Route CR-11 ProjectDescription
SHELBY CR-11 (PHASE 2) GUARDRAIL AND RAILROAD CROSSING IMPROVMENTS: FROM SR-3 TO CR-68
Type of Work SAFETY IMPROVEMENTS
Project Length in Miles 1.580 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100040846 STPBH 7118 () UTILITIES
Approved in a STIP Plan 2020 $10 $2 $12
100007571 STPBH 7118 () CONSTRUCTION
Approved in a STIP Plan 2020 $323 $81 $403
TOTAL COST: $332 $83 $415
Route CR-11 ProjectDescription
WIDEN AND RESURFACE CR-11 FROM SR-3 (US-31) TO CR-332 (WEATHERLY WAY)
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 3.200 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100007575 STPBH 7118 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $190 $48 $238
100007576 STPBH 7118 () RIGHT OF WAY
Approved in a STIP Plan 2021 $1,937 $484 $2,421
100007577 STPBH 7118 () UTILITIES
Approved in a STIP Plan 2022 $963 $241 $1,204
100007572 STPBH 7118 () CONSTRUCTION
Approved in a STIP Plan 2022 $3,078 $770 $3,848
TOTAL COST: $6,169 $1,542 $7,711
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
1 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
Route CR-12 ProjectDescription
INTERSECTION IMPROVEMENTS AT CR-12 AND CR-22
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.010 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064319 CMAQ 5915 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2018 $120 $30 $150
100064320 CMAQ 5915 () RIGHT OF WAY
Approved in a STIP Plan 2019 $200 $50 $250
100064321 CMAQ 5915 () UTILITIES
Approved in a STIP Plan 2020 $160 $40 $200
100064322 CMAQ 5915 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,600 $400 $2,000
TOTAL COST: $2,080 $520 $2,600
Route CR-1396 ProjectDescription
CR-1396 (CAHABA BEACH ROAD), EXTENSION FROM CR-346 (SWAN DRIVE) TO CR-60 (SICARD HOLLOW ROAD) INCLUDING A BRIDGE OVER THE LITTLE CAHABA RIVER
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100059534 ACAA59534 ATRP (015) CONSTRUCTION
Approved in a STIP Plan 2019 $3,200 $800 $4,000
TOTAL COST: $3,200 $800 $4,000
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
2 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
Route CR-17 ProjectDescription
ADDITIONAL LANES ON CR-17 (VALLEYDALE RD) FROM SR-3 (US-31) TO RIVERCHASE PARKWAY EAST
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 0.750 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100046238 STPBH 7112 (602) UTILITIES
Approved in a STIP Plan 2020 $553 $138 $691
100046239 STPBH 7112 () CONSTRUCTION
Approved in a STIP Plan 2020 $3,149 $787 $3,936
TOTAL COST: $3,702 $925 $4,627
Route CR-17 ProjectDescription
RESURFACE CR-17 FROM CR-22 TO CR-26 (KENT DAIRY ROAD)
Type of Work RESURFACING
Project Length in Miles 4.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100059513 ACAA59513 ATRP (010) CONSTRUCTION
Approved in a STIP Plan 2019 $1,294 $323 $1,617
TOTAL COST: $1,294 $323 $1,617
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
3 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
Route CR-17 ProjectDescription
RESURFACING ON CR-17 (VALLEYDALE ROAD) FROM I-65 TO CR-29 (CALDWELL MILL ROAD) AND ON CR-43 (BEAR CREEK ROAD) FROM SR-38 (US-280) TO SR-25
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067603 STPBH 5918 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2018 $80 $20 $100
100067607 STPBH 5918 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,200 $300 $1,500
TOTAL COST: $1,280 $320 $1,600
Route CR-29 ProjectDescription
WIDEN CR-29\1277 FROM CR-370(HEATHERWOOD DR.) TO CR-2311 (ACTON ROAD) AND BRG REPLACEMENT OVER CAHABA RIVER.
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 4.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100045964 STPBH 5939 (200) RIGHT OF WAY
Approved in a STIP Plan 2019 $4,274 $1,069 $5,343
100007540 STPBH 5939 (200) CONSTRUCTION
Approved in a STIP Plan 2020 $1,589 $397 $1,986
TOTAL COST: $5,863 $1,466 $7,329
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
4 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
Route CR-52 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON CR-52 OVER CAHABA RIVER (BIN 2380) FROM OLD CAHABA LANE TO OAK VIEW LANE
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.300 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100059503 STPBH 5914 () CONSTRUCTION
Approved in a STIP Plan 2019 $3,702 $926 $4,628
TOTAL COST: $3,702 $926 $4,628
Route CR-52 ProjectDescription
BRIDGE WIDENING (BIN 003267) ON CR-52 (4TH AVENUE) OVER BUCK CREEK
Type of Work BRIDGE WIDENING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100059502 ACBR59502 ATRP (009) CONSTRUCTION
Approved in a STIP Plan 2018 $1,816 $454 $2,269
TOTAL COST: $1,816 $454 $2,269
Route CR-52 ProjectDescription
INTERSECTION IMPROVEMENTS AT CR-52 AND CR-93
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100059509 CMAQ 5918 (250) CONSTRUCTION
Approved in a STIP Plan 2019 $760 $190 $950
TOTAL COST: $760 $190 $950
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
5 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
Route CR-55 ProjectDescription
BRIDGE REPLACEMENT ON CR-55 OVER NORFOLK SOUTHERN RAILROAD NEAR STERRETT BIN # 10357
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.300 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100056309 STPBH 5914 (250) RIGHT OF WAY
Approved in a STIP Plan 2019 $772 $193 $965
100056310 STPBH 5914 (250) UTILITIES
Approved in a STIP Plan 2019 $200 $50 $250
100056311 STPBH 5914 () CONSTRUCTION
Approved in a STIP Plan 2019 $1,000 $250 $1,250
TOTAL COST: $1,972 $493 $2,465
Route CR-NA ProjectDescription
>VALLEYDALE RD FR CALDWELL MILL RD TO INVERNESS CENTER CITY OF HOOVER
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 3.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100033067 STPBH 9802 (905) UTILITIES
Approved in a STIP Plan 2018 $2,596 $649 $3,245
100033064 STPBH 9802 (905) CONSTRUCTION
Approved in a STIP Plan 2020 $10,212 $2,553 $12,765
TOTAL COST: $12,808 $3,202 $16,009
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
6 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
Route CR-NA ProjectDescription
PINE LANE/REF. # 1255(XIII-R)/DOT # 639 526U
Type of Work RR CROSSING IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100061165 RHCH RR13 (909) CONSTRUCTION
Approved in a STIP Plan 2018 $5 $1 $5
TOTAL COST: $5 $1 $5
Route CR-NA ProjectDescription
SAFETY AND INTERSECTION IMPROVEMENTS ON STATE PARK ROAD FROM JOHN FINDLAY DRIVE TO STATE ROUTE 119 TO INCLUDE THE ADDITION OF BIKE LANES IN THE CITY OF PELHAM
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 1.853 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100063241 CMAQ 5915 (250) RIGHT OF WAY
Approved in a STIP Plan 2018 $520 $130 $649
100063242 STPBH-CMAQ 5915 (250)
UTILITIES
Approved in a STIP Plan 2019 $60 $15 $75
100063243 STPBH-CMAQ 5915 () CONSTRUCTION
Approved in a STIP Plan 2019 $1,359 $340 $1,699
TOTAL COST: $1,938 $485 $2,423
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
7 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
Route CR-NA ProjectDescription
RAILROAD CROSSING IMPROVEMENTS AT PILGREEN DRIVE IN CALERA, REF # 1323, DOT NO. 727400E
Type of Work RR CROSSING IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066434 RHCH RR17 (909) CONSTRUCTION
Approved in a STIP Plan 2018 $350 $0 $350
TOTAL COST: $350 $0 $350
Route I -65 ProjectDescription
I-65 ADD LANES FROM SOUTH END OF OVERPASSATCR-17 (VALLEYDALE RD) TO SOUTH END OF CAHABA RIVER BRIDGE (PHASE 5)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.180 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100047970 NH I065 () RIGHT OF WAY
Approved in a STIP Plan 2049 $77 $19 $96
100047787 NH I065 () UTILITIES
Approved in a STIP Plan 2050 $78 $19 $97
100044677 NH I065 () CONSTRUCTION
Approved in a STIP Plan 2050 $13,978 $3,495 $17,473
TOTAL COST: $14,133 $3,533 $17,666
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
8 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
Route I -65 ProjectDescription
I-65 ADD LANES FROM CAHABA RIVER BRIDGE TO SOUTH END OF CR-2310 (WISTERIA DR) OVERPASS (PHASE 6)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 2.870 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100044678 NH I065 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $1,151 $288 $1,439
100049081 NH I065 () UTILITIES
Approved in a STIP Plan 2050 $78 $19 $97
100044679 NH I065 () CONSTRUCTION
Approved in a STIP Plan 2051 $17,239 $4,310 $21,548
TOTAL COST: $18,467 $4,617 $23,084
Route I -65 ProjectDescription
I-65 ADD LANES FROM RAMPS TO SR-3(US-31), NORTH OF CALERA TO RAMPS SOUTH OF CR-87
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 2.740 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100047786 NH I065 () UTILITIES
Approved in a STIP Plan 2045 $74 $18 $92
100047486 NH I065 () CONSTRUCTION
Approved in a STIP Plan 2045 $38,470 $9,617 $48,087
TOTAL COST: $38,544 $9,636 $48,180
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
9 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
Route I -65 ProjectDescription
I-65 ADD LANES FROM 0.2 MILE SOUTH OF CR-87 TO SR-3 (US-31) NEAR ALABASTER (PHASE 3)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 4.520 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100063657 NH I065 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2047 $825 $206 $1,031
100044964 NH I065 () UTILITIES
Approved in a STIP Plan 2049 $153 $38 $192
100044963 NH I065 () CONSTRUCTION
Approved in a STIP Plan 2049 $69,090 $17,272
$86,362
TOTAL COST: $70,068 $17,517
$87,585
Route I -65 ProjectDescription
CONGESTION MGT. TRAFFIC SYSTEM, SUPP. ITS DEVICES ALONG I-65 FROM SR-119 (EXIT 246) TO NORTH OF I-20/I-59 (EXIT 261), INCLUDES CCTV AND RADAR
Type of Work UNCLASSIFIED
Project Length in Miles 15.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100046079 CMAQ I065 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $213 $53 $266
100046081 CMAQ I065 () CONSTRUCTION
Approved in a STIP Plan 2020 $2,817 $704 $3,521
100046080 CMAQ I065 () SPECIAL
Approved in a STIP Plan 2020 $469 $117 $587
TOTAL COST: $3,499 $875 $4,374
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
10 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
Route I -65 ProjectDescription
BRIDGE WIDEN ON I-65 CSX RR AND BUXAHATCHEE CK, SOUTH OF EXIT 228 BIN# 006832 AND #006833
Type of Work BRIDGE WIDENING
Project Length in Miles 0.010 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100055322 IMF I065 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $746 $83 $829
100055323 IMF I065 () CONSTRUCTION
Approved in a STIP Plan 2022 $7,000 $778 $7,778
TOTAL COST: $7,746 $861 $8,607
Route I -65 ProjectDescription
BRIDGE WIDENING ON I-65 OVER L AND N RAILROAD, 0.8 MILE NORTH OF SR-3 (US-31) IN CALERA, BIN #006484 AND #006485
Type of Work BRIDGE WIDENING
Project Length in Miles 0.040 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100055332 IMF I065 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $368 $41 $409
100055333 IMF I065 () CONSTRUCTION
Approved in a STIP Plan 2022 $3,756 $417 $4,173
TOTAL COST: $4,125 $458 $4,583
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
11 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
Route I -65 ProjectDescription
BRIDGE WIDENING ON I-65 SOUTH OF SR-3 (US-31) IN ALABASTER BIN #006489 AND #006490 OVER L AND N RR, BIN #006491 AND #006492 OVER CR-26 AND BIN #006493 AND #006494 OVER L AND N RR/CR-87
Type of Work BRIDGE WIDENING
Project Length in Miles 0.540 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100055334 IMF I065 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $1,297 $144 $1,442
100055335 IMF I065 () CONSTRUCTION
Approved in a STIP Plan 2022 $12,212 $1,357 $13,569
TOTAL COST: $13,509 $1,501 $15,010
Route I -65 ProjectDescription
CONTRACT MOWING IN SHELBY COUNTY, DISTRICT FIVE ON I-65 FROM CHILTON COUNTY LINE TO THE JEFFERSON COUNTY LINE AND SR-38 FROM THE JEFFERSON COUNTY LINE TO THE TALLADEGA COUNTY LINE.
Type of Work ROADSIDE MOWING
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100061693 99-403-595-000-402 () MAINTENANCE CONSTRUCTION
Approved in a STIP Plan 2018 $0 $274 $274
TOTAL COST: $0 $274 $274
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
12 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
Route NA- ProjectDescription
BUCK CREEK MULTI-USE TRAIL FROM BUCK CREEK TO THOMPSON HIGH SCHOOL. TRAIL WILL LINK HIGH DENSITY RESIDENTIAL PARTS OF ALABASTER TO DESTINATIONS SUCH AS PARKS AND SCHOOLS. PROJECT SPONSOR: CITY OF ALABASTER .
Type of Work UNCLASSIFIED
Project Length in Miles 1.250 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100032369 CMAQ 9802 () CONSTRUCTION
Approved in a STIP Plan 2020 $230 $58 $288
TOTAL COST: $230 $58 $288
Route NA- ProjectDescription
HELENA BUCK CREEK, TACOA, AND RUFFIN TRAIL SYSTEMS MULTIUSE TRAIL AND BRIDGES NEAR CSX RAILROAD
Type of Work UNCLASSIFIED
Project Length in Miles 3.670 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100032383 CMAQ 9802 (925) CONSTRUCTION
Approved in a STIP Plan 2019 $2,261 $565 $2,826
100032386 CMAQ 9802 () CONSTRUCTION
Approved in a STIP Plan 2020 $287 $72 $358
TOTAL COST: $2,547 $637 $3,184
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
13 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
Route NA- ProjectDescription
INVERNESS COMMUNITY GREENWAY FROM INVERNESS FIRE STATION TO HOOVER'S NATURE PARK
Type of Work UNCLASSIFIED
Project Length in Miles 1.800 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100054519 CMAQ 5917 (904) CONSTRUCTION
Approved in a STIP Plan 2019 $1,032 $258 $1,290
TOTAL COST: $1,032 $258 $1,290
Route NA- ProjectDescription
CALERA NORTHERN BYPASS FROM SR-25 WEST OF CALERA TO SR-3 (US-31) NORTH OF CALERA
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 3.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100050235 HPP A152 (901) PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $299 $75 $374
100050243 HPP A152 () RIGHT OF WAY
Approved in a STIP Plan 2021 $1,796 $449 $2,245
100050244 HPP A152 () UTILITIES
Approved in a STIP Plan 2022 $292 $73 $365
100050239 HPP-STPBH A152 () CONSTRUCTION
Approved in a STIP Plan 2022 $4,863 $1,216 $6,078
TOTAL COST: $7,250 $1,812 $9,062
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
14 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
Route NA- ProjectDescription
NON-COMPLIANT CURB RAMP REPLACEMENT ON STATE ROUTES WITHIN JEFFERSON, SHELBY AND WALKER COUNTIES
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100060174 STPAA NR13 (909) CONSTRUCTION
Approved in a STIP Plan 2019 $1,432 $358 $1,790
TOTAL COST: $1,432 $358 $1,790
Route NA- ProjectDescription
PROPOSED BIKE LANES ALONG JOHN FINDLAY DRIVE FROM NORTH OF STATE PARK ROAD TO THE NORTH TRAILHEAD AT OAK MOUNTAIN STATE PARK
Type of Work UNCLASSIFIED
Project Length in Miles 6.008 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064282 CMAQ 5916 (252) CONSTRUCTION
Approved in a STIP Plan 2019 $4,390 $1,097 $5,487
TOTAL COST: $4,390 $1,097 $5,487
Route NA- ProjectDescription
DOWNTOWN SIDEWALK IMPROVEMENT ALONG SR-25 (US-231) IN DOWNTOWN VINCENT.
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064513 TAPNU TA15 (909) CONSTRUCTION
Approved in a STIP Plan 2018 $400 $100 $500
TOTAL COST: $400 $100 $500
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
15 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
Route NA- ProjectDescription
TRAIL DESIGN AND CONSTRUCTION PELHAM GREENWAY ALONG BISHOP CREEK FROM PELHAM CITY PARK TO OAK MOUNTAIN PARK ROAD.
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100065162 CMAQ 5916 (253) RIGHT OF WAY
Approved in a STIP Plan 2019 $82 $21 $103
100065163 CMAQ 5916 (253) UTILITIES
Approved in a STIP Plan 2019 $82 $21 $103
TOTAL COST: $165 $41 $206
Route NA- ProjectDescription
PELHAM TRAILS AND GREENWAYS LOCATED ALONG THE SR-3 (US-31) CORRIDOR IN PELHAM ADJACENT TO BISHOP CREEK FROM CR-105 TO SR-119 AND EVENTUALLY CROSSING UNDER I-65 AND CONTINUING TO THE ENTRANCE OF OAK MOUNTAIN STATE PARK: PHASE 1 AND 2
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100065519 TAPAA-CMAQ TA16 (901)
CONSTRUCTION
Approved in a STIP Plan 2018 $1,159 $290 $1,448
TOTAL COST: $1,159 $290 $1,448
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
16 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
Route NA- ProjectDescription
STREETSCAPE IMPROVEMENTS FROM DOWNTOWN WILSONVILLE TO NEW COMMERCIAL DEVELOPMENT ON SR-25
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067296 TAPNU TA17 (907) CONSTRUCTION
Approved in a STIP Plan 2018 $400 $100 $500
TOTAL COST: $400 $100 $500
Route NA- ProjectDescription
CONSTRUCT FIVE MILES OF TRAILS AND A TRAILHEAD FACILITY WITH PARKING. (SHELBY COUNTY COMMISSION)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068009 RECTR RT17 (316) SPECIAL
Approved in a STIP Plan 2018 $200 $86 $286
TOTAL COST: $200 $86 $286
Route NA- ProjectDescription
MULTI-USE TRAIL AND GREENWAY SYSTEM ALONG THE SR-3 (US-31) CORRIDOR ADJACENT TO BISHOP CREEK IN PELHAM; PHASES 3 AND 4
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067294 TAPAA-CMAQ TA17 (904)
CONSTRUCTION
Approved in a STIP Plan 2019 $1,183 $296 $1,479
TOTAL COST: $1,183 $296 $1,479
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
17 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
Route SR-119 ProjectDescription
ADDITIONAL LANES ON SR-119 FROM CR-80 TO CR-26
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.694 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100061118 ACAA61118 ATRP (012) CONSTRUCTION
Approved in a STIP Plan 2019 $9,839 $2,460 $12,298
TOTAL COST: $9,839 $2,460 $12,298
Route SR-119 ProjectDescription
ADDITIONAL LANES ON SR-119 FROM CR-80 TO CR-26
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.694 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100061286 STPBH 0119 (510) RIGHT OF WAY
Approved in a STIP Plan 2019 $426 $106 $532
100063109 STPBH 0119 (510) UTILITIES
Approved in a STIP Plan 2019 $600 $150 $750
TOTAL COST: $1,026 $256 $1,282
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
18 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
Route SR-145 ProjectDescription
EXTEND SR-145 FR CR-61 NORTH TO SR-25 IN WILSONVILLE
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 2.360 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100040859 STPAA 0145 () UTILITIES
Approved in a STIP Plan 2048 $30 $7 $37
100046121 STPAA 0145 (500) CONSTRUCTION
Approved in a STIP Plan 2048 $21,682 $5,420 $27,102
TOTAL COST: $21,712 $5,428 $27,140
Route SR-25 ProjectDescription
BRIDGE REPLACEMENT ON SR-25 OVER BULLEY CREEK BIN # 000769
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.011 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066556 BR 0025 () CONSTRUCTION
Approved in a STIP Plan 2019 $500 $500 $1,000
TOTAL COST: $500 $500 $1,000
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
19 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
Route SR-261 ProjectDescription
ADD LANES SR-261 FROM BEARDEN RD TO SR-3 (US-31)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 2.600 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100046437 STPNU 7112 () UTILITIES
Approved in a STIP Plan 2020 $1,381 $345 $1,726
100009265 STPAA 7112 () CONSTRUCTION
Approved in a STIP Plan 2020 $22,372 $5,593 $27,965
TOTAL COST: $23,753 $5,938 $29,691
Route SR-261 ProjectDescription
HELENA BYPASS FROM CR-52 WEST OF HELENA TO SR-261 NORTH OF HELENA
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 5.897 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100049209 HPP A139 () RIGHT OF WAY
Approved in a STIP Plan 2021 $1,945 $486 $2,431
100049210 HPP A139 () UTILITIES
Approved in a STIP Plan 2022 $117 $29 $146
100049211 HPP-STPBH A139 () CONSTRUCTION
Approved in a STIP Plan 2022 $20,826 $5,207 $26,033
TOTAL COST: $22,888 $5,722 $28,610
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
20 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
Route SR-261 ProjectDescription
INTERSECTION IMPROVEMENTS AT SR-261 AND CR-52E IN THE CITY OF HELENA
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067712 CMAQ 0261 (501) RIGHT OF WAY
Approved in a STIP Plan 2019 $323 $81 $404
100067713 CMAQ 0261 (501) UTILITIES
Approved in a STIP Plan 2020 $589 $147 $736
100067714 CMAQ 0261 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,198 $300 $1,498
TOTAL COST: $2,110 $528 $2,638
Route SR-3 ProjectDescription
PELHAM TOPICS, SR-3(US-31) FROM CR-52 TO A POINT 0.25 MILES NORTH OF CR-105 (PHASE II)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 1.125 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100039450 STPBH 7012 () CONSTRUCTION
Approved in a STIP Plan 2019 $449 $112 $561
TOTAL COST: $449 $112 $561
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
21 of 22
COUNTY HIGHWAY PROJECTS - SHELBY
Route SR-3 ProjectDescription
SR-3 (US-31) BRIDGE (BIN NO. 2091) OVER PEVINE CREEK AND CSX RR, BRIDGE REPLACEMENT
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.090 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100057649 BRF 0003 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $432 $108 $540
100057650 BRF 0003 () CONSTRUCTION
Approved in a STIP Plan 2022 $4,450 $1,113 $5,563
TOTAL COST: $4,883 $1,221 $6,103
Route SR-3 ProjectDescription
RESURFACE, PLANE, TRAFFIC STRIPE, LEVEL AND PATCH SR-3 (US-31) FROM THE CHILTON COUNTY LINE TO 7TH AVE. IN CALERA (INCLUDING RAILROAD CROSSINGS OF NORFOLK SOUTHERN AND CSX TRANSPORTATION) MP 240.565 TO MP 243.400 SHELBY COUNTY
Type of Work PAVEMENT MINOR REHABILITATION
Project Length in Miles 2.835 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067325 STPAA 0003 (613) FEDERAL MAINT CN
Approved in a STIP Plan 2019 $1,815 $454 $2,268
TOTAL COST: $1,815 $454 $2,268
7/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
22 of 22
COUNTY HIGHWAY PROJECTS - SHELBY