92
Route CR-18 Project Description EASTERN VALLEY ROAD (CR-18), WIDENING TO 3 LANES FROM MCASHAN DRIVE TO LETSON FARM PARKWAY Type of Work ADDITIONAL ROADWAY LANES Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS Project Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State- Other TOTAL 100064231 STPBH 3715 () PRELIMINARY ENGINEERING Approved in a STIP Plan 2019 $480 $120 $600 100064232 STPBH 3715 () RIGHT OF WAY Approved in a STIP Plan 2020 $1,600 $400 $2,000 100064233 STPBH 3715 () UTILITIES Approved in a STIP Plan 2020 $1,360 $340 $1,700 100064234 STPBH 3715 () CONSTRUCTION Approved in a STIP Plan 2020 $5,045 $1,261 $6,306 TOTAL COST: $8,485 $2,121 $10,606 Route CR-2303 Project Description CR-2303 (LAKESHORE PKWY) AT I-65 INTERCHANGE MODIFICATIONS. Type of Work RAMP REVISIONS Project Length in Miles 0.560 Urban Area BIRMINGHAM COST IN THOUSANDS Project Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State- Other TOTAL 100040770 STPBHF 7026 () UTILITIES Approved in a STIP Plan 2019 $180 $45 $225 100040771 STPBHF 7026 (601) CONSTRUCTION Approved in a STIP Plan 2020 $10,723 $2,681 $13,403 TOTAL COST: $10,903 $2,726 $13,628 11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 1 of 92 COUNTY HIGHWAY PROJECTS - JEFFERSON

11/4/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100040770 STPBHF 7026 UTILITIES

Embed Size (px)

Citation preview

Route CR-18 ProjectDescription

EASTERN VALLEY ROAD (CR-18), WIDENING TO 3 LANES FROM MCASHAN DRIVE TO LETSON FARM PARKWAY

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064231 STPBH 3715 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $480 $120 $600

100064232 STPBH 3715 () RIGHT OF WAY

Approved in a STIP Plan 2020 $1,600 $400 $2,000

100064233 STPBH 3715 () UTILITIES

Approved in a STIP Plan 2020 $1,360 $340 $1,700

100064234 STPBH 3715 () CONSTRUCTION

Approved in a STIP Plan 2020 $5,045 $1,261 $6,306

TOTAL COST: $8,485 $2,121 $10,606

Route CR-2303 ProjectDescription

CR-2303 (LAKESHORE PKWY) AT I-65 INTERCHANGE MODIFICATIONS.

Type of Work RAMP REVISIONS

Project Length in Miles 0.560 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100040770 STPBHF 7026 () UTILITIES

Approved in a STIP Plan 2019 $180 $45 $225

100040771 STPBHF 7026 (601) CONSTRUCTION

Approved in a STIP Plan 2020 $10,723 $2,681 $13,403

TOTAL COST: $10,903 $2,726 $13,628

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

1 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route CR-30 ProjectDescription

CR-30 (OLD SPRINGVILLE RD) IMPROVEMENTS TO VARIOUS INTERSECTIONS FROM CARDINAL DRIVE TO CR-153 (CLAY/TRUSSVILLE RD) CITY OF CLAY

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056273 STPBH 7245 () RIGHT OF WAY

Approved in a STIP Plan 2020 $2,040 $510 $2,550

100056275 STPBH 7245 () UTILITIES

Approved in a STIP Plan 2022 $1,128 $282 $1,410

100056276 STPBH 7245 () CONSTRUCTION

Approved in a STIP Plan 2024 $3,880 $970 $4,850

TOTAL COST: $7,048 $1,762 $8,810

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

2 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route CR-337 ProjectDescription

RESURFACE AND DRAINAGE IMPROVEMENTS ON CR-337 (MCCALLA ROAD) FROM CR-20 (OLD TUSCALOOSA HIGHWAY) TO CR-18 (EASTERN VALLEY ROAD)

Type of Work RESURFACING

Project Length in Miles 1.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100059497 ACAA59497 ATRP (007) CONSTRUCTION

Approved in a STIP Plan 2019 $1,257 $314 $1,571

TOTAL COST: $1,257 $314 $1,571

Route CR-337 ProjectDescription

RESURFACING AND TURN LANES ON CR-337 (MCCALLA ROAD) FROM CR-18 (EASTERN VALLEY ROAD) TO CR-20 (OLD TUSCALOOSA HIGHWAY)

Type of Work TURN LANES

Project Length in Miles 0.960 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100060502 STPBH 3713 () RIGHT OF WAY

Approved in a STIP Plan 2019 $1,572 $393 $1,965

100060504 STPBH 3713 () UTILITIES

Approved in a STIP Plan 2019 $560 $140 $700

TOTAL COST: $2,132 $533 $2,665

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

3 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route CR-46 ProjectDescription

CR-46 (HUEYTOWN ROAD) ADDITIONAL TURN LANES AND INTERSECTION IMPROVEMENTS FROM WALKER AVENUE TO NORTH OF HILLSIDE DRIVE

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056289 STPBH 7021 (600) UTILITIES

Approved in a STIP Plan 2019 $200 $50 $250

100056290 STPBH 7021 (600) CONSTRUCTION

Approved in a STIP Plan 2020 $1,200 $300 $1,500

TOTAL COST: $1,400 $350 $1,750

Route CR-47 ProjectDescription

RESURFACING ON CR-47 (POWDER PLANT ROAD) FROM ACADEMY DRIVE TO SPLASH ADVENTURE PARKWAY, TO INCLUDE TRAFFIC SIGNAL WORK AND CONSTRUCTION OF AN ENTRANCE TO THE INDUSTRIAL FACILITY IN BESSEMER

Type of Work RESURFACING

Project Length in Miles 1.050 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068800 IAR-037-000-008 () CONSTRUCTION

Approved in a STIP Plan 2019 $0 $1,584 $1,584

TOTAL COST: $0 $1,584 $1,584

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

4 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route CR-52 ProjectDescription

CR-52 (MORGAN RD) ADDITIONAL LANES FROM I-459 TO CR-2 (SOUTH SHADES CREST RD)

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 2.470 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100007542 STPBH 7002 (600) CONSTRUCTION

Approved in a STIP Plan 2019 $9,907 $2,477 $12,383

TOTAL COST: $9,907 $2,477 $12,383

Route CR-6 ProjectDescription

>PARKWOOD RD IMPROVEMENTS - PHASE 3 PARKWOOD ROADATPINELANE SE AND HILLTOP ROAD.

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100007636 STPBH 9802 () RIGHT OF WAY

Approved in a STIP Plan 2020 $9 $2 $11

100007630 STPBH 9802 () CONSTRUCTION

Approved in a STIP Plan 2020 $709 $177 $886

TOTAL COST: $718 $179 $897

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

5 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route CR-65 ProjectDescription

BRIDGES ON CR-65 MINOR RD TO BIRMINGPORT RD (ENS ADM)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.050 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100007588 STPBH 7147 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,710 $427 $2,137

TOTAL COST: $1,710 $427 $2,137

Route CR-65 ProjectDescription

CR-65 (HILLCREST RD) FROM SR-5(US-78) TO CORRIDOR X (PRELIMINARY ENGINEERING-DESIGN)

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 2.100 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100040404 STPBH 7174 (600) PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $487 $122 $608

100038801 STPBH 7174 () RIGHT OF WAY

Approved in a STIP Plan 2021 $6,650 $1,663 $8,313

100040405 STPBH 7174 () UTILITIES

Approved in a STIP Plan 2022 $158 $39 $197

100038803 STPBH 7174 () CONSTRUCTION

Approved in a STIP Plan 2022 $8,800 $2,200 $11,000

TOTAL COST: $16,095 $4,024 $20,118

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

6 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route CR-94 ProjectDescription

CR-94 (DANIEL PAYNE DRIVE) ADD CONTINUOUS TWO-WAY LEFT TURN LANE FROM CR-105 (CHERRY AVE) TO I-65 (PROJECT SPONSOR THE CITY OF BIRMINGHAM)

Type of Work TURN LANES

Project Length in Miles 2.600 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100042371 STPBH 3716 () RIGHT OF WAY

Approved in a STIP Plan 2020 $45 $11 $56

100042372 STPBH 3716 () UTILITIES

Approved in a STIP Plan 2020 $146 $36 $182

100042373 STPBH 3716 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,947 $487 $2,433

TOTAL COST: $2,138 $534 $2,672

Route CR-NA ProjectDescription

FINLEY BLVD. EXT FROM 26TH STREET (US-31) TO 27TH AVENUE NEAR 32ND STREET NORTH

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 2.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100059888 STPBH 7173 () UTILITIES

Approved in a STIP Plan 2020 $3,041 $760 $3,801

100046959 STPBH 7173 () CONSTRUCTION

Approved in a STIP Plan 2020 $19,882 $4,971 $24,853

TOTAL COST: $22,924 $5,731 $28,655

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

7 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route CR-NA ProjectDescription

>VARIOUS INTERSECTIONS - PHASE 7 1. MT. OLIVE RD AT NEW FOUND RD./MT OLIVE-BROOKSIDE RD 2. UNION GROVE AT BANKHEAD HWY 3. HEFLIN AV AT RIDERWOOD TR 4. TARRANT RD AT PINEYWOOD RD /SKELTON AVE 5.TYLER LOOP RD AT SWEENEY HOLLOW RD 6.CHALKVILLE RD.

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.250 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100060490 STPBH 9802 (904) UTILITIES

Approved in a STIP Plan 2019 $80 $20 $100

100007628 STPBH 9802 (904) CONSTRUCTION

Approved in a STIP Plan 2020 $5,245 $1,311 $6,556

TOTAL COST: $5,325 $1,331 $6,656

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS AT 2 LOCATIONS; SITE 1. MAYFIELD ROAD AND MONTEVALLO ROAD. SITE 3 CROSSHAVEN DRIVE AND GREEN VALLEY DRIVE.

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100060046 STPBH 9802 (924) UTILITIES

Approved in a STIP Plan 2019 $120 $30 $150

100007629 STPBH 9802 (924) CONSTRUCTION

Approved in a STIP Plan 2020 $2,655 $664 $3,318

TOTAL COST: $2,775 $694 $3,468

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

8 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route CR-NA ProjectDescription

GALLERIA BOULEVARD EXTENSION FROM CR-458 (LORNA ROAD) TO SR-150

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 0.350 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056488 STPBH 3715 (255) UTILITIES

Approved in a STIP Plan 2020 $400 $100 $500

100056489 STPBH 3715 (255) CONSTRUCTION

Approved in a STIP Plan 2020 $3,200 $800 $4,000

TOTAL COST: $3,600 $900 $4,500

Route CR-NA ProjectDescription

HOOVER TOPICS PROJECT-PATTON CHAPEL RD, PHASE III FROM CRAYRICH DRIVE TO CHAPEL LANE. COORDINATE WITH JEFFERSON CO. PROJECT. ADD 3RD LANE.

Type of Work TURN LANES

Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100069325 STPBH 7020 (601) UTILITIES

Approved in a STIP Plan 2019 $2,000 $500 $2,500

100007555 STPBH 7020 (601) CONSTRUCTION

Approved in a STIP Plan 2019 $2,017 $504 $2,521

TOTAL COST: $4,017 $1,004 $5,021

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

9 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route CR-NA ProjectDescription

LAKESHORE DR EXTENSION FROM SR-150 TO I-459

Type of Work GRADE, DRAIN AND BRIDGE

Project Length in Miles 3.100 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100007562 STPBHF 7026 () UTILITIES

Approved in a STIP Plan 2030 $2,808 $702 $3,510

100046956 STPBHF 7026 () CONSTRUCTION

Approved in a STIP Plan 2030 $9,644 $2,411 $12,055

TOTAL COST: $12,452 $3,113 $15,565

Route CR-NA ProjectDescription

LAKESHORE DR EXTENSION FROM SR-150 TO I-459

Type of Work BASE AND PAVE

Project Length in Miles 3.100 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100046957 STPBHF 7026 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2030 $114 $28 $142

100046954 STPBHF 7026 () CONSTRUCTION

Approved in a STIP Plan 2031 $16,022 $4,006 $20,028

TOTAL COST: $16,136 $4,034 $20,170

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

10 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route CR-NA ProjectDescription

>GARDENDALE - MAIN STREET FR TARRANT DR. TO REDMAYNE RD. PROJECT SPONSOR: JEFFERSON COUNTY.

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 1.100 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100007597 STPBH 7164 (600) RIGHT OF WAY

Approved in a STIP Plan 2020 $275 $69 $343

100007595 STPBH 7164 (600) CONSTRUCTION

Approved in a STIP Plan 2021 $1,638 $409 $2,047

TOTAL COST: $1,912 $478 $2,390

Route CR-NA ProjectDescription

EAST LAKE BLVD FROM 39TH ST TO 40TH ST N, ADD TURN LANES ; WEST OF B'HAM INTERNATIONAL AIRPORT (PHASE 2)

Type of Work TURN LANES

Project Length in Miles 0.170 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100053046 STPBH 7173 () CONSTRUCTION

Approved in a STIP Plan 2020 $240 $60 $300

TOTAL COST: $240 $60 $300

Route CR-NA ProjectDescription

JEFFERSON COUNTY TOPICS (PHASE 9) TARRANT HUFFMAN ROAD FROM SR-79 (OLD PINSON HIGHWAY) TO TREADWELL ROAD

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.600 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100007609 STPBH 7229 (602) CONSTRUCTION

Approved in a STIP Plan 2021 $3,691 $923 $4,614

TOTAL COST: $3,691 $923 $4,614

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

11 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON SPRINGDALE ROAD OVER FIVE MILE CREEK BIN# 15837

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068651 STPBH 3717 (250) UTILITIES

Approved in a STIP Plan 2019 $404 $101 $505

100059460 STPBH 3717 (250) CONSTRUCTION

Approved in a STIP Plan 2020 $1,644 $411 $2,055

TOTAL COST: $2,048 $512 $2,560

Route CR-NA ProjectDescription

OXMOOR BLVD-GREEN SPRINGS TO BARBER COURT. INTERSECTION IMPROVEMENTS AT BARBER CT. AND OXMOOR RD. AND I-65 AND CONTINUOUS TWO WAY TURN LANE

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 1.100 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100029563 STPBH 9802 () RIGHT OF WAY

Approved in a STIP Plan 2019 $243 $61 $304

100029566 STPBH 9802 () UTILITIES

Approved in a STIP Plan 2020 $658 $164 $822

100029510 STPBH 9802 () CONSTRUCTION

Approved in a STIP Plan 2020 $3,597 $899 $4,496

TOTAL COST: $4,498 $1,125 $5,623

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

12 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route CR-NA ProjectDescription

ITS TRAFFIC SIGNALIZATION, SYSTEM WIDE TIMING PLAN AND PHASE 1 EQUIPMENT UPGRADE PLAN FOR TRAFFIC SIGNAL SYSTEM AT 100 INTERSECTIONS

Type of Work SIGNALIZATION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100039866 CMAQ NR01 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $747 $187 $933

100039867 CMAQ NR01 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,352 $338 $1,691

TOTAL COST: $2,099 $525 $2,624

Route CR-NA ProjectDescription

ITS TRAFFIC SIGNALIZATION 100 INTERSECTION. PHASE 2

Type of Work SIGNALIZATION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100039868 CMAQ NR04 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $575 $144 $719

100039869 CMAQ NR04 () CONSTRUCTION

Approved in a STIP Plan 2020 $3,452 $863 $4,315

TOTAL COST: $4,027 $1,007 $5,034

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

13 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route CR-NA ProjectDescription

ITS TRAFFIC SIGNALIZATION 100 INTERSECTION. PHASE 3

Type of Work SIGNALIZATION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100039870 CMAQ NR06 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $575 $144 $719

100039871 CMAQ NR06 () CONSTRUCTION

Approved in a STIP Plan 2020 $3,452 $863 $4,315

TOTAL COST: $4,027 $1,007 $5,034

Route CR-NA ProjectDescription

OPORTO-MADRID BLVD, SAFETY IMPROVEMENTS TO CORRECT SIGHT DISTANCE DEFICIENCIES (PHASE 4)

Type of Work SAFETY IMPROVEMENTS

Project Length in Miles 0.230 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100041014 HPP 1602 (537) UTILITIES

Approved in a STIP Plan 2028 $37 $9 $47

100041015 HPP 1602 (537) CONSTRUCTION

Approved in a STIP Plan 2029 $1,022 $256 $1,278

TOTAL COST: $1,060 $265 $1,325

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

14 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route CR-NA ProjectDescription

ADD CONTINUOUS TWO-WAY LEFT TURN LANE ON 40TH STREET NORTH, FROM 400' SOUTH OF 10TH AVE N TO THE SOUTH ON AND OFF RAMPS OF I-59

Type of Work TURN LANES

Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100042375 STPBH 7170 () RIGHT OF WAY

Approved in a STIP Plan 2025 $45 $11 $56

100042376 STPBH 7170 () UTILITIES

Approved in a STIP Plan 2026 $146 $36 $182

100042377 STPBH 7170 () CONSTRUCTION

Approved in a STIP Plan 2026 $633 $158 $791

TOTAL COST: $824 $206 $1,030

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT (BIN# 000282) ON PRATT HIGHWAY AT BLACK CREEK NEAR SANDUSKY IN BIRMINGHAM

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.250 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100059893 STPBH 1602 (519) RIGHT OF WAY

Approved in a STIP Plan 2019 $800 $200 $1,000

100033434 HPP-STPBH 1602 (519) UTILITIES

Approved in a STIP Plan 2019 $424 $106 $530

100059894 STPBH 1602 (519) CONSTRUCTION

Approved in a STIP Plan 2020 $1,680 $420 $2,100

TOTAL COST: $2,904 $726 $3,630

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

15 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route CR-NA ProjectDescription

STREETSCAPE AND TRANSPORTATION IMPROVEMENTS ON 16TH STREET CORRIDOR FROM 11TH AVE NORTH TO I-65 WITHIN FOUNTAIN HEIGHTS NEIGHBORHOOD

Type of Work UTILITY ADJUSTMENT

Project Length in Miles 0.550 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056315 STPBH 7117 () UTILITIES

Approved in a STIP Plan 2019 $200 $50 $250

TOTAL COST: $200 $50 $250

Route CR-NA ProjectDescription

RESURFACE RUTLEDGE DRIVE FROM CR-56(ALLISON BONNETT MEMORIAL DRIVE) TO WOODWARD ROAD AND RESURFACE WILKES ROAD FROM WOODWARD ROAD TO SR-5 (US-11) CITY OF MIDFIELD

Type of Work RESURFACING

Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100059488 ACAA59488 ATRP (006) CONSTRUCTION

Approved in a STIP Plan 2019 $674 $169 $843

TOTAL COST: $674 $169 $843

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

16 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS AND ADDITIONAL TURN LANE AT CALDWELL MILL ROAD AND JAGUAR DRIVE IN THE CITY OF HOOVER

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100062345 CMAQ 3714 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $40 $10 $50

100062346 CMAQ 3714 () RIGHT OF WAY

Approved in a STIP Plan 2020 $40 $10 $50

100062347 CMAQ 3714 () UTILITIES

Approved in a STIP Plan 2020 $90 $22 $112

100062348 CMAQ 3714 () CONSTRUCTION

Approved in a STIP Plan 2020 $692 $173 $865

TOTAL COST: $862 $216 $1,078

Route CR-NA ProjectDescription

ROADWAY AND INTERSECTION IMPROVEMENTS ON CAHABA RIVER ROAD FROM SR-38 (US-280) TO KEY DRIVE

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 3.350 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100063245 STPBH 3716 (252) RIGHT OF WAY

Approved in a STIP Plan 2020 $800 $200 $1,000

100063246 STPBH 3716 (252) UTILITIES

Approved in a STIP Plan 2021 $1,000 $250 $1,250

100063247 STPBH 3716 () CONSTRUCTION

Approved in a STIP Plan 2021 $4,150 $1,037 $5,187

TOTAL COST: $5,950 $1,487 $7,437

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

17 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS CAHABA RD/SR-38(US-280)/CULVER RD/LANE PARK RD-CITY OF MOUNTAIN BROOK

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064200 CMAQ 3715 () RIGHT OF WAY

Approved in a STIP Plan 2019 $300 $75 $375

100064201 CMAQ 3715 () UTILITIES

Approved in a STIP Plan 2020 $420 $105 $526

100064202 CMAQ 3715 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,779 $445 $2,224

TOTAL COST: $2,499 $625 $3,124

Route CR-NA ProjectDescription

UPGRADE AND REPLACE INTERSTATE LIGHTING AT VARIOUS LOCATION IN THE CITY OF BIRMINGHAM

Type of Work LIGHTING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064216 STPBH 3716 () CONSTRUCTION

Approved in a STIP Plan 2019 $800 $200 $1,000

TOTAL COST: $800 $200 $1,000

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

18 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route CR-NA ProjectDescription

PAVEMENT REHABILITATION ON LAKESHORE PARKWAY FROM VENICE ROAD TO THE BIRMINGHAM CITY LIMITS

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064225 STPBH 3715 () CONSTRUCTION

Approved in a STIP Plan 2019 $800 $200 $1,000

TOTAL COST: $800 $200 $1,000

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS AT REX LAKE ROAD AND ZEIGLER ROAD

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064310 CMAQ 3715 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $160 $40 $200

100064311 CMAQ 3715 () RIGHT OF WAY

Approved in a STIP Plan 2019 $160 $40 $200

100064312 CMAQ 3715 () UTILITIES

Approved in a STIP Plan 2020 $160 $40 $200

100064313 CMAQ 3715 () CONSTRUCTION

Approved in a STIP Plan 2020 $480 $120 $600

TOTAL COST: $960 $240 $1,200

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

19 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route CR-NA ProjectDescription

RAILROAD CROSSING IMPROVEMENTS SIGNALS, BELLS, GATES, SIGNS, MARKINGS AND LEDGENDS REF # 1305(XV-R) ON 22ND STREET AT CSX AT DOT # 352619R

Type of Work RR CROSSING IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064749 RHCH RR16 (912) CONSTRUCTION

Approved in a STIP Plan 2019 $237 $26 $263

TOTAL COST: $237 $26 $263

Route CR-NA ProjectDescription

BRIDGE RECONSTRUCTION AND REHABILITATION FOR OLD BROOK TRAIL BRIDGE (BIN # 012869) OVER LITTLE SHADES CREEK AND CANTERBURY ROAD BRIDGE (BIN # 002873) OVER WATKINS CREEK, CITY OF MOUNTAIN BROOK

Type of Work BRIDGE REHABILITATION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100066111 STPBH 3716 (256) RIGHT OF WAY

Approved in a STIP Plan 2020 $80 $20 $100

100066112 STPBH 3716 (256) UTILITIES

Approved in a STIP Plan 2020 $80 $20 $100

100066113 STPBH 3716 () CONSTRUCTION

Approved in a STIP Plan 2020 $880 $220 $1,100

TOTAL COST: $1,040 $260 $1,300

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

20 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route CR-NA ProjectDescription

RESURFACING VARIOUS CITY STREETS IN THE CITY OF BIRMINGHAM

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100067672 ST-037-999-018 () CONSTRUCTION

Approved in a STIP Plan 2019 $0 $2,200 $2,200

TOTAL COST: $0 $2,200 $2,200

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT (BIN 000090) ON 21ST STREET NORTH (RICHARD ARRINGTON JR BOULEVARD) BETWEEN 1ST AVENUE SOUTH AND 1ST AVENUE NORTH OVER NORFOLK SOUTHERN AND CSX RAILROAD - CITY OF BIRMINGHAM

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100067934 STPBH 3718 (250) PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $640 $160 $800

TOTAL COST: $640 $160 $800

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

21 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route CR-NA ProjectDescription

13TH STREET SOUTH - ADD BIKE LANES AND STREETSCAPE IMPROVEMENTS FROM 1ST AVE SOUTH TO 10TH AVE SOUTH

Type of Work STREETSCAPE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068127 CMAQ 3718 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $299 $75 $374

100068128 CMAQ 3718 () UTILITIES

Approved in a STIP Plan 2021 $82 $21 $103

100068129 CMAQ 3718 () CONSTRUCTION

Approved in a STIP Plan 2021 $1,714 $429 $2,143

TOTAL COST: $2,096 $524 $2,620

Route CR-NA ProjectDescription

GREENWAY AND ROAD DIET ON RICHARD ARRINGTON JR BOULEVARD FROM 15TH AVENUE SOUTH TO VALLEY AVENUE

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068467 CMAQ 3718 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $242 $61 $303

TOTAL COST: $242 $61 $303

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

22 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route I -20 ProjectDescription

CONGESTION MGT. TRAFFIC SYS, SUPPLEMENTAL ITS DEVICES ALONG I-20/I-59 FROM 0.75 MILE WEST OF ENSLEY AVE (EXIT 120) TO I-65 (EXIT 124) AND ALONG SR-38 (US-280) FROM SR-119 TO I-59 (EXIT 126), INCLUDES FIBER, POLES, ECT, NONE ELECTRONICS

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100046082 CMAQ NR05 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $89 $22 $111

100046083 CMAQ NR05 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,181 $295 $1,477

TOTAL COST: $1,270 $317 $1,587

Route I -20 ProjectDescription

CONGESTION MGT. TRAFFIC SYS, SUPPLEMENTAL ITS DEVICES ALONG I-20/I-59 FR DMS #5 (3/4 MI WEST OF ENSLEY AVE (EXIT120)) TO I-65 (EXIT 124) AND ALONG US-280 FR SR-119 TO I-20/I-59 (EXIT 126), INCLUDES CCTV, RADAR, ETC. ELECTRONIC DEVICES AND EQUIPMENT

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100046084 CMAQ NR05 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $52 $13 $66

100046086 CMAQ NR05 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,049 $262 $1,312

100046085 CMAQ NR05 () SPECIAL

Approved in a STIP Plan 2020 $193 $48 $242

TOTAL COST: $1,295 $324 $1,619

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

23 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route I -20 ProjectDescription

PAVEMENT REHABILITATION ON I-20 FROM EXIT 140 TO THE JEFFERSON/ST CLAIR COUNTY LINE

Type of Work PREVENTATIVE MAINTENANCE LEVEL 2

Project Length in Miles 2.800 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068064 IM I020 (356) PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $136 $15 $152

100068066 IM I020 () CONSTRUCTION

Approved in a STIP Plan 2019 $6,300 $700 $7,000

TOTAL COST: $6,436 $715 $7,152

Route I -22 ProjectDescription

I-22 (CORRIDOR X) FROM EAST OF I-65 TO SR-3(US-31)

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 0.351 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100045131 NH 0471 (523) CONSTRUCTION

Approved in a STIP Plan 2025 $21,252 $5,313 $26,565

100059531 NH I022 () CONSTRUCTION

Approved in a STIP Plan 2025 $16,080 $4,020 $20,100

TOTAL COST: $37,332 $9,333 $46,665

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

24 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route I -459 ProjectDescription

INCHG LGT ON I-459ATCR-18 (EXIT #1) AND CR-52 (EXIT #6)

Type of Work LIGHTING

Project Length in Miles 4.564 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100005123 IM I459 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $129 $14 $143

100005120 IM I459 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,617 $180 $1,797

TOTAL COST: $1,746 $194 $1,940

Route I -459 ProjectDescription

COLONNADE DRIVE RELOCATION (GRADE, DRAIN, BASE, PAVE, AND RETAINING WALL)

Type of Work RAMP REVISIONS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100038955 IM I459 (306) CONSTRUCTION

Approved in a STIP Plan 2021 $1,854 $206 $2,059

TOTAL COST: $1,854 $206 $2,059

Route I -459 ProjectDescription

I-459, RAMP MODIFICATIONS AT THE SR-38 (US-280) INTERCHANGE (PHASE 3)

Type of Work RAMP REVISIONS

Project Length in Miles 0.080 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100063754 IM I459 () CONSTRUCTION

Approved in a STIP Plan 2022 $26,250 $2,917 $29,167

TOTAL COST: $26,250 $2,917 $29,167

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

25 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route I -459 ProjectDescription

INTERCHANGE AT I-459 AND CR-2 (SOUTH SHADES CREST ROAD) INCLUDES BRIDGE OVER INTERSTATE AND RAMP BRIDGE OVER RAILROAD, CITY OF HOOVER

Type of Work INTERCHANGE

Project Length in Miles 0.002 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100062062 STPBHF I459 (310) PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $1,200 $300 $1,500

100056292 STPBHF I459 (310) RIGHT OF WAY

Approved in a STIP Plan 2021 $1,600 $400 $2,000

100056293 STPBHF I459 (310) UTILITIES

Approved in a STIP Plan 2024 $400 $100 $500

100056294 STPBHF I459 (310) CONSTRUCTION

Approved in a STIP Plan 2024 $20,800 $5,200 $26,000

TOTAL COST: $24,000 $6,000 $30,000

Route I -459 ProjectDescription

I-459 INTERSTATE MEDIAN CROSSOVER PROTECTION FROM I-20/I-59 TO 0.56 MILES SOUTH OF SR-150

Type of Work SAFETY IMPROVEMENTS

Project Length in Miles 10.700 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100063237 HSIP I459 (312) CONSTRUCTION

Approved in a STIP Plan 2020 $900 $0 $900

TOTAL COST: $900 $0 $900

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

26 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route I -59 ProjectDescription

PAVEMENT REHABILITATION ON I-20/59 FROM ARKADELPHIA ROAD TO THE SOUTH END OF THE CENTRAL BUSINESS DISTRICT BRIDGE NEAR 15TH STREET AND ON I-65 FROM SOUTH OF 1 ST. AVENUE NORTH TO 16TH STREET NORTH

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100063656 IM I059 (410) CONSTRUCTION

Approved in a STIP Plan 2019 $13,909 $1,545 $15,455

TOTAL COST: $13,909 $1,545 $15,455

Route I -59 ProjectDescription

RESURFACE I-59 FROM 1ST AVENUE NORTH (MP 132.160) TO I-459 (MP 137.19) IN TRUSSVILLE

Type of Work RESURFACING

Project Length in Miles 4.990 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100062068 IM I059 () CONSTRUCTION

Approved in a STIP Plan 2020 $12,593 $1,399 $13,993

TOTAL COST: $12,593 $1,399 $13,993

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

27 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route I -59 ProjectDescription

6-LANE I-59 FR I-459 (EXIT 106) TO 18TH/19TH ST (EXIT 112)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 5.770 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100063758 NH I059 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2044 $267 $67 $334

100039734 IM-NH I059 () RIGHT OF WAY

Approved in a STIP Plan 2046 $222 $27 $250

100047739 NH I059 () UTILITIES

Approved in a STIP Plan 2046 $75 $19 $93

100033202 IM-NH I059 () CONSTRUCTION

Approved in a STIP Plan 2047 $24,016 $2,968 $26,984

TOTAL COST: $24,580 $3,081 $27,661

Route I -59 ProjectDescription

I-59 ADD LANES FROM SR-5 (US-11,EXIT 108) TO CR-46 (18TH/19TH ST, EXIT 112), PHASE II

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 3.570 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100044587 IM-NH I059 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2047 $379 $89 $468

100047790 NH I059 () UTILITIES

Approved in a STIP Plan 2048 $76 $19 $95

100043629 IM-NH I059 () CONSTRUCTION

Approved in a STIP Plan 2048 $22,179 $5,202 $27,381

TOTAL COST: $22,634 $5,310 $27,945

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

28 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route I -59 ProjectDescription

ADD LANES ON I-59 FROM 18TH/19TH STREET (EXIT 112) TO VALLEY ROAD (EXIT 118)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 6.388 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100047791 NH I059 () UTILITIES

Approved in a STIP Plan 2024 $60 $15 $74

100056495 NH I059 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2021 $291 $73 $364

100039736 IM-NH I059 () RIGHT OF WAY

Approved in a STIP Plan 2023 $341 $42 $383

100033203 IM-NH I059 () CONSTRUCTION

Approved in a STIP Plan 2025 $28,915 $3,574 $32,488

TOTAL COST: $29,607 $3,704 $33,310

Route I -59 ProjectDescription

SIGN REHAB ON I-59 FROM TUSCALOOSA CL TO ST.CLAIR CL; I-65 FROM SHELBY CL TO EXIT 280 (WARRIOR); I-459 FROM I-59 S OF TRUSSVILLE (PHASE 3)

Type of Work SIGN REHABILITATION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100042475 IM I059 () CONSTRUCTION

Approved in a STIP Plan 2019 $3,766 $418 $4,184

TOTAL COST: $3,766 $418 $4,184

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

29 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route I -59 ProjectDescription

MOWING ON ALL THE INTERSTATE ROUTES IN DISTRICT ONE JEFFERSON COUNTY FROM THE BEGINNING OF THE DISTRICT LINE TO THE END OF THE DISTRICT LINE.

Type of Work ROADSIDE MOWING

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100061632 99-403-371-000-404 () MAINTENANCE CONSTRUCTION

Approved in a STIP Plan 2019 $0 $1,082 $1,082

TOTAL COST: $0 $1,082 $1,082

Route I -59 ProjectDescription

RESURFACE I-59 FROM I-459 TO 1.23 MILES NORTH OF ACADEMY DRIVE (EXIT 108) PLANNING, RESURFACING, CROSS SLOPE/SUPERELEVATION CORRECTION, TRAFFIC STRIPING AND MARKINGS, GUARDRAIL AND GUARDRAIL END ANCHORS

Type of Work PAVEMENT MINOR REHABILITATION

Project Length in Miles 3.357 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100067734 IM I059 (408) CONSTRUCTION

Approved in a STIP Plan 2019 $8,958 $995 $9,953

TOTAL COST: $8,958 $995 $9,953

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

30 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route I -59 ProjectDescription

I-59 FR MP 132.16AT1ST AV N TO MP 137.19ATI-459 6 LANES

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 4.990 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064120 NH I059 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $1,682 $420 $2,102

100045051 NH I059 () UTILITIES

Approved in a STIP Plan 2022 $117 $29 $146

100004982 NH I059 () CONSTRUCTION

Approved in a STIP Plan 2023 $37,537 $9,384 $46,921

TOTAL COST: $39,335 $9,834 $49,169

Route I -59 ProjectDescription

RECONSTRUCTION AND LANE ADDITION ON I-59 FROM I-459 TO CR-10 (CHALKVILLE MOUNTAIN ROAD)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 2.800 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064600 IM-NH I059 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $442 $78 $520

100064602 IM-NH I059 () CONSTRUCTION

Approved in a STIP Plan 2022 $19,138 $3,377 $22,515

TOTAL COST: $19,580 $3,455 $23,035

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

31 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route I -65 ProjectDescription

ROADWAY LIGHTING I-65 FROM 5100' SOUTH OF ALFORD AVENUE TO 6TH AVENUE NORTH

Type of Work LIGHTING

Project Length in Miles 7.700 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100048475 STPBH I065 (445) CONSTRUCTION

Approved in a STIP Plan 2021 $5,556 $1,389 $6,945

TOTAL COST: $5,556 $1,389 $6,945

Route I -65 ProjectDescription

CONCRETE PAVEMENT REHAB, UNDERSEAL, GRINDING, PAVERLAID SURFACE TREATMENT, UNDERDRAIN, SHOULDER PAVEMENT,GUARDRAIL ON I-65 FROM SR-3(US-31) TO RALEIGH AVENUE OVERPASS (PRIORITY #35)

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 3.760 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100066473 IM I065 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $227 $25 $253

100055415 IM I065 () CONSTRUCTION

Approved in a STIP Plan 2019 $9,320 $1,036 $10,356

TOTAL COST: $9,548 $1,061 $10,609

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

32 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route I -65 ProjectDescription

PLANING, RESURFACING, STRIPING, MARKINGS AND SAFETY IMPROVEMENTS TO GUARDRAILS AND GUARDRAIL END ANCHORS ON I-65 FROM MOUNT OLIVE INTERCHANGE TO .78 MILE NORTH OF SR-160

Type of Work PREVENTATIVE MAINTENANCE LEVEL 2

Project Length in Miles 13.400 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100060142 IM-HSIP I065 (484) CONSTRUCTION

Approved in a STIP Plan 2019 $20,036 $2,226 $22,262

TOTAL COST: $20,036 $2,226 $22,262

Route NA- ProjectDescription

OXMOOR VALLEY GREENWAY-BIKE TRAIL PROJECT SPONSOR:CITY OF BIRMINGHAM (1.) FROM SAND RIDGE/LITTLE SHADES CREEK TO OXMOOR VILLAGE CENTER.

Type of Work UNCLASSIFIED

Project Length in Miles 2.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100029522 CMAQ 9802 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,450 $363 $1,813

TOTAL COST: $1,450 $363 $1,813

Route NA- ProjectDescription

HOOVER-TRAFFIC CONTROL CENTER

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100029518 STPBH 9802 () CONSTRUCTION

Approved in a STIP Plan 2020 $198 $49 $247

TOTAL COST: $198 $49 $247

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

33 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

SHADES CREEK GREENWAY MULTI-PURPOSE TRAIL - PHASE TWO GRADE, DRAIN, BASE, PAVE, BRIDGE, STRIPING, SIGNING AND LANDSCAPING CITY OF HOMEWOOD JEFFERSON COUNTY

Type of Work UNCLASSIFIED

Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100029525 CMAQ 9802 (911) CONSTRUCTION

Approved in a STIP Plan 2019 $2,945 $736 $3,682

100029526 CMAQ 9802 (912) CONSTRUCTION

Approved in a STIP Plan 2021 $4,735 $1,184 $5,919

TOTAL COST: $7,680 $1,920 $9,600

Route NA- ProjectDescription

BESSEMER RAIL TO TRAIL CONVERSION PROJECT FROM THE HOOVER CITY LIMITS NEAR PARKWOOD TO SR-150 AT LAKESHORE PARKWAY CONNECTION -CITY OF BESSEMER PROJECT SPONSOR

Type of Work UNCLASSIFIED

Project Length in Miles 4.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100029565 CMAQ 9802 () RIGHT OF WAY

Approved in a STIP Plan 2020 $633 $158 $791

100029524 CMAQ 9802 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,114 $278 $1,392

TOTAL COST: $1,746 $437 $2,183

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

34 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

"CBD INCIDENT AND CONGESTION MANAGMENT PROGRAM"

Type of Work UNCLASSIFIED

Project Length in Miles 0.270 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100029534 CMAQ 9802 (926) CONSTRUCTION

Approved in a STIP Plan 2020 $1,367 $342 $1,709

TOTAL COST: $1,367 $342 $1,709

Route NA- ProjectDescription

CONGESTION MGT TRAFFIC SYSTEM (PHASE 7) FIBER OPTIC CABLE MESSAGE SIGNS AND VEHICLE DETECTION DEVICES, SR-3 FR UNIV. BLVD TO SR-38 THEN SR-38 FR SR-3 TO SR-119

Type of Work UNCLASSIFIED

Project Length in Miles 16.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100029515 CMAQ 9802 () CONSTRUCTION

Approved in a STIP Plan 2020 $4,603 $1,151 $5,754

TOTAL COST: $4,603 $1,151 $5,754

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

35 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

CONGESTION MGT / AREAWIDE TRAFFIC SYSTEM / PHASE 3 AND 3A PROJECT SPONSOR: ALDOT, TRANSPORTATION MANAGEMENT CENTER TO BE BUILT AT 3RD DIVISION COMPLEX

Type of Work UTILITY ADJUSTMENT

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100040855 CMAQ 9802 () UTILITIES

Approved in a STIP Plan 2020 $12 $3 $14

100029517 CMAQ 9802 () CONSTRUCTION

Approved in a STIP Plan 2021 $4,881 $1,220 $6,102

TOTAL COST: $4,893 $1,223 $6,116

Route NA- ProjectDescription

CONGESTION MGT / AREAWIDE TRAFFIC SYSTEM (PHASE 4) PROJECT SPONSOR:ALDOT,REGIONAL HIGHWAY RADIO: TO BE BUILTATCORNER 26TH ST AND 12 AVE N

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100029519 CMAQ 9802 () CONSTRUCTION

Approved in a STIP Plan 2020 $575 $144 $719

TOTAL COST: $575 $144 $719

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

36 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

TRUSSVILLE GREENWAY AND WALKWAY MULTI-USE TRAIL-GREENWAY FROM CHALKVILLE MTN RD (CR-10) TO CALUMET PARKWAY NEAR SR-7 (US-11), (PHASE 1)

Type of Work UNCLASSIFIED

Project Length in Miles 5.900 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100052630 CMAQ 9802 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,151 $288 $1,439

TOTAL COST: $1,151 $288 $1,439

Route NA- ProjectDescription

OLD LEEDS ROAD BICYCLE LANES FROM IRONDALE CITY LIMITS/ BERMUDA DR TO GRANTS MILL. WIDEN TO 31 FT TO ACCOMMODATE TWO 14-FOOT WIDE TRAVEL LANES WITH THE REMAINDER AS PAVED SHOULDER. PROJECT SPONSOR: IRONDALE

Type of Work UNCLASSIFIED

Project Length in Miles 0.090 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100032371 CMAQ 9802 () CONSTRUCTION

Approved in a STIP Plan 2020 $600 $150 $750

TOTAL COST: $600 $150 $750

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

37 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

>SHADES CREEK GREENWAY MULTI-USE TRAIL SHADES CREEK GREENWAY - 1. ON-ROAD CONNECTION VIA ELDER STREET MONCLAIR ROAD AND CRESTWOOD BLVD FROM 15TH STREET TO 20TH ST. 2. OFF-ROAD TRAIL ALONG SHADESCREEK. CONNECTORS ALONG GREENWAY TRAIL INCLUD

Type of Work UNCLASSIFIED

Project Length in Miles 2.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100032397 CMAQ 9802 () RIGHT OF WAY

Approved in a STIP Plan 2019 $63 $16 $78

100032392 CMAQ 9802 () CONSTRUCTION

Approved in a STIP Plan 2042 $1,283 $321 $1,603

TOTAL COST: $1,345 $336 $1,682

Route NA- ProjectDescription

CITY OF BIRMINGHAM ARTERIAL CCTV 41 INTERSECTIONS WITH FIBER OPTIC CABLE INSTALLED, PHASE 2.

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100033183 CMAQ 9802 () CONSTRUCTION

Approved in a STIP Plan 2020 $426 $106 $532

TOTAL COST: $426 $106 $532

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

38 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

VILLAGE CREEK GREENWAY (PHASE 3) FROM HUFFMAN PARK TO 65TH STREET N

Type of Work UNCLASSIFIED

Project Length in Miles 5.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100039850 CMAQ NR03 () RIGHT OF WAY

Approved in a STIP Plan 2021 $174 $44 $218

100039851 CMAQ NR03 () CONSTRUCTION

Approved in a STIP Plan 2022 $1,763 $441 $2,204

TOTAL COST: $1,938 $484 $2,422

Route NA- ProjectDescription

VILLAGE CREEK GREENWAY (PHASE 2) FROM 3RD STREET TO TALLAPOOSA STREET

Type of Work UNCLASSIFIED

Project Length in Miles 5.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100039846 CMAQ NR02 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $513 $128 $641

100039847 CMAQ NR02 () RIGHT OF WAY

Approved in a STIP Plan 2020 $259 $65 $324

100039848 CMAQ NR02 () CONSTRUCTION

Approved in a STIP Plan 2021 $2,619 $655 $3,273

TOTAL COST: $3,390 $848 $4,238

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

39 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

VILLAGE CREEK GREENWAY (PHASE 3) FROM HUFFMAN PARK TO 65TH STREET N

Type of Work UNCLASSIFIED

Project Length in Miles 5.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100039849 CMAQ NR03 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $345 $86 $432

TOTAL COST: $345 $86 $432

Route NA- ProjectDescription

VALLEY CREEK GREENWAY FROM 12TH STREET AT RICKWOOD FIELD TO AVENUE W AT FIVE POINTS WEST

Type of Work UNCLASSIFIED

Project Length in Miles 1.950 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100039852 CMAQ NR06 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $460 $115 $575

100039853 CMAQ NR06 () RIGHT OF WAY

Approved in a STIP Plan 2020 $138 $35 $173

100039854 CMAQ NR06 () CONSTRUCTION

Approved in a STIP Plan 2020 $460 $115 $575

TOTAL COST: $1,059 $265 $1,323

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

40 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

RAILROAD RESERVATION/1ST AVENUE SOUTH PHASE 2 AND 3 ENGINEERING: 1ST AVENUE SOUTH FROM 18TH STREET TO 32ND STREET AND NORTH TO SLOSS FURNACE.

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056176 CMAQ 3700 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $253 $63 $316

TOTAL COST: $253 $63 $316

Route NA- ProjectDescription

ITS FIBER OPTIC PLAN, CITY WIDE FOR ITS ARTERIAL INCIDENT MGT.

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100039861 STPBH NR01 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $135 $34 $169

TOTAL COST: $135 $34 $169

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

41 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

ITS MONITORS, VIDEO CAMERA, 7 LOCATIONS. EMERGENGY RESPONSE ROUTING

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100039864 STPBH NR01 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $19 $5 $23

100039865 STPBH NR01 () CONSTRUCTION

Approved in a STIP Plan 2020 $187 $47 $234

TOTAL COST: $206 $51 $257

Route NA- ProjectDescription

ITS MONITORS, VIDEO CAMERAS NSRR, 41ST ST NORTH TO BRUSSELS CIRCLE ( RAILROAD CROSSING)

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100039872 STPBH NR01 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $140 $35 $175

100039873 STPBH NR01 () CONSTRUCTION

Approved in a STIP Plan 2020 $234 $58 $292

TOTAL COST: $374 $94 $468

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

42 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

CAHABA RIVER EAST GREENWAY; OFF CR-115-1 (OLD ROCKY RIDGE RD) NEAR CHESTNUT RIDGE (SUB-DIVISION) AND CAHABA RIVER

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100039922 CMAQ CN07 (911) CONSTRUCTION

Approved in a STIP Plan 2020 $449 $112 $561

TOTAL COST: $449 $112 $561

Route NA- ProjectDescription

CAHABA RIVER GREENWAY-PHASE 3 (TRUSSVILLE) CORRIDOR STUDY FOR A PEDESTRIAN BRIDGE OVER THE CAHABA RIVER, SOUTH OF SR-7 (US-11)

Type of Work CORRIDOR STUDY

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100048496 CMAQ PE07 (912) PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $41 $10 $52

TOTAL COST: $41 $10 $52

Route NA- ProjectDescription

CAHABA RIVER GREENWAY-PHASE 4 (TRUSSVILLE) CORRIDOR STUDY FOR WALKWAY AND TRAILHEAD CONNECTING CONNECTING SENIOR CENTER TO THE CAHABA RIVER GREENWAY, NORTH OF SR-7 (US-11)

Type of Work CORRIDOR STUDY

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100048497 CMAQ PE07 (911) PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $41 $10 $52

TOTAL COST: $41 $10 $52

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

43 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

RESURFACING, SIDEWALK ADDITIONS AND DRAINAGE IMPROVEMENTS ALONG POLLY REED ROAD FROM SR-75 TO REED ROAD NE

Type of Work UNCLASSIFIED

Project Length in Miles 0.400 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100058033 STPBH 3716 (250) UTILITIES

Approved in a STIP Plan 2019 $160 $40 $200

100054521 STPBH 3716 (250) CONSTRUCTION

Approved in a STIP Plan 2019 $2,724 $681 $3,405

TOTAL COST: $2,884 $721 $3,605

Route NA- ProjectDescription

SIDEWALKS ALONG CR-67 (HAZELWOOD ROAD), FROM BURGANDY DR TO HARRIS AVENUE

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100048382 STPBH 7234 (600) CONSTRUCTION

Approved in a STIP Plan 2019 $86 $21 $107

TOTAL COST: $86 $21 $107

Route NA- ProjectDescription

CONSTRUCT SIDEWALKS IN THE CITY OF LEEDS ALONG SR-119 (MONTEVALLO ROAD) FROM LEEDS HISTORICAL PARK TO LEEDS ELEMENTARY SCHOOL

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100048880 HPP A133 (900) CONSTRUCTION

Approved in a STIP Plan 2019 $150 $37 $187

TOTAL COST: $150 $37 $187

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

44 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

PEDESTRIAN IMPROVEMENTS FOR THE CITY OF GARDENDALE AT BELL STREET AND MAIN STREET

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100050724 CMAQF 3717 () CONSTRUCTION

Approved in a STIP Plan 2019 $480 $120 $600

TOTAL COST: $480 $120 $600

Route NA- ProjectDescription

PEDESTRIAN WALKWAY OVER US-31 IN VESTAVIA HILLS NEAR CITY HALL

Type of Work PEDESTRIAN OVERPASS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100051157 DE-HPP-TAPBH A124 () CONSTRUCTION

Approved in a STIP Plan 2019 $1,067 $266 $1,333

TOTAL COST: $1,067 $266 $1,333

Route NA- ProjectDescription

NORFOLK SOUTHERN BIRMINGHAM REGIONAL INTERMODAL FACILITY, MCCALLA

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100055374 CTGR-STPBH-FAUP 3714 ()

CONSTRUCTION

Approved in a STIP Plan 2019 $2,673 $668 $3,342

TOTAL COST: $2,673 $668 $3,342

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

45 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

STREETSCAPE AND TRANSPORTATION IMPROVEMENTS ON 16TH STREET CORRIDOR FROM 11TH AVE NORTH TO I-65 WITHIN FOUNTAIN HEIGHTS NEIGHBORHOOD

Type of Work STREETSCAPE

Project Length in Miles 0.550 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056316 STPBH 7117 () CONSTRUCTION

Approved in a STIP Plan 2019 $2,613 $653 $3,266

TOTAL COST: $2,613 $653 $3,266

Route NA- ProjectDescription

SIDEWALKS ON PARTS OF 24 TH STREET NORTH, BERKLEY AVENUE, ARLINGTON AVENUE AND OWEN AVENUE IN BESSEMER

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056509 CMAQ NR13 (954) UTILITIES

Approved in a STIP Plan 2019 $83 $21 $104

100056510 CMAQ NR13 (954) CONSTRUCTION

Approved in a STIP Plan 2019 $546 $137 $683

TOTAL COST: $630 $157 $787

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

46 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

SIDEWALKS ALONG CR-99 (COLUMBIANA RD) FROM SR-3 (US-31,MONTGOMERY HIGHWAY) TO SHADES CREST RD IN VESTAVIA HILLS

Type of Work SIDEWALK

Project Length in Miles 1.350 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056515 CMAQ NR13 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $189 $47 $236

100056516 CMAQ NR13 () RIGHT OF WAY

Approved in a STIP Plan 2021 $92 $23 $115

100056517 CMAQ NR13 () UTILITIES

Approved in a STIP Plan 2022 $90 $22 $112

100056518 CMAQ NR13 () CONSTRUCTION

Approved in a STIP Plan 2024 $577 $144 $721

TOTAL COST: $947 $237 $1,184

Route NA- ProjectDescription

REED HARVEY GREENWAY ALONG FIVE MILE CREEK FROM BOBOLINK LANE TO CENTER POINT BALL PARK

Type of Work UNCLASSIFIED

Project Length in Miles 2.100 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056520 CMAQ RW13 () RIGHT OF WAY

Approved in a STIP Plan 2019 $90 $23 $113

100056521 CMAQ UT14 () UTILITIES

Approved in a STIP Plan 2019 $87 $22 $108

100056522 CMAQ CN14 () CONSTRUCTION

Approved in a STIP Plan 2019 $568 $142 $710

TOTAL COST: $745 $186 $931

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

47 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

SIDEWALK ALONG CR-1142 (CHAPEL ROAD) FROM PARK AVE TO STONE BROOK PKWY (CITY OF HOOVER)

Type of Work SIDEWALK

Project Length in Miles 1.200 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056540 CMAQ 7282 (600) UTILITIES

Approved in a STIP Plan 2019 $89 $22 $111

100056541 CMAQ 7282 (600) CONSTRUCTION

Approved in a STIP Plan 2019 $824 $206 $1,030

TOTAL COST: $913 $228 $1,142

Route NA- ProjectDescription

SIDEWALK ON VALLEY STREET, TYLER ROAD, CLOULAND DRIVE, SAVOY STREET AND CLEARVIEW ROAD IN BLUFF PARK

Type of Work SIDEWALK

Project Length in Miles 1.420 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056546 CMAQ 3715 (254) UTILITIES

Approved in a STIP Plan 2019 $52 $13 $65

100056547 CMAQ 3715 (254) CONSTRUCTION

Approved in a STIP Plan 2019 $742 $185 $927

TOTAL COST: $794 $198 $992

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

48 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

SIDEWALKS ALONG SR-150 (JOHN HAWKINS PKWY) FROM CAHABA RIVER ESTATES RD. TO SR-3 (US-31, MONTGOMERY HWY) CITY OF HOOVER

Type of Work SIDEWALK

Project Length in Miles 1.810 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056557 CMAQ NR13 (961) RIGHT OF WAY

Approved in a STIP Plan 2020 $109 $27 $137

100056558 CMAQ NR13 (961) UTILITIES

Approved in a STIP Plan 2021 $102 $26 $128

100056559 CMAQ NR13 () CONSTRUCTION

Approved in a STIP Plan 2021 $2,830 $708 $3,538

TOTAL COST: $3,042 $760 $3,802

Route NA- ProjectDescription

SIDEWALKS ALONG CR-42 (MASSEY ROAD) FROM SR-3 (US-31, MONTGOMERY HIGHWAY) TO CR-99 (COLUMBIANA ROAD) IN VESTAVIA HILLS

Type of Work SIDEWALK

Project Length in Miles 0.760 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100057172 CMAQ 7030 (600) RIGHT OF WAY

Approved in a STIP Plan 2019 $72 $18 $90

100057173 CMAQ 7030 (600) UTILITIES

Approved in a STIP Plan 2020 $73 $18 $91

100057174 CMAQ 7030 (600) CONSTRUCTION

Approved in a STIP Plan 2020 $752 $188 $940

TOTAL COST: $897 $224 $1,121

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

49 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

STREET IMPROVEMENTS ON 19TH STREET ENSLEY FROM ENSLEY AVENUE TO BUSH BOULEVARD PAVING, SIDEWALKS, CURB AND GUTTER, AND STORM DRAINAGE

Type of Work STREETSCAPE

Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100033432 STPBH 3716 (251) CONSTRUCTION

Approved in a STIP Plan 2019 $661 $165 $827

TOTAL COST: $661 $165 $827

Route NA- ProjectDescription

BIRMINGHAM SAFE ROUTES TO SCHOOL, SIDEWALKS ON TARRANT-HUFFMAN ROAD FROM WILLIAMSBURG TO ROEBUCK DR, AND WALKWAY TO CONNECT ROSE DR TO GASTON MIDDLE AND NORTH ROEBUCK ELEMENTARY SCHOOLS

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100048384 STPBH CN07 (906) CONSTRUCTION

Approved in a STIP Plan 2020 $253 $63 $316

TOTAL COST: $253 $63 $316

Route NA- ProjectDescription

BUILDING COMMUNITIES PROGRAMS FY 2019-2020

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100062376 STPBH NR19 () SPECIAL

Approved in a STIP Plan 2019 $550 $138 $688

TOTAL COST: $550 $138 $688

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

50 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

NORWOOD NEIGHBORHOOD STREETSCAPE ALONG 12TH AVE NORTH FROM 24TH STREET NORTH TO 31ST STREET NORTH

Type of Work STREETSCAPE

Project Length in Miles 0.630 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100059190 CMAQ 3715 (257) CONSTRUCTION

Approved in a STIP Plan 2020 $520 $130 $650

TOTAL COST: $520 $130 $650

Route NA- ProjectDescription

VULCAN TRAIL EXTENSION FROM 11TH PLACE SOUTH TO GREEN SPRINGS HIGHWAY

Type of Work UNCLASSIFIED

Project Length in Miles 0.900 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064288 CMAQ 3715 (267) RIGHT OF WAY

Approved in a STIP Plan 2019 $40 $10 $50

100064289 CMAQ 3715 (267) UTILITIES

Approved in a STIP Plan 2020 $40 $10 $50

100064290 CMAQ 3715 () CONSTRUCTION

Approved in a STIP Plan 2020 $320 $80 $400

TOTAL COST: $400 $100 $500

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

51 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

PEDESTRIAN IMPROVEMENTS- BIKELANES, SIDEWALKS, AND CROSSWALKS- 2ND AVENUE SOUTH FROM 28TH STREET TO 30TH STREET, AND 29TH STREET FROM 2ND AVENUE TO 3RD AVENUE

Type of Work UNCLASSIFIED

Project Length in Miles 0.600 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064292 CMAQ 3715 (262) RIGHT OF WAY

Approved in a STIP Plan 2019 $75 $19 $94

100064293 CMAQ 3715 (262) UTILITIES

Approved in a STIP Plan 2020 $83 $21 $104

100064294 CMAQ 3715 () CONSTRUCTION

Approved in a STIP Plan 2020 $600 $150 $750

TOTAL COST: $758 $190 $948

Route NA- ProjectDescription

41ST STREET STREETSCAPE- FROM 1ST AVENUE SOUTH TO 5TH AVENUE SOUTH

Type of Work STREETSCAPE

Project Length in Miles 0.400 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064296 CMAQ 3715 (261) UTILITIES

Approved in a STIP Plan 2019 $80 $20 $100

100064297 CMAQ 3715 () CONSTRUCTION

Approved in a STIP Plan 2019 $816 $204 $1,020

TOTAL COST: $896 $224 $1,120

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

52 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

ZOO SIDEWALK CONNECTOR FROM POINCIANA DRIVE TO 20TH PLACE SOUTH, ALONG 20TH PLACE SOUTH TO CAHABA ROAD

Type of Work SIDEWALK

Project Length in Miles 0.300 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064299 CMAQ 3715 (268) CONSTRUCTION

Approved in a STIP Plan 2019 $496 $124 $619

TOTAL COST: $496 $124 $619

Route NA- ProjectDescription

SIDEWALKS AND STREETSCAPE ON GREENSPRINGS HIGHWAY FROM VALLEY AVENUE TO 16TH STREET SOUTH

Type of Work SIDEWALK

Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064302 CMAQ 3715 (264) UTILITIES

Approved in a STIP Plan 2019 $40 $10 $50

100064303 CMAQ 3715 () CONSTRUCTION

Approved in a STIP Plan 2019 $1,600 $400 $2,000

TOTAL COST: $1,640 $410 $2,050

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

53 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

SIDEWALKS, BICYCLE LANES, CROSSWALKS, LANDSCAPE AND SIGNAGE INSTALLATION ALONG 22ND ST. N., 12TH AVE. N., 20TH ST. N., AND SHUTTLESWORTH DRIVE/HUNTSVILLE ROAD

Type of Work SIDEWALK

Project Length in Miles 1.800 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064315 CMAQ 3715 (263) RIGHT OF WAY

Approved in a STIP Plan 2019 $40 $10 $50

100064316 CMAQ 3715 (263) UTILITIES

Approved in a STIP Plan 2020 $40 $10 $50

100064317 CMAQ 3715 () CONSTRUCTION

Approved in a STIP Plan 2020 $960 $240 $1,200

TOTAL COST: $1,040 $260 $1,300

Route NA- ProjectDescription

COMPLETE STREET AND STORMWATER REMEDIATION ON SECOND AVENUE SOUTH IN THE LAKEVIEW NEIGHBORHOOD WITHIN THE CITY LIMITS OF BIRMINGHAM.

Type of Work STREETSCAPE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064563 TAPBH TA15 (947) CONSTRUCTION

Approved in a STIP Plan 2019 $400 $100 $500

TOTAL COST: $400 $100 $500

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

54 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

18TH STREET REVITALIZATION FROM 28TH AVENUE SOUTH TO A POINT APPROXIMATELY 1000' NORTH OF ROSEDALE DRIVE IN THE CITY OF HOMEWOOD

Type of Work STREETSCAPE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100065218 CMAQ TA15 (903) PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $247 $62 $309

100065219 CMAQ TA15 (903) RIGHT OF WAY

Approved in a STIP Plan 2019 $82 $21 $103

100065220 CMAQ TA15 (903) UTILITIES

Approved in a STIP Plan 2019 $82 $21 $103

100064505 TAPAA-CMAQ TA15 (903)

CONSTRUCTION

Approved in a STIP Plan 2019 $1,200 $300 $1,500

TOTAL COST: $1,612 $403 $2,015

Route NA- ProjectDescription

DOWNTOWN STREETSCAPE AND SIDEWALKS ALONG B.Y. WILLIAMS SR. DRIVE IN THE CITY OF MIDFIELD.

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100065504 CMAQ TA14 (930) UTILITIES

Approved in a STIP Plan 2019 $82 $21 $103

100062999 TAPAA-CMAQ TA14 (930)

CONSTRUCTION

Approved in a STIP Plan 2019 $899 $225 $1,123

TOTAL COST: $981 $245 $1,226

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

55 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

SIDEWALKS CONNECTION INITIATIVE PROJECT NEAR SR-5 (US-11) IN THE CITY OF MIDFIELD

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100065517 TAPAA TA16 (900) CONSTRUCTION

Approved in a STIP Plan 2019 $400 $100 $500

TOTAL COST: $400 $100 $500

Route NA- ProjectDescription

7TH AVENUE SOUTH STREETSCAPE AND IMPROVEMENTS PROJECT LOCATED ON 7TH AVENUE SOUTH AND OTHER VARIOUS STREETS IN THE CITY OF BIRMINGHAM.

Type of Work STREETSCAPE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100065573 TAPBH TA16 (943) CONSTRUCTION

Approved in a STIP Plan 2019 $1,100 $275 $1,375

TOTAL COST: $1,100 $275 $1,375

Route NA- ProjectDescription

PEDESTRIAN AND STREETSCAPE IMPROVEMENTS UNDERNEATH THE I-59/I-20 CBD BRIDGE

Type of Work STREETSCAPE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100065615 ACIM-ACCMAQ-CMAQ 3716 ()

CONSTRUCTION

Approved in a STIP Plan 2020 $32,675 $4,787 $37,462

TOTAL COST: $32,675 $4,787 $37,462

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

56 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

ADVANCED TRAFFIC MANAGEMENT SYSTEM ASSESSMENT

Type of Work TRAFFIC CONTROL MARKING & LEGN

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100065798 CMAQ 3716 () SPECIAL

Approved in a STIP Plan 2019 $330 $82 $412

TOTAL COST: $330 $82 $412

Route NA- ProjectDescription

BIKESHARE WAYFINDING SIGNS AT VARIOUS LOCATIONS IN DOWNTOWN BIRMINGHAM

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100066621 CMAQ 3717 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $190 $48 $238

100066622 CMAQ 3717 () CONSTRUCTION

Approved in a STIP Plan 2019 $1,120 $280 $1,400

TOTAL COST: $1,310 $328 $1,638

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

57 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

WOODLAWN NEIGHBORHOOD STREETSCAPE PHASE 2 (CITY OF BIRMINGHAM)

Type of Work STREETSCAPE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100066708 CMAQ 3717 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $204 $51 $255

100066710 CMAQ 3717 () UTILITIES

Approved in a STIP Plan 2019 $204 $51 $255

100066709 CMAQ 3717 () CONSTRUCTION

Approved in a STIP Plan 2019 $1,224 $306 $1,530

TOTAL COST: $1,632 $408 $2,040

Route NA- ProjectDescription

INTERSECTION IMPROVEMENT STUDY THROUGHOUT THE CITY OF HOMEWOOD FOR IDENTIFICATION OF POTENTIAL ROADWAY IMPROVEMENTS.

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100066930 STPBH 3717 () SPECIAL

Approved in a STIP Plan 2019 $80 $20 $100

TOTAL COST: $80 $20 $100

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

58 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

STREETSCAPE AND OTHER PEDESTRIAN IMPROVEMENTS ALONG THE FOLLOWING BLOCKS IN DOWNTOWN BIRMINGHAM: 4TH AVE. N FROM 15TH N TO 17TH N, 5TH AVE. N FROM 15TH N TO 17TH N,15TH ST. N FROM 4TH AVE. N TO 5TH AVE. N, 16TH ST. N FROM 4TH AVE. N TO 5TH AVE. N.

Type of Work STREETSCAPE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100067026 CMAQ 3717 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $98 $24 $122

100067027 CMAQ 3717 () UTILITIES

Approved in a STIP Plan 2019 $122 $31 $153

100067028 CMAQ 3717 () CONSTRUCTION

Approved in a STIP Plan 2019 $408 $102 $510

TOTAL COST: $628 $157 $785

Route NA- ProjectDescription

MULTI-USE TRAIL ADJACENT/PARALLEL TO SR-150 BETWEEN BERKLEY AVENUE AND ARLINGTON AVENUE IN BESSEMER

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100067295 TAPAA TA17 (905) CONSTRUCTION

Approved in a STIP Plan 2019 $370 $92 $462

TOTAL COST: $370 $92 $462

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

59 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

SIDEWALKS ALONG PINE RIDGE ROAD FROM OVERBROOK ROAD TO OLD LEEDS ROAD

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068123 CMAQ 3718 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $162 $40 $202

100068125 CMAQ 3718 () RIGHT OF WAY

Approved in a STIP Plan 2020 $41 $10 $51

100068124 CMAQ 3718 () UTILITIES

Approved in a STIP Plan 2020 $82 $20 $102

100068126 CMAQ 3718 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,906 $476 $2,382

TOTAL COST: $2,190 $547 $2,737

Route NA- ProjectDescription

BIRMINGHAM RIDE SHARE PROGRAMS APPORTIONMENT FY 2019 - FY 2020

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068135 STPBH TR18 () SPECIAL

Approved in a STIP Plan 2019 $1,300 $0 $1,300

TOTAL COST: $1,300 $0 $1,300

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

60 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

A SIDEWALK FROM MERRYVALE LANE TO 1090 MONTGOMERY HIGHWAY THEN WRAPPING AROUND TO CONNECT TO MAYLAND LANE

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068361 TAPAA TA18 (911) CONSTRUCTION

Approved in a STIP Plan 2019 $280 $70 $350

TOTAL COST: $280 $70 $350

Route NA- ProjectDescription

SIDEWALKS ALONG ALDEN AVENUE FROM 8TH STREET TO 12TH STREET AND ALONG 12TH STREET FROM ALDEN AVENUE TO 12TH AVENUE

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068363 TAPAA TA18 (912) CONSTRUCTION

Approved in a STIP Plan 2019 $405 $101 $507

TOTAL COST: $405 $101 $507

Route NA- ProjectDescription

MULTI-USE TRAIL EXTENSION, PEDESTRIAN BRIDGE AND ADA COMPLIANT ACCESS RAMP ALONG SR-150 ON AN ABANDONED RAILROAD BETWEEN BERKLEY AVENUE AND CAROLINA AVENUE

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068368 TAPAA TA18 (913) CONSTRUCTION

Approved in a STIP Plan 2019 $638 $160 $798

TOTAL COST: $638 $160 $798

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

61 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

SIDEWALK, LANDSCAPING AND LIGHTING AROUND THE HOOVER MUNICIPAL COMPLEX

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068449 TAPBH TA18 (932) CONSTRUCTION

Approved in a STIP Plan 2019 $583 $146 $729

TOTAL COST: $583 $146 $729

Route NA- ProjectDescription

A SIDEWALK ALONG DUNBARTON DRIVE FROM NORTH WOODRIDGE ROAD TO LOCKSLEY DRIVE

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068450 TAPBH TA18 (931) CONSTRUCTION

Approved in a STIP Plan 2019 $549 $137 $686

TOTAL COST: $549 $137 $686

Route NA- ProjectDescription

BICYCLE/PEDESTRIAN PLAN FOR JEFFERSON COUNTY, SPONSOR IS JEFFERSON COUNTY

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068759 CMAQ NR18 () SPECIAL

Approved in a STIP Plan 2019 $120 $30 $150

TOTAL COST: $120 $30 $150

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

62 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route NA- ProjectDescription

PURCHASE OF 5 FULLY EQUIPPED (ASAP) VEHICLES FOR THE BIRMINGHAM AREA

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100069333 CMAQ NR19 () SPECIAL

Approved in a STIP Plan 2019 $240 $60 $300

TOTAL COST: $240 $60 $300

Route SR-119 ProjectDescription

REPLACE BRIDGE, BIN 001308, SR-119 OVER UNNAMED BRANCH, 1.3 MILES NORTH SHELBY COUNTY LINE (SUFF=56.3, STATUS=FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.100 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100049954 BR 0119 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $228 $57 $285

100049986 BR 0119 () RIGHT OF WAY

Approved in a STIP Plan 2019 $57 $14 $71

100049987 BR 0119 () UTILITIES

Approved in a STIP Plan 2022 $35 $9 $44

100049955 BR 0119 () CONSTRUCTION

Approved in a STIP Plan 2023 $2,362 $591 $2,953

TOTAL COST: $2,682 $671 $3,353

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

63 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-150 ProjectDescription

SR-150 FR WEST OF CR-6 (PARKWOOD RD) TO WEST OF SHADES CREEK (PHASE 2)

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 2.349 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100025540 ST-659-17 () CONSTRUCTION

Approved in a STIP Plan 2020 $0 $9,948 $9,948

TOTAL COST: $0 $9,948 $9,948

Route SR-150 ProjectDescription

PEDESTRIAN BRIDGE OVER SR-150 BETWEEN BERKLEY AVE AND CLARENDON AVE - CITY OF BESSEMER

Type of Work PEDESTRIAN OVERPASS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064226 CMAQ 3715 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $250 $62 $312

100064228 CMAQ 3715 () RIGHT OF WAY

Approved in a STIP Plan 2019 $83 $21 $104

100064229 CMAQ 3715 () UTILITIES

Approved in a STIP Plan 2020 $84 $21 $105

100064230 CMAQ 3715 () CONSTRUCTION

Approved in a STIP Plan 2020 $841 $210 $1,051

TOTAL COST: $1,258 $314 $1,572

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

64 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-150 ProjectDescription

BRIDGE REPLACEMENT ON SR-150 OVER LITTLE SHADES CREEK BIN # 2866

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100066943 BR 0150 (505) UTILITIES

Approved in a STIP Plan 2019 $245 $61 $306

100066944 BR 0150 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,236 $309 $1,545

TOTAL COST: $1,481 $370 $1,851

Route SR-3 ProjectDescription

BR REPL AND APP ON SR-3 (US-31) BIN# 002243 OVER SOU RR #3-37-15.8B

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.100 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100003818 BR 7044 (600) PRELIMINARY ENGINEERING

Approved in a STIP Plan 2023 $126 $31 $157

100003817 BR 7044 () CONSTRUCTION

Approved in a STIP Plan 2026 $2,586 $647 $3,233

TOTAL COST: $2,712 $678 $3,390

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

65 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-3 ProjectDescription

SR-3(US-31) FROM COLUMBIANA RD TO SHADES CREST RD VESTAVIA HILLS, TRAFFIC CONTROL SYSTEM / TRAFFIC CONTROL CENTER

Type of Work UNCLASSIFIED

Project Length in Miles 3.265 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100039841 CMAQ 7012 () UTILITIES

Approved in a STIP Plan 2019 $9 $2 $12

100039842 CMAQ 7012 () CONSTRUCTION

Approved in a STIP Plan 2020 $636 $159 $796

TOTAL COST: $646 $161 $807

Route SR-3 ProjectDescription

SLOPE STABILIZATION ON SR-3 (US-31) AT BROOKWOOD MEDICAL CENTER DRIVE

Type of Work SLIDE CORRECTION

Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056427 NH 0003 () CONSTRUCTION

Approved in a STIP Plan 2020 $91 $23 $114

TOTAL COST: $91 $23 $114

Route SR-3 ProjectDescription

SR-3 (US-31)ATSR-150 UPGRADE TRAFFIC CAMERAS AND INSTALL FIBER OPTIC CABLE

Type of Work SIGNALIZATION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056560 CMAQF NR13 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $90 $23 $113

TOTAL COST: $90 $23 $113

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

66 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-3 ProjectDescription

ROADSIDE MOWING ALL STATE ROUTES IN DISTRICT ONE JEFFERSON COUNTY, SR-3, SR-4, SR-5, SR-25, SR-38, SR-75, SR-79, SR-119, SR-150, SR-151, SR-269 FROM THE BEGINNING OF THE DISTRICT LINE TO THE END OF THE DISTRICT LINE

Type of Work ROADSIDE MOWING

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100061626 99-403-371-000-403 () MAINTENANCE CONSTRUCTION

Approved in a STIP Plan 2019 $0 $277 $277

TOTAL COST: $0 $277 $277

Route SR-3 ProjectDescription

ROADWAY LIGHTING IMPROVEMENTS ALONG SR-3(US-31, E.B. STEPHENS EXPRESSWAY) FROM SR-38(US-280) TO I-59

Type of Work LIGHTING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100062977 NH 0003 () CONSTRUCTION

Approved in a STIP Plan 2033 $3,349 $837 $4,187

100062976 NH 0003 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2033 $239 $60 $299

TOTAL COST: $3,588 $897 $4,486

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

67 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-3 ProjectDescription

SR-3 (US-31) LIGHTING SYSTEM FROM PATTON CHAPEL ROAD TO I-65 CITY OF HOOVER

Type of Work LIGHTING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064203 STPBH 3715 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $80 $20 $100

100064209 STPBH 3715 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,600 $400 $2,000

TOTAL COST: $1,680 $420 $2,100

Route SR-3 ProjectDescription

AUXILIARY LANES ON SR-3(US-31/RED MOUNTAIN EXPRESSWAY) BETWEEN HIGHLAND AVE AND 21ST AVE.

Type of Work STREETSCAPE

Project Length in Miles 1.598 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064506 CMAQ 0003 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $83 $21 $104

100064507 CMAQ 0003 () CONSTRUCTION

Approved in a STIP Plan 2019 $2,602 $650 $3,252

TOTAL COST: $2,685 $671 $3,356

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

68 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-3 ProjectDescription

STORM DRAINAGE REPAIRS ON SR-3 (US-31) ADJACENT TO WALD PARK IN VESTAVIA HILLS

Type of Work DRAINAGE CORRECTION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064599 ST-037-003-011 () CONSTRUCTION

Approved in a STIP Plan 2019 $0 $225 $225

TOTAL COST: $0 $225 $225

Route SR-38 ProjectDescription

BRIDGE WIDENING ON SR-38 (US-280) OVER I-459 FROM SUMMIT BOULEVARD TO BLUE LAKE DRIVE

Type of Work BRIDGE WIDENING

Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100060860 BR 0038 () CONSTRUCTION

Approved in a STIP Plan 2022 $267 $67 $334

TOTAL COST: $267 $67 $334

Route SR-38 ProjectDescription

INTERSECTION IMPROVEMENTS ON SR-38 (US-280) FROM EAST OF GRANDVIEW PARKWAY TO WEST OF RESOURCE CENTER PARKWAY FROM EAST OF GRANDVIEW PARKWAY TO WEST OF RESOURCE CENTER PARKWAY

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.885 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068116 ST-037-038-011 () CONSTRUCTION

Approved in a STIP Plan 2020 $0 $4,500 $4,500

TOTAL COST: $0 $4,500 $4,500

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

69 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-4 ProjectDescription

REPLACE BRIDGE, BIN 000884, SR-4 (US-78) OVER LITTLE CAHABA RIVER (SUFF=58.4, STATUS=FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.200 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100049988 BR 0004 () RIGHT OF WAY

Approved in a STIP Plan 2020 $58 $14 $72

100049989 BR 0004 () UTILITIES

Approved in a STIP Plan 2022 $35 $9 $44

100049957 BR 0004 () CONSTRUCTION

Approved in a STIP Plan 2022 $2,639 $660 $3,299

TOTAL COST: $2,732 $683 $3,415

Route SR-4 ProjectDescription

INTERSECTION IMPROVEMENTS AT PARKWAY DRIVE SR-4 (US-78) AND PRESIDENT STREET IN THE CITY OF LEEDS

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.260 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100065396 STPAA 0004 () RIGHT OF WAY

Approved in a STIP Plan 2019 $412 $103 $515

100065397 STPAA 0004 () UTILITIES

Approved in a STIP Plan 2020 $416 $104 $520

100063799 STPAA 0004 () CONSTRUCTION

Approved in a STIP Plan 2020 $2,522 $631 $3,153

TOTAL COST: $3,351 $838 $4,188

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

70 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-4 ProjectDescription

RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-4 (US-78) FROM 1ST AVE NORTH TO 47TH STREET SOUTH INCLUDING EASTBOUND AND WESTBOUND LANES

Type of Work PREVENTATIVE MAINTENANCE LEVEL 2

Project Length in Miles 3.910 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068637 STPAA 0004 (546) FEDERAL MAINT CN

Approved in a STIP Plan 2019 $906 $226 $1,132

TOTAL COST: $906 $226 $1,132

Route SR-4 ProjectDescription

RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-4 (US-78) FROM 47TH STREET SOUTH TO ST. PATRICK CIRCLE

Type of Work PREVENTATIVE MAINTENANCE LEVEL 2

Project Length in Miles 3.460 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068636 STPAA 0004 () FEDERAL MAINT CN

Approved in a STIP Plan 2019 $1,435 $359 $1,794

TOTAL COST: $1,435 $359 $1,794

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

71 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-5 ProjectDescription

BRIDGE REPLACEMENT (BIN 007627) ON SR-5 OVER LOCUST FORK OF BLACK WARRIOR RIVER

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.681 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100050015 BR 0005 (517) UTILITIES

Approved in a STIP Plan 2019 $91 $23 $114

100002809 BR 0005 (517) CONSTRUCTION

Approved in a STIP Plan 2019 $5,135 $1,284 $6,418

TOTAL COST: $5,226 $1,306 $6,532

Route SR-5 ProjectDescription

SR-5 (US-78) ADD LANES FROM FINLEY BLVD. TO PRATT HWY (2ND ST) (PHASE 2)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 0.810 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100063746 NH 0005 (510) PRELIMINARY ENGINEERING

Approved in a STIP Plan 2023 $217 $54 $271

100044952 NH 0005 () RIGHT OF WAY

Approved in a STIP Plan 2025 $3,342 $835 $4,177

100044953 NH 0005 () UTILITIES

Approved in a STIP Plan 2026 $1,220 $305 $1,525

100044951 NH 0005 () CONSTRUCTION

Approved in a STIP Plan 2027 $6,643 $1,661 $8,304

100042352 BRF 0005 (511) CONSTRUCTION

Approved in a STIP Plan 2027 $3,794 $948 $4,742

TOTAL COST: $15,216 $3,804 $19,019

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

72 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-7 ProjectDescription

WIDEN SR-7(US-11) FR END OF 5-LANE FACILITY, EAST OF CHALKVILLE RD TO THE CAHABA RIVER BRIDGE

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.441 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100039839 STPBH 7073 (602) CONSTRUCTION

Approved in a STIP Plan 2019 $2,049 $512 $2,562

TOTAL COST: $2,049 $512 $2,562

Route SR-7 ProjectDescription

US-11 ADDITIONAL LANES FROM I-459 TO TUTWILER DRIVE

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.250 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100047792 STPAA 0007 (509) UTILITIES

Approved in a STIP Plan 2048 $380 $95 $475

100047793 STPAA 0007 (509) CONSTRUCTION

Approved in a STIP Plan 2048 $7,606 $1,901 $9,507

TOTAL COST: $7,986 $1,997 $9,983

Route SR-75 ProjectDescription

RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-75 FROM 25TH AVENUE NW/NE TO INNSBROOKE PARKWAY

Type of Work PREVENTATIVE MAINTENANCE LEVEL 2

Project Length in Miles 4.270 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068643 NH 0075 (535) FEDERAL MAINT CN

Approved in a STIP Plan 2019 $1,726 $432 $2,158

TOTAL COST: $1,726 $432 $2,158

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

73 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-79 ProjectDescription

INTERCHANGE IMPROVEMENTS, TRAFFIC SIGNAL AND STRIPING ON TALLAPOOSA STREET (40TH STREET) FROM NORTH OF I-59 / I-20 INTERCHANGE TO APPROX 1200 FEET SOUTH OF I-59 / I-20 INTERCHANGE FOR CITY OF BIRMINGHAM

Type of Work UNCLASSIFIED

Project Length in Miles 0.276 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056048 IAR-037-000-005 () CONSTRUCTION

Approved in a STIP Plan 2019 $0 $1,554 $1,554

TOTAL COST: $0 $1,554 $1,554

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM I-459 TO CR-46

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 8.242 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100051647 ACNHF 1602 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $54,557 $13,639

$68,196

100051648 ACNHF 1602 () RIGHT OF WAY

Approved in a STIP Plan 2049 $112,419 $28,105

$140,524

100051649 ACNHF 1602 () UTILITIES

Approved in a STIP Plan 2049 $6,638 $1,659 $8,297

100051650 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2049 $783,482 $195,871

$979,353

TOTAL COST: $957,096 $239,274

$1,196,370

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

74 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM SR-75 TO 0.57 MI EAST OF CR-30 (OLD SPRINGVILLE ROAD). INCLUDES SINGLE BRIDGES ON BROOKWOOD ROAD AT STATIONS 8+01 TO 11+31 AND STATIONS 21+70 TO 22+28. GRADE, DRAIN, PARTIAL BASE AND PAVE, AND BRIDGE.

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100058452 ACNHF 1602 (556) RIGHT OF WAY

Approved in a STIP Plan 2026 $4,418 $1,105 $5,523

100058453 ACNHF 1602 (556) UTILITIES

Approved in a STIP Plan 2039 $203 $51 $254

100058454 ACNHF 1602 (556) CONSTRUCTION

Approved in a STIP Plan 2039 $56,973 $14,243

$71,217

TOTAL COST: $61,595 $15,399

$76,994

Route SR-959 ProjectDescription

(BNB) DUAL MAINLINE BRGS OVER CR-129 (GLENWOOD RD), TURKEY CREEK, CR-131 (MAJESTIC RD) / CSX RR, CR-121 (BRADFORD ROAD), CR-141 (OLD DIXIANA RD), SR-79, AND SELF CREEK STATIONS 2149+00 TO 2158+00. ALSO INCLUDES RAMP C BRIDGE AT SR-79.

Type of Work BRIDGE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100058465 ACNHF 1602 (553) CONSTRUCTION

Approved in a STIP Plan 2026 $26,789 $6,697 $33,487

TOTAL COST: $26,789 $6,697 $33,487

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

75 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM CR-566 (PINEWOOD AVE) TO SOUTH OF SR-269. INCLUDES DUAL MAINLINE BRIDGES OVER CR-566 (PINEWOOD AVE). GRADE, DRAIN, AND BRIDGES.

Type of Work GRADE, DRAIN AND BRIDGE

Project Length in Miles 4.408 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056212 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2049 $26,292 $6,573 $32,866

100056209 ACNHF 1602 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $2,068 $517 $2,585

100056210 ACNHF 1602 () RIGHT OF WAY

Approved in a STIP Plan 2049 $228 $57 $285

100056211 ACNHF 1602 () UTILITIES

Approved in a STIP Plan 2049 $1,898 $474 $2,372

TOTAL COST: $30,486 $7,621 $38,107

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM CR-566 (PINEWOOD AVE) TO SOUTH OF SR-269. INCLUDES DUAL MAINLINE BRIDGES OVER CR-566 (PINEWOOD AVE). GRADE, DRAIN, AND BRIDGES.

Type of Work BASE AND PAVE

Project Length in Miles 4.408 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056214 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2049 $17,522 $4,380 $21,902

100056213 ACNHF 1602 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $547 $137 $684

TOTAL COST: $18,069 $4,517 $22,586

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

76 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM SOUTH OF SR-269 TO CR-45 (PORTER RD). INCLUDES DUAL MAINLINE BRIDGES OVER SR-269 AND CR-2537 (CROCKER MINE RD) BRIDGE OVER MAINLINE. GRADE, DRAIN, AND BRIDGE.

Type of Work GRADE, DRAIN AND BRIDGE

Project Length in Miles 3.760 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056215 ACNHF 1602 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $1,269 $317 $1,586

100056216 ACNHF 1602 () RIGHT OF WAY

Approved in a STIP Plan 2049 $1,260 $315 $1,576

100056217 ACNHF 1602 () UTILITIES

Approved in a STIP Plan 2049 $2,363 $591 $2,954

100056218 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2049 $16,776 $4,194 $20,970

TOTAL COST: $21,669 $5,417 $27,086

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM SOUTH OF SR-269 TO SR-269. BASE AND PAVE

Type of Work BASE AND PAVE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056221 ACNHF 1602 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $196 $49 $245

100056222 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2049 $6,271 $1,568 $7,839

TOTAL COST: $6,467 $1,617 $8,083

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

77 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM SR-269 TO CR-45 (PORTER RD). BASE AND PAVE.

Type of Work BASE AND PAVE

Project Length in Miles 3.760 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056223 ACNHF 1602 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $543 $136 $679

100056224 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2049 $17,388 $4,347 $21,735

TOTAL COST: $17,931 $4,483 $22,414

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER SHORT CREEK.

Type of Work BRIDGE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056219 ACNHF 1602 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $923 $231 $1,153

100056220 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2050 $12,827 $3,207 $16,034

TOTAL COST: $13,750 $3,437 $17,187

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

78 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM CR-45 (PORTER RD) TO SOUTH OF CR-67 (HAZELWOOD RD). INLCUDES CR-45 (PORTER RD) AND CR-675 (SHADY GROVE RD) BRIDGES OVER MAINLINE. GRADE, DRAIN, AND BRIDGE.

Type of Work GRADE, DRAIN AND BRIDGE

Project Length in Miles 3.130 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056225 ACNHF 1602 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $1,235 $309 $1,544

100056226 ACNHF 1602 () RIGHT OF WAY

Approved in a STIP Plan 2049 $1,070 $268 $1,338

100056227 ACNHF 1602 () UTILITIES

Approved in a STIP Plan 2049 $988 $247 $1,235

100056228 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2049 $16,422 $4,106 $20,528

TOTAL COST: $19,716 $4,929 $24,645

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM CR-45 (PORTER RD) TO VILLAGE CREEK. BASE AND PAVE.

Type of Work BASE AND PAVE

Project Length in Miles 1.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056231 ACNHF 1602 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $303 $76 $379

100056232 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2049 $9,704 $2,426 $12,130

TOTAL COST: $10,008 $2,502 $12,509

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

79 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM VILLAGE CREEK TO SOUTH OF CR-67 (HAZELWOOD RD). BASE AND PAVE.

Type of Work BASE AND PAVE

Project Length in Miles 1.792 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056233 ACNHF 1602 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $488 $122 $610

100056234 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2049 $15,598 $3,900 $19,498

TOTAL COST: $16,086 $4,021 $20,107

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER VILLAGE CREEK.

Type of Work BRIDGE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056229 ACNHF 1602 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $748 $187 $936

100056230 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2049 $10,252 $2,563 $12,814

TOTAL COST: $11,000 $2,750 $13,750

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

80 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM SR-5 (US-78) NEAR GRAYSVILLE TO CR-77 NE OF BROOKSIDE

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 7.710 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100051655 ACNHF 1602 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $31,338 $7,835 $39,173

100051656 ACNHF 1602 () RIGHT OF WAY

Approved in a STIP Plan 2049 $101,287 $25,322

$126,609

100051657 ACNHF 1602 () UTILITIES

Approved in a STIP Plan 2049 $9,619 $2,405 $12,024

100051658 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2049 $447,976 $111,994

$559,971

TOTAL COST: $590,220 $147,555

$737,776

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

81 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM 0.32 MILE SOUTHWEST OF CR-1538 (DOWNS RD) TO CROOKED CREEK. INCLUDES BRIDGES ON CR-77 (NEW FOUND RD) AND CR-112 (MT. OLIVE RD) OVER MAINLINE.

Type of Work GRADE, DRAIN AND BRIDGE

Project Length in Miles 2.660 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100047818 ACNHF 1602 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $1,618 $404 $2,022

100047819 ACNHF 1602 () RIGHT OF WAY

Approved in a STIP Plan 2049 $38,773 $9,693 $48,466

100047821 ACNHF 1602 () UTILITIES

Approved in a STIP Plan 2049 $3,952 $988 $4,940

100047822 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2049 $36,332 $9,083 $45,415

TOTAL COST: $80,675 $20,169

$100,844

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM 0.32 MILE SOUTHWEST OF CR-1538 (DOWNS RD) TO CROOKED CREEK. INCLUDES BRIDGES ON CR-77 (NEW FOUND RD) AND CR-112 (MT. OLIVE RD) OVER MAINLINE.

Type of Work BASE AND PAVE

Project Length in Miles 2.660 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100047823 ACNHF 1602 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $700 $175 $875

100047824 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2049 $15,222 $3,806 $19,028

TOTAL COST: $15,922 $3,980 $19,902

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

82 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER CROOKED CREEK AND UNNAMED TRIBUTARY.

Type of Work BRIDGE

Project Length in Miles 0.240 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100047825 ACNHF 1602 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $2,349 $587 $2,936

100047826 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2049 $50,160 $12,540

$62,700

TOTAL COST: $52,509 $13,127

$65,636

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM CROOKED CREEK TO 0.17 MILE WEST OF I-65.

Type of Work GRADE, DRAIN AND BRIDGE

Project Length in Miles 0.883 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100047827 ACNHF 1602 (541) PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $1,466 $367 $1,833

100047828 ACNHF 1602 () RIGHT OF WAY

Approved in a STIP Plan 2049 $10,896 $2,724 $13,620

100047829 ACNHF 1602 () UTILITIES

Approved in a STIP Plan 2049 $220 $55 $275

100047830 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2049 $30,561 $7,640 $38,202

TOTAL COST: $43,144 $10,786

$53,929

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

83 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM CROOKED CREEK TO 0.17 MILE WEST OF I-65.

Type of Work BASE AND PAVE

Project Length in Miles 0.883 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100047831 ACNHF 1602 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $448 $112 $561

100047832 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2049 $9,402 $2,350 $11,752

TOTAL COST: $9,850 $2,463 $12,313

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM 0.13 MILE WEST OF I-65 TO 0.09 MILE WEST OF SR-3 (US-31). INCLUDES ACCEL/DECEL LANES ON I-65

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 1.210 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100047841 ACNHF 1602 () RIGHT OF WAY

Approved in a STIP Plan 2025 $15,330 $3,832 $19,162

100047842 ACNHF 1602 () UTILITIES

Approved in a STIP Plan 2038 $1,175 $294 $1,469

100047843 ACNHF 1602 (559) CONSTRUCTION

Approved in a STIP Plan 2038 $66,757 $16,689

$83,447

TOTAL COST: $83,262 $20,816

$104,078

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

84 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM 0.13 MILE WEST OF I-65 TO 0.09 MILE WEST OF SR-3 (US-31). INCLUDES ACCEL/DECEL LANES ON I-65

Type of Work BASE AND PAVE

Project Length in Miles 1.210 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100047844 ACNHF 1602 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2039 $424 $106 $529

100047845 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2039 $17,645 $4,411 $22,056

TOTAL COST: $18,069 $4,517 $22,586

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE INCLUDES DUAL MAINLINE BRIDGES OVER US-31, RAMP A AND B, BRIDGES AT US-31 AND RAMP 3 AND 4, BRIDGES AT I-65

Type of Work BRIDGE

Project Length in Miles 0.970 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100047834 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2025 $59,727 $14,932

$74,659

TOTAL COST: $59,727 $14,932

$74,659

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

85 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM 0.09 MILE WEST OF SR-3 (US-31) TO CUNNINGHAM CREEK

Type of Work GRADE, DRAIN AND BRIDGE

Project Length in Miles 1.877 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100047848 ACNHF 1602 () RIGHT OF WAY

Approved in a STIP Plan 2025 $7,340 $1,835 $9,176

100047849 ACNHF 1602 () UTILITIES

Approved in a STIP Plan 2037 $1,753 $438 $2,192

100047850 ACNHF 1602 (558) CONSTRUCTION

Approved in a STIP Plan 2037 $42,339 $10,585

$52,924

TOTAL COST: $51,433 $12,858

$64,292

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM 0.09 MILE WEST OF SR-3 (US-31) TO CUNNINGHAM CREEK. INCLUDES DUAL MAINLINE BRIDGES OVER SR-3 (US-31).

Type of Work BASE AND PAVE

Project Length in Miles 1.877 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100047851 ACNHF 1602 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2037 $559 $140 $699

100047852 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2038 $16,131 $4,033 $20,164

TOTAL COST: $16,690 $4,172 $20,862

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

86 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER CUNNINGHAM CREEK.

Type of Work BRIDGE

Project Length in Miles 0.240 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100047854 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2025 $51,536 $12,884

$64,420

TOTAL COST: $51,536 $12,884

$64,420

Route SR-959 ProjectDescription

SR-959 (BIRMINGHAM NORTHERN BELTLINE) FROM CUNNINGHAM CREEK TO 0.39 MI EAST OF SR-79. GRADE, DRAIN, PARTIAL BASE AND PAVE.

Type of Work GRADE AND DRAIN

Project Length in Miles 6.840 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100058461 ACNHF 1602 (555) RIGHT OF WAY

Approved in a STIP Plan 2026 $18,541 $4,635 $23,176

100058462 ACNHF 1602 (555) UTILITIES

Approved in a STIP Plan 2039 $203 $51 $254

100058463 ACNHF 1602 (555) CONSTRUCTION

Approved in a STIP Plan 2039 $122,360 $30,590

$152,951

TOTAL COST: $141,105 $35,276

$176,381

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

87 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM CUNNINGHAM CREEK TO 0.78 MI WEST OF SR-79. BASE AND PAVE.

Type of Work BASE AND PAVE

Project Length in Miles 6.910 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100058466 ACNHF 1602 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2040 $1,026 $256 $1,282

100058467 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2042 $24,076 $6,019 $30,095

TOTAL COST: $25,102 $6,276 $31,378

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER SELF CREEK AT STATIONS 2183+00 TO 2199+00, DUAL MAINLINE BRIDGES AT STATION 2208+50 TO 2218+50, AND SINGLE BRIDGES ON RAMPS B AND D AT SR-79.

Type of Work BRIDGE

Project Length in Miles 2.780 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100048413 ACAPDF 1602 (550) CONSTRUCTION

Approved in a STIP Plan 2023 $52,718 $0 $52,718

TOTAL COST: $52,718 $0 $52,718

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

88 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM SR-79 TO SR-75; INCLUDES RAMPS B AND D AT SR-79 AND RAMPS F, H, AND J AT SR-75.

Type of Work BASE AND PAVE

Project Length in Miles 2.780 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100048414 ACNHF 1602 (542) PRELIMINARY ENGINEERING

Approved in a STIP Plan 2038 $808 $202 $1,010

100048415 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2039 $102,593 $25,648

$128,241

TOTAL COST: $103,401 $25,850

$129,251

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM 0.76 MI EAST OF SR-75 TO 0.57 MI EAST OF CR-30 (OLD SPRINGVILLE ROAD) BASE AND PAVE

Type of Work BASE AND PAVE

Project Length in Miles 4.400 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056653 ACNHF 1602 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2040 $754 $189 $943

100056654 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2041 $48,988 $12,247

$61,235

TOTAL COST: $49,742 $12,436

$62,178

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

89 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER SR-75, CR-159 (CEDAR MT. ROAD), CR-2186 (CAVERN RD / BUD ALISON RD), AND CR-30 (OLD SPRINGVILLE ROAD). ALSO INCLUDES SINGLE RAMP H AND I BRIDGES AT SR-75.

Type of Work BRIDGE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056652 ACNHF 1602 (561) CONSTRUCTION

Approved in a STIP Plan 2025 $299,327 $74,832

$374,158

TOTAL COST: $299,327 $74,832

$374,158

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM 0.57 MI EAST OF CR-30 (OLD SPRINGVILLE ROAD) TO I-59. BASE AND PAVE

Type of Work BASE AND PAVE

Project Length in Miles 3.360 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056665 ACNHF 1602 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2040 $826 $206 $1,032

100056666 ACNHF 1602 () CONSTRUCTION

Approved in a STIP Plan 2041 $21,860 $5,465 $27,325

TOTAL COST: $22,686 $5,671 $28,357

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

90 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE FROM 0.57 MI EAST OF CR-30 (OLD SPRINGVILLE RD) TO I-59. INCLUDES ACCEL/DECEL LANES ON I-59 BETWEEN CR-2133 (DEERFOOT PKWY) AND CR-2145 (HONOR KEITH RD / LILES LN) AND BRIDGE OVER I-59 ON CR-2137 (ADVENT CIRCLE)

Type of Work GRADE, DRAIN AND BRIDGE

Project Length in Miles 3.360 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100058456 ACNHF 1602 (557) RIGHT OF WAY

Approved in a STIP Plan 2026 $1,854 $464 $2,318

100058457 ACNHF 1602 (557) UTILITIES

Approved in a STIP Plan 2039 $203 $51 $254

100058458 ACNHF 1602 (557) CONSTRUCTION

Approved in a STIP Plan 2039 $51,635 $12,909

$64,544

TOTAL COST: $53,693 $13,423

$67,116

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER CR-2137 (ADVENT CIRCLE) AND SINGLE BRIDGES ON RAMP O AND RAMP Q OVER I-59.

Type of Work BRIDGE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056660 ACNHF 1602 (554) CONSTRUCTION

Approved in a STIP Plan 2026 $36,684 $9,171 $45,855

TOTAL COST: $36,684 $9,171 $45,855

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

91 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON

Route SR-959 ProjectDescription

FY 2020 AND 2021 BIRMINGHAM NORTHERN BELTLINE WETLAND AND STREAM MITIGATION CREDITS

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100063385 APDF 1602 () SPECIAL

Approved in a STIP Plan 2020 $2,353 $0 $2,353

TOTAL COST: $2,353 $0 $2,353

11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

92 of 92

COUNTY HIGHWAY PROJECTS - JEFFERSON