Route CR-18 Project Description RESURFACING AND TRAFFIC STRIPE ON CR-18 (SNOWDOUN CHAMBERS ROAD) FROM CR-61 (HOBBIE ROAD) TO CR-39 (WOODLEY ROAD) Type of Work RESURFACING Project Length in Miles 5.380 Urban Area MONTGOMERY COST IN THOUSANDS Project Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State- Other TOTAL 100067620 STPMN 5118 () PRELIMINARY ENGINEERING Approved in a STIP Plan 2019 $4 $1 $5 100067621 STPMN 5118 () CONSTRUCTION Approved in a STIP Plan 2019 $751 $188 $939 TOTAL COST: $755 $189 $944 Route CR-2120 Project Description RESURFACING AND TRAFFIC STRIPE ON CR-2120 (ALABAMA RIVER PARKWAY) FROM JACKSON FERRY ROAD TO THE MONTGOMERY CITY LIMITS Type of Work RESURFACING Project Length in Miles 1.890 Urban Area MONTGOMERY COST IN THOUSANDS Project Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State- Other TOTAL 100067623 STPMN 5118 () CONSTRUCTION Approved in a STIP Plan 2020 $446 $111 $557 TOTAL COST: $446 $111 $557 11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT 1 of 43 COUNTY HIGHWAY PROJECTS - MONTGOMERY

11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Embed Size (px)

Citation preview

Page 1: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route CR-18 ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON CR-18 (SNOWDOUN CHAMBERS ROAD) FROM CR-61 (HOBBIE ROAD) TO CR-39 (WOODLEY ROAD)

Type of Work RESURFACING

Project Length in Miles 5.380 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100067620 STPMN 5118 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $4 $1 $5

100067621 STPMN 5118 () CONSTRUCTION

Approved in a STIP Plan 2019 $751 $188 $939

TOTAL COST: $755 $189 $944

Route CR-2120 ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON CR-2120 (ALABAMA RIVER PARKWAY) FROM JACKSON FERRY ROAD TO THE MONTGOMERY CITY LIMITS

Type of Work RESURFACING

Project Length in Miles 1.890 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100067623 STPMN 5118 () CONSTRUCTION

Approved in a STIP Plan 2020 $446 $111 $557

TOTAL COST: $446 $111 $557

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

1 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 2: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route CR-234 ProjectDescription

RESURFACE AND WIDEN RYAN ROAD (CR-234) FROM VAUGHN ROAD TO CHANTILLY PARKWAY

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.820 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064673 STPMN 5115 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $286 $71 $357

100064674 STPMN 5115 () RIGHT OF WAY

Approved in a STIP Plan 2021 $170 $42 $212

100064675 STPMN 5115 () CONSTRUCTION

Approved in a STIP Plan 2022 $2,400 $600 $3,000

TOTAL COST: $2,855 $714 $3,569

Route CR-236 ProjectDescription

RESURFACE, CURB AND GUTTER, INLET CONVERSION, TRAFFIC STRIPING AND SIDEWALKS ON FEDERAL DRIVE FROM ATLANTA HIGHWAY TO CSX RAILROAD CROSSING.

Type of Work RESURFACING

Project Length in Miles 2.130 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100059831 STPMN 5116 () CONSTRUCTION

Approved in a STIP Plan 2020 $2,400 $600 $3,000

TOTAL COST: $2,400 $600 $3,000

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

2 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 3: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route CR-28 ProjectDescription

RESURFACING ON CR-28 (MERIWETHER TRAIL) FROM SR-94 TO THE COUNTY LINE - MCP 51-04-18

Type of Work RESURFACING

Project Length in Miles 7.047 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068888 STPNU 5118 () CONSTRUCTION

Approved in a STIP Plan 2019 $889 $222 $1,111

TOTAL COST: $889 $222 $1,111

Route CR-33 ProjectDescription

BRIDGE REPLACEMENT ON CR-33 (NARROW LANE ROAD) AT HANNON SLOUGH (BIN # 003250 AND # 003249)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100060092 STPMN 7702 (601) RIGHT OF WAY

Approved in a STIP Plan 2020 $60 $15 $75

100060091 STPMN 7702 (601) UTILITIES

Approved in a STIP Plan 2020 $160 $40 $200

100055807 STPMN 7702 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,600 $400 $2,000

TOTAL COST: $1,820 $455 $2,275

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

3 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 4: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route CR-39 ProjectDescription

BRIDGE REPLACEMENT ON CR-39 (WOODLEY ROAD)ATWHITES SLOUGH AND TRIBUTARY (BIN # 003047 AND 003048)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100060096 STPAA 7701 (602) RIGHT OF WAY

Approved in a STIP Plan 2019 $60 $15 $75

100060095 STPMN 7701 (602) UTILITIES

Approved in a STIP Plan 2020 $160 $40 $200

100055809 STPMN 7701 (602) CONSTRUCTION

Approved in a STIP Plan 2021 $2,340 $585 $2,925

TOTAL COST: $2,560 $640 $3,200

Route CR-42 ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON HYUNDAI BOULEVARD (CR-42) FROM SR-3 (US-31) TO SR-9 (US-331)

Type of Work RESURFACING

Project Length in Miles 2.700 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064378 STPMN 5118 (251) CONSTRUCTION

Approved in a STIP Plan 2019 $1,279 $320 $1,599

TOTAL COST: $1,279 $320 $1,599

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

4 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 5: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route CR-43 ProjectDescription

WIDEN, RESURFACE AND ADD TURN LANES CR-43(BELL RD) FROM NORTH END I-85 BRIDGE TO SR-8 (US-80, ATLANTA HWY), TURN LANESATBELL GABLES, BELL ROAD MANOR, BELL ROAD COURT, OLIVER DRIVE AND HENLEY WAY

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 1.400 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100044515 STPMN 7707 () CONSTRUCTION

Approved in a STIP Plan 2020 $888 $222 $1,110

TOTAL COST: $888 $222 $1,110

Route CR-54 ProjectDescription

RESURFACING ON CR-54 (HUNTER LOOP ROAD) FROM OLD SELMA ROAD TO SR-3 (US-31)

Type of Work RESURFACING

Project Length in Miles 3.700 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100067638 STPMN 5118 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $64 $16 $80

100067639 STPMN 5118 () CONSTRUCTION

Approved in a STIP Plan 2022 $2,800 $700 $3,500

TOTAL COST: $2,864 $716 $3,580

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

5 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 6: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route CR-626 ProjectDescription

FEASIBILITY STUDY FOR SIDEWALKS/MULTI-USE PATH ON (CR-626) VAUGHN ROAD FROM TAYLOR ROAD TO CHANTILLY PARKWAY

Type of Work SIDEWALK

Project Length in Miles 4.400 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100062338 STPAA 5115 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $240 $60 $300

TOTAL COST: $240 $60 $300

Route CR-74 ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON ANDERSON ROAD/LOWER WETUMPKA ROAD (CR-74) FROM ALABAMA RIVER PARKWAY TO SR-9 (US-231) - MCP 51-83-17

Type of Work RESURFACING

Project Length in Miles 5.230 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064380 STPAA 5117 (253) CONSTRUCTION

Approved in a STIP Plan 2019 $1,006 $252 $1,258

TOTAL COST: $1,006 $252 $1,258

Route CR-NA ProjectDescription

WIDEN AND RESURFACE ATLANTA HIGHWAY FROM MOUNTAINVIEW DRIVE TO SR-9 (US-231:EAST BLVD)

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.400 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100040822 STPMN 7771 () CONSTRUCTION

Approved in a STIP Plan 2020 $692 $173 $865

TOTAL COST: $692 $173 $865

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

6 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 7: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route CR-NA ProjectDescription

WIDEN AND RESURFACE PERRY HILL ROAD FROM HARRISON ROAD TO CR-235 (ATLANTA HIGHWAY)

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 1.710 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100044273 STPMN 7724 () RIGHT OF WAY

Approved in a STIP Plan 2019 $1,052 $263 $1,315

100044272 STPMN 7724 () UTILITIES

Approved in a STIP Plan 2020 $1,642 $411 $2,053

100007740 STPMN 7724 () CONSTRUCTION

Approved in a STIP Plan 2020 $4,737 $1,184 $5,921

TOTAL COST: $7,431 $1,858 $9,289

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS AT PERRY HILL ROAD AND ATLANTA HIGHWAY

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100067740 STPMN 5115 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $444 $111 $555

100064161 STPMN 5115 () RIGHT OF WAY

Approved in a STIP Plan 2019 $800 $200 $1,000

100064162 STPMN 5115 () CONSTRUCTION

Approved in a STIP Plan 2020 $5,600 $1,400 $7,000

TOTAL COST: $6,844 $1,711 $8,555

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

7 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 8: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route CR-NA ProjectDescription

WIDEN AND RESURFACE ANN STREET FROM HIGHLAND AVENUE TO BREWTON STREET (PHASE2)

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 0.450 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100053061 STPAA 7733 (602) RIGHT OF WAY

Approved in a STIP Plan 2019 $973 $243 $1,217

100045392 STPMN 7733 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,474 $368 $1,842

100053059 STPAA 7733 (601) CONSTRUCTION

Approved in a STIP Plan 2021 $1,898 $474 $2,372

TOTAL COST: $4,345 $1,086 $5,431

Route CR-NA ProjectDescription

RESURFACE AND SIDEWALK BEAUTIFICATION SOUTH COURT STREET FROM CR-233 (FAIRVIEW AVENUE) TO SR-6 (US-331,SOUTH BOULEVARD)

Type of Work RESURFACING

Project Length in Miles 1.720 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100054277 STPAA 7729 (600) CONSTRUCTION

Approved in a STIP Plan 2019 $3,200 $800 $4,000

TOTAL COST: $3,200 $800 $4,000

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

8 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 9: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route CR-NA ProjectDescription

RESURFACE ADAMS AVE FROM CR-232 (DECATUR STREET) TO SOUTH COURT STREET, AND WASHINGTON AVE FROM CR-232 (DECATUR STREET) TO SOUTH COURTATLEE STREET

Type of Work RESURFACING

Project Length in Miles 0.700 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100054280 STPMN CN10 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,316 $329 $1,645

TOTAL COST: $1,316 $329 $1,645

Route CR-NA ProjectDescription

RESURFACE SOUTH PERRY STREET FROM CR-233 (FAIRVIEW AVENUE) TO ARBA STREET

Type of Work RESURFACING

Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100054282 STPMN 7716 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,125 $281 $1,406

TOTAL COST: $1,125 $281 $1,406

Route CR-NA ProjectDescription

DRAINAGE, WIDENING, RESURFACING, SIGNALS AND LANDSCAPING FAIRVIEW AVENUE (CR-233) FROM I-65 TO SOUTH COURT STREET

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.810 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100054285 STPMN 7730 (600) CONSTRUCTION

Approved in a STIP Plan 2020 $3,360 $840 $4,200

TOTAL COST: $3,360 $840 $4,200

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

9 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 10: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route CR-NA ProjectDescription

FEASIBILITY STUDY FOR WIDENING (ADDING CAPACITY) AND RESURFACING CARTER HILL ROAD FROM ZELDA TO MCGEHEE ROAD

Type of Work CORRIDOR STUDY

Project Length in Miles 1.060 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100059732 STPAA 5100 () SPECIAL

Approved in a STIP Plan 2019 $240 $60 $300

TOTAL COST: $240 $60 $300

Route CR-NA ProjectDescription

BRIDGE PAINTING ON AIRBASE BOULEVARD (BIN#011513, #011514), MAXWELL AFB ENTRANCE (#006013), UPPER WETUMPKA ROAD (#008715 AND 008716), MADISON AVENUE (#011480)

Type of Work BRIDGE PAINTING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100060097 STPMN 5113 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $40 $10 $50

100060098 STPMN 5113 () CONSTRUCTION

Approved in a STIP Plan 2020 $200 $50 $250

TOTAL COST: $240 $60 $300

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

10 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 11: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route CR-NA ProjectDescription

WIDEN AND RESURFACE ZELDA ROAD FROM ANN STREET TO CARTER HILL ROAD

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100040817 STPMN 5116 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,248 $312 $1,560

TOTAL COST: $1,248 $312 $1,560

Route CR-NA ProjectDescription

WIDEN AND RESURFACE ZELDA ROAD FROM ANN STREET TO CARTER HILL ROAD

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064606 STPAA 5116 (250) RIGHT OF WAY

Approved in a STIP Plan 2019 $200 $50 $250

100064607 STPMN 5116 (250) UTILITIES

Approved in a STIP Plan 2020 $40 $10 $50

TOTAL COST: $240 $60 $300

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

11 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 12: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route CR-NA ProjectDescription

RESURFACE, CURB AND GUTTER, INLET CONVERSION, STRIPING, SIDEWALKS AND CONVERSION FROM 4 LANE TO 3 LANE WITH PEDESTRIAN FACILITIES ON FAIRVIEW FROM SOUTH COURT STREET TO NARROW LANE ROAD

Type of Work RESURFACING

Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100059726 STPMN 5115 (251) UTILITIES

Approved in a STIP Plan 2020 $80 $20 $100

100063695 STPMN 5115 () CONSTRUCTION

Approved in a STIP Plan 2020 $3,200 $800 $4,000

TOTAL COST: $3,280 $820 $4,100

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON PERRY STREET FROM NOBLE AVE. TO HIGH ST.

Type of Work RESURFACING

Project Length in Miles 0.600 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100063696 STPMN 5115 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $87 $22 $108

100063697 STPMN 5115 () CONSTRUCTION

Approved in a STIP Plan 2021 $997 $249 $1,247

TOTAL COST: $1,084 $271 $1,355

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

12 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 13: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON PERRY STREET FROM JEFFERSON ST. TO POLLARD ST.

Type of Work RESURFACING

Project Length in Miles 0.200 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100063698 STPMN 5115 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $35 $9 $43

100063699 STPMN 5115 () CONSTRUCTION

Approved in a STIP Plan 2022 $398 $99 $497

TOTAL COST: $433 $108 $541

Route CR-NA ProjectDescription

RESURFACE, OPERATIONAL IMPROVEMENTS, HANDICAP RAMPS AND SIDEWALKS ON FEDERAL DRIVE FROM SOUTH OF THE RR TO ATLANTA HWY.

Type of Work RESURFACING

Project Length in Miles 2.100 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100063731 STPMN 5115 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $342 $86 $428

100063732 STPMN 5115 () CONSTRUCTION

Approved in a STIP Plan 2021 $3,939 $985 $4,923

TOTAL COST: $4,281 $1,070 $5,351

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

13 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 14: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON DAILRAIDA ROAD FROM ATLANTA HWY TO GUNTER AFB

Type of Work RESURFACING

Project Length in Miles 1.400 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064163 STPMN 5115 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $232 $58 $290

100064164 STPMN 5115 () CONSTRUCTION

Approved in a STIP Plan 2022 $2,085 $521 $2,606

TOTAL COST: $2,316 $579 $2,896

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON LOWER WETUMPKA ROAD FROM TOLVERT STREET TO THE BYPASS

Type of Work RESURFACING

Project Length in Miles 1.700 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064165 STPMN 5115 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $257 $64 $321

100064166 STPMN 5115 () CONSTRUCTION

Approved in a STIP Plan 2021 $2,314 $579 $2,893

TOTAL COST: $2,571 $643 $3,214

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

14 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 15: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON DAY STREET BRIDGE BIN # 016848

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064167 STPMN 5115 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $824 $206 $1,030

100064168 STPMN 5115 () CONSTRUCTION

Approved in a STIP Plan 2021 $7,416 $1,854 $9,270

TOTAL COST: $8,240 $2,060 $10,300

Route CR-NA ProjectDescription

WIDEN MARLER ROAD TO 3-LANE FROM SR-8 (US-80) TO OKFUSKI TRAIL

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 2.500 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064169 STPMN 5115 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $800 $200 $1,000

100064170 STPMN 5115 () RIGHT OF WAY

Approved in a STIP Plan 2021 $1,600 $400 $2,000

100064171 STPMN 5115 () CONSTRUCTION

Approved in a STIP Plan 2022 $13,040 $3,260 $16,300

TOTAL COST: $15,440 $3,860 $19,300

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

15 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 16: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route CR-NA ProjectDescription

CONVERT SOUTH COURT STREET FROM FAIRVIEW AVENUE TO ARBA STREET FROM ONE-WAY TO TWO-WAY

Type of Work RESURFACING

Project Length in Miles 1.064 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064180 STPMN 5115 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $8 $2 $10

100064156 STPMN 5115 () CONSTRUCTION

Approved in a STIP Plan 2020 $1,680 $420 $2,100

TOTAL COST: $1,688 $422 $2,110

Route CR-NA ProjectDescription

INSTALLATION OF WRONG WAY ENTRY TREATMENTS I-65 INTERCHANGE AT THE INTERSECTION OF EDGEMONT AVENUE AND OAK STREET

Type of Work SAFETY IMPROVEMENTS

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100065325 HSIP NR16 (916) PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $51 $0 $51

100065326 HSIP NR16 () CONSTRUCTION

Approved in a STIP Plan 2019 $182 $20 $202

TOTAL COST: $233 $20 $253

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

16 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 17: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON RAY THORINGTON ROAD FROM PARK CROSSING TO PIKE ROAD

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100066880 STPMN 5117 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $200 $50 $250

100066881 STPMN 5117 () CONSTRUCTION

Approved in a STIP Plan 2022 $2,800 $700 $3,500

TOTAL COST: $3,000 $750 $3,750

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON MCGEHEE ROAD FROM WOODLEY ROAD TO SOUTHERN BLVD

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100066882 STPMN 5117 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $160 $40 $200

100066883 STPMN 5117 () CONSTRUCTION

Approved in a STIP Plan 2022 $3,376 $844 $4,220

TOTAL COST: $3,536 $884 $4,420

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

17 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 18: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON VIRGINIA LOOP ROAD FROM SR-6 (US-231) TO WOODLEY ROAD

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100066884 STPMN 5117 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $200 $50 $250

100066885 STPMN 5117 () CONSTRUCTION

Approved in a STIP Plan 2022 $976 $244 $1,220

TOTAL COST: $1,176 $294 $1,470

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON ATLANTA HIGHWAY FROM ANN STREET TO PERRY HILL ROAD

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100066886 STPMN 5117 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $200 $50 $250

100066887 STPMN 5117 () CONSTRUCTION

Approved in a STIP Plan 2022 $4,000 $1,000 $5,000

TOTAL COST: $4,200 $1,050 $5,250

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

18 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 19: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS AT VAUGHN ROAD AND RYAN ROAD

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100067610 STPAA 5117 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $48 $12 $60

100067611 STPAA 5117 () RIGHT OF WAY

Approved in a STIP Plan 2019 $32 $8 $40

100067613 STPAA 5117 () UTILITIES

Approved in a STIP Plan 2020 $80 $20 $100

100067614 STPMN 5117 () CONSTRUCTION

Approved in a STIP Plan 2020 $400 $100 $500

TOTAL COST: $560 $140 $700

Route CR-NA ProjectDescription

RESURFACING ON MCINNIS ROAD FROM WOODLEY ROAD TO NARROW LANE ROAD

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100067636 STPMN 5117 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $80 $20 $100

100067637 STPMN 5117 () CONSTRUCTION

Approved in a STIP Plan 2022 $2,400 $600 $3,000

TOTAL COST: $2,480 $620 $3,100

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

19 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 20: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route CR-NA ProjectDescription

RESURFACING, TRAFFIC SIGNALS AND SIDEWALKS ON WARES FERRY ROAD FROM EASTERN BOULEVARD TO MCLEMORE DRIVE

Type of Work RESURFACING

Project Length in Miles 3.250 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068971 STPMN 5118 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $160 $40 $200

TOTAL COST: $160 $40 $200

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

20 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 21: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route I -65 ProjectDescription

RESURFACE I-65 FROM CATOMA CREEK TO NORTH OF FAIRVIEW AVENUE

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 3.420 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100066453 IM I065 () CONSTRUCTION

Approved in a STIP Plan 2019 $2,685 $298 $2,984

TOTAL COST: $2,685 $298 $2,984

Route I -65 ProjectDescription

RESURFACE I-65 FROM NORTH OF FAIRVIEW AVENUE TO THE ALABAMA RIVER BRIDGE

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 2.030 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100066459 IM I065 () CONSTRUCTION

Approved in a STIP Plan 2020 $2,061 $229 $2,290

TOTAL COST: $2,061 $229 $2,290

Route I -65 ProjectDescription

PAVEMENT PRESERVATION ON I-65 FROM THE NORTH END OF THE ALABAMA RIVER BRIDGE TO THE ELMORE COUNTY LINE

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 4.650 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100069067 IM I065 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $158 $18 $175

TOTAL COST: $158 $18 $175

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

21 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 22: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route I -85 ProjectDescription

ADD LANES ON I-85 FROM 1.5 MILES EAST OF SR-271 TO OUTERLOOP INTERCHANGE

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 7.970 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100059847 NH I085 (999) PRELIMINARY ENGINEERING

Approved in a STIP Plan 2045 $1,331 $333 $1,664

100045921 NH I085 () CONSTRUCTION

Approved in a STIP Plan 2048 $17,798 $4,449 $22,247

TOTAL COST: $19,129 $4,782 $23,911

Route I -85 ProjectDescription

SIGN REHABILITATION ALONG I-85 FROM I-65 THROUGH MONTGOMERY AND MACON COUNTY TO LEE COUNTY LINE

Type of Work SIGN REHABILITATION

Project Length in Miles 47.460 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100054302 IM I085 (333) CONSTRUCTION

Approved in a STIP Plan 2019 $2,510 $279 $2,789

TOTAL COST: $2,510 $279 $2,789

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

22 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 23: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route I -85 ProjectDescription

BRIDGE WIDENING ON I-85 OVER LINE CREEK (INCLUDING TWO RELIEF BRIDGES)BIN # 7555,7557,7567

Type of Work BRIDGE WIDENING

Project Length in Miles 0.480 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100059252 IM I085 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $350 $39 $389

100059253 IM I085 () CONSTRUCTION

Approved in a STIP Plan 2022 $3,555 $395 $3,950

TOTAL COST: $3,906 $434 $4,340

Route I -85 ProjectDescription

PAVEMENT REHAB AND SLAB REPAIRS ON I-85 FROM I-65 TO JUST NORTH OF THE HALL STREET OVERPASS

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 1.842 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100062472 IM I085 (357) CONSTRUCTION

Approved in a STIP Plan 2019 $2,536 $282 $2,818

TOTAL COST: $2,536 $282 $2,818

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

23 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 24: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route I -85 ProjectDescription

I-85 ADDITIONAL LANES, MEDIAN AND BRIDGE WIDENING FROM 0.4 MILE EAST SR-271 TO JENKINS CREEK (BIN #KS 009004, 009005, 009006, 009007)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 2.760 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100063747 NHF-IM I085 (336) PRELIMINARY ENGINEERING

Approved in a STIP Plan 2041 $1,388 $264 $1,653

100054608 NH-IM I085 () CONSTRUCTION

Approved in a STIP Plan 2041 $16,142 $3,492 $19,635

TOTAL COST: $17,531 $3,757 $21,288

Route I -85 ProjectDescription

INSTALL NEW DMS ON I-85 NB AT MP 0.4

Type of Work SIGNING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100066909 99-606-513-085-702 () MAINTENANCE CONSTRUCTION

Approved in a STIP Plan 2019 $0 $250 $250

TOTAL COST: $0 $250 $250

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

24 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 25: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route NA- ProjectDescription

RETROFITTING OF HANDICAP RAMPS ON VARIOUS STREETS IN THE CITY OF MONTGOMERY DOWNTOWN CENTRAL BUSINESS DISTRICT

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100060099 STPMN 5113 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $64 $16 $80

100060100 STPMN 5113 () CONSTRUCTION

Approved in a STIP Plan 2020 $400 $100 $500

TOTAL COST: $464 $116 $580

Route NA- ProjectDescription

STREET LIGHT CONVERSION TO LED IN CENTRAL BUSINESS DISTRICT (CITY OF MONTGOMERY)

Type of Work LIGHTING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100063692 STPAA 5115 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $626 $156 $782

100063693 STPMN 5115 () CONSTRUCTION

Approved in a STIP Plan 2019 $1,653 $413 $2,066

TOTAL COST: $2,278 $570 $2,848

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

25 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 26: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route NA- ProjectDescription

DAY STREET/MAXWELL AIR FORCE BASE FEASIBILITY STUDY

Type of Work CORRIDOR STUDY

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100063733 STPMN 5115 () SPECIAL

Approved in a STIP Plan 2020 $240 $60 $300

TOTAL COST: $240 $60 $300

Route NA- ProjectDescription

MULTI-PURPOSE NATURE TRAIL,WALLAHATCHIE ROAD - PHASE 3, LOCATED ALONG MARLER ROAD NORTH WAUGH TOWN CENTER CONNECTOR

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100066530 TAPMN TA16 (949) CONSTRUCTION

Approved in a STIP Plan 2019 $188 $47 $235

TOTAL COST: $188 $47 $235

Route NA- ProjectDescription

PIKE ROAD NATURE TRAIL: WALLAHATCHIE ROAD-PHASE 4

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100066847 TAPMN TA17 (900) CONSTRUCTION

Approved in a STIP Plan 2019 $200 $50 $250

TOTAL COST: $200 $50 $250

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

26 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 27: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route NA- ProjectDescription

RESURFACING, TRAFFIC SIGNALS AND SIDEWALKS ON WARES FERRY ROAD FROM EASTERN BOULEVARD TO MCLEMORE DRIVE

Type of Work RESURFACING

Project Length in Miles 3.250 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068972 STPMN 5118 () RIGHT OF WAY

Approved in a STIP Plan 2020 $160 $40 $200

100068973 STPMN 5118 () UTILITIES

Approved in a STIP Plan 2020 $80 $20 $100

100068974 STPMN 5118 () CONSTRUCTION

Approved in a STIP Plan 2021 $2,600 $650 $3,250

TOTAL COST: $2,840 $710 $3,550

Route SR-108 ProjectDescription

SR-108 (MGM OUTER LOOP) FROM SR-8 (US-80) TO WEST OF CR-103 (FELDER ROAD),INCLUDES INTERCHANGEATUS-80

Type of Work GRADE AND DRAIN

Project Length in Miles 2.700 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100043287 ACNH 0035 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $210 $53 $263

100043288 ACNH 0035 () RIGHT OF WAY

Approved in a STIP Plan 2049 $4,613 $1,153 $5,766

100043295 ACNH 0035 () UTILITIES

Approved in a STIP Plan 2049 $923 $231 $1,153

100043289 ACNH 0035 () CONSTRUCTION

Approved in a STIP Plan 2049 $8,718 $2,179 $10,897

TOTAL COST: $14,464 $3,616 $18,080

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

27 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 28: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route SR-108 ProjectDescription

SR-108 (MGM OUTER LOOP) FROM SR-8 (US-80) TO WEST OF CR-103 (FELDER ROAD),INCLUDES INTERCHANGEATUS-80

Type of Work BRIDGE

Project Length in Miles 2.700 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100043290 ACNH 0035 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $154 $38 $192

100043291 ACNH 0035 () CONSTRUCTION

Approved in a STIP Plan 2049 $2,756 $689 $3,445

TOTAL COST: $2,909 $727 $3,637

Route SR-108 ProjectDescription

SR-108 (MGM OUTER LOOP) FROM SR-8 (US-80) TO WEST OF CR-103 (FELDER ROAD),INCLUDES INTERCHANGEATUS-80

Type of Work BASE AND PAVE

Project Length in Miles 2.700 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100043293 ACNH 0035 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $95 $24 $118

100043294 ACNH 0035 () CONSTRUCTION

Approved in a STIP Plan 2049 $15,275 $3,819 $19,094

TOTAL COST: $15,369 $3,842 $19,212

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

28 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 29: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route SR-108 ProjectDescription

SR-108 (MGM OUTER LOOP) FROM WEST OF CR-103 (FELDER ROAD) TO I-65, INCLUDES INTERCHANGEATCR-103

Type of Work GRADE AND DRAIN

Project Length in Miles 3.130 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100043296 ACNH 0035 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $371 $93 $464

100043297 ACNH 0035 () RIGHT OF WAY

Approved in a STIP Plan 2049 $4,590 $1,148 $5,738

100043298 ACNH 0035 () UTILITIES

Approved in a STIP Plan 2049 $1,530 $383 $1,913

100043299 ACNH 0035 () CONSTRUCTION

Approved in a STIP Plan 2049 $16,292 $4,073 $20,365

TOTAL COST: $22,784 $5,696 $28,480

Route SR-108 ProjectDescription

SR-108 (MGM OUTER LOOP) FROM WEST OF CR-103 (FELDER ROAD) TO I-65, INCLUDES INTERCHANGEATCR-103

Type of Work BRIDGE

Project Length in Miles 3.130 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100043300 ACNH 0035 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $154 $38 $192

100043301 ACNH 0035 () CONSTRUCTION

Approved in a STIP Plan 2049 $2,774 $694 $3,468

TOTAL COST: $2,928 $732 $3,660

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

29 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 30: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route SR-108 ProjectDescription

SR-108 (MGM OUTER LOOP) FROM WEST OF CR-103 (FELDER ROAD) TO I-65, INCLUDES INTERCHANGEATCR-103

Type of Work BASE AND PAVE

Project Length in Miles 3.130 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100043302 ACNH 0035 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $246 $61 $307

100043303 ACNH 0035 () CONSTRUCTION

Approved in a STIP Plan 2049 $24,812 $6,203 $31,015

TOTAL COST: $25,058 $6,264 $31,322

Route SR-108 ProjectDescription

SR-108 (MGM OUTER LOOP) INTERCHANGE, RAMPS AND BRIDGESATI-65

Type of Work BRIDGE

Project Length in Miles 3.750 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100043304 ACNH 0035 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $1,660 $415 $2,075

100043305 ACNH 0035 () CONSTRUCTION

Approved in a STIP Plan 2049 $33,199 $8,300 $41,498

TOTAL COST: $34,859 $8,715 $43,573

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

30 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 31: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route SR-108 ProjectDescription

SR-108 (MGM OUTER LOOP) FROM I-65 TO WEST OF SR-9 (US-331), INCLUDES INTERCHANGEATSR-3 (US-31)

Type of Work GRADE AND DRAIN

Project Length in Miles 3.750 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100043306 ACNH 0035 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $386 $96 $482

100043307 ACNH 0035 () RIGHT OF WAY

Approved in a STIP Plan 2049 $6,138 $1,535 $7,673

100043308 ACNH 0035 () UTILITIES

Approved in a STIP Plan 2049 $1,536 $384 $1,920

100043309 ACNH 0035 () CONSTRUCTION

Approved in a STIP Plan 2049 $16,487 $4,122 $20,608

TOTAL COST: $24,547 $6,137 $30,684

Route SR-108 ProjectDescription

SR-108 (MGM OUTER LOOP) FROM I-65 TO WEST OF SR-9 (US-331), INCLUDES INTERCHANGEATSR-3 (US-31)

Type of Work BRIDGE

Project Length in Miles 3.750 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100043310 ACNH 0035 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $154 $38 $192

100043311 ACNH 0035 () CONSTRUCTION

Approved in a STIP Plan 2049 $1,576 $394 $1,970

TOTAL COST: $1,729 $432 $2,162

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

31 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 32: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route SR-108 ProjectDescription

SR-108 (MGM OUTER LOOP) FROM I-65 TO WEST OF SR-9 (US-331), INCLUDES INTERCHANGEATSR-3 (US-31)

Type of Work BASE AND PAVE

Project Length in Miles 3.750 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100043312 ACNH 0035 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $537 $134 $672

100043313 ACNH 0035 () CONSTRUCTION

Approved in a STIP Plan 2049 $25,120 $6,280 $31,400

TOTAL COST: $25,658 $6,414 $32,072

Route SR-108 ProjectDescription

SR-108 (MGM OUTER LOOP) FROM WEST OF SR-9 (US-331) TO WEST OF CR-39 (WOODLEY RD.), INCLUDES INTERCHANGEATUS-331

Type of Work GRADE AND DRAIN

Project Length in Miles 5.480 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100043314 ACNH 0035 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $526 $131 $657

100043315 ACNH 0035 () RIGHT OF WAY

Approved in a STIP Plan 2049 $9,241 $2,310 $11,551

100043316 ACNH 0035 () UTILITIES

Approved in a STIP Plan 2049 $2,365 $591 $2,956

100043317 ACNH 0035 () CONSTRUCTION

Approved in a STIP Plan 2049 $22,600 $5,650 $28,250

TOTAL COST: $34,732 $8,683 $43,415

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

32 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 33: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route SR-108 ProjectDescription

SR-108 (MGM OUTER LOOP) FROM WEST OF SR-9 (US-331) TO WEST OF CR-39 (WOODLEY RD.), INCLUDES INTERCHANGEATUS-331

Type of Work BRIDGE

Project Length in Miles 6.090 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100043318 ACNH 0035 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $230 $58 $288

100043319 ACNH 0035 () CONSTRUCTION

Approved in a STIP Plan 2049 $8,108 $2,027 $10,135

TOTAL COST: $8,339 $2,085 $10,423

Route SR-108 ProjectDescription

SR-108 (MGM OUTER LOOP) FROM WEST OF SR-9 (US-331) TO WEST OF CR-39 (WOODLEY RD.), INCLUDES INTERCHANGEATUS-331

Type of Work BASE AND PAVE

Project Length in Miles 6.090 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100043320 ACNH 0035 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $845 $211 $1,057

100043321 ACNH 0035 () CONSTRUCTION

Approved in a STIP Plan 2049 $42,193 $10,548

$52,741

TOTAL COST: $43,038 $10,760

$53,798

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

33 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 34: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route SR-108 ProjectDescription

SR-108 (MGM OUTER LOOP) FROM WEST OF CR-39 (WOODLEY RD) TO SR-6 (US-231), INCLUDES INTERCHANGEATCR-39, CR-39 OVER MOL

Type of Work GRADE, DRAIN AND BRIDGE

Project Length in Miles 2.940 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100043323 ACNH 0035 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $210 $53 $263

100043324 ACNH 0035 () UTILITIES

Approved in a STIP Plan 2049 $1,535 $384 $1,918

100043325 ACNH 0035 () CONSTRUCTION

Approved in a STIP Plan 2049 $9,139 $2,285 $11,423

TOTAL COST: $10,883 $2,721 $13,604

Route SR-108 ProjectDescription

SR-108 (MGM OUTER LOOP) FROM WEST OF CR-39 (WOODLEY RD) TO SR-6 (US-231), INCLUDES INTERCHANGEATCR-39, CR-39 OVER MOL

Type of Work BRIDGE

Project Length in Miles 2.940 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100043326 ACNH 0035 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $891 $223 $1,114

100043327 ACNH 0035 () CONSTRUCTION

Approved in a STIP Plan 2049 $17,866 $4,467 $22,333

TOTAL COST: $18,757 $4,689 $23,447

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

34 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 35: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route SR-108 ProjectDescription

SR-108 (MGM OUTER LOOP) FROM WEST OF CR-39 (WOODLEY RD) TO SR-6 (US-231), INCLUDES INTERCHANGEATCR-39, CR-39 OVER MOL

Type of Work BASE AND PAVE

Project Length in Miles 2.940 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100043328 ACNH 0035 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $231 $58 $289

100043329 ACNH 0035 () CONSTRUCTION

Approved in a STIP Plan 2049 $7,713 $1,928 $9,642

TOTAL COST: $7,944 $1,986 $9,930

Route SR-108 ProjectDescription

MGM OUTER LOOP FROM SR-6 (US-231) TO CR-85 (CARTER HILL RD)

Type of Work BASE AND PAVE

Project Length in Miles 3.835 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100016439 ACNH 0035 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $679 $170 $849

100016427 ACNH 0035 () CONSTRUCTION

Approved in a STIP Plan 2049 $32,110 $8,028 $40,138

TOTAL COST: $32,789 $8,197 $40,986

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

35 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 36: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route SR-108 ProjectDescription

MGM OUTER LOOP FROM SR-6 (US-231) TO CR-85 (CARTER HILL RD)

Type of Work GRADE, DRAIN AND BRIDGE

Project Length in Miles 3.835 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100016443 ACNH 0035 () UTILITIES

Approved in a STIP Plan 2049 $1,136 $284 $1,420

100016428 ACNH 0035 (500) CONSTRUCTION

Approved in a STIP Plan 2049 $37,194 $9,298 $46,492

TOTAL COST: $38,330 $9,582 $47,912

Route SR-108 ProjectDescription

MGM OUTER LOOP FROM CR-85 (OLD CARTER HILL RD) TO SR-110

Type of Work BASE AND PAVE

Project Length in Miles 5.023 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100016440 ACNH 0035 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2049 $922 $231 $1,153

100016429 ACNH 0035 () CONSTRUCTION

Approved in a STIP Plan 2049 $36,300 $9,075 $45,375

TOTAL COST: $37,222 $9,306 $46,528

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

36 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 37: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route SR-108 ProjectDescription

MGM OUTER LOOP FROM CR-85 (OLD CARTER HILL RD) TO SR-110

Type of Work GRADE, DRAIN AND BRIDGE

Project Length in Miles 5.023 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100016430 ACNH 0035 (900) CONSTRUCTION

Approved in a STIP Plan 2049 $78,593 $19,648

$98,242

TOTAL COST: $78,593 $19,648

$98,242

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

37 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 38: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route SR-110 ProjectDescription

ADDITIONAL LANES ON SR-110 FROM CHANTILLY PKWY TO CR-294 (BRIDLEBROOK BLVD)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.030 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100043877 STPAA 0110 (501) UTILITIES

Approved in a STIP Plan 2019 $687 $172 $859

100050187 STPAA 0110 (501) CONSTRUCTION

Approved in a STIP Plan 2021 $2,917 $729 $3,647

TOTAL COST: $3,604 $901 $4,505

Route SR-110 ProjectDescription

ADDITIONAL LANES ON SR-110 FROM CR-294 (BRIDLEBROOK BLVD) TO THE OUTER LOOP

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.450 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100067733 STPAA 0110 (502) UTILITIES

Approved in a STIP Plan 2019 $687 $172 $859

100043868 STPAA 0110 (502) CONSTRUCTION

Approved in a STIP Plan 2041 $4,841 $1,210 $6,051

TOTAL COST: $5,528 $1,382 $6,910

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

38 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 39: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route SR-271 ProjectDescription

INTERSECTION IMPROVEMENTS ON SR-271 (EXIT 9) ONTO I-85 SOUTHBOUND

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100067646 STPAA 0271 () CONSTRUCTION

Approved in a STIP Plan 2019 $2,040 $510 $2,550

TOTAL COST: $2,040 $510 $2,550

Route SR-3 ProjectDescription

RESURFACING ON SR-3 (US-31) FROM THE LOWNDES COUNTY LINE TO THE END OF 2-LANE NEAR FISCHER ROAD

Type of Work PAVEMENT MINOR REHABILITATION

Project Length in Miles 12.500 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100067904 STPAA 0003 (617) FEDERAL MAINT CN

Approved in a STIP Plan 2019 $4,355 $1,089 $5,444

TOTAL COST: $4,355 $1,089 $5,444

Route SR-6 ProjectDescription

BRIDGE REPLACEMENT ON SR-6 (US-231) AT JENKINS CREEK BIN #000735 STR #6-51-17.5

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.010 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100038170 BR 0006 (563) UTILITIES

Approved in a STIP Plan 2019 $242 $61 $303

100004312 BR 0006 () CONSTRUCTION

Approved in a STIP Plan 2020 $3,981 $995 $4,976

TOTAL COST: $4,223 $1,056 $5,279

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

39 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 40: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route SR-8 ProjectDescription

WIDEN AND RESURFACE SR-8 (US-80) FROM THE WAUGH INTERSECTION TO THE MARLER ROAD INTERSECTION

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064153 STPMN 5115 () PRELIMINARY ENGINEERING

Approved in a STIP Plan 2020 $203 $51 $254

100064154 STPMN 5115 () RIGHT OF WAY

Approved in a STIP Plan 2020 $160 $40 $200

100064155 STPMN 5115 () CONSTRUCTION

Approved in a STIP Plan 2021 $1,669 $417 $2,086

TOTAL COST: $2,032 $508 $2,540

Route SR-8 ProjectDescription

TRAFFIC STUDY ON SR-8 (US-80) FROM WAUGH TO MARLER ROAD

Type of Work CORRIDOR STUDY

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100064157 STPMN 5115 () SPECIAL

Approved in a STIP Plan 2020 $96 $24 $120

TOTAL COST: $96 $24 $120

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

40 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 41: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route SR-9 ProjectDescription

ADDITIONAL LANES (SB ONLY) SR-9 (US-231) FROM ANDERSON RD TO NEAR JASMINE HILL RD (INCLUDES TALLAPOOSA RIVER BRIDGE REPLACEMENT BIN 005162)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.390 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100054909 NH 0009 (517) CONSTRUCTION

Approved in a STIP Plan 2048 $15,604 $3,901 $19,505

TOTAL COST: $15,604 $3,901 $19,505

Route SR-9 ProjectDescription

SR-9 (US-331) ADDITIONAL LANES FR CR-5 TO STRATA

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 3.650 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100047865 NH 0009 () UTILITIES

Approved in a STIP Plan 2048 $228 $57 $285

100004583 NH 0009 (514) CONSTRUCTION

Approved in a STIP Plan 2048 $25,322 $6,331 $31,653

TOTAL COST: $25,550 $6,388 $31,938

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

41 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 42: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route SR-9 ProjectDescription

SR-9 (US-331) ADDITIONAL LANES FROM STRATA TO 2000' SOUTH OF SR-94

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 5.021 Urban Area COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100045971 NHF 0009 (513) UTILITIES

Approved in a STIP Plan 2049 $153 $38 $192

100004582 NHF 0009 (513) CONSTRUCTION

Approved in a STIP Plan 2050 $22,769 $5,692 $28,462

TOTAL COST: $22,923 $5,731 $28,653

Route SR-9 ProjectDescription

EXTEND SEVICE ROAD ALONG SR-9 (NOTHERN BLVD) NORTH BOUND FROM HACKEL DRIVE TO PLANTATION WAY AND SOUTHBOUND FROM LAGOON PARK DRIVE TO THE EXISTING SERVICE ROAD

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 0.760 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100063744 NH 0009 (533) PRELIMINARY ENGINEERING

Approved in a STIP Plan 2023 $69 $17 $87

100050519 NH 0009 () CONSTRUCTION

Approved in a STIP Plan 2025 $1,184 $296 $1,481

TOTAL COST: $1,254 $313 $1,567

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

42 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY

Page 43: 11/1/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work STIP Indicator Fiscal Year Federal State-Other TOTAL 100067620 STPMN 5118 PRELIMINARY ENGINEERING

Route SR-9 ProjectDescription

RESURFACING ON SR-9 (US-231) FROM SR-152 (NORTHERN BOULEVARD) TO NORTH OF BROOKS ROAD

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 0.841 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100067903 NH 0009 (567) FEDERAL MAINT CN

Approved in a STIP Plan 2019 $1,059 $265 $1,323

TOTAL COST: $1,059 $265 $1,323

Route SR-NA ProjectDescription

INSTALLATION OF ROUNDABOUTS ON SR-126 AT BOTH I-85 EXIT 16 RAMPS, AND AT SR-126/SR-8 (US-80) INTERSECTION, AND ON SR-8 (US-80) AT MARLER ROAD

Type of Work SAFETY IMPROVEMENTS

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work STIP Indicator Fiscal Year Federal

State-Other TOTAL

100068811 HSIP 5119 (250) PRELIMINARY ENGINEERING

Approved in a STIP Plan 2019 $217 $24 $241

100068821 HSIP 5119 (250) RIGHT OF WAY

Approved in a STIP Plan 2020 $50 $6 $56

100068820 HSIP 5119 (250) UTILITIES

Approved in a STIP Plan 2020 $159 $18 $177

100068810 HSIP 5119 () CONSTRUCTION

Approved in a STIP Plan 2021 $1,716 $191 $1,906

TOTAL COST: $2,141 $238 $2,379

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT

43 of 43

COUNTY HIGHWAY PROJECTS - MONTGOMERY