Route CR-18 ProjectDescription
EASTERN VALLEY ROAD (CR-18), WIDENING TO 3 LANES FROM MCASHAN DRIVE TO LETSON FARM PARKWAY
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064231 STPBH 3715 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $480 $120 $600
100064232 STPBH 3715 () RIGHT OF WAY
Approved in a STIP Plan 2020 $1,600 $400 $2,000
100064233 STPBH 3715 () UTILITIES
Approved in a STIP Plan 2020 $1,360 $340 $1,700
100064234 STPBH 3715 () CONSTRUCTION
Approved in a STIP Plan 2020 $5,045 $1,261 $6,306
TOTAL COST: $8,485 $2,121 $10,606
Route CR-2303 ProjectDescription
CR-2303 (LAKESHORE PKWY) AT I-65 INTERCHANGE MODIFICATIONS.
Type of Work RAMP REVISIONS
Project Length in Miles 0.560 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100040770 STPBHF 7026 () UTILITIES
Approved in a STIP Plan 2019 $180 $45 $225
100040771 STPBHF 7026 (601) CONSTRUCTION
Approved in a STIP Plan 2020 $10,723 $2,681 $13,403
TOTAL COST: $10,903 $2,726 $13,628
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
1 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route CR-30 ProjectDescription
CR-30 (OLD SPRINGVILLE RD) IMPROVEMENTS TO VARIOUS INTERSECTIONS FROM CARDINAL DRIVE TO CR-153 (CLAY/TRUSSVILLE RD) CITY OF CLAY
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056273 STPBH 7245 () RIGHT OF WAY
Approved in a STIP Plan 2020 $2,040 $510 $2,550
100056275 STPBH 7245 () UTILITIES
Approved in a STIP Plan 2022 $1,128 $282 $1,410
100056276 STPBH 7245 () CONSTRUCTION
Approved in a STIP Plan 2024 $3,880 $970 $4,850
TOTAL COST: $7,048 $1,762 $8,810
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
2 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route CR-337 ProjectDescription
RESURFACE AND DRAINAGE IMPROVEMENTS ON CR-337 (MCCALLA ROAD) FROM CR-20 (OLD TUSCALOOSA HIGHWAY) TO CR-18 (EASTERN VALLEY ROAD)
Type of Work RESURFACING
Project Length in Miles 1.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100059497 ACAA59497 ATRP (007) CONSTRUCTION
Approved in a STIP Plan 2019 $1,257 $314 $1,571
TOTAL COST: $1,257 $314 $1,571
Route CR-337 ProjectDescription
RESURFACING AND TURN LANES ON CR-337 (MCCALLA ROAD) FROM CR-18 (EASTERN VALLEY ROAD) TO CR-20 (OLD TUSCALOOSA HIGHWAY)
Type of Work TURN LANES
Project Length in Miles 0.960 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100060502 STPBH 3713 () RIGHT OF WAY
Approved in a STIP Plan 2019 $1,572 $393 $1,965
100060504 STPBH 3713 () UTILITIES
Approved in a STIP Plan 2019 $560 $140 $700
TOTAL COST: $2,132 $533 $2,665
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
3 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route CR-46 ProjectDescription
CR-46 (HUEYTOWN ROAD) ADDITIONAL TURN LANES AND INTERSECTION IMPROVEMENTS FROM WALKER AVENUE TO NORTH OF HILLSIDE DRIVE
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056289 STPBH 7021 (600) UTILITIES
Approved in a STIP Plan 2019 $200 $50 $250
100056290 STPBH 7021 (600) CONSTRUCTION
Approved in a STIP Plan 2020 $1,200 $300 $1,500
TOTAL COST: $1,400 $350 $1,750
Route CR-47 ProjectDescription
RESURFACING ON CR-47 (POWDER PLANT ROAD) FROM ACADEMY DRIVE TO SPLASH ADVENTURE PARKWAY, TO INCLUDE TRAFFIC SIGNAL WORK AND CONSTRUCTION OF AN ENTRANCE TO THE INDUSTRIAL FACILITY IN BESSEMER
Type of Work RESURFACING
Project Length in Miles 1.050 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068800 IAR-037-000-008 () CONSTRUCTION
Approved in a STIP Plan 2019 $0 $1,584 $1,584
TOTAL COST: $0 $1,584 $1,584
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
4 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route CR-52 ProjectDescription
CR-52 (MORGAN RD) ADDITIONAL LANES FROM I-459 TO CR-2 (SOUTH SHADES CREST RD)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 2.470 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100007542 STPBH 7002 (600) CONSTRUCTION
Approved in a STIP Plan 2019 $9,907 $2,477 $12,383
TOTAL COST: $9,907 $2,477 $12,383
Route CR-6 ProjectDescription
>PARKWOOD RD IMPROVEMENTS - PHASE 3 PARKWOOD ROADATPINELANE SE AND HILLTOP ROAD.
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100007636 STPBH 9802 () RIGHT OF WAY
Approved in a STIP Plan 2020 $9 $2 $11
100007630 STPBH 9802 () CONSTRUCTION
Approved in a STIP Plan 2020 $709 $177 $886
TOTAL COST: $718 $179 $897
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
5 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route CR-65 ProjectDescription
BRIDGES ON CR-65 MINOR RD TO BIRMINGPORT RD (ENS ADM)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.050 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100007588 STPBH 7147 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,710 $427 $2,137
TOTAL COST: $1,710 $427 $2,137
Route CR-65 ProjectDescription
CR-65 (HILLCREST RD) FROM SR-5(US-78) TO CORRIDOR X (PRELIMINARY ENGINEERING-DESIGN)
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 2.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100040404 STPBH 7174 (600) PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $487 $122 $608
100038801 STPBH 7174 () RIGHT OF WAY
Approved in a STIP Plan 2021 $6,650 $1,663 $8,313
100040405 STPBH 7174 () UTILITIES
Approved in a STIP Plan 2022 $158 $39 $197
100038803 STPBH 7174 () CONSTRUCTION
Approved in a STIP Plan 2022 $8,800 $2,200 $11,000
TOTAL COST: $16,095 $4,024 $20,118
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
6 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route CR-94 ProjectDescription
CR-94 (DANIEL PAYNE DRIVE) ADD CONTINUOUS TWO-WAY LEFT TURN LANE FROM CR-105 (CHERRY AVE) TO I-65 (PROJECT SPONSOR THE CITY OF BIRMINGHAM)
Type of Work TURN LANES
Project Length in Miles 2.600 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100042371 STPBH 3716 () RIGHT OF WAY
Approved in a STIP Plan 2020 $45 $11 $56
100042372 STPBH 3716 () UTILITIES
Approved in a STIP Plan 2020 $146 $36 $182
100042373 STPBH 3716 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,947 $487 $2,433
TOTAL COST: $2,138 $534 $2,672
Route CR-NA ProjectDescription
FINLEY BLVD. EXT FROM 26TH STREET (US-31) TO 27TH AVENUE NEAR 32ND STREET NORTH
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 2.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100059888 STPBH 7173 () UTILITIES
Approved in a STIP Plan 2020 $3,041 $760 $3,801
100046959 STPBH 7173 () CONSTRUCTION
Approved in a STIP Plan 2020 $19,882 $4,971 $24,853
TOTAL COST: $22,924 $5,731 $28,655
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
7 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route CR-NA ProjectDescription
>VARIOUS INTERSECTIONS - PHASE 7 1. MT. OLIVE RD AT NEW FOUND RD./MT OLIVE-BROOKSIDE RD 2. UNION GROVE AT BANKHEAD HWY 3. HEFLIN AV AT RIDERWOOD TR 4. TARRANT RD AT PINEYWOOD RD /SKELTON AVE 5.TYLER LOOP RD AT SWEENEY HOLLOW RD 6.CHALKVILLE RD.
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.250 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100060490 STPBH 9802 (904) UTILITIES
Approved in a STIP Plan 2019 $80 $20 $100
100007628 STPBH 9802 (904) CONSTRUCTION
Approved in a STIP Plan 2020 $5,245 $1,311 $6,556
TOTAL COST: $5,325 $1,331 $6,656
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AT 2 LOCATIONS; SITE 1. MAYFIELD ROAD AND MONTEVALLO ROAD. SITE 3 CROSSHAVEN DRIVE AND GREEN VALLEY DRIVE.
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100060046 STPBH 9802 (924) UTILITIES
Approved in a STIP Plan 2019 $120 $30 $150
100007629 STPBH 9802 (924) CONSTRUCTION
Approved in a STIP Plan 2020 $2,655 $664 $3,318
TOTAL COST: $2,775 $694 $3,468
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
8 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route CR-NA ProjectDescription
GALLERIA BOULEVARD EXTENSION FROM CR-458 (LORNA ROAD) TO SR-150
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 0.350 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056488 STPBH 3715 (255) UTILITIES
Approved in a STIP Plan 2020 $400 $100 $500
100056489 STPBH 3715 (255) CONSTRUCTION
Approved in a STIP Plan 2020 $3,200 $800 $4,000
TOTAL COST: $3,600 $900 $4,500
Route CR-NA ProjectDescription
HOOVER TOPICS PROJECT-PATTON CHAPEL RD, PHASE III FROM CRAYRICH DRIVE TO CHAPEL LANE. COORDINATE WITH JEFFERSON CO. PROJECT. ADD 3RD LANE.
Type of Work TURN LANES
Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100069325 STPBH 7020 (601) UTILITIES
Approved in a STIP Plan 2019 $2,000 $500 $2,500
100007555 STPBH 7020 (601) CONSTRUCTION
Approved in a STIP Plan 2019 $2,017 $504 $2,521
TOTAL COST: $4,017 $1,004 $5,021
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
9 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route CR-NA ProjectDescription
LAKESHORE DR EXTENSION FROM SR-150 TO I-459
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 3.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100007562 STPBHF 7026 () UTILITIES
Approved in a STIP Plan 2030 $2,808 $702 $3,510
100046956 STPBHF 7026 () CONSTRUCTION
Approved in a STIP Plan 2030 $9,644 $2,411 $12,055
TOTAL COST: $12,452 $3,113 $15,565
Route CR-NA ProjectDescription
LAKESHORE DR EXTENSION FROM SR-150 TO I-459
Type of Work BASE AND PAVE
Project Length in Miles 3.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100046957 STPBHF 7026 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2030 $114 $28 $142
100046954 STPBHF 7026 () CONSTRUCTION
Approved in a STIP Plan 2031 $16,022 $4,006 $20,028
TOTAL COST: $16,136 $4,034 $20,170
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
10 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route CR-NA ProjectDescription
>GARDENDALE - MAIN STREET FR TARRANT DR. TO REDMAYNE RD. PROJECT SPONSOR: JEFFERSON COUNTY.
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 1.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100007597 STPBH 7164 (600) RIGHT OF WAY
Approved in a STIP Plan 2020 $275 $69 $343
100007595 STPBH 7164 (600) CONSTRUCTION
Approved in a STIP Plan 2021 $1,638 $409 $2,047
TOTAL COST: $1,912 $478 $2,390
Route CR-NA ProjectDescription
EAST LAKE BLVD FROM 39TH ST TO 40TH ST N, ADD TURN LANES ; WEST OF B'HAM INTERNATIONAL AIRPORT (PHASE 2)
Type of Work TURN LANES
Project Length in Miles 0.170 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100053046 STPBH 7173 () CONSTRUCTION
Approved in a STIP Plan 2020 $240 $60 $300
TOTAL COST: $240 $60 $300
Route CR-NA ProjectDescription
JEFFERSON COUNTY TOPICS (PHASE 9) TARRANT HUFFMAN ROAD FROM SR-79 (OLD PINSON HIGHWAY) TO TREADWELL ROAD
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.600 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100007609 STPBH 7229 (602) CONSTRUCTION
Approved in a STIP Plan 2021 $3,691 $923 $4,614
TOTAL COST: $3,691 $923 $4,614
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
11 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON SPRINGDALE ROAD OVER FIVE MILE CREEK BIN# 15837
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068651 STPBH 3717 (250) UTILITIES
Approved in a STIP Plan 2019 $404 $101 $505
100059460 STPBH 3717 (250) CONSTRUCTION
Approved in a STIP Plan 2020 $1,644 $411 $2,055
TOTAL COST: $2,048 $512 $2,560
Route CR-NA ProjectDescription
OXMOOR BLVD-GREEN SPRINGS TO BARBER COURT. INTERSECTION IMPROVEMENTS AT BARBER CT. AND OXMOOR RD. AND I-65 AND CONTINUOUS TWO WAY TURN LANE
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 1.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100029563 STPBH 9802 () RIGHT OF WAY
Approved in a STIP Plan 2019 $243 $61 $304
100029566 STPBH 9802 () UTILITIES
Approved in a STIP Plan 2020 $658 $164 $822
100029510 STPBH 9802 () CONSTRUCTION
Approved in a STIP Plan 2020 $3,597 $899 $4,496
TOTAL COST: $4,498 $1,125 $5,623
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
12 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route CR-NA ProjectDescription
ITS TRAFFIC SIGNALIZATION, SYSTEM WIDE TIMING PLAN AND PHASE 1 EQUIPMENT UPGRADE PLAN FOR TRAFFIC SIGNAL SYSTEM AT 100 INTERSECTIONS
Type of Work SIGNALIZATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100039866 CMAQ NR01 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $747 $187 $933
100039867 CMAQ NR01 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,352 $338 $1,691
TOTAL COST: $2,099 $525 $2,624
Route CR-NA ProjectDescription
ITS TRAFFIC SIGNALIZATION 100 INTERSECTION. PHASE 2
Type of Work SIGNALIZATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100039868 CMAQ NR04 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $575 $144 $719
100039869 CMAQ NR04 () CONSTRUCTION
Approved in a STIP Plan 2020 $3,452 $863 $4,315
TOTAL COST: $4,027 $1,007 $5,034
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
13 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route CR-NA ProjectDescription
ITS TRAFFIC SIGNALIZATION 100 INTERSECTION. PHASE 3
Type of Work SIGNALIZATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100039870 CMAQ NR06 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $575 $144 $719
100039871 CMAQ NR06 () CONSTRUCTION
Approved in a STIP Plan 2020 $3,452 $863 $4,315
TOTAL COST: $4,027 $1,007 $5,034
Route CR-NA ProjectDescription
OPORTO-MADRID BLVD, SAFETY IMPROVEMENTS TO CORRECT SIGHT DISTANCE DEFICIENCIES (PHASE 4)
Type of Work SAFETY IMPROVEMENTS
Project Length in Miles 0.230 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100041014 HPP 1602 (537) UTILITIES
Approved in a STIP Plan 2028 $37 $9 $47
100041015 HPP 1602 (537) CONSTRUCTION
Approved in a STIP Plan 2029 $1,022 $256 $1,278
TOTAL COST: $1,060 $265 $1,325
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
14 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route CR-NA ProjectDescription
ADD CONTINUOUS TWO-WAY LEFT TURN LANE ON 40TH STREET NORTH, FROM 400' SOUTH OF 10TH AVE N TO THE SOUTH ON AND OFF RAMPS OF I-59
Type of Work TURN LANES
Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100042375 STPBH 7170 () RIGHT OF WAY
Approved in a STIP Plan 2025 $45 $11 $56
100042376 STPBH 7170 () UTILITIES
Approved in a STIP Plan 2026 $146 $36 $182
100042377 STPBH 7170 () CONSTRUCTION
Approved in a STIP Plan 2026 $633 $158 $791
TOTAL COST: $824 $206 $1,030
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT (BIN# 000282) ON PRATT HIGHWAY AT BLACK CREEK NEAR SANDUSKY IN BIRMINGHAM
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.250 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100059893 STPBH 1602 (519) RIGHT OF WAY
Approved in a STIP Plan 2019 $800 $200 $1,000
100033434 HPP-STPBH 1602 (519) UTILITIES
Approved in a STIP Plan 2019 $424 $106 $530
100059894 STPBH 1602 (519) CONSTRUCTION
Approved in a STIP Plan 2020 $1,680 $420 $2,100
TOTAL COST: $2,904 $726 $3,630
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
15 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route CR-NA ProjectDescription
STREETSCAPE AND TRANSPORTATION IMPROVEMENTS ON 16TH STREET CORRIDOR FROM 11TH AVE NORTH TO I-65 WITHIN FOUNTAIN HEIGHTS NEIGHBORHOOD
Type of Work UTILITY ADJUSTMENT
Project Length in Miles 0.550 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056315 STPBH 7117 () UTILITIES
Approved in a STIP Plan 2019 $200 $50 $250
TOTAL COST: $200 $50 $250
Route CR-NA ProjectDescription
RESURFACE RUTLEDGE DRIVE FROM CR-56(ALLISON BONNETT MEMORIAL DRIVE) TO WOODWARD ROAD AND RESURFACE WILKES ROAD FROM WOODWARD ROAD TO SR-5 (US-11) CITY OF MIDFIELD
Type of Work RESURFACING
Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100059488 ACAA59488 ATRP (006) CONSTRUCTION
Approved in a STIP Plan 2019 $674 $169 $843
TOTAL COST: $674 $169 $843
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
16 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AND ADDITIONAL TURN LANE AT CALDWELL MILL ROAD AND JAGUAR DRIVE IN THE CITY OF HOOVER
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100062345 CMAQ 3714 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $40 $10 $50
100062346 CMAQ 3714 () RIGHT OF WAY
Approved in a STIP Plan 2020 $40 $10 $50
100062347 CMAQ 3714 () UTILITIES
Approved in a STIP Plan 2020 $90 $22 $112
100062348 CMAQ 3714 () CONSTRUCTION
Approved in a STIP Plan 2020 $692 $173 $865
TOTAL COST: $862 $216 $1,078
Route CR-NA ProjectDescription
ROADWAY AND INTERSECTION IMPROVEMENTS ON CAHABA RIVER ROAD FROM SR-38 (US-280) TO KEY DRIVE
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 3.350 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100063245 STPBH 3716 (252) RIGHT OF WAY
Approved in a STIP Plan 2020 $800 $200 $1,000
100063246 STPBH 3716 (252) UTILITIES
Approved in a STIP Plan 2021 $1,000 $250 $1,250
100063247 STPBH 3716 () CONSTRUCTION
Approved in a STIP Plan 2021 $4,150 $1,037 $5,187
TOTAL COST: $5,950 $1,487 $7,437
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
17 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS CAHABA RD/SR-38(US-280)/CULVER RD/LANE PARK RD-CITY OF MOUNTAIN BROOK
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064200 CMAQ 3715 () RIGHT OF WAY
Approved in a STIP Plan 2019 $300 $75 $375
100064201 CMAQ 3715 () UTILITIES
Approved in a STIP Plan 2020 $420 $105 $526
100064202 CMAQ 3715 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,779 $445 $2,224
TOTAL COST: $2,499 $625 $3,124
Route CR-NA ProjectDescription
UPGRADE AND REPLACE INTERSTATE LIGHTING AT VARIOUS LOCATION IN THE CITY OF BIRMINGHAM
Type of Work LIGHTING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064216 STPBH 3716 () CONSTRUCTION
Approved in a STIP Plan 2019 $800 $200 $1,000
TOTAL COST: $800 $200 $1,000
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
18 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route CR-NA ProjectDescription
PAVEMENT REHABILITATION ON LAKESHORE PARKWAY FROM VENICE ROAD TO THE BIRMINGHAM CITY LIMITS
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064225 STPBH 3715 () CONSTRUCTION
Approved in a STIP Plan 2019 $800 $200 $1,000
TOTAL COST: $800 $200 $1,000
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AT REX LAKE ROAD AND ZEIGLER ROAD
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064310 CMAQ 3715 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $160 $40 $200
100064311 CMAQ 3715 () RIGHT OF WAY
Approved in a STIP Plan 2019 $160 $40 $200
100064312 CMAQ 3715 () UTILITIES
Approved in a STIP Plan 2020 $160 $40 $200
100064313 CMAQ 3715 () CONSTRUCTION
Approved in a STIP Plan 2020 $480 $120 $600
TOTAL COST: $960 $240 $1,200
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
19 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route CR-NA ProjectDescription
RAILROAD CROSSING IMPROVEMENTS SIGNALS, BELLS, GATES, SIGNS, MARKINGS AND LEDGENDS REF # 1305(XV-R) ON 22ND STREET AT CSX AT DOT # 352619R
Type of Work RR CROSSING IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064749 RHCH RR16 (912) CONSTRUCTION
Approved in a STIP Plan 2019 $237 $26 $263
TOTAL COST: $237 $26 $263
Route CR-NA ProjectDescription
BRIDGE RECONSTRUCTION AND REHABILITATION FOR OLD BROOK TRAIL BRIDGE (BIN # 012869) OVER LITTLE SHADES CREEK AND CANTERBURY ROAD BRIDGE (BIN # 002873) OVER WATKINS CREEK, CITY OF MOUNTAIN BROOK
Type of Work BRIDGE REHABILITATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066111 STPBH 3716 (256) RIGHT OF WAY
Approved in a STIP Plan 2020 $80 $20 $100
100066112 STPBH 3716 (256) UTILITIES
Approved in a STIP Plan 2020 $80 $20 $100
100066113 STPBH 3716 () CONSTRUCTION
Approved in a STIP Plan 2020 $880 $220 $1,100
TOTAL COST: $1,040 $260 $1,300
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
20 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route CR-NA ProjectDescription
RESURFACING VARIOUS CITY STREETS IN THE CITY OF BIRMINGHAM
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067672 ST-037-999-018 () CONSTRUCTION
Approved in a STIP Plan 2019 $0 $2,200 $2,200
TOTAL COST: $0 $2,200 $2,200
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT (BIN 000090) ON 21ST STREET NORTH (RICHARD ARRINGTON JR BOULEVARD) BETWEEN 1ST AVENUE SOUTH AND 1ST AVENUE NORTH OVER NORFOLK SOUTHERN AND CSX RAILROAD - CITY OF BIRMINGHAM
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067934 STPBH 3718 (250) PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $640 $160 $800
TOTAL COST: $640 $160 $800
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
21 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route CR-NA ProjectDescription
13TH STREET SOUTH - ADD BIKE LANES AND STREETSCAPE IMPROVEMENTS FROM 1ST AVE SOUTH TO 10TH AVE SOUTH
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068127 CMAQ 3718 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $299 $75 $374
100068128 CMAQ 3718 () UTILITIES
Approved in a STIP Plan 2021 $82 $21 $103
100068129 CMAQ 3718 () CONSTRUCTION
Approved in a STIP Plan 2021 $1,714 $429 $2,143
TOTAL COST: $2,096 $524 $2,620
Route CR-NA ProjectDescription
GREENWAY AND ROAD DIET ON RICHARD ARRINGTON JR BOULEVARD FROM 15TH AVENUE SOUTH TO VALLEY AVENUE
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068467 CMAQ 3718 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $242 $61 $303
TOTAL COST: $242 $61 $303
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
22 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route I -20 ProjectDescription
CONGESTION MGT. TRAFFIC SYS, SUPPLEMENTAL ITS DEVICES ALONG I-20/I-59 FROM 0.75 MILE WEST OF ENSLEY AVE (EXIT 120) TO I-65 (EXIT 124) AND ALONG SR-38 (US-280) FROM SR-119 TO I-59 (EXIT 126), INCLUDES FIBER, POLES, ECT, NONE ELECTRONICS
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100046082 CMAQ NR05 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $89 $22 $111
100046083 CMAQ NR05 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,181 $295 $1,477
TOTAL COST: $1,270 $317 $1,587
Route I -20 ProjectDescription
CONGESTION MGT. TRAFFIC SYS, SUPPLEMENTAL ITS DEVICES ALONG I-20/I-59 FR DMS #5 (3/4 MI WEST OF ENSLEY AVE (EXIT120)) TO I-65 (EXIT 124) AND ALONG US-280 FR SR-119 TO I-20/I-59 (EXIT 126), INCLUDES CCTV, RADAR, ETC. ELECTRONIC DEVICES AND EQUIPMENT
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100046084 CMAQ NR05 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $52 $13 $66
100046086 CMAQ NR05 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,049 $262 $1,312
100046085 CMAQ NR05 () SPECIAL
Approved in a STIP Plan 2020 $193 $48 $242
TOTAL COST: $1,295 $324 $1,619
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
23 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route I -20 ProjectDescription
PAVEMENT REHABILITATION ON I-20 FROM EXIT 140 TO THE JEFFERSON/ST CLAIR COUNTY LINE
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 2.800 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068064 IM I020 (356) PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $136 $15 $152
100068066 IM I020 () CONSTRUCTION
Approved in a STIP Plan 2019 $6,300 $700 $7,000
TOTAL COST: $6,436 $715 $7,152
Route I -22 ProjectDescription
I-22 (CORRIDOR X) FROM EAST OF I-65 TO SR-3(US-31)
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 0.351 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100045131 NH 0471 (523) CONSTRUCTION
Approved in a STIP Plan 2025 $21,252 $5,313 $26,565
100059531 NH I022 () CONSTRUCTION
Approved in a STIP Plan 2025 $16,080 $4,020 $20,100
TOTAL COST: $37,332 $9,333 $46,665
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
24 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route I -459 ProjectDescription
INCHG LGT ON I-459ATCR-18 (EXIT #1) AND CR-52 (EXIT #6)
Type of Work LIGHTING
Project Length in Miles 4.564 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100005123 IM I459 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $129 $14 $143
100005120 IM I459 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,617 $180 $1,797
TOTAL COST: $1,746 $194 $1,940
Route I -459 ProjectDescription
COLONNADE DRIVE RELOCATION (GRADE, DRAIN, BASE, PAVE, AND RETAINING WALL)
Type of Work RAMP REVISIONS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100038955 IM I459 (306) CONSTRUCTION
Approved in a STIP Plan 2021 $1,854 $206 $2,059
TOTAL COST: $1,854 $206 $2,059
Route I -459 ProjectDescription
I-459, RAMP MODIFICATIONS AT THE SR-38 (US-280) INTERCHANGE (PHASE 3)
Type of Work RAMP REVISIONS
Project Length in Miles 0.080 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100063754 IM I459 () CONSTRUCTION
Approved in a STIP Plan 2022 $26,250 $2,917 $29,167
TOTAL COST: $26,250 $2,917 $29,167
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
25 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route I -459 ProjectDescription
INTERCHANGE AT I-459 AND CR-2 (SOUTH SHADES CREST ROAD) INCLUDES BRIDGE OVER INTERSTATE AND RAMP BRIDGE OVER RAILROAD, CITY OF HOOVER
Type of Work INTERCHANGE
Project Length in Miles 0.002 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100062062 STPBHF I459 (310) PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $1,200 $300 $1,500
100056292 STPBHF I459 (310) RIGHT OF WAY
Approved in a STIP Plan 2021 $1,600 $400 $2,000
100056293 STPBHF I459 (310) UTILITIES
Approved in a STIP Plan 2024 $400 $100 $500
100056294 STPBHF I459 (310) CONSTRUCTION
Approved in a STIP Plan 2024 $20,800 $5,200 $26,000
TOTAL COST: $24,000 $6,000 $30,000
Route I -459 ProjectDescription
I-459 INTERSTATE MEDIAN CROSSOVER PROTECTION FROM I-20/I-59 TO 0.56 MILES SOUTH OF SR-150
Type of Work SAFETY IMPROVEMENTS
Project Length in Miles 10.700 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100063237 HSIP I459 (312) CONSTRUCTION
Approved in a STIP Plan 2020 $900 $0 $900
TOTAL COST: $900 $0 $900
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
26 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route I -59 ProjectDescription
PAVEMENT REHABILITATION ON I-20/59 FROM ARKADELPHIA ROAD TO THE SOUTH END OF THE CENTRAL BUSINESS DISTRICT BRIDGE NEAR 15TH STREET AND ON I-65 FROM SOUTH OF 1 ST. AVENUE NORTH TO 16TH STREET NORTH
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100063656 IM I059 (410) CONSTRUCTION
Approved in a STIP Plan 2019 $13,909 $1,545 $15,455
TOTAL COST: $13,909 $1,545 $15,455
Route I -59 ProjectDescription
RESURFACE I-59 FROM 1ST AVENUE NORTH (MP 132.160) TO I-459 (MP 137.19) IN TRUSSVILLE
Type of Work RESURFACING
Project Length in Miles 4.990 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100062068 IM I059 () CONSTRUCTION
Approved in a STIP Plan 2020 $12,593 $1,399 $13,993
TOTAL COST: $12,593 $1,399 $13,993
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
27 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route I -59 ProjectDescription
6-LANE I-59 FR I-459 (EXIT 106) TO 18TH/19TH ST (EXIT 112)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 5.770 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100063758 NH I059 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2044 $267 $67 $334
100039734 IM-NH I059 () RIGHT OF WAY
Approved in a STIP Plan 2046 $222 $27 $250
100047739 NH I059 () UTILITIES
Approved in a STIP Plan 2046 $75 $19 $93
100033202 IM-NH I059 () CONSTRUCTION
Approved in a STIP Plan 2047 $24,016 $2,968 $26,984
TOTAL COST: $24,580 $3,081 $27,661
Route I -59 ProjectDescription
I-59 ADD LANES FROM SR-5 (US-11,EXIT 108) TO CR-46 (18TH/19TH ST, EXIT 112), PHASE II
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 3.570 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100044587 IM-NH I059 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2047 $379 $89 $468
100047790 NH I059 () UTILITIES
Approved in a STIP Plan 2048 $76 $19 $95
100043629 IM-NH I059 () CONSTRUCTION
Approved in a STIP Plan 2048 $22,179 $5,202 $27,381
TOTAL COST: $22,634 $5,310 $27,945
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
28 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route I -59 ProjectDescription
ADD LANES ON I-59 FROM 18TH/19TH STREET (EXIT 112) TO VALLEY ROAD (EXIT 118)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 6.388 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100047791 NH I059 () UTILITIES
Approved in a STIP Plan 2024 $60 $15 $74
100056495 NH I059 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2021 $291 $73 $364
100039736 IM-NH I059 () RIGHT OF WAY
Approved in a STIP Plan 2023 $341 $42 $383
100033203 IM-NH I059 () CONSTRUCTION
Approved in a STIP Plan 2025 $28,915 $3,574 $32,488
TOTAL COST: $29,607 $3,704 $33,310
Route I -59 ProjectDescription
SIGN REHAB ON I-59 FROM TUSCALOOSA CL TO ST.CLAIR CL; I-65 FROM SHELBY CL TO EXIT 280 (WARRIOR); I-459 FROM I-59 S OF TRUSSVILLE (PHASE 3)
Type of Work SIGN REHABILITATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100042475 IM I059 () CONSTRUCTION
Approved in a STIP Plan 2019 $3,766 $418 $4,184
TOTAL COST: $3,766 $418 $4,184
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
29 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route I -59 ProjectDescription
MOWING ON ALL THE INTERSTATE ROUTES IN DISTRICT ONE JEFFERSON COUNTY FROM THE BEGINNING OF THE DISTRICT LINE TO THE END OF THE DISTRICT LINE.
Type of Work ROADSIDE MOWING
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100061632 99-403-371-000-404 () MAINTENANCE CONSTRUCTION
Approved in a STIP Plan 2019 $0 $1,082 $1,082
TOTAL COST: $0 $1,082 $1,082
Route I -59 ProjectDescription
RESURFACE I-59 FROM I-459 TO 1.23 MILES NORTH OF ACADEMY DRIVE (EXIT 108) PLANNING, RESURFACING, CROSS SLOPE/SUPERELEVATION CORRECTION, TRAFFIC STRIPING AND MARKINGS, GUARDRAIL AND GUARDRAIL END ANCHORS
Type of Work PAVEMENT MINOR REHABILITATION
Project Length in Miles 3.357 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067734 IM I059 (408) CONSTRUCTION
Approved in a STIP Plan 2019 $8,958 $995 $9,953
TOTAL COST: $8,958 $995 $9,953
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
30 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route I -59 ProjectDescription
I-59 FR MP 132.16AT1ST AV N TO MP 137.19ATI-459 6 LANES
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 4.990 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064120 NH I059 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $1,682 $420 $2,102
100045051 NH I059 () UTILITIES
Approved in a STIP Plan 2022 $117 $29 $146
100004982 NH I059 () CONSTRUCTION
Approved in a STIP Plan 2023 $37,537 $9,384 $46,921
TOTAL COST: $39,335 $9,834 $49,169
Route I -59 ProjectDescription
RECONSTRUCTION AND LANE ADDITION ON I-59 FROM I-459 TO CR-10 (CHALKVILLE MOUNTAIN ROAD)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 2.800 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064600 IM-NH I059 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $442 $78 $520
100064602 IM-NH I059 () CONSTRUCTION
Approved in a STIP Plan 2022 $19,138 $3,377 $22,515
TOTAL COST: $19,580 $3,455 $23,035
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
31 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route I -65 ProjectDescription
ROADWAY LIGHTING I-65 FROM 5100' SOUTH OF ALFORD AVENUE TO 6TH AVENUE NORTH
Type of Work LIGHTING
Project Length in Miles 7.700 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100048475 STPBH I065 (445) CONSTRUCTION
Approved in a STIP Plan 2021 $5,556 $1,389 $6,945
TOTAL COST: $5,556 $1,389 $6,945
Route I -65 ProjectDescription
CONCRETE PAVEMENT REHAB, UNDERSEAL, GRINDING, PAVERLAID SURFACE TREATMENT, UNDERDRAIN, SHOULDER PAVEMENT,GUARDRAIL ON I-65 FROM SR-3(US-31) TO RALEIGH AVENUE OVERPASS (PRIORITY #35)
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 3.760 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066473 IM I065 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $227 $25 $253
100055415 IM I065 () CONSTRUCTION
Approved in a STIP Plan 2019 $9,320 $1,036 $10,356
TOTAL COST: $9,548 $1,061 $10,609
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
32 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route I -65 ProjectDescription
PLANING, RESURFACING, STRIPING, MARKINGS AND SAFETY IMPROVEMENTS TO GUARDRAILS AND GUARDRAIL END ANCHORS ON I-65 FROM MOUNT OLIVE INTERCHANGE TO .78 MILE NORTH OF SR-160
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 13.400 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100060142 IM-HSIP I065 (484) CONSTRUCTION
Approved in a STIP Plan 2019 $20,036 $2,226 $22,262
TOTAL COST: $20,036 $2,226 $22,262
Route NA- ProjectDescription
OXMOOR VALLEY GREENWAY-BIKE TRAIL PROJECT SPONSOR:CITY OF BIRMINGHAM (1.) FROM SAND RIDGE/LITTLE SHADES CREEK TO OXMOOR VILLAGE CENTER.
Type of Work UNCLASSIFIED
Project Length in Miles 2.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100029522 CMAQ 9802 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,450 $363 $1,813
TOTAL COST: $1,450 $363 $1,813
Route NA- ProjectDescription
HOOVER-TRAFFIC CONTROL CENTER
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100029518 STPBH 9802 () CONSTRUCTION
Approved in a STIP Plan 2020 $198 $49 $247
TOTAL COST: $198 $49 $247
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
33 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
SHADES CREEK GREENWAY MULTI-PURPOSE TRAIL - PHASE TWO GRADE, DRAIN, BASE, PAVE, BRIDGE, STRIPING, SIGNING AND LANDSCAPING CITY OF HOMEWOOD JEFFERSON COUNTY
Type of Work UNCLASSIFIED
Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100029525 CMAQ 9802 (911) CONSTRUCTION
Approved in a STIP Plan 2019 $2,945 $736 $3,682
100029526 CMAQ 9802 (912) CONSTRUCTION
Approved in a STIP Plan 2021 $4,735 $1,184 $5,919
TOTAL COST: $7,680 $1,920 $9,600
Route NA- ProjectDescription
BESSEMER RAIL TO TRAIL CONVERSION PROJECT FROM THE HOOVER CITY LIMITS NEAR PARKWOOD TO SR-150 AT LAKESHORE PARKWAY CONNECTION -CITY OF BESSEMER PROJECT SPONSOR
Type of Work UNCLASSIFIED
Project Length in Miles 4.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100029565 CMAQ 9802 () RIGHT OF WAY
Approved in a STIP Plan 2020 $633 $158 $791
100029524 CMAQ 9802 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,114 $278 $1,392
TOTAL COST: $1,746 $437 $2,183
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
34 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
"CBD INCIDENT AND CONGESTION MANAGMENT PROGRAM"
Type of Work UNCLASSIFIED
Project Length in Miles 0.270 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100029534 CMAQ 9802 (926) CONSTRUCTION
Approved in a STIP Plan 2020 $1,367 $342 $1,709
TOTAL COST: $1,367 $342 $1,709
Route NA- ProjectDescription
CONGESTION MGT TRAFFIC SYSTEM (PHASE 7) FIBER OPTIC CABLE MESSAGE SIGNS AND VEHICLE DETECTION DEVICES, SR-3 FR UNIV. BLVD TO SR-38 THEN SR-38 FR SR-3 TO SR-119
Type of Work UNCLASSIFIED
Project Length in Miles 16.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100029515 CMAQ 9802 () CONSTRUCTION
Approved in a STIP Plan 2020 $4,603 $1,151 $5,754
TOTAL COST: $4,603 $1,151 $5,754
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
35 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
CONGESTION MGT / AREAWIDE TRAFFIC SYSTEM / PHASE 3 AND 3A PROJECT SPONSOR: ALDOT, TRANSPORTATION MANAGEMENT CENTER TO BE BUILT AT 3RD DIVISION COMPLEX
Type of Work UTILITY ADJUSTMENT
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100040855 CMAQ 9802 () UTILITIES
Approved in a STIP Plan 2020 $12 $3 $14
100029517 CMAQ 9802 () CONSTRUCTION
Approved in a STIP Plan 2021 $4,881 $1,220 $6,102
TOTAL COST: $4,893 $1,223 $6,116
Route NA- ProjectDescription
CONGESTION MGT / AREAWIDE TRAFFIC SYSTEM (PHASE 4) PROJECT SPONSOR:ALDOT,REGIONAL HIGHWAY RADIO: TO BE BUILTATCORNER 26TH ST AND 12 AVE N
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100029519 CMAQ 9802 () CONSTRUCTION
Approved in a STIP Plan 2020 $575 $144 $719
TOTAL COST: $575 $144 $719
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
36 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
TRUSSVILLE GREENWAY AND WALKWAY MULTI-USE TRAIL-GREENWAY FROM CHALKVILLE MTN RD (CR-10) TO CALUMET PARKWAY NEAR SR-7 (US-11), (PHASE 1)
Type of Work UNCLASSIFIED
Project Length in Miles 5.900 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100052630 CMAQ 9802 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,151 $288 $1,439
TOTAL COST: $1,151 $288 $1,439
Route NA- ProjectDescription
OLD LEEDS ROAD BICYCLE LANES FROM IRONDALE CITY LIMITS/ BERMUDA DR TO GRANTS MILL. WIDEN TO 31 FT TO ACCOMMODATE TWO 14-FOOT WIDE TRAVEL LANES WITH THE REMAINDER AS PAVED SHOULDER. PROJECT SPONSOR: IRONDALE
Type of Work UNCLASSIFIED
Project Length in Miles 0.090 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100032371 CMAQ 9802 () CONSTRUCTION
Approved in a STIP Plan 2020 $600 $150 $750
TOTAL COST: $600 $150 $750
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
37 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
>SHADES CREEK GREENWAY MULTI-USE TRAIL SHADES CREEK GREENWAY - 1. ON-ROAD CONNECTION VIA ELDER STREET MONCLAIR ROAD AND CRESTWOOD BLVD FROM 15TH STREET TO 20TH ST. 2. OFF-ROAD TRAIL ALONG SHADESCREEK. CONNECTORS ALONG GREENWAY TRAIL INCLUD
Type of Work UNCLASSIFIED
Project Length in Miles 2.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100032397 CMAQ 9802 () RIGHT OF WAY
Approved in a STIP Plan 2019 $63 $16 $78
100032392 CMAQ 9802 () CONSTRUCTION
Approved in a STIP Plan 2042 $1,283 $321 $1,603
TOTAL COST: $1,345 $336 $1,682
Route NA- ProjectDescription
CITY OF BIRMINGHAM ARTERIAL CCTV 41 INTERSECTIONS WITH FIBER OPTIC CABLE INSTALLED, PHASE 2.
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100033183 CMAQ 9802 () CONSTRUCTION
Approved in a STIP Plan 2020 $426 $106 $532
TOTAL COST: $426 $106 $532
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
38 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
VILLAGE CREEK GREENWAY (PHASE 3) FROM HUFFMAN PARK TO 65TH STREET N
Type of Work UNCLASSIFIED
Project Length in Miles 5.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100039850 CMAQ NR03 () RIGHT OF WAY
Approved in a STIP Plan 2021 $174 $44 $218
100039851 CMAQ NR03 () CONSTRUCTION
Approved in a STIP Plan 2022 $1,763 $441 $2,204
TOTAL COST: $1,938 $484 $2,422
Route NA- ProjectDescription
VILLAGE CREEK GREENWAY (PHASE 2) FROM 3RD STREET TO TALLAPOOSA STREET
Type of Work UNCLASSIFIED
Project Length in Miles 5.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100039846 CMAQ NR02 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $513 $128 $641
100039847 CMAQ NR02 () RIGHT OF WAY
Approved in a STIP Plan 2020 $259 $65 $324
100039848 CMAQ NR02 () CONSTRUCTION
Approved in a STIP Plan 2021 $2,619 $655 $3,273
TOTAL COST: $3,390 $848 $4,238
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
39 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
VILLAGE CREEK GREENWAY (PHASE 3) FROM HUFFMAN PARK TO 65TH STREET N
Type of Work UNCLASSIFIED
Project Length in Miles 5.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100039849 CMAQ NR03 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $345 $86 $432
TOTAL COST: $345 $86 $432
Route NA- ProjectDescription
VALLEY CREEK GREENWAY FROM 12TH STREET AT RICKWOOD FIELD TO AVENUE W AT FIVE POINTS WEST
Type of Work UNCLASSIFIED
Project Length in Miles 1.950 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100039852 CMAQ NR06 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $460 $115 $575
100039853 CMAQ NR06 () RIGHT OF WAY
Approved in a STIP Plan 2020 $138 $35 $173
100039854 CMAQ NR06 () CONSTRUCTION
Approved in a STIP Plan 2020 $460 $115 $575
TOTAL COST: $1,059 $265 $1,323
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
40 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
RAILROAD RESERVATION/1ST AVENUE SOUTH PHASE 2 AND 3 ENGINEERING: 1ST AVENUE SOUTH FROM 18TH STREET TO 32ND STREET AND NORTH TO SLOSS FURNACE.
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056176 CMAQ 3700 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $253 $63 $316
TOTAL COST: $253 $63 $316
Route NA- ProjectDescription
ITS FIBER OPTIC PLAN, CITY WIDE FOR ITS ARTERIAL INCIDENT MGT.
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100039861 STPBH NR01 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $135 $34 $169
TOTAL COST: $135 $34 $169
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
41 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
ITS MONITORS, VIDEO CAMERA, 7 LOCATIONS. EMERGENGY RESPONSE ROUTING
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100039864 STPBH NR01 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $19 $5 $23
100039865 STPBH NR01 () CONSTRUCTION
Approved in a STIP Plan 2020 $187 $47 $234
TOTAL COST: $206 $51 $257
Route NA- ProjectDescription
ITS MONITORS, VIDEO CAMERAS NSRR, 41ST ST NORTH TO BRUSSELS CIRCLE ( RAILROAD CROSSING)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100039872 STPBH NR01 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $140 $35 $175
100039873 STPBH NR01 () CONSTRUCTION
Approved in a STIP Plan 2020 $234 $58 $292
TOTAL COST: $374 $94 $468
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
42 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
CAHABA RIVER EAST GREENWAY; OFF CR-115-1 (OLD ROCKY RIDGE RD) NEAR CHESTNUT RIDGE (SUB-DIVISION) AND CAHABA RIVER
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100039922 CMAQ CN07 (911) CONSTRUCTION
Approved in a STIP Plan 2020 $449 $112 $561
TOTAL COST: $449 $112 $561
Route NA- ProjectDescription
CAHABA RIVER GREENWAY-PHASE 3 (TRUSSVILLE) CORRIDOR STUDY FOR A PEDESTRIAN BRIDGE OVER THE CAHABA RIVER, SOUTH OF SR-7 (US-11)
Type of Work CORRIDOR STUDY
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100048496 CMAQ PE07 (912) PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $41 $10 $52
TOTAL COST: $41 $10 $52
Route NA- ProjectDescription
CAHABA RIVER GREENWAY-PHASE 4 (TRUSSVILLE) CORRIDOR STUDY FOR WALKWAY AND TRAILHEAD CONNECTING CONNECTING SENIOR CENTER TO THE CAHABA RIVER GREENWAY, NORTH OF SR-7 (US-11)
Type of Work CORRIDOR STUDY
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100048497 CMAQ PE07 (911) PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $41 $10 $52
TOTAL COST: $41 $10 $52
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
43 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
RESURFACING, SIDEWALK ADDITIONS AND DRAINAGE IMPROVEMENTS ALONG POLLY REED ROAD FROM SR-75 TO REED ROAD NE
Type of Work UNCLASSIFIED
Project Length in Miles 0.400 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100058033 STPBH 3716 (250) UTILITIES
Approved in a STIP Plan 2019 $160 $40 $200
100054521 STPBH 3716 (250) CONSTRUCTION
Approved in a STIP Plan 2019 $2,724 $681 $3,405
TOTAL COST: $2,884 $721 $3,605
Route NA- ProjectDescription
SIDEWALKS ALONG CR-67 (HAZELWOOD ROAD), FROM BURGANDY DR TO HARRIS AVENUE
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100048382 STPBH 7234 (600) CONSTRUCTION
Approved in a STIP Plan 2019 $86 $21 $107
TOTAL COST: $86 $21 $107
Route NA- ProjectDescription
CONSTRUCT SIDEWALKS IN THE CITY OF LEEDS ALONG SR-119 (MONTEVALLO ROAD) FROM LEEDS HISTORICAL PARK TO LEEDS ELEMENTARY SCHOOL
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100048880 HPP A133 (900) CONSTRUCTION
Approved in a STIP Plan 2019 $150 $37 $187
TOTAL COST: $150 $37 $187
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
44 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
PEDESTRIAN IMPROVEMENTS FOR THE CITY OF GARDENDALE AT BELL STREET AND MAIN STREET
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100050724 CMAQF 3717 () CONSTRUCTION
Approved in a STIP Plan 2019 $480 $120 $600
TOTAL COST: $480 $120 $600
Route NA- ProjectDescription
PEDESTRIAN WALKWAY OVER US-31 IN VESTAVIA HILLS NEAR CITY HALL
Type of Work PEDESTRIAN OVERPASS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100051157 DE-HPP-TAPBH A124 () CONSTRUCTION
Approved in a STIP Plan 2019 $1,067 $266 $1,333
TOTAL COST: $1,067 $266 $1,333
Route NA- ProjectDescription
NORFOLK SOUTHERN BIRMINGHAM REGIONAL INTERMODAL FACILITY, MCCALLA
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100055374 CTGR-STPBH-FAUP 3714 ()
CONSTRUCTION
Approved in a STIP Plan 2019 $2,673 $668 $3,342
TOTAL COST: $2,673 $668 $3,342
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
45 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
STREETSCAPE AND TRANSPORTATION IMPROVEMENTS ON 16TH STREET CORRIDOR FROM 11TH AVE NORTH TO I-65 WITHIN FOUNTAIN HEIGHTS NEIGHBORHOOD
Type of Work STREETSCAPE
Project Length in Miles 0.550 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056316 STPBH 7117 () CONSTRUCTION
Approved in a STIP Plan 2019 $2,613 $653 $3,266
TOTAL COST: $2,613 $653 $3,266
Route NA- ProjectDescription
SIDEWALKS ON PARTS OF 24 TH STREET NORTH, BERKLEY AVENUE, ARLINGTON AVENUE AND OWEN AVENUE IN BESSEMER
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056509 CMAQ NR13 (954) UTILITIES
Approved in a STIP Plan 2019 $83 $21 $104
100056510 CMAQ NR13 (954) CONSTRUCTION
Approved in a STIP Plan 2019 $546 $137 $683
TOTAL COST: $630 $157 $787
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
46 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
SIDEWALKS ALONG CR-99 (COLUMBIANA RD) FROM SR-3 (US-31,MONTGOMERY HIGHWAY) TO SHADES CREST RD IN VESTAVIA HILLS
Type of Work SIDEWALK
Project Length in Miles 1.350 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056515 CMAQ NR13 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $189 $47 $236
100056516 CMAQ NR13 () RIGHT OF WAY
Approved in a STIP Plan 2021 $92 $23 $115
100056517 CMAQ NR13 () UTILITIES
Approved in a STIP Plan 2022 $90 $22 $112
100056518 CMAQ NR13 () CONSTRUCTION
Approved in a STIP Plan 2024 $577 $144 $721
TOTAL COST: $947 $237 $1,184
Route NA- ProjectDescription
REED HARVEY GREENWAY ALONG FIVE MILE CREEK FROM BOBOLINK LANE TO CENTER POINT BALL PARK
Type of Work UNCLASSIFIED
Project Length in Miles 2.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056520 CMAQ RW13 () RIGHT OF WAY
Approved in a STIP Plan 2019 $90 $23 $113
100056521 CMAQ UT14 () UTILITIES
Approved in a STIP Plan 2019 $87 $22 $108
100056522 CMAQ CN14 () CONSTRUCTION
Approved in a STIP Plan 2019 $568 $142 $710
TOTAL COST: $745 $186 $931
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
47 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
SIDEWALK ALONG CR-1142 (CHAPEL ROAD) FROM PARK AVE TO STONE BROOK PKWY (CITY OF HOOVER)
Type of Work SIDEWALK
Project Length in Miles 1.200 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056540 CMAQ 7282 (600) UTILITIES
Approved in a STIP Plan 2019 $89 $22 $111
100056541 CMAQ 7282 (600) CONSTRUCTION
Approved in a STIP Plan 2019 $824 $206 $1,030
TOTAL COST: $913 $228 $1,142
Route NA- ProjectDescription
SIDEWALK ON VALLEY STREET, TYLER ROAD, CLOULAND DRIVE, SAVOY STREET AND CLEARVIEW ROAD IN BLUFF PARK
Type of Work SIDEWALK
Project Length in Miles 1.420 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056546 CMAQ 3715 (254) UTILITIES
Approved in a STIP Plan 2019 $52 $13 $65
100056547 CMAQ 3715 (254) CONSTRUCTION
Approved in a STIP Plan 2019 $742 $185 $927
TOTAL COST: $794 $198 $992
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
48 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
SIDEWALKS ALONG SR-150 (JOHN HAWKINS PKWY) FROM CAHABA RIVER ESTATES RD. TO SR-3 (US-31, MONTGOMERY HWY) CITY OF HOOVER
Type of Work SIDEWALK
Project Length in Miles 1.810 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056557 CMAQ NR13 (961) RIGHT OF WAY
Approved in a STIP Plan 2020 $109 $27 $137
100056558 CMAQ NR13 (961) UTILITIES
Approved in a STIP Plan 2021 $102 $26 $128
100056559 CMAQ NR13 () CONSTRUCTION
Approved in a STIP Plan 2021 $2,830 $708 $3,538
TOTAL COST: $3,042 $760 $3,802
Route NA- ProjectDescription
SIDEWALKS ALONG CR-42 (MASSEY ROAD) FROM SR-3 (US-31, MONTGOMERY HIGHWAY) TO CR-99 (COLUMBIANA ROAD) IN VESTAVIA HILLS
Type of Work SIDEWALK
Project Length in Miles 0.760 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100057172 CMAQ 7030 (600) RIGHT OF WAY
Approved in a STIP Plan 2019 $72 $18 $90
100057173 CMAQ 7030 (600) UTILITIES
Approved in a STIP Plan 2020 $73 $18 $91
100057174 CMAQ 7030 (600) CONSTRUCTION
Approved in a STIP Plan 2020 $752 $188 $940
TOTAL COST: $897 $224 $1,121
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
49 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
STREET IMPROVEMENTS ON 19TH STREET ENSLEY FROM ENSLEY AVENUE TO BUSH BOULEVARD PAVING, SIDEWALKS, CURB AND GUTTER, AND STORM DRAINAGE
Type of Work STREETSCAPE
Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100033432 STPBH 3716 (251) CONSTRUCTION
Approved in a STIP Plan 2019 $661 $165 $827
TOTAL COST: $661 $165 $827
Route NA- ProjectDescription
BIRMINGHAM SAFE ROUTES TO SCHOOL, SIDEWALKS ON TARRANT-HUFFMAN ROAD FROM WILLIAMSBURG TO ROEBUCK DR, AND WALKWAY TO CONNECT ROSE DR TO GASTON MIDDLE AND NORTH ROEBUCK ELEMENTARY SCHOOLS
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100048384 STPBH CN07 (906) CONSTRUCTION
Approved in a STIP Plan 2020 $253 $63 $316
TOTAL COST: $253 $63 $316
Route NA- ProjectDescription
BUILDING COMMUNITIES PROGRAMS FY 2019-2020
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100062376 STPBH NR19 () SPECIAL
Approved in a STIP Plan 2019 $550 $138 $688
TOTAL COST: $550 $138 $688
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
50 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
NORWOOD NEIGHBORHOOD STREETSCAPE ALONG 12TH AVE NORTH FROM 24TH STREET NORTH TO 31ST STREET NORTH
Type of Work STREETSCAPE
Project Length in Miles 0.630 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100059190 CMAQ 3715 (257) CONSTRUCTION
Approved in a STIP Plan 2020 $520 $130 $650
TOTAL COST: $520 $130 $650
Route NA- ProjectDescription
VULCAN TRAIL EXTENSION FROM 11TH PLACE SOUTH TO GREEN SPRINGS HIGHWAY
Type of Work UNCLASSIFIED
Project Length in Miles 0.900 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064288 CMAQ 3715 (267) RIGHT OF WAY
Approved in a STIP Plan 2019 $40 $10 $50
100064289 CMAQ 3715 (267) UTILITIES
Approved in a STIP Plan 2020 $40 $10 $50
100064290 CMAQ 3715 () CONSTRUCTION
Approved in a STIP Plan 2020 $320 $80 $400
TOTAL COST: $400 $100 $500
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
51 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
PEDESTRIAN IMPROVEMENTS- BIKELANES, SIDEWALKS, AND CROSSWALKS- 2ND AVENUE SOUTH FROM 28TH STREET TO 30TH STREET, AND 29TH STREET FROM 2ND AVENUE TO 3RD AVENUE
Type of Work UNCLASSIFIED
Project Length in Miles 0.600 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064292 CMAQ 3715 (262) RIGHT OF WAY
Approved in a STIP Plan 2019 $75 $19 $94
100064293 CMAQ 3715 (262) UTILITIES
Approved in a STIP Plan 2020 $83 $21 $104
100064294 CMAQ 3715 () CONSTRUCTION
Approved in a STIP Plan 2020 $600 $150 $750
TOTAL COST: $758 $190 $948
Route NA- ProjectDescription
41ST STREET STREETSCAPE- FROM 1ST AVENUE SOUTH TO 5TH AVENUE SOUTH
Type of Work STREETSCAPE
Project Length in Miles 0.400 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064296 CMAQ 3715 (261) UTILITIES
Approved in a STIP Plan 2019 $80 $20 $100
100064297 CMAQ 3715 () CONSTRUCTION
Approved in a STIP Plan 2019 $816 $204 $1,020
TOTAL COST: $896 $224 $1,120
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
52 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
ZOO SIDEWALK CONNECTOR FROM POINCIANA DRIVE TO 20TH PLACE SOUTH, ALONG 20TH PLACE SOUTH TO CAHABA ROAD
Type of Work SIDEWALK
Project Length in Miles 0.300 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064299 CMAQ 3715 (268) CONSTRUCTION
Approved in a STIP Plan 2019 $496 $124 $619
TOTAL COST: $496 $124 $619
Route NA- ProjectDescription
SIDEWALKS AND STREETSCAPE ON GREENSPRINGS HIGHWAY FROM VALLEY AVENUE TO 16TH STREET SOUTH
Type of Work SIDEWALK
Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064302 CMAQ 3715 (264) UTILITIES
Approved in a STIP Plan 2019 $40 $10 $50
100064303 CMAQ 3715 () CONSTRUCTION
Approved in a STIP Plan 2019 $1,600 $400 $2,000
TOTAL COST: $1,640 $410 $2,050
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
53 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
SIDEWALKS, BICYCLE LANES, CROSSWALKS, LANDSCAPE AND SIGNAGE INSTALLATION ALONG 22ND ST. N., 12TH AVE. N., 20TH ST. N., AND SHUTTLESWORTH DRIVE/HUNTSVILLE ROAD
Type of Work SIDEWALK
Project Length in Miles 1.800 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064315 CMAQ 3715 (263) RIGHT OF WAY
Approved in a STIP Plan 2019 $40 $10 $50
100064316 CMAQ 3715 (263) UTILITIES
Approved in a STIP Plan 2020 $40 $10 $50
100064317 CMAQ 3715 () CONSTRUCTION
Approved in a STIP Plan 2020 $960 $240 $1,200
TOTAL COST: $1,040 $260 $1,300
Route NA- ProjectDescription
COMPLETE STREET AND STORMWATER REMEDIATION ON SECOND AVENUE SOUTH IN THE LAKEVIEW NEIGHBORHOOD WITHIN THE CITY LIMITS OF BIRMINGHAM.
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064563 TAPBH TA15 (947) CONSTRUCTION
Approved in a STIP Plan 2019 $400 $100 $500
TOTAL COST: $400 $100 $500
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
54 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
18TH STREET REVITALIZATION FROM 28TH AVENUE SOUTH TO A POINT APPROXIMATELY 1000' NORTH OF ROSEDALE DRIVE IN THE CITY OF HOMEWOOD
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100065218 CMAQ TA15 (903) PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $247 $62 $309
100065219 CMAQ TA15 (903) RIGHT OF WAY
Approved in a STIP Plan 2019 $82 $21 $103
100065220 CMAQ TA15 (903) UTILITIES
Approved in a STIP Plan 2019 $82 $21 $103
100064505 TAPAA-CMAQ TA15 (903)
CONSTRUCTION
Approved in a STIP Plan 2019 $1,200 $300 $1,500
TOTAL COST: $1,612 $403 $2,015
Route NA- ProjectDescription
DOWNTOWN STREETSCAPE AND SIDEWALKS ALONG B.Y. WILLIAMS SR. DRIVE IN THE CITY OF MIDFIELD.
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100065504 CMAQ TA14 (930) UTILITIES
Approved in a STIP Plan 2019 $82 $21 $103
100062999 TAPAA-CMAQ TA14 (930)
CONSTRUCTION
Approved in a STIP Plan 2019 $899 $225 $1,123
TOTAL COST: $981 $245 $1,226
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
55 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
SIDEWALKS CONNECTION INITIATIVE PROJECT NEAR SR-5 (US-11) IN THE CITY OF MIDFIELD
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100065517 TAPAA TA16 (900) CONSTRUCTION
Approved in a STIP Plan 2019 $400 $100 $500
TOTAL COST: $400 $100 $500
Route NA- ProjectDescription
7TH AVENUE SOUTH STREETSCAPE AND IMPROVEMENTS PROJECT LOCATED ON 7TH AVENUE SOUTH AND OTHER VARIOUS STREETS IN THE CITY OF BIRMINGHAM.
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100065573 TAPBH TA16 (943) CONSTRUCTION
Approved in a STIP Plan 2019 $1,100 $275 $1,375
TOTAL COST: $1,100 $275 $1,375
Route NA- ProjectDescription
PEDESTRIAN AND STREETSCAPE IMPROVEMENTS UNDERNEATH THE I-59/I-20 CBD BRIDGE
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100065615 ACIM-ACCMAQ-CMAQ 3716 ()
CONSTRUCTION
Approved in a STIP Plan 2020 $32,675 $4,787 $37,462
TOTAL COST: $32,675 $4,787 $37,462
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
56 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
ADVANCED TRAFFIC MANAGEMENT SYSTEM ASSESSMENT
Type of Work TRAFFIC CONTROL MARKING & LEGN
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100065798 CMAQ 3716 () SPECIAL
Approved in a STIP Plan 2019 $330 $82 $412
TOTAL COST: $330 $82 $412
Route NA- ProjectDescription
BIKESHARE WAYFINDING SIGNS AT VARIOUS LOCATIONS IN DOWNTOWN BIRMINGHAM
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066621 CMAQ 3717 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $190 $48 $238
100066622 CMAQ 3717 () CONSTRUCTION
Approved in a STIP Plan 2019 $1,120 $280 $1,400
TOTAL COST: $1,310 $328 $1,638
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
57 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
WOODLAWN NEIGHBORHOOD STREETSCAPE PHASE 2 (CITY OF BIRMINGHAM)
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066708 CMAQ 3717 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $204 $51 $255
100066710 CMAQ 3717 () UTILITIES
Approved in a STIP Plan 2019 $204 $51 $255
100066709 CMAQ 3717 () CONSTRUCTION
Approved in a STIP Plan 2019 $1,224 $306 $1,530
TOTAL COST: $1,632 $408 $2,040
Route NA- ProjectDescription
INTERSECTION IMPROVEMENT STUDY THROUGHOUT THE CITY OF HOMEWOOD FOR IDENTIFICATION OF POTENTIAL ROADWAY IMPROVEMENTS.
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066930 STPBH 3717 () SPECIAL
Approved in a STIP Plan 2019 $80 $20 $100
TOTAL COST: $80 $20 $100
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
58 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
STREETSCAPE AND OTHER PEDESTRIAN IMPROVEMENTS ALONG THE FOLLOWING BLOCKS IN DOWNTOWN BIRMINGHAM: 4TH AVE. N FROM 15TH N TO 17TH N, 5TH AVE. N FROM 15TH N TO 17TH N,15TH ST. N FROM 4TH AVE. N TO 5TH AVE. N, 16TH ST. N FROM 4TH AVE. N TO 5TH AVE. N.
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067026 CMAQ 3717 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $98 $24 $122
100067027 CMAQ 3717 () UTILITIES
Approved in a STIP Plan 2019 $122 $31 $153
100067028 CMAQ 3717 () CONSTRUCTION
Approved in a STIP Plan 2019 $408 $102 $510
TOTAL COST: $628 $157 $785
Route NA- ProjectDescription
MULTI-USE TRAIL ADJACENT/PARALLEL TO SR-150 BETWEEN BERKLEY AVENUE AND ARLINGTON AVENUE IN BESSEMER
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067295 TAPAA TA17 (905) CONSTRUCTION
Approved in a STIP Plan 2019 $370 $92 $462
TOTAL COST: $370 $92 $462
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
59 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
SIDEWALKS ALONG PINE RIDGE ROAD FROM OVERBROOK ROAD TO OLD LEEDS ROAD
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068123 CMAQ 3718 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $162 $40 $202
100068125 CMAQ 3718 () RIGHT OF WAY
Approved in a STIP Plan 2020 $41 $10 $51
100068124 CMAQ 3718 () UTILITIES
Approved in a STIP Plan 2020 $82 $20 $102
100068126 CMAQ 3718 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,906 $476 $2,382
TOTAL COST: $2,190 $547 $2,737
Route NA- ProjectDescription
BIRMINGHAM RIDE SHARE PROGRAMS APPORTIONMENT FY 2019 - FY 2020
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068135 STPBH TR18 () SPECIAL
Approved in a STIP Plan 2019 $1,300 $0 $1,300
TOTAL COST: $1,300 $0 $1,300
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
60 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
A SIDEWALK FROM MERRYVALE LANE TO 1090 MONTGOMERY HIGHWAY THEN WRAPPING AROUND TO CONNECT TO MAYLAND LANE
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068361 TAPAA TA18 (911) CONSTRUCTION
Approved in a STIP Plan 2019 $280 $70 $350
TOTAL COST: $280 $70 $350
Route NA- ProjectDescription
SIDEWALKS ALONG ALDEN AVENUE FROM 8TH STREET TO 12TH STREET AND ALONG 12TH STREET FROM ALDEN AVENUE TO 12TH AVENUE
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068363 TAPAA TA18 (912) CONSTRUCTION
Approved in a STIP Plan 2019 $405 $101 $507
TOTAL COST: $405 $101 $507
Route NA- ProjectDescription
MULTI-USE TRAIL EXTENSION, PEDESTRIAN BRIDGE AND ADA COMPLIANT ACCESS RAMP ALONG SR-150 ON AN ABANDONED RAILROAD BETWEEN BERKLEY AVENUE AND CAROLINA AVENUE
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068368 TAPAA TA18 (913) CONSTRUCTION
Approved in a STIP Plan 2019 $638 $160 $798
TOTAL COST: $638 $160 $798
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
61 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
SIDEWALK, LANDSCAPING AND LIGHTING AROUND THE HOOVER MUNICIPAL COMPLEX
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068449 TAPBH TA18 (932) CONSTRUCTION
Approved in a STIP Plan 2019 $583 $146 $729
TOTAL COST: $583 $146 $729
Route NA- ProjectDescription
A SIDEWALK ALONG DUNBARTON DRIVE FROM NORTH WOODRIDGE ROAD TO LOCKSLEY DRIVE
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068450 TAPBH TA18 (931) CONSTRUCTION
Approved in a STIP Plan 2019 $549 $137 $686
TOTAL COST: $549 $137 $686
Route NA- ProjectDescription
BICYCLE/PEDESTRIAN PLAN FOR JEFFERSON COUNTY, SPONSOR IS JEFFERSON COUNTY
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068759 CMAQ NR18 () SPECIAL
Approved in a STIP Plan 2019 $120 $30 $150
TOTAL COST: $120 $30 $150
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
62 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route NA- ProjectDescription
PURCHASE OF 5 FULLY EQUIPPED (ASAP) VEHICLES FOR THE BIRMINGHAM AREA
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100069333 CMAQ NR19 () SPECIAL
Approved in a STIP Plan 2019 $240 $60 $300
TOTAL COST: $240 $60 $300
Route SR-119 ProjectDescription
REPLACE BRIDGE, BIN 001308, SR-119 OVER UNNAMED BRANCH, 1.3 MILES NORTH SHELBY COUNTY LINE (SUFF=56.3, STATUS=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100049954 BR 0119 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $228 $57 $285
100049986 BR 0119 () RIGHT OF WAY
Approved in a STIP Plan 2019 $57 $14 $71
100049987 BR 0119 () UTILITIES
Approved in a STIP Plan 2022 $35 $9 $44
100049955 BR 0119 () CONSTRUCTION
Approved in a STIP Plan 2023 $2,362 $591 $2,953
TOTAL COST: $2,682 $671 $3,353
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
63 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-150 ProjectDescription
SR-150 FR WEST OF CR-6 (PARKWOOD RD) TO WEST OF SHADES CREEK (PHASE 2)
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 2.349 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100025540 ST-659-17 () CONSTRUCTION
Approved in a STIP Plan 2020 $0 $9,948 $9,948
TOTAL COST: $0 $9,948 $9,948
Route SR-150 ProjectDescription
PEDESTRIAN BRIDGE OVER SR-150 BETWEEN BERKLEY AVE AND CLARENDON AVE - CITY OF BESSEMER
Type of Work PEDESTRIAN OVERPASS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064226 CMAQ 3715 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $250 $62 $312
100064228 CMAQ 3715 () RIGHT OF WAY
Approved in a STIP Plan 2019 $83 $21 $104
100064229 CMAQ 3715 () UTILITIES
Approved in a STIP Plan 2020 $84 $21 $105
100064230 CMAQ 3715 () CONSTRUCTION
Approved in a STIP Plan 2020 $841 $210 $1,051
TOTAL COST: $1,258 $314 $1,572
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
64 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-150 ProjectDescription
BRIDGE REPLACEMENT ON SR-150 OVER LITTLE SHADES CREEK BIN # 2866
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066943 BR 0150 (505) UTILITIES
Approved in a STIP Plan 2019 $245 $61 $306
100066944 BR 0150 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,236 $309 $1,545
TOTAL COST: $1,481 $370 $1,851
Route SR-3 ProjectDescription
BR REPL AND APP ON SR-3 (US-31) BIN# 002243 OVER SOU RR #3-37-15.8B
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100003818 BR 7044 (600) PRELIMINARY ENGINEERING
Approved in a STIP Plan 2023 $126 $31 $157
100003817 BR 7044 () CONSTRUCTION
Approved in a STIP Plan 2026 $2,586 $647 $3,233
TOTAL COST: $2,712 $678 $3,390
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
65 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-3 ProjectDescription
SR-3(US-31) FROM COLUMBIANA RD TO SHADES CREST RD VESTAVIA HILLS, TRAFFIC CONTROL SYSTEM / TRAFFIC CONTROL CENTER
Type of Work UNCLASSIFIED
Project Length in Miles 3.265 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100039841 CMAQ 7012 () UTILITIES
Approved in a STIP Plan 2019 $9 $2 $12
100039842 CMAQ 7012 () CONSTRUCTION
Approved in a STIP Plan 2020 $636 $159 $796
TOTAL COST: $646 $161 $807
Route SR-3 ProjectDescription
SLOPE STABILIZATION ON SR-3 (US-31) AT BROOKWOOD MEDICAL CENTER DRIVE
Type of Work SLIDE CORRECTION
Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056427 NH 0003 () CONSTRUCTION
Approved in a STIP Plan 2020 $91 $23 $114
TOTAL COST: $91 $23 $114
Route SR-3 ProjectDescription
SR-3 (US-31)ATSR-150 UPGRADE TRAFFIC CAMERAS AND INSTALL FIBER OPTIC CABLE
Type of Work SIGNALIZATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056560 CMAQF NR13 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $90 $23 $113
TOTAL COST: $90 $23 $113
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
66 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-3 ProjectDescription
ROADSIDE MOWING ALL STATE ROUTES IN DISTRICT ONE JEFFERSON COUNTY, SR-3, SR-4, SR-5, SR-25, SR-38, SR-75, SR-79, SR-119, SR-150, SR-151, SR-269 FROM THE BEGINNING OF THE DISTRICT LINE TO THE END OF THE DISTRICT LINE
Type of Work ROADSIDE MOWING
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100061626 99-403-371-000-403 () MAINTENANCE CONSTRUCTION
Approved in a STIP Plan 2019 $0 $277 $277
TOTAL COST: $0 $277 $277
Route SR-3 ProjectDescription
ROADWAY LIGHTING IMPROVEMENTS ALONG SR-3(US-31, E.B. STEPHENS EXPRESSWAY) FROM SR-38(US-280) TO I-59
Type of Work LIGHTING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100062977 NH 0003 () CONSTRUCTION
Approved in a STIP Plan 2033 $3,349 $837 $4,187
100062976 NH 0003 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2033 $239 $60 $299
TOTAL COST: $3,588 $897 $4,486
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
67 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-3 ProjectDescription
SR-3 (US-31) LIGHTING SYSTEM FROM PATTON CHAPEL ROAD TO I-65 CITY OF HOOVER
Type of Work LIGHTING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064203 STPBH 3715 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $80 $20 $100
100064209 STPBH 3715 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,600 $400 $2,000
TOTAL COST: $1,680 $420 $2,100
Route SR-3 ProjectDescription
AUXILIARY LANES ON SR-3(US-31/RED MOUNTAIN EXPRESSWAY) BETWEEN HIGHLAND AVE AND 21ST AVE.
Type of Work STREETSCAPE
Project Length in Miles 1.598 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064506 CMAQ 0003 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $83 $21 $104
100064507 CMAQ 0003 () CONSTRUCTION
Approved in a STIP Plan 2019 $2,602 $650 $3,252
TOTAL COST: $2,685 $671 $3,356
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
68 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-3 ProjectDescription
STORM DRAINAGE REPAIRS ON SR-3 (US-31) ADJACENT TO WALD PARK IN VESTAVIA HILLS
Type of Work DRAINAGE CORRECTION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064599 ST-037-003-011 () CONSTRUCTION
Approved in a STIP Plan 2019 $0 $225 $225
TOTAL COST: $0 $225 $225
Route SR-38 ProjectDescription
BRIDGE WIDENING ON SR-38 (US-280) OVER I-459 FROM SUMMIT BOULEVARD TO BLUE LAKE DRIVE
Type of Work BRIDGE WIDENING
Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100060860 BR 0038 () CONSTRUCTION
Approved in a STIP Plan 2022 $267 $67 $334
TOTAL COST: $267 $67 $334
Route SR-38 ProjectDescription
INTERSECTION IMPROVEMENTS ON SR-38 (US-280) FROM EAST OF GRANDVIEW PARKWAY TO WEST OF RESOURCE CENTER PARKWAY FROM EAST OF GRANDVIEW PARKWAY TO WEST OF RESOURCE CENTER PARKWAY
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.885 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068116 ST-037-038-011 () CONSTRUCTION
Approved in a STIP Plan 2020 $0 $4,500 $4,500
TOTAL COST: $0 $4,500 $4,500
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
69 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-4 ProjectDescription
REPLACE BRIDGE, BIN 000884, SR-4 (US-78) OVER LITTLE CAHABA RIVER (SUFF=58.4, STATUS=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.200 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100049988 BR 0004 () RIGHT OF WAY
Approved in a STIP Plan 2020 $58 $14 $72
100049989 BR 0004 () UTILITIES
Approved in a STIP Plan 2022 $35 $9 $44
100049957 BR 0004 () CONSTRUCTION
Approved in a STIP Plan 2022 $2,639 $660 $3,299
TOTAL COST: $2,732 $683 $3,415
Route SR-4 ProjectDescription
INTERSECTION IMPROVEMENTS AT PARKWAY DRIVE SR-4 (US-78) AND PRESIDENT STREET IN THE CITY OF LEEDS
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.260 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100065396 STPAA 0004 () RIGHT OF WAY
Approved in a STIP Plan 2019 $412 $103 $515
100065397 STPAA 0004 () UTILITIES
Approved in a STIP Plan 2020 $416 $104 $520
100063799 STPAA 0004 () CONSTRUCTION
Approved in a STIP Plan 2020 $2,522 $631 $3,153
TOTAL COST: $3,351 $838 $4,188
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
70 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-4 ProjectDescription
RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-4 (US-78) FROM 1ST AVE NORTH TO 47TH STREET SOUTH INCLUDING EASTBOUND AND WESTBOUND LANES
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 3.910 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068637 STPAA 0004 (546) FEDERAL MAINT CN
Approved in a STIP Plan 2019 $906 $226 $1,132
TOTAL COST: $906 $226 $1,132
Route SR-4 ProjectDescription
RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-4 (US-78) FROM 47TH STREET SOUTH TO ST. PATRICK CIRCLE
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 3.460 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068636 STPAA 0004 () FEDERAL MAINT CN
Approved in a STIP Plan 2019 $1,435 $359 $1,794
TOTAL COST: $1,435 $359 $1,794
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
71 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-5 ProjectDescription
BRIDGE REPLACEMENT (BIN 007627) ON SR-5 OVER LOCUST FORK OF BLACK WARRIOR RIVER
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.681 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100050015 BR 0005 (517) UTILITIES
Approved in a STIP Plan 2019 $91 $23 $114
100002809 BR 0005 (517) CONSTRUCTION
Approved in a STIP Plan 2019 $5,135 $1,284 $6,418
TOTAL COST: $5,226 $1,306 $6,532
Route SR-5 ProjectDescription
SR-5 (US-78) ADD LANES FROM FINLEY BLVD. TO PRATT HWY (2ND ST) (PHASE 2)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 0.810 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100063746 NH 0005 (510) PRELIMINARY ENGINEERING
Approved in a STIP Plan 2023 $217 $54 $271
100044952 NH 0005 () RIGHT OF WAY
Approved in a STIP Plan 2025 $3,342 $835 $4,177
100044953 NH 0005 () UTILITIES
Approved in a STIP Plan 2026 $1,220 $305 $1,525
100044951 NH 0005 () CONSTRUCTION
Approved in a STIP Plan 2027 $6,643 $1,661 $8,304
100042352 BRF 0005 (511) CONSTRUCTION
Approved in a STIP Plan 2027 $3,794 $948 $4,742
TOTAL COST: $15,216 $3,804 $19,019
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
72 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-7 ProjectDescription
WIDEN SR-7(US-11) FR END OF 5-LANE FACILITY, EAST OF CHALKVILLE RD TO THE CAHABA RIVER BRIDGE
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.441 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100039839 STPBH 7073 (602) CONSTRUCTION
Approved in a STIP Plan 2019 $2,049 $512 $2,562
TOTAL COST: $2,049 $512 $2,562
Route SR-7 ProjectDescription
US-11 ADDITIONAL LANES FROM I-459 TO TUTWILER DRIVE
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.250 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100047792 STPAA 0007 (509) UTILITIES
Approved in a STIP Plan 2048 $380 $95 $475
100047793 STPAA 0007 (509) CONSTRUCTION
Approved in a STIP Plan 2048 $7,606 $1,901 $9,507
TOTAL COST: $7,986 $1,997 $9,983
Route SR-75 ProjectDescription
RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-75 FROM 25TH AVENUE NW/NE TO INNSBROOKE PARKWAY
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 4.270 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068643 NH 0075 (535) FEDERAL MAINT CN
Approved in a STIP Plan 2019 $1,726 $432 $2,158
TOTAL COST: $1,726 $432 $2,158
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
73 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-79 ProjectDescription
INTERCHANGE IMPROVEMENTS, TRAFFIC SIGNAL AND STRIPING ON TALLAPOOSA STREET (40TH STREET) FROM NORTH OF I-59 / I-20 INTERCHANGE TO APPROX 1200 FEET SOUTH OF I-59 / I-20 INTERCHANGE FOR CITY OF BIRMINGHAM
Type of Work UNCLASSIFIED
Project Length in Miles 0.276 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056048 IAR-037-000-005 () CONSTRUCTION
Approved in a STIP Plan 2019 $0 $1,554 $1,554
TOTAL COST: $0 $1,554 $1,554
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM I-459 TO CR-46
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 8.242 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100051647 ACNHF 1602 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $54,557 $13,639
$68,196
100051648 ACNHF 1602 () RIGHT OF WAY
Approved in a STIP Plan 2049 $112,419 $28,105
$140,524
100051649 ACNHF 1602 () UTILITIES
Approved in a STIP Plan 2049 $6,638 $1,659 $8,297
100051650 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2049 $783,482 $195,871
$979,353
TOTAL COST: $957,096 $239,274
$1,196,370
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
74 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM SR-75 TO 0.57 MI EAST OF CR-30 (OLD SPRINGVILLE ROAD). INCLUDES SINGLE BRIDGES ON BROOKWOOD ROAD AT STATIONS 8+01 TO 11+31 AND STATIONS 21+70 TO 22+28. GRADE, DRAIN, PARTIAL BASE AND PAVE, AND BRIDGE.
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100058452 ACNHF 1602 (556) RIGHT OF WAY
Approved in a STIP Plan 2026 $4,418 $1,105 $5,523
100058453 ACNHF 1602 (556) UTILITIES
Approved in a STIP Plan 2039 $203 $51 $254
100058454 ACNHF 1602 (556) CONSTRUCTION
Approved in a STIP Plan 2039 $56,973 $14,243
$71,217
TOTAL COST: $61,595 $15,399
$76,994
Route SR-959 ProjectDescription
(BNB) DUAL MAINLINE BRGS OVER CR-129 (GLENWOOD RD), TURKEY CREEK, CR-131 (MAJESTIC RD) / CSX RR, CR-121 (BRADFORD ROAD), CR-141 (OLD DIXIANA RD), SR-79, AND SELF CREEK STATIONS 2149+00 TO 2158+00. ALSO INCLUDES RAMP C BRIDGE AT SR-79.
Type of Work BRIDGE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100058465 ACNHF 1602 (553) CONSTRUCTION
Approved in a STIP Plan 2026 $26,789 $6,697 $33,487
TOTAL COST: $26,789 $6,697 $33,487
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
75 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM CR-566 (PINEWOOD AVE) TO SOUTH OF SR-269. INCLUDES DUAL MAINLINE BRIDGES OVER CR-566 (PINEWOOD AVE). GRADE, DRAIN, AND BRIDGES.
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 4.408 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056212 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2049 $26,292 $6,573 $32,866
100056209 ACNHF 1602 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $2,068 $517 $2,585
100056210 ACNHF 1602 () RIGHT OF WAY
Approved in a STIP Plan 2049 $228 $57 $285
100056211 ACNHF 1602 () UTILITIES
Approved in a STIP Plan 2049 $1,898 $474 $2,372
TOTAL COST: $30,486 $7,621 $38,107
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM CR-566 (PINEWOOD AVE) TO SOUTH OF SR-269. INCLUDES DUAL MAINLINE BRIDGES OVER CR-566 (PINEWOOD AVE). GRADE, DRAIN, AND BRIDGES.
Type of Work BASE AND PAVE
Project Length in Miles 4.408 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056214 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2049 $17,522 $4,380 $21,902
100056213 ACNHF 1602 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $547 $137 $684
TOTAL COST: $18,069 $4,517 $22,586
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
76 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM SOUTH OF SR-269 TO CR-45 (PORTER RD). INCLUDES DUAL MAINLINE BRIDGES OVER SR-269 AND CR-2537 (CROCKER MINE RD) BRIDGE OVER MAINLINE. GRADE, DRAIN, AND BRIDGE.
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 3.760 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056215 ACNHF 1602 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $1,269 $317 $1,586
100056216 ACNHF 1602 () RIGHT OF WAY
Approved in a STIP Plan 2049 $1,260 $315 $1,576
100056217 ACNHF 1602 () UTILITIES
Approved in a STIP Plan 2049 $2,363 $591 $2,954
100056218 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2049 $16,776 $4,194 $20,970
TOTAL COST: $21,669 $5,417 $27,086
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM SOUTH OF SR-269 TO SR-269. BASE AND PAVE
Type of Work BASE AND PAVE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056221 ACNHF 1602 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $196 $49 $245
100056222 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2049 $6,271 $1,568 $7,839
TOTAL COST: $6,467 $1,617 $8,083
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
77 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM SR-269 TO CR-45 (PORTER RD). BASE AND PAVE.
Type of Work BASE AND PAVE
Project Length in Miles 3.760 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056223 ACNHF 1602 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $543 $136 $679
100056224 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2049 $17,388 $4,347 $21,735
TOTAL COST: $17,931 $4,483 $22,414
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER SHORT CREEK.
Type of Work BRIDGE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056219 ACNHF 1602 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $923 $231 $1,153
100056220 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2050 $12,827 $3,207 $16,034
TOTAL COST: $13,750 $3,437 $17,187
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
78 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM CR-45 (PORTER RD) TO SOUTH OF CR-67 (HAZELWOOD RD). INLCUDES CR-45 (PORTER RD) AND CR-675 (SHADY GROVE RD) BRIDGES OVER MAINLINE. GRADE, DRAIN, AND BRIDGE.
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 3.130 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056225 ACNHF 1602 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $1,235 $309 $1,544
100056226 ACNHF 1602 () RIGHT OF WAY
Approved in a STIP Plan 2049 $1,070 $268 $1,338
100056227 ACNHF 1602 () UTILITIES
Approved in a STIP Plan 2049 $988 $247 $1,235
100056228 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2049 $16,422 $4,106 $20,528
TOTAL COST: $19,716 $4,929 $24,645
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM CR-45 (PORTER RD) TO VILLAGE CREEK. BASE AND PAVE.
Type of Work BASE AND PAVE
Project Length in Miles 1.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056231 ACNHF 1602 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $303 $76 $379
100056232 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2049 $9,704 $2,426 $12,130
TOTAL COST: $10,008 $2,502 $12,509
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
79 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM VILLAGE CREEK TO SOUTH OF CR-67 (HAZELWOOD RD). BASE AND PAVE.
Type of Work BASE AND PAVE
Project Length in Miles 1.792 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056233 ACNHF 1602 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $488 $122 $610
100056234 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2049 $15,598 $3,900 $19,498
TOTAL COST: $16,086 $4,021 $20,107
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER VILLAGE CREEK.
Type of Work BRIDGE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056229 ACNHF 1602 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $748 $187 $936
100056230 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2049 $10,252 $2,563 $12,814
TOTAL COST: $11,000 $2,750 $13,750
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
80 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM SR-5 (US-78) NEAR GRAYSVILLE TO CR-77 NE OF BROOKSIDE
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 7.710 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100051655 ACNHF 1602 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $31,338 $7,835 $39,173
100051656 ACNHF 1602 () RIGHT OF WAY
Approved in a STIP Plan 2049 $101,287 $25,322
$126,609
100051657 ACNHF 1602 () UTILITIES
Approved in a STIP Plan 2049 $9,619 $2,405 $12,024
100051658 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2049 $447,976 $111,994
$559,971
TOTAL COST: $590,220 $147,555
$737,776
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
81 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM 0.32 MILE SOUTHWEST OF CR-1538 (DOWNS RD) TO CROOKED CREEK. INCLUDES BRIDGES ON CR-77 (NEW FOUND RD) AND CR-112 (MT. OLIVE RD) OVER MAINLINE.
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 2.660 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100047818 ACNHF 1602 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $1,618 $404 $2,022
100047819 ACNHF 1602 () RIGHT OF WAY
Approved in a STIP Plan 2049 $38,773 $9,693 $48,466
100047821 ACNHF 1602 () UTILITIES
Approved in a STIP Plan 2049 $3,952 $988 $4,940
100047822 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2049 $36,332 $9,083 $45,415
TOTAL COST: $80,675 $20,169
$100,844
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM 0.32 MILE SOUTHWEST OF CR-1538 (DOWNS RD) TO CROOKED CREEK. INCLUDES BRIDGES ON CR-77 (NEW FOUND RD) AND CR-112 (MT. OLIVE RD) OVER MAINLINE.
Type of Work BASE AND PAVE
Project Length in Miles 2.660 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100047823 ACNHF 1602 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $700 $175 $875
100047824 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2049 $15,222 $3,806 $19,028
TOTAL COST: $15,922 $3,980 $19,902
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
82 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER CROOKED CREEK AND UNNAMED TRIBUTARY.
Type of Work BRIDGE
Project Length in Miles 0.240 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100047825 ACNHF 1602 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $2,349 $587 $2,936
100047826 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2049 $50,160 $12,540
$62,700
TOTAL COST: $52,509 $13,127
$65,636
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM CROOKED CREEK TO 0.17 MILE WEST OF I-65.
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 0.883 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100047827 ACNHF 1602 (541) PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $1,466 $367 $1,833
100047828 ACNHF 1602 () RIGHT OF WAY
Approved in a STIP Plan 2049 $10,896 $2,724 $13,620
100047829 ACNHF 1602 () UTILITIES
Approved in a STIP Plan 2049 $220 $55 $275
100047830 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2049 $30,561 $7,640 $38,202
TOTAL COST: $43,144 $10,786
$53,929
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
83 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM CROOKED CREEK TO 0.17 MILE WEST OF I-65.
Type of Work BASE AND PAVE
Project Length in Miles 0.883 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100047831 ACNHF 1602 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $448 $112 $561
100047832 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2049 $9,402 $2,350 $11,752
TOTAL COST: $9,850 $2,463 $12,313
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM 0.13 MILE WEST OF I-65 TO 0.09 MILE WEST OF SR-3 (US-31). INCLUDES ACCEL/DECEL LANES ON I-65
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 1.210 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100047841 ACNHF 1602 () RIGHT OF WAY
Approved in a STIP Plan 2025 $15,330 $3,832 $19,162
100047842 ACNHF 1602 () UTILITIES
Approved in a STIP Plan 2038 $1,175 $294 $1,469
100047843 ACNHF 1602 (559) CONSTRUCTION
Approved in a STIP Plan 2038 $66,757 $16,689
$83,447
TOTAL COST: $83,262 $20,816
$104,078
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
84 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM 0.13 MILE WEST OF I-65 TO 0.09 MILE WEST OF SR-3 (US-31). INCLUDES ACCEL/DECEL LANES ON I-65
Type of Work BASE AND PAVE
Project Length in Miles 1.210 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100047844 ACNHF 1602 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2039 $424 $106 $529
100047845 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2039 $17,645 $4,411 $22,056
TOTAL COST: $18,069 $4,517 $22,586
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE INCLUDES DUAL MAINLINE BRIDGES OVER US-31, RAMP A AND B, BRIDGES AT US-31 AND RAMP 3 AND 4, BRIDGES AT I-65
Type of Work BRIDGE
Project Length in Miles 0.970 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100047834 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2025 $59,727 $14,932
$74,659
TOTAL COST: $59,727 $14,932
$74,659
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
85 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM 0.09 MILE WEST OF SR-3 (US-31) TO CUNNINGHAM CREEK
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 1.877 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100047848 ACNHF 1602 () RIGHT OF WAY
Approved in a STIP Plan 2025 $7,340 $1,835 $9,176
100047849 ACNHF 1602 () UTILITIES
Approved in a STIP Plan 2037 $1,753 $438 $2,192
100047850 ACNHF 1602 (558) CONSTRUCTION
Approved in a STIP Plan 2037 $42,339 $10,585
$52,924
TOTAL COST: $51,433 $12,858
$64,292
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM 0.09 MILE WEST OF SR-3 (US-31) TO CUNNINGHAM CREEK. INCLUDES DUAL MAINLINE BRIDGES OVER SR-3 (US-31).
Type of Work BASE AND PAVE
Project Length in Miles 1.877 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100047851 ACNHF 1602 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2037 $559 $140 $699
100047852 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2038 $16,131 $4,033 $20,164
TOTAL COST: $16,690 $4,172 $20,862
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
86 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER CUNNINGHAM CREEK.
Type of Work BRIDGE
Project Length in Miles 0.240 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100047854 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2025 $51,536 $12,884
$64,420
TOTAL COST: $51,536 $12,884
$64,420
Route SR-959 ProjectDescription
SR-959 (BIRMINGHAM NORTHERN BELTLINE) FROM CUNNINGHAM CREEK TO 0.39 MI EAST OF SR-79. GRADE, DRAIN, PARTIAL BASE AND PAVE.
Type of Work GRADE AND DRAIN
Project Length in Miles 6.840 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100058461 ACNHF 1602 (555) RIGHT OF WAY
Approved in a STIP Plan 2026 $18,541 $4,635 $23,176
100058462 ACNHF 1602 (555) UTILITIES
Approved in a STIP Plan 2039 $203 $51 $254
100058463 ACNHF 1602 (555) CONSTRUCTION
Approved in a STIP Plan 2039 $122,360 $30,590
$152,951
TOTAL COST: $141,105 $35,276
$176,381
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
87 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM CUNNINGHAM CREEK TO 0.78 MI WEST OF SR-79. BASE AND PAVE.
Type of Work BASE AND PAVE
Project Length in Miles 6.910 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100058466 ACNHF 1602 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2040 $1,026 $256 $1,282
100058467 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2042 $24,076 $6,019 $30,095
TOTAL COST: $25,102 $6,276 $31,378
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER SELF CREEK AT STATIONS 2183+00 TO 2199+00, DUAL MAINLINE BRIDGES AT STATION 2208+50 TO 2218+50, AND SINGLE BRIDGES ON RAMPS B AND D AT SR-79.
Type of Work BRIDGE
Project Length in Miles 2.780 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100048413 ACAPDF 1602 (550) CONSTRUCTION
Approved in a STIP Plan 2023 $52,718 $0 $52,718
TOTAL COST: $52,718 $0 $52,718
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
88 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM SR-79 TO SR-75; INCLUDES RAMPS B AND D AT SR-79 AND RAMPS F, H, AND J AT SR-75.
Type of Work BASE AND PAVE
Project Length in Miles 2.780 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100048414 ACNHF 1602 (542) PRELIMINARY ENGINEERING
Approved in a STIP Plan 2038 $808 $202 $1,010
100048415 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2039 $102,593 $25,648
$128,241
TOTAL COST: $103,401 $25,850
$129,251
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM 0.76 MI EAST OF SR-75 TO 0.57 MI EAST OF CR-30 (OLD SPRINGVILLE ROAD) BASE AND PAVE
Type of Work BASE AND PAVE
Project Length in Miles 4.400 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056653 ACNHF 1602 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2040 $754 $189 $943
100056654 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2041 $48,988 $12,247
$61,235
TOTAL COST: $49,742 $12,436
$62,178
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
89 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER SR-75, CR-159 (CEDAR MT. ROAD), CR-2186 (CAVERN RD / BUD ALISON RD), AND CR-30 (OLD SPRINGVILLE ROAD). ALSO INCLUDES SINGLE RAMP H AND I BRIDGES AT SR-75.
Type of Work BRIDGE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056652 ACNHF 1602 (561) CONSTRUCTION
Approved in a STIP Plan 2025 $299,327 $74,832
$374,158
TOTAL COST: $299,327 $74,832
$374,158
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM 0.57 MI EAST OF CR-30 (OLD SPRINGVILLE ROAD) TO I-59. BASE AND PAVE
Type of Work BASE AND PAVE
Project Length in Miles 3.360 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056665 ACNHF 1602 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2040 $826 $206 $1,032
100056666 ACNHF 1602 () CONSTRUCTION
Approved in a STIP Plan 2041 $21,860 $5,465 $27,325
TOTAL COST: $22,686 $5,671 $28,357
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
90 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM 0.57 MI EAST OF CR-30 (OLD SPRINGVILLE RD) TO I-59. INCLUDES ACCEL/DECEL LANES ON I-59 BETWEEN CR-2133 (DEERFOOT PKWY) AND CR-2145 (HONOR KEITH RD / LILES LN) AND BRIDGE OVER I-59 ON CR-2137 (ADVENT CIRCLE)
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 3.360 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100058456 ACNHF 1602 (557) RIGHT OF WAY
Approved in a STIP Plan 2026 $1,854 $464 $2,318
100058457 ACNHF 1602 (557) UTILITIES
Approved in a STIP Plan 2039 $203 $51 $254
100058458 ACNHF 1602 (557) CONSTRUCTION
Approved in a STIP Plan 2039 $51,635 $12,909
$64,544
TOTAL COST: $53,693 $13,423
$67,116
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER CR-2137 (ADVENT CIRCLE) AND SINGLE BRIDGES ON RAMP O AND RAMP Q OVER I-59.
Type of Work BRIDGE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056660 ACNHF 1602 (554) CONSTRUCTION
Approved in a STIP Plan 2026 $36,684 $9,171 $45,855
TOTAL COST: $36,684 $9,171 $45,855
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
91 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON
Route SR-959 ProjectDescription
FY 2020 AND 2021 BIRMINGHAM NORTHERN BELTLINE WETLAND AND STREAM MITIGATION CREDITS
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100063385 APDF 1602 () SPECIAL
Approved in a STIP Plan 2020 $2,353 $0 $2,353
TOTAL COST: $2,353 $0 $2,353
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
92 of 92
COUNTY HIGHWAY PROJECTS - JEFFERSON