22
Route CR-11 Project Description SHELBY CR-11 (PHASE 2) GUARDRAIL AND RAILROAD CROSSING IMPROVMENTS: FROM SR-3 TO CR-68 Type of Work SAFETY IMPROVEMENTS Project Length in Miles 1.580 Urban Area BIRMINGHAM COST IN THOUSANDS Project Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State- Other TOTAL 100040846 STPBH 7118 () UTILITIES Approved in a STIP Plan 2020 $10 $2 $12 100007571 STPBH 7118 () CONSTRUCTION Approved in a STIP Plan 2020 $323 $81 $403 TOTAL COST: $332 $83 $415 Route CR-11 Project Description WIDEN AND RESURFACE CR-11 FROM SR-3 (US-31) TO CR-332 (WEATHERLY WAY) Type of Work WIDENING AND RESURFACING (RDWY) Project Length in Miles 3.200 Urban Area BIRMINGHAM COST IN THOUSANDS Project Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State- Other TOTAL 100007575 STPBH 7118 () PRELIMINARY ENGINEERING Approved in a STIP Plan 2020 $190 $48 $238 100007576 STPBH 7118 () RIGHT OF WAY Approved in a STIP Plan 2021 $1,937 $484 $2,421 100007577 STPBH 7118 () UTILITIES Approved in a STIP Plan 2022 $963 $241 $1,204 100007572 STPBH 7118 () CONSTRUCTION Approved in a STIP Plan 2022 $3,078 $770 $3,848 TOTAL COST: $6,169 $1,542 $7,711 7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 1 of 22 COUNTY HIGHWAY PROJECTS - SHELBY

5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

  • Upload
    lamnga

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route CR-11 ProjectDescription

SHELBY CR-11 (PHASE 2) GUARDRAIL AND RAILROAD CROSSING IMPROVMENTS: FROM SR-3 TO CR-68

Type of Work SAFETY IMPROVEMENTS

Project Length in Miles 1.580 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100040846 STPBH 7118 () UTILITIES

Approved in a STIP Plan 2020 $10 $2 $12

100007571 STPBH 7118 () CONSTRUCTION

Approved in a STIP Plan 2020 $323 $81 $403

TOTAL COST: $332 $83 $415

Route CR-11 ProjectDescription

WIDEN AND RESURFACE CR-11 FROM SR-3 (US-31) TO CR-332 (WEATHERLY WAY)

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 3.200 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100007575 STPBH 7118 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $190 $48 $238

100007576 STPBH 7118 () RIGHT OF WAY

Approved in a STIP Plan 2021 $1,937 $484 $2,421

100007577 STPBH 7118 () UTILITIES

Approved in a STIP Plan 2022 $963 $241 $1,204

100007572 STPBH 7118 () CONSTRUCTION

Approved in a STIP Plan 2022 $3,078 $770 $3,848

TOTAL COST: $6,169 $1,542 $7,711

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

1 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

Page 2: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route CR-12 ProjectDescription

INTERSECTION IMPROVEMENTS AT CR-12 AND CR-22

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.010 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064319 CMAQ 5915 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2018 $120 $30 $150

100064320 CMAQ 5915 () RIGHT OF WAY

Approved in a STIP Plan 2019 $200 $50 $250

100064321 CMAQ 5915 () UTILITIES

Approved in a STIP Plan 2020 $160 $40 $200

100064322 CMAQ 5915 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,600 $400 $2,000

TOTAL COST: $2,080 $520 $2,600

Route CR-1396 ProjectDescription

CR-1396 (CAHABA BEACH ROAD), EXTENSION FROM CR-346 (SWAN DRIVE) TO CR-60 (SICARD HOLLOW ROAD) INCLUDING A BRIDGE OVER THE LITTLE CAHABA RIVER

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100059534 ACAA59534 ATRP (015) CONSTRUCTION

Approved in a STIP Plan 2019 $3,200 $800 $4,000

TOTAL COST: $3,200 $800 $4,000

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

2 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

Page 3: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route CR-17 ProjectDescription

ADDITIONAL LANES ON CR-17 (VALLEYDALE RD) FROM SR-3 (US-31) TO RIVERCHASE PARKWAY EAST

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 0.750 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100046238 STPBH 7112 (602) UTILITIES

Approved in a STIP Plan 2020 $553 $138 $691

100046239 STPBH 7112 () CONSTRUCTION

Approved in a STIP Plan 2020 $3,149 $787 $3,936

TOTAL COST: $3,702 $925 $4,627

Route CR-17 ProjectDescription

RESURFACE CR-17 FROM CR-22 TO CR-26 (KENT DAIRY ROAD)

Type of Work RESURFACING

Project Length in Miles 4.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100059513 ACAA59513 ATRP (010) CONSTRUCTION

Approved in a STIP Plan 2019 $1,294 $323 $1,617

TOTAL COST: $1,294 $323 $1,617

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

3 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

Page 4: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route CR-17 ProjectDescription

RESURFACING ON CR-17 (VALLEYDALE ROAD) FROM I-65 TO CR-29 (CALDWELL MILL ROAD) AND ON CR-43 (BEAR CREEK ROAD) FROM SR-38 (US-280) TO SR-25

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100067603 STPBH 5918 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2018 $80 $20 $100

100067607 STPBH 5918 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,200 $300 $1,500

TOTAL COST: $1,280 $320 $1,600

Route CR-29 ProjectDescription

WIDEN CR-29\1277 FROM CR-370(HEATHERWOOD DR.) TO CR-2311 (ACTON ROAD) AND BRG REPLACEMENT OVER CAHABA RIVER.

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 4.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100045964 STPBH 5939 (200) RIGHT OF WAY

Approved in a STIP Plan 2019 $4,274 $1,069 $5,343

100007540 STPBH 5939 (200) CONSTRUCTION

Approved in a STIP Plan 2020 $1,589 $397 $1,986

TOTAL COST: $5,863 $1,466 $7,329

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

4 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

Page 5: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route CR-52 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON CR-52 OVER CAHABA RIVER (BIN 2380) FROM OLD CAHABA LANE TO OAK VIEW LANE

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.300 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100059503 STPBH 5914 () CONSTRUCTION

Approved in a STIP Plan 2019 $3,702 $926 $4,628

TOTAL COST: $3,702 $926 $4,628

Route CR-52 ProjectDescription

BRIDGE WIDENING (BIN 003267) ON CR-52 (4TH AVENUE) OVER BUCK CREEK

Type of Work BRIDGE WIDENING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100059502 ACBR59502 ATRP (009) CONSTRUCTION

Approved in a STIP Plan 2018 $1,816 $454 $2,269

TOTAL COST: $1,816 $454 $2,269

Route CR-52 ProjectDescription

INTERSECTION IMPROVEMENTS AT CR-52 AND CR-93

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100059509 CMAQ 5918 (250) CONSTRUCTION

Approved in a STIP Plan 2019 $760 $190 $950

TOTAL COST: $760 $190 $950

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

5 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

Page 6: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route CR-55 ProjectDescription

BRIDGE REPLACEMENT ON CR-55 OVER NORFOLK SOUTHERN RAILROAD NEAR STERRETT BIN # 10357

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.300 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100056309 STPBH 5914 (250) RIGHT OF WAY

Approved in a STIP Plan 2019 $772 $193 $965

100056310 STPBH 5914 (250) UTILITIES

Approved in a STIP Plan 2019 $200 $50 $250

100056311 STPBH 5914 () CONSTRUCTION

Approved in a STIP Plan 2019 $1,000 $250 $1,250

TOTAL COST: $1,972 $493 $2,465

Route CR-NA ProjectDescription

>VALLEYDALE RD FR CALDWELL MILL RD TO INVERNESS CENTER CITY OF HOOVER

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 3.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100033067 STPBH 9802 (905) UTILITIES

Approved in a STIP Plan 2018 $2,596 $649 $3,245

100033064 STPBH 9802 (905) CONSTRUCTION

Approved in a STIP Plan 2020 $10,212 $2,553 $12,765

TOTAL COST: $12,808 $3,202 $16,009

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

6 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

Page 7: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route CR-NA ProjectDescription

PINE LANE/REF. # 1255(XIII-R)/DOT # 639 526U

Type of Work RR CROSSING IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100061165 RHCH RR13 (909) CONSTRUCTION

Approved in a STIP Plan 2018 $5 $1 $5

TOTAL COST: $5 $1 $5

Route CR-NA ProjectDescription

SAFETY AND INTERSECTION IMPROVEMENTS ON STATE PARK ROAD FROM JOHN FINDLAY DRIVE TO STATE ROUTE 119 TO INCLUDE THE ADDITION OF BIKE LANES IN THE CITY OF PELHAM

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 1.853 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100063241 CMAQ 5915 (250) RIGHT OF WAY

Approved in a STIP Plan 2018 $520 $130 $649

100063242 STPBH-CMAQ 5915 (250)

UTILITIES

Approved in a STIP Plan 2019 $60 $15 $75

100063243 STPBH-CMAQ 5915 () CONSTRUCTION

Approved in a STIP Plan 2019 $1,359 $340 $1,699

TOTAL COST: $1,938 $485 $2,423

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

7 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

Page 8: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route CR-NA ProjectDescription

RAILROAD CROSSING IMPROVEMENTS AT PILGREEN DRIVE IN CALERA, REF # 1323, DOT NO. 727400E

Type of Work RR CROSSING IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100066434 RHCH RR17 (909) CONSTRUCTION

Approved in a STIP Plan 2018 $350 $0 $350

TOTAL COST: $350 $0 $350

Route I -65 ProjectDescription

I-65 ADD LANES FROM SOUTH END OF OVERPASSATCR-17 (VALLEYDALE RD) TO SOUTH END OF CAHABA RIVER BRIDGE (PHASE 5)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.180 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100047970 NH I065 () RIGHT OF WAY

Approved in a STIP Plan 2049 $77 $19 $96

100047787 NH I065 () UTILITIES

Approved in a STIP Plan 2050 $78 $19 $97

100044677 NH I065 () CONSTRUCTION

Approved in a STIP Plan 2050 $13,978 $3,495 $17,473

TOTAL COST: $14,133 $3,533 $17,666

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

8 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

Page 9: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route I -65 ProjectDescription

I-65 ADD LANES FROM CAHABA RIVER BRIDGE TO SOUTH END OF CR-2310 (WISTERIA DR) OVERPASS (PHASE 6)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 2.870 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100044678 NH I065 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $1,151 $288 $1,439

100049081 NH I065 () UTILITIES

Approved in a STIP Plan 2050 $78 $19 $97

100044679 NH I065 () CONSTRUCTION

Approved in a STIP Plan 2051 $17,239 $4,310 $21,548

TOTAL COST: $18,467 $4,617 $23,084

Route I -65 ProjectDescription

I-65 ADD LANES FROM RAMPS TO SR-3(US-31), NORTH OF CALERA TO RAMPS SOUTH OF CR-87

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 2.740 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100047786 NH I065 () UTILITIES

Approved in a STIP Plan 2045 $74 $18 $92

100047486 NH I065 () CONSTRUCTION

Approved in a STIP Plan 2045 $38,470 $9,617 $48,087

TOTAL COST: $38,544 $9,636 $48,180

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

9 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

Page 10: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route I -65 ProjectDescription

I-65 ADD LANES FROM 0.2 MILE SOUTH OF CR-87 TO SR-3 (US-31) NEAR ALABASTER (PHASE 3)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 4.520 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100063657 NH I065 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2047 $825 $206 $1,031

100044964 NH I065 () UTILITIES

Approved in a STIP Plan 2049 $153 $38 $192

100044963 NH I065 () CONSTRUCTION

Approved in a STIP Plan 2049 $69,090 $17,272

$86,362

TOTAL COST: $70,068 $17,517

$87,585

Route I -65 ProjectDescription

CONGESTION MGT. TRAFFIC SYSTEM, SUPP. ITS DEVICES ALONG I-65 FROM SR-119 (EXIT 246) TO NORTH OF I-20/I-59 (EXIT 261), INCLUDES CCTV AND RADAR

Type of Work UNCLASSIFIED

Project Length in Miles 15.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100046079 CMAQ I065 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $213 $53 $266

100046081 CMAQ I065 () CONSTRUCTION

Approved in a STIP Plan 2020 $2,817 $704 $3,521

100046080 CMAQ I065 () SPECIAL

Approved in a STIP Plan 2020 $469 $117 $587

TOTAL COST: $3,499 $875 $4,374

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

10 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

Page 11: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route I -65 ProjectDescription

BRIDGE WIDEN ON I-65 CSX RR AND BUXAHATCHEE CK, SOUTH OF EXIT 228 BIN# 006832 AND #006833

Type of Work BRIDGE WIDENING

Project Length in Miles 0.010 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100055322 IMF I065 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $746 $83 $829

100055323 IMF I065 () CONSTRUCTION

Approved in a STIP Plan 2022 $7,000 $778 $7,778

TOTAL COST: $7,746 $861 $8,607

Route I -65 ProjectDescription

BRIDGE WIDENING ON I-65 OVER L AND N RAILROAD, 0.8 MILE NORTH OF SR-3 (US-31) IN CALERA, BIN #006484 AND #006485

Type of Work BRIDGE WIDENING

Project Length in Miles 0.040 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100055332 IMF I065 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $368 $41 $409

100055333 IMF I065 () CONSTRUCTION

Approved in a STIP Plan 2022 $3,756 $417 $4,173

TOTAL COST: $4,125 $458 $4,583

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

11 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

Page 12: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route I -65 ProjectDescription

BRIDGE WIDENING ON I-65 SOUTH OF SR-3 (US-31) IN ALABASTER BIN #006489 AND #006490 OVER L AND N RR, BIN #006491 AND #006492 OVER CR-26 AND BIN #006493 AND #006494 OVER L AND N RR/CR-87

Type of Work BRIDGE WIDENING

Project Length in Miles 0.540 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100055334 IMF I065 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $1,297 $144 $1,442

100055335 IMF I065 () CONSTRUCTION

Approved in a STIP Plan 2022 $12,212 $1,357 $13,569

TOTAL COST: $13,509 $1,501 $15,010

Route I -65 ProjectDescription

CONTRACT MOWING IN SHELBY COUNTY, DISTRICT FIVE ON I-65 FROM CHILTON COUNTY LINE TO THE JEFFERSON COUNTY LINE AND SR-38 FROM THE JEFFERSON COUNTY LINE TO THE TALLADEGA COUNTY LINE.

Type of Work ROADSIDE MOWING

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100061693 99-403-595-000-402 () MAINTENANCE CONSTRUCTION

Approved in a STIP Plan 2018 $0 $274 $274

TOTAL COST: $0 $274 $274

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

12 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

Page 13: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route NA- ProjectDescription

BUCK CREEK MULTI-USE TRAIL FROM BUCK CREEK TO THOMPSON HIGH SCHOOL. TRAIL WILL LINK HIGH DENSITY RESIDENTIAL PARTS OF ALABASTER TO DESTINATIONS SUCH AS PARKS AND SCHOOLS. PROJECT SPONSOR: CITY OF ALABASTER .

Type of Work UNCLASSIFIED

Project Length in Miles 1.250 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100032369 CMAQ 9802 () CONSTRUCTION

Approved in a STIP Plan 2020 $230 $58 $288

TOTAL COST: $230 $58 $288

Route NA- ProjectDescription

HELENA BUCK CREEK, TACOA, AND RUFFIN TRAIL SYSTEMS MULTIUSE TRAIL AND BRIDGES NEAR CSX RAILROAD

Type of Work UNCLASSIFIED

Project Length in Miles 3.670 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100032383 CMAQ 9802 (925) CONSTRUCTION

Approved in a STIP Plan 2019 $2,261 $565 $2,826

100032386 CMAQ 9802 () CONSTRUCTION

Approved in a STIP Plan 2020 $287 $72 $358

TOTAL COST: $2,547 $637 $3,184

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

13 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

Page 14: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route NA- ProjectDescription

INVERNESS COMMUNITY GREENWAY FROM INVERNESS FIRE STATION TO HOOVER'S NATURE PARK

Type of Work UNCLASSIFIED

Project Length in Miles 1.800 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100054519 CMAQ 5917 (904) CONSTRUCTION

Approved in a STIP Plan 2019 $1,032 $258 $1,290

TOTAL COST: $1,032 $258 $1,290

Route NA- ProjectDescription

CALERA NORTHERN BYPASS FROM SR-25 WEST OF CALERA TO SR-3 (US-31) NORTH OF CALERA

Type of Work GRADE, DRAIN AND BRIDGE

Project Length in Miles 3.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100050235 HPP A152 (901) PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $299 $75 $374

100050243 HPP A152 () RIGHT OF WAY

Approved in a STIP Plan 2021 $1,796 $449 $2,245

100050244 HPP A152 () UTILITIES

Approved in a STIP Plan 2022 $292 $73 $365

100050239 HPP-STPBH A152 () CONSTRUCTION

Approved in a STIP Plan 2022 $4,863 $1,216 $6,078

TOTAL COST: $7,250 $1,812 $9,062

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

14 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

Page 15: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route NA- ProjectDescription

NON-COMPLIANT CURB RAMP REPLACEMENT ON STATE ROUTES WITHIN JEFFERSON, SHELBY AND WALKER COUNTIES

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100060174 STPAA NR13 (909) CONSTRUCTION

Approved in a STIP Plan 2019 $1,432 $358 $1,790

TOTAL COST: $1,432 $358 $1,790

Route NA- ProjectDescription

PROPOSED BIKE LANES ALONG JOHN FINDLAY DRIVE FROM NORTH OF STATE PARK ROAD TO THE NORTH TRAILHEAD AT OAK MOUNTAIN STATE PARK

Type of Work UNCLASSIFIED

Project Length in Miles 6.008 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064282 CMAQ 5916 (252) CONSTRUCTION

Approved in a STIP Plan 2019 $4,390 $1,097 $5,487

TOTAL COST: $4,390 $1,097 $5,487

Route NA- ProjectDescription

DOWNTOWN SIDEWALK IMPROVEMENT ALONG SR-25 (US-231) IN DOWNTOWN VINCENT.

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064513 TAPNU TA15 (909) CONSTRUCTION

Approved in a STIP Plan 2018 $400 $100 $500

TOTAL COST: $400 $100 $500

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

15 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

Page 16: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route NA- ProjectDescription

TRAIL DESIGN AND CONSTRUCTION PELHAM GREENWAY ALONG BISHOP CREEK FROM PELHAM CITY PARK TO OAK MOUNTAIN PARK ROAD.

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100065162 CMAQ 5916 (253) RIGHT OF WAY

Approved in a STIP Plan 2019 $82 $21 $103

100065163 CMAQ 5916 (253) UTILITIES

Approved in a STIP Plan 2019 $82 $21 $103

TOTAL COST: $165 $41 $206

Route NA- ProjectDescription

PELHAM TRAILS AND GREENWAYS LOCATED ALONG THE SR-3 (US-31) CORRIDOR IN PELHAM ADJACENT TO BISHOP CREEK FROM CR-105 TO SR-119 AND EVENTUALLY CROSSING UNDER I-65 AND CONTINUING TO THE ENTRANCE OF OAK MOUNTAIN STATE PARK: PHASE 1 AND 2

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100065519 TAPAA-CMAQ TA16 (901)

CONSTRUCTION

Approved in a STIP Plan 2018 $1,159 $290 $1,448

TOTAL COST: $1,159 $290 $1,448

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

16 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

Page 17: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route NA- ProjectDescription

STREETSCAPE IMPROVEMENTS FROM DOWNTOWN WILSONVILLE TO NEW COMMERCIAL DEVELOPMENT ON SR-25

Type of Work STREETSCAPE

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100067296 TAPNU TA17 (907) CONSTRUCTION

Approved in a STIP Plan 2018 $400 $100 $500

TOTAL COST: $400 $100 $500

Route NA- ProjectDescription

CONSTRUCT FIVE MILES OF TRAILS AND A TRAILHEAD FACILITY WITH PARKING. (SHELBY COUNTY COMMISSION)

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068009 RECTR RT17 (316) SPECIAL

Approved in a STIP Plan 2018 $200 $86 $286

TOTAL COST: $200 $86 $286

Route NA- ProjectDescription

MULTI-USE TRAIL AND GREENWAY SYSTEM ALONG THE SR-3 (US-31) CORRIDOR ADJACENT TO BISHOP CREEK IN PELHAM; PHASES 3 AND 4

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100067294 TAPAA-CMAQ TA17 (904)

CONSTRUCTION

Approved in a STIP Plan 2019 $1,183 $296 $1,479

TOTAL COST: $1,183 $296 $1,479

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

17 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

Page 18: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route SR-119 ProjectDescription

ADDITIONAL LANES ON SR-119 FROM CR-80 TO CR-26

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.694 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100061118 ACAA61118 ATRP (012) CONSTRUCTION

Approved in a STIP Plan 2019 $9,839 $2,460 $12,298

TOTAL COST: $9,839 $2,460 $12,298

Route SR-119 ProjectDescription

ADDITIONAL LANES ON SR-119 FROM CR-80 TO CR-26

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.694 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100061286 STPBH 0119 (510) RIGHT OF WAY

Approved in a STIP Plan 2019 $426 $106 $532

100063109 STPBH 0119 (510) UTILITIES

Approved in a STIP Plan 2019 $600 $150 $750

TOTAL COST: $1,026 $256 $1,282

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

18 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

Page 19: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route SR-145 ProjectDescription

EXTEND SR-145 FR CR-61 NORTH TO SR-25 IN WILSONVILLE

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 2.360 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100040859 STPAA 0145 () UTILITIES

Approved in a STIP Plan 2048 $30 $7 $37

100046121 STPAA 0145 (500) CONSTRUCTION

Approved in a STIP Plan 2048 $21,682 $5,420 $27,102

TOTAL COST: $21,712 $5,428 $27,140

Route SR-25 ProjectDescription

BRIDGE REPLACEMENT ON SR-25 OVER BULLEY CREEK BIN # 000769

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.011 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100066556 BR 0025 () CONSTRUCTION

Approved in a STIP Plan 2019 $500 $500 $1,000

TOTAL COST: $500 $500 $1,000

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

19 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

Page 20: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route SR-261 ProjectDescription

ADD LANES SR-261 FROM BEARDEN RD TO SR-3 (US-31)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 2.600 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100046437 STPNU 7112 () UTILITIES

Approved in a STIP Plan 2020 $1,381 $345 $1,726

100009265 STPAA 7112 () CONSTRUCTION

Approved in a STIP Plan 2020 $22,372 $5,593 $27,965

TOTAL COST: $23,753 $5,938 $29,691

Route SR-261 ProjectDescription

HELENA BYPASS FROM CR-52 WEST OF HELENA TO SR-261 NORTH OF HELENA

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 5.897 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100049209 HPP A139 () RIGHT OF WAY

Approved in a STIP Plan 2021 $1,945 $486 $2,431

100049210 HPP A139 () UTILITIES

Approved in a STIP Plan 2022 $117 $29 $146

100049211 HPP-STPBH A139 () CONSTRUCTION

Approved in a STIP Plan 2022 $20,826 $5,207 $26,033

TOTAL COST: $22,888 $5,722 $28,610

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

20 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

Page 21: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route SR-261 ProjectDescription

INTERSECTION IMPROVEMENTS AT SR-261 AND CR-52E IN THE CITY OF HELENA

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100067712 CMAQ 0261 (501) RIGHT OF WAY

Approved in a STIP Plan 2019 $323 $81 $404

100067713 CMAQ 0261 (501) UTILITIES

Approved in a STIP Plan 2020 $589 $147 $736

100067714 CMAQ 0261 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,198 $300 $1,498

TOTAL COST: $2,110 $528 $2,638

Route SR-3 ProjectDescription

PELHAM TOPICS, SR-3(US-31) FROM CR-52 TO A POINT 0.25 MILES NORTH OF CR-105 (PHASE II)

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 1.125 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100039450 STPBH 7012 () CONSTRUCTION

Approved in a STIP Plan 2019 $449 $112 $561

TOTAL COST: $449 $112 $561

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

21 of 22

COUNTY HIGHWAY PROJECTS - SHELBY

Page 22: 5/29/2018 ALABAMA DEPARTMENT OF … · 2018-05-29 · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100044678 NH I065 PRELIMINARY ENGINEERING

Route SR-3 ProjectDescription

SR-3 (US-31) BRIDGE (BIN NO. 2091) OVER PEVINE CREEK AND CSX RR, BRIDGE REPLACEMENT

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.090 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100057649 BRF 0003 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $432 $108 $540

100057650 BRF 0003 () CONSTRUCTION

Approved in a STIP Plan 2022 $4,450 $1,113 $5,563

TOTAL COST: $4,883 $1,221 $6,103

Route SR-3 ProjectDescription

RESURFACE, PLANE, TRAFFIC STRIPE, LEVEL AND PATCH SR-3 (US-31) FROM THE CHILTON COUNTY LINE TO 7TH AVE. IN CALERA (INCLUDING RAILROAD CROSSINGS OF NORFOLK SOUTHERN AND CSX TRANSPORTATION) MP 240.565 TO MP 243.400 SHELBY COUNTY

Type of Work PAVEMENT MINOR REHABILITATION

Project Length in Miles 2.835 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100067325 STPAA 0003 (613) FEDERAL MAINT CN

Approved in a STIP Plan 2019 $1,815 $454 $2,268

TOTAL COST: $1,815 $454 $2,268

7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

22 of 22

COUNTY HIGHWAY PROJECTS - SHELBY