROAD
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 3.317 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100061812 NH 0007 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2031 $763 $191 $953
100062109 NH 0007 () RIGHT OF WAY
Approved in a STIP Plan 2033 $191 $48 $239
100062110 NH 0007 () UTILITIES
Approved in a STIP Plan 2033 $383 $96 $478
100061928 NH 0007 () CONSTRUCTION
Approved in a STIP Plan 2033 $9,402 $2,350 $11,752
TOTAL COST: $10,739 $2,685 $13,423
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
39 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
Route SR-7 ProjectDescription
ADD LANES ON SR-7 (US-11) FROM DAIMLER BENZ BOULEVARD TO THE INTERSECTION WITH SR-5
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 6.920 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068755 STPAA 0007 (549) RIGHT OF WAY
Approved in a STIP Plan 2019 $4,848 $1,212 $6,060
100068756 STPAA 0007 (549) UTILITIES
Approved in a STIP Plan 2019 $4,848 $1,212 $6,060
100068757 STPAA 0007 () CONSTRUCTION
Approved in a STIP Plan 2019 $33,128 $8,282 $41,410
TOTAL COST: $42,824 $10,706
$53,530
11/29/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
40 of 40
COUNTY HIGHWAY PROJECTS - TUSCALOOSA