Route CR-18 ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON CR-18 (SNOWDOUN CHAMBERS ROAD) FROM CR-61 (HOBBIE ROAD) TO CR-39 (WOODLEY ROAD)
Type of Work RESURFACING
Project Length in Miles 5.380 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067620 STPMN 5118 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $4 $1 $5
100067621 STPMN 5118 () CONSTRUCTION
Approved in a STIP Plan 2019 $751 $188 $939
TOTAL COST: $755 $189 $944
Route CR-2120 ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON CR-2120 (ALABAMA RIVER PARKWAY) FROM JACKSON FERRY ROAD TO THE MONTGOMERY CITY LIMITS
Type of Work RESURFACING
Project Length in Miles 1.890 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067623 STPMN 5118 () CONSTRUCTION
Approved in a STIP Plan 2020 $446 $111 $557
TOTAL COST: $446 $111 $557
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
1 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route CR-234 ProjectDescription
RESURFACE AND WIDEN RYAN ROAD (CR-234) FROM VAUGHN ROAD TO CHANTILLY PARKWAY
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.820 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064673 STPMN 5115 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $286 $71 $357
100064674 STPMN 5115 () RIGHT OF WAY
Approved in a STIP Plan 2021 $170 $42 $212
100064675 STPMN 5115 () CONSTRUCTION
Approved in a STIP Plan 2022 $2,400 $600 $3,000
TOTAL COST: $2,855 $714 $3,569
Route CR-236 ProjectDescription
RESURFACE, CURB AND GUTTER, INLET CONVERSION, TRAFFIC STRIPING AND SIDEWALKS ON FEDERAL DRIVE FROM ATLANTA HIGHWAY TO CSX RAILROAD CROSSING.
Type of Work RESURFACING
Project Length in Miles 2.130 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100059831 STPMN 5116 () CONSTRUCTION
Approved in a STIP Plan 2020 $2,400 $600 $3,000
TOTAL COST: $2,400 $600 $3,000
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
2 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route CR-28 ProjectDescription
RESURFACING ON CR-28 (MERIWETHER TRAIL) FROM SR-94 TO THE COUNTY LINE - MCP 51-04-18
Type of Work RESURFACING
Project Length in Miles 7.047 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068888 STPNU 5118 () CONSTRUCTION
Approved in a STIP Plan 2019 $889 $222 $1,111
TOTAL COST: $889 $222 $1,111
Route CR-33 ProjectDescription
BRIDGE REPLACEMENT ON CR-33 (NARROW LANE ROAD) AT HANNON SLOUGH (BIN # 003250 AND # 003249)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100060092 STPMN 7702 (601) RIGHT OF WAY
Approved in a STIP Plan 2020 $60 $15 $75
100060091 STPMN 7702 (601) UTILITIES
Approved in a STIP Plan 2020 $160 $40 $200
100055807 STPMN 7702 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,600 $400 $2,000
TOTAL COST: $1,820 $455 $2,275
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
3 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route CR-39 ProjectDescription
BRIDGE REPLACEMENT ON CR-39 (WOODLEY ROAD)ATWHITES SLOUGH AND TRIBUTARY (BIN # 003047 AND 003048)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100060096 STPAA 7701 (602) RIGHT OF WAY
Approved in a STIP Plan 2019 $60 $15 $75
100060095 STPMN 7701 (602) UTILITIES
Approved in a STIP Plan 2020 $160 $40 $200
100055809 STPMN 7701 (602) CONSTRUCTION
Approved in a STIP Plan 2021 $2,340 $585 $2,925
TOTAL COST: $2,560 $640 $3,200
Route CR-42 ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON HYUNDAI BOULEVARD (CR-42) FROM SR-3 (US-31) TO SR-9 (US-331)
Type of Work RESURFACING
Project Length in Miles 2.700 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064378 STPMN 5118 (251) CONSTRUCTION
Approved in a STIP Plan 2019 $1,279 $320 $1,599
TOTAL COST: $1,279 $320 $1,599
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
4 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route CR-43 ProjectDescription
WIDEN, RESURFACE AND ADD TURN LANES CR-43(BELL RD) FROM NORTH END I-85 BRIDGE TO SR-8 (US-80, ATLANTA HWY), TURN LANESATBELL GABLES, BELL ROAD MANOR, BELL ROAD COURT, OLIVER DRIVE AND HENLEY WAY
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 1.400 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100044515 STPMN 7707 () CONSTRUCTION
Approved in a STIP Plan 2020 $888 $222 $1,110
TOTAL COST: $888 $222 $1,110
Route CR-54 ProjectDescription
RESURFACING ON CR-54 (HUNTER LOOP ROAD) FROM OLD SELMA ROAD TO SR-3 (US-31)
Type of Work RESURFACING
Project Length in Miles 3.700 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067638 STPMN 5118 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $64 $16 $80
100067639 STPMN 5118 () CONSTRUCTION
Approved in a STIP Plan 2022 $2,800 $700 $3,500
TOTAL COST: $2,864 $716 $3,580
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
5 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route CR-626 ProjectDescription
FEASIBILITY STUDY FOR SIDEWALKS/MULTI-USE PATH ON (CR-626) VAUGHN ROAD FROM TAYLOR ROAD TO CHANTILLY PARKWAY
Type of Work SIDEWALK
Project Length in Miles 4.400 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100062338 STPAA 5115 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $240 $60 $300
TOTAL COST: $240 $60 $300
Route CR-74 ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON ANDERSON ROAD/LOWER WETUMPKA ROAD (CR-74) FROM ALABAMA RIVER PARKWAY TO SR-9 (US-231) - MCP 51-83-17
Type of Work RESURFACING
Project Length in Miles 5.230 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064380 STPAA 5117 (253) CONSTRUCTION
Approved in a STIP Plan 2019 $1,006 $252 $1,258
TOTAL COST: $1,006 $252 $1,258
Route CR-NA ProjectDescription
WIDEN AND RESURFACE ATLANTA HIGHWAY FROM MOUNTAINVIEW DRIVE TO SR-9 (US-231:EAST BLVD)
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.400 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100040822 STPMN 7771 () CONSTRUCTION
Approved in a STIP Plan 2020 $692 $173 $865
TOTAL COST: $692 $173 $865
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
6 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route CR-NA ProjectDescription
WIDEN AND RESURFACE PERRY HILL ROAD FROM HARRISON ROAD TO CR-235 (ATLANTA HIGHWAY)
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 1.710 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100044273 STPMN 7724 () RIGHT OF WAY
Approved in a STIP Plan 2019 $1,052 $263 $1,315
100044272 STPMN 7724 () UTILITIES
Approved in a STIP Plan 2020 $1,642 $411 $2,053
100007740 STPMN 7724 () CONSTRUCTION
Approved in a STIP Plan 2020 $4,737 $1,184 $5,921
TOTAL COST: $7,431 $1,858 $9,289
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AT PERRY HILL ROAD AND ATLANTA HIGHWAY
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067740 STPMN 5115 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $444 $111 $555
100064161 STPMN 5115 () RIGHT OF WAY
Approved in a STIP Plan 2019 $800 $200 $1,000
100064162 STPMN 5115 () CONSTRUCTION
Approved in a STIP Plan 2020 $5,600 $1,400 $7,000
TOTAL COST: $6,844 $1,711 $8,555
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
7 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route CR-NA ProjectDescription
WIDEN AND RESURFACE ANN STREET FROM HIGHLAND AVENUE TO BREWTON STREET (PHASE2)
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 0.450 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100053061 STPAA 7733 (602) RIGHT OF WAY
Approved in a STIP Plan 2019 $973 $243 $1,217
100045392 STPMN 7733 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,474 $368 $1,842
100053059 STPAA 7733 (601) CONSTRUCTION
Approved in a STIP Plan 2021 $1,898 $474 $2,372
TOTAL COST: $4,345 $1,086 $5,431
Route CR-NA ProjectDescription
RESURFACE AND SIDEWALK BEAUTIFICATION SOUTH COURT STREET FROM CR-233 (FAIRVIEW AVENUE) TO SR-6 (US-331,SOUTH BOULEVARD)
Type of Work RESURFACING
Project Length in Miles 1.720 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100054277 STPAA 7729 (600) CONSTRUCTION
Approved in a STIP Plan 2019 $3,200 $800 $4,000
TOTAL COST: $3,200 $800 $4,000
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
8 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route CR-NA ProjectDescription
RESURFACE ADAMS AVE FROM CR-232 (DECATUR STREET) TO SOUTH COURT STREET, AND WASHINGTON AVE FROM CR-232 (DECATUR STREET) TO SOUTH COURTATLEE STREET
Type of Work RESURFACING
Project Length in Miles 0.700 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100054280 STPMN CN10 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,316 $329 $1,645
TOTAL COST: $1,316 $329 $1,645
Route CR-NA ProjectDescription
RESURFACE SOUTH PERRY STREET FROM CR-233 (FAIRVIEW AVENUE) TO ARBA STREET
Type of Work RESURFACING
Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100054282 STPMN 7716 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,125 $281 $1,406
TOTAL COST: $1,125 $281 $1,406
Route CR-NA ProjectDescription
DRAINAGE, WIDENING, RESURFACING, SIGNALS AND LANDSCAPING FAIRVIEW AVENUE (CR-233) FROM I-65 TO SOUTH COURT STREET
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.810 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100054285 STPMN 7730 (600) CONSTRUCTION
Approved in a STIP Plan 2020 $3,360 $840 $4,200
TOTAL COST: $3,360 $840 $4,200
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
9 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route CR-NA ProjectDescription
FEASIBILITY STUDY FOR WIDENING (ADDING CAPACITY) AND RESURFACING CARTER HILL ROAD FROM ZELDA TO MCGEHEE ROAD
Type of Work CORRIDOR STUDY
Project Length in Miles 1.060 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100059732 STPAA 5100 () SPECIAL
Approved in a STIP Plan 2019 $240 $60 $300
TOTAL COST: $240 $60 $300
Route CR-NA ProjectDescription
BRIDGE PAINTING ON AIRBASE BOULEVARD (BIN#011513, #011514), MAXWELL AFB ENTRANCE (#006013), UPPER WETUMPKA ROAD (#008715 AND 008716), MADISON AVENUE (#011480)
Type of Work BRIDGE PAINTING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100060097 STPMN 5113 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $40 $10 $50
100060098 STPMN 5113 () CONSTRUCTION
Approved in a STIP Plan 2020 $200 $50 $250
TOTAL COST: $240 $60 $300
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
10 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route CR-NA ProjectDescription
WIDEN AND RESURFACE ZELDA ROAD FROM ANN STREET TO CARTER HILL ROAD
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100040817 STPMN 5116 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,248 $312 $1,560
TOTAL COST: $1,248 $312 $1,560
Route CR-NA ProjectDescription
WIDEN AND RESURFACE ZELDA ROAD FROM ANN STREET TO CARTER HILL ROAD
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064606 STPAA 5116 (250) RIGHT OF WAY
Approved in a STIP Plan 2019 $200 $50 $250
100064607 STPMN 5116 (250) UTILITIES
Approved in a STIP Plan 2020 $40 $10 $50
TOTAL COST: $240 $60 $300
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
11 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route CR-NA ProjectDescription
RESURFACE, CURB AND GUTTER, INLET CONVERSION, STRIPING, SIDEWALKS AND CONVERSION FROM 4 LANE TO 3 LANE WITH PEDESTRIAN FACILITIES ON FAIRVIEW FROM SOUTH COURT STREET TO NARROW LANE ROAD
Type of Work RESURFACING
Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100059726 STPMN 5115 (251) UTILITIES
Approved in a STIP Plan 2020 $80 $20 $100
100063695 STPMN 5115 () CONSTRUCTION
Approved in a STIP Plan 2020 $3,200 $800 $4,000
TOTAL COST: $3,280 $820 $4,100
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON PERRY STREET FROM NOBLE AVE. TO HIGH ST.
Type of Work RESURFACING
Project Length in Miles 0.600 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100063696 STPMN 5115 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $87 $22 $108
100063697 STPMN 5115 () CONSTRUCTION
Approved in a STIP Plan 2021 $997 $249 $1,247
TOTAL COST: $1,084 $271 $1,355
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
12 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON PERRY STREET FROM JEFFERSON ST. TO POLLARD ST.
Type of Work RESURFACING
Project Length in Miles 0.200 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100063698 STPMN 5115 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $35 $9 $43
100063699 STPMN 5115 () CONSTRUCTION
Approved in a STIP Plan 2022 $398 $99 $497
TOTAL COST: $433 $108 $541
Route CR-NA ProjectDescription
RESURFACE, OPERATIONAL IMPROVEMENTS, HANDICAP RAMPS AND SIDEWALKS ON FEDERAL DRIVE FROM SOUTH OF THE RR TO ATLANTA HWY.
Type of Work RESURFACING
Project Length in Miles 2.100 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100063731 STPMN 5115 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $342 $86 $428
100063732 STPMN 5115 () CONSTRUCTION
Approved in a STIP Plan 2021 $3,939 $985 $4,923
TOTAL COST: $4,281 $1,070 $5,351
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
13 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON DAILRAIDA ROAD FROM ATLANTA HWY TO GUNTER AFB
Type of Work RESURFACING
Project Length in Miles 1.400 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064163 STPMN 5115 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $232 $58 $290
100064164 STPMN 5115 () CONSTRUCTION
Approved in a STIP Plan 2022 $2,085 $521 $2,606
TOTAL COST: $2,316 $579 $2,896
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON LOWER WETUMPKA ROAD FROM TOLVERT STREET TO THE BYPASS
Type of Work RESURFACING
Project Length in Miles 1.700 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064165 STPMN 5115 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $257 $64 $321
100064166 STPMN 5115 () CONSTRUCTION
Approved in a STIP Plan 2021 $2,314 $579 $2,893
TOTAL COST: $2,571 $643 $3,214
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
14 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON DAY STREET BRIDGE BIN # 016848
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064167 STPMN 5115 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $824 $206 $1,030
100064168 STPMN 5115 () CONSTRUCTION
Approved in a STIP Plan 2021 $7,416 $1,854 $9,270
TOTAL COST: $8,240 $2,060 $10,300
Route CR-NA ProjectDescription
WIDEN MARLER ROAD TO 3-LANE FROM SR-8 (US-80) TO OKFUSKI TRAIL
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 2.500 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064169 STPMN 5115 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $800 $200 $1,000
100064170 STPMN 5115 () RIGHT OF WAY
Approved in a STIP Plan 2021 $1,600 $400 $2,000
100064171 STPMN 5115 () CONSTRUCTION
Approved in a STIP Plan 2022 $13,040 $3,260 $16,300
TOTAL COST: $15,440 $3,860 $19,300
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
15 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route CR-NA ProjectDescription
CONVERT SOUTH COURT STREET FROM FAIRVIEW AVENUE TO ARBA STREET FROM ONE-WAY TO TWO-WAY
Type of Work RESURFACING
Project Length in Miles 1.064 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064180 STPMN 5115 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $8 $2 $10
100064156 STPMN 5115 () CONSTRUCTION
Approved in a STIP Plan 2020 $1,680 $420 $2,100
TOTAL COST: $1,688 $422 $2,110
Route CR-NA ProjectDescription
INSTALLATION OF WRONG WAY ENTRY TREATMENTS I-65 INTERCHANGE AT THE INTERSECTION OF EDGEMONT AVENUE AND OAK STREET
Type of Work SAFETY IMPROVEMENTS
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100065325 HSIP NR16 (916) PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $51 $0 $51
100065326 HSIP NR16 () CONSTRUCTION
Approved in a STIP Plan 2019 $182 $20 $202
TOTAL COST: $233 $20 $253
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
16 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON RAY THORINGTON ROAD FROM PARK CROSSING TO PIKE ROAD
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066880 STPMN 5117 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $200 $50 $250
100066881 STPMN 5117 () CONSTRUCTION
Approved in a STIP Plan 2022 $2,800 $700 $3,500
TOTAL COST: $3,000 $750 $3,750
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON MCGEHEE ROAD FROM WOODLEY ROAD TO SOUTHERN BLVD
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066882 STPMN 5117 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $160 $40 $200
100066883 STPMN 5117 () CONSTRUCTION
Approved in a STIP Plan 2022 $3,376 $844 $4,220
TOTAL COST: $3,536 $884 $4,420
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
17 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON VIRGINIA LOOP ROAD FROM SR-6 (US-231) TO WOODLEY ROAD
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066884 STPMN 5117 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $200 $50 $250
100066885 STPMN 5117 () CONSTRUCTION
Approved in a STIP Plan 2022 $976 $244 $1,220
TOTAL COST: $1,176 $294 $1,470
Route CR-NA ProjectDescription
RESURFACE AND OPERATIONAL IMPROVEMENTS ON ATLANTA HIGHWAY FROM ANN STREET TO PERRY HILL ROAD
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066886 STPMN 5117 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $200 $50 $250
100066887 STPMN 5117 () CONSTRUCTION
Approved in a STIP Plan 2022 $4,000 $1,000 $5,000
TOTAL COST: $4,200 $1,050 $5,250
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
18 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AT VAUGHN ROAD AND RYAN ROAD
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067610 STPAA 5117 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $48 $12 $60
100067611 STPAA 5117 () RIGHT OF WAY
Approved in a STIP Plan 2019 $32 $8 $40
100067613 STPAA 5117 () UTILITIES
Approved in a STIP Plan 2020 $80 $20 $100
100067614 STPMN 5117 () CONSTRUCTION
Approved in a STIP Plan 2020 $400 $100 $500
TOTAL COST: $560 $140 $700
Route CR-NA ProjectDescription
RESURFACING ON MCINNIS ROAD FROM WOODLEY ROAD TO NARROW LANE ROAD
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067636 STPMN 5117 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $80 $20 $100
100067637 STPMN 5117 () CONSTRUCTION
Approved in a STIP Plan 2022 $2,400 $600 $3,000
TOTAL COST: $2,480 $620 $3,100
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
19 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route CR-NA ProjectDescription
RESURFACING, TRAFFIC SIGNALS AND SIDEWALKS ON WARES FERRY ROAD FROM EASTERN BOULEVARD TO MCLEMORE DRIVE
Type of Work RESURFACING
Project Length in Miles 3.250 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068971 STPMN 5118 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $160 $40 $200
TOTAL COST: $160 $40 $200
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
20 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route I -65 ProjectDescription
RESURFACE I-65 FROM CATOMA CREEK TO NORTH OF FAIRVIEW AVENUE
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 3.420 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066453 IM I065 () CONSTRUCTION
Approved in a STIP Plan 2019 $2,685 $298 $2,984
TOTAL COST: $2,685 $298 $2,984
Route I -65 ProjectDescription
RESURFACE I-65 FROM NORTH OF FAIRVIEW AVENUE TO THE ALABAMA RIVER BRIDGE
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 2.030 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066459 IM I065 () CONSTRUCTION
Approved in a STIP Plan 2020 $2,061 $229 $2,290
TOTAL COST: $2,061 $229 $2,290
Route I -65 ProjectDescription
PAVEMENT PRESERVATION ON I-65 FROM THE NORTH END OF THE ALABAMA RIVER BRIDGE TO THE ELMORE COUNTY LINE
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 4.650 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100069067 IM I065 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $158 $18 $175
TOTAL COST: $158 $18 $175
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
21 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route I -85 ProjectDescription
ADD LANES ON I-85 FROM 1.5 MILES EAST OF SR-271 TO OUTERLOOP INTERCHANGE
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 7.970 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100059847 NH I085 (999) PRELIMINARY ENGINEERING
Approved in a STIP Plan 2045 $1,331 $333 $1,664
100045921 NH I085 () CONSTRUCTION
Approved in a STIP Plan 2048 $17,798 $4,449 $22,247
TOTAL COST: $19,129 $4,782 $23,911
Route I -85 ProjectDescription
SIGN REHABILITATION ALONG I-85 FROM I-65 THROUGH MONTGOMERY AND MACON COUNTY TO LEE COUNTY LINE
Type of Work SIGN REHABILITATION
Project Length in Miles 47.460 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100054302 IM I085 (333) CONSTRUCTION
Approved in a STIP Plan 2019 $2,510 $279 $2,789
TOTAL COST: $2,510 $279 $2,789
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
22 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route I -85 ProjectDescription
BRIDGE WIDENING ON I-85 OVER LINE CREEK (INCLUDING TWO RELIEF BRIDGES)BIN # 7555,7557,7567
Type of Work BRIDGE WIDENING
Project Length in Miles 0.480 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100059252 IM I085 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $350 $39 $389
100059253 IM I085 () CONSTRUCTION
Approved in a STIP Plan 2022 $3,555 $395 $3,950
TOTAL COST: $3,906 $434 $4,340
Route I -85 ProjectDescription
PAVEMENT REHAB AND SLAB REPAIRS ON I-85 FROM I-65 TO JUST NORTH OF THE HALL STREET OVERPASS
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 1.842 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100062472 IM I085 (357) CONSTRUCTION
Approved in a STIP Plan 2019 $2,536 $282 $2,818
TOTAL COST: $2,536 $282 $2,818
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
23 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route I -85 ProjectDescription
I-85 ADDITIONAL LANES, MEDIAN AND BRIDGE WIDENING FROM 0.4 MILE EAST SR-271 TO JENKINS CREEK (BIN #KS 009004, 009005, 009006, 009007)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 2.760 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100063747 NHF-IM I085 (336) PRELIMINARY ENGINEERING
Approved in a STIP Plan 2041 $1,388 $264 $1,653
100054608 NH-IM I085 () CONSTRUCTION
Approved in a STIP Plan 2041 $16,142 $3,492 $19,635
TOTAL COST: $17,531 $3,757 $21,288
Route I -85 ProjectDescription
INSTALL NEW DMS ON I-85 NB AT MP 0.4
Type of Work SIGNING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066909 99-606-513-085-702 () MAINTENANCE CONSTRUCTION
Approved in a STIP Plan 2019 $0 $250 $250
TOTAL COST: $0 $250 $250
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
24 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route NA- ProjectDescription
RETROFITTING OF HANDICAP RAMPS ON VARIOUS STREETS IN THE CITY OF MONTGOMERY DOWNTOWN CENTRAL BUSINESS DISTRICT
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100060099 STPMN 5113 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $64 $16 $80
100060100 STPMN 5113 () CONSTRUCTION
Approved in a STIP Plan 2020 $400 $100 $500
TOTAL COST: $464 $116 $580
Route NA- ProjectDescription
STREET LIGHT CONVERSION TO LED IN CENTRAL BUSINESS DISTRICT (CITY OF MONTGOMERY)
Type of Work LIGHTING
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100063692 STPAA 5115 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $626 $156 $782
100063693 STPMN 5115 () CONSTRUCTION
Approved in a STIP Plan 2019 $1,653 $413 $2,066
TOTAL COST: $2,278 $570 $2,848
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
25 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route NA- ProjectDescription
DAY STREET/MAXWELL AIR FORCE BASE FEASIBILITY STUDY
Type of Work CORRIDOR STUDY
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100063733 STPMN 5115 () SPECIAL
Approved in a STIP Plan 2020 $240 $60 $300
TOTAL COST: $240 $60 $300
Route NA- ProjectDescription
MULTI-PURPOSE NATURE TRAIL,WALLAHATCHIE ROAD - PHASE 3, LOCATED ALONG MARLER ROAD NORTH WAUGH TOWN CENTER CONNECTOR
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066530 TAPMN TA16 (949) CONSTRUCTION
Approved in a STIP Plan 2019 $188 $47 $235
TOTAL COST: $188 $47 $235
Route NA- ProjectDescription
PIKE ROAD NATURE TRAIL: WALLAHATCHIE ROAD-PHASE 4
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100066847 TAPMN TA17 (900) CONSTRUCTION
Approved in a STIP Plan 2019 $200 $50 $250
TOTAL COST: $200 $50 $250
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
26 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route NA- ProjectDescription
RESURFACING, TRAFFIC SIGNALS AND SIDEWALKS ON WARES FERRY ROAD FROM EASTERN BOULEVARD TO MCLEMORE DRIVE
Type of Work RESURFACING
Project Length in Miles 3.250 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068972 STPMN 5118 () RIGHT OF WAY
Approved in a STIP Plan 2020 $160 $40 $200
100068973 STPMN 5118 () UTILITIES
Approved in a STIP Plan 2020 $80 $20 $100
100068974 STPMN 5118 () CONSTRUCTION
Approved in a STIP Plan 2021 $2,600 $650 $3,250
TOTAL COST: $2,840 $710 $3,550
Route SR-108 ProjectDescription
SR-108 (MGM OUTER LOOP) FROM SR-8 (US-80) TO WEST OF CR-103 (FELDER ROAD),INCLUDES INTERCHANGEATUS-80
Type of Work GRADE AND DRAIN
Project Length in Miles 2.700 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100043287 ACNH 0035 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $210 $53 $263
100043288 ACNH 0035 () RIGHT OF WAY
Approved in a STIP Plan 2049 $4,613 $1,153 $5,766
100043295 ACNH 0035 () UTILITIES
Approved in a STIP Plan 2049 $923 $231 $1,153
100043289 ACNH 0035 () CONSTRUCTION
Approved in a STIP Plan 2049 $8,718 $2,179 $10,897
TOTAL COST: $14,464 $3,616 $18,080
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
27 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route SR-108 ProjectDescription
SR-108 (MGM OUTER LOOP) FROM SR-8 (US-80) TO WEST OF CR-103 (FELDER ROAD),INCLUDES INTERCHANGEATUS-80
Type of Work BRIDGE
Project Length in Miles 2.700 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100043290 ACNH 0035 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $154 $38 $192
100043291 ACNH 0035 () CONSTRUCTION
Approved in a STIP Plan 2049 $2,756 $689 $3,445
TOTAL COST: $2,909 $727 $3,637
Route SR-108 ProjectDescription
SR-108 (MGM OUTER LOOP) FROM SR-8 (US-80) TO WEST OF CR-103 (FELDER ROAD),INCLUDES INTERCHANGEATUS-80
Type of Work BASE AND PAVE
Project Length in Miles 2.700 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100043293 ACNH 0035 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $95 $24 $118
100043294 ACNH 0035 () CONSTRUCTION
Approved in a STIP Plan 2049 $15,275 $3,819 $19,094
TOTAL COST: $15,369 $3,842 $19,212
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
28 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route SR-108 ProjectDescription
SR-108 (MGM OUTER LOOP) FROM WEST OF CR-103 (FELDER ROAD) TO I-65, INCLUDES INTERCHANGEATCR-103
Type of Work GRADE AND DRAIN
Project Length in Miles 3.130 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100043296 ACNH 0035 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $371 $93 $464
100043297 ACNH 0035 () RIGHT OF WAY
Approved in a STIP Plan 2049 $4,590 $1,148 $5,738
100043298 ACNH 0035 () UTILITIES
Approved in a STIP Plan 2049 $1,530 $383 $1,913
100043299 ACNH 0035 () CONSTRUCTION
Approved in a STIP Plan 2049 $16,292 $4,073 $20,365
TOTAL COST: $22,784 $5,696 $28,480
Route SR-108 ProjectDescription
SR-108 (MGM OUTER LOOP) FROM WEST OF CR-103 (FELDER ROAD) TO I-65, INCLUDES INTERCHANGEATCR-103
Type of Work BRIDGE
Project Length in Miles 3.130 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100043300 ACNH 0035 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $154 $38 $192
100043301 ACNH 0035 () CONSTRUCTION
Approved in a STIP Plan 2049 $2,774 $694 $3,468
TOTAL COST: $2,928 $732 $3,660
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
29 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route SR-108 ProjectDescription
SR-108 (MGM OUTER LOOP) FROM WEST OF CR-103 (FELDER ROAD) TO I-65, INCLUDES INTERCHANGEATCR-103
Type of Work BASE AND PAVE
Project Length in Miles 3.130 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100043302 ACNH 0035 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $246 $61 $307
100043303 ACNH 0035 () CONSTRUCTION
Approved in a STIP Plan 2049 $24,812 $6,203 $31,015
TOTAL COST: $25,058 $6,264 $31,322
Route SR-108 ProjectDescription
SR-108 (MGM OUTER LOOP) INTERCHANGE, RAMPS AND BRIDGESATI-65
Type of Work BRIDGE
Project Length in Miles 3.750 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100043304 ACNH 0035 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $1,660 $415 $2,075
100043305 ACNH 0035 () CONSTRUCTION
Approved in a STIP Plan 2049 $33,199 $8,300 $41,498
TOTAL COST: $34,859 $8,715 $43,573
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
30 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route SR-108 ProjectDescription
SR-108 (MGM OUTER LOOP) FROM I-65 TO WEST OF SR-9 (US-331), INCLUDES INTERCHANGEATSR-3 (US-31)
Type of Work GRADE AND DRAIN
Project Length in Miles 3.750 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100043306 ACNH 0035 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $386 $96 $482
100043307 ACNH 0035 () RIGHT OF WAY
Approved in a STIP Plan 2049 $6,138 $1,535 $7,673
100043308 ACNH 0035 () UTILITIES
Approved in a STIP Plan 2049 $1,536 $384 $1,920
100043309 ACNH 0035 () CONSTRUCTION
Approved in a STIP Plan 2049 $16,487 $4,122 $20,608
TOTAL COST: $24,547 $6,137 $30,684
Route SR-108 ProjectDescription
SR-108 (MGM OUTER LOOP) FROM I-65 TO WEST OF SR-9 (US-331), INCLUDES INTERCHANGEATSR-3 (US-31)
Type of Work BRIDGE
Project Length in Miles 3.750 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100043310 ACNH 0035 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $154 $38 $192
100043311 ACNH 0035 () CONSTRUCTION
Approved in a STIP Plan 2049 $1,576 $394 $1,970
TOTAL COST: $1,729 $432 $2,162
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
31 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route SR-108 ProjectDescription
SR-108 (MGM OUTER LOOP) FROM I-65 TO WEST OF SR-9 (US-331), INCLUDES INTERCHANGEATSR-3 (US-31)
Type of Work BASE AND PAVE
Project Length in Miles 3.750 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100043312 ACNH 0035 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $537 $134 $672
100043313 ACNH 0035 () CONSTRUCTION
Approved in a STIP Plan 2049 $25,120 $6,280 $31,400
TOTAL COST: $25,658 $6,414 $32,072
Route SR-108 ProjectDescription
SR-108 (MGM OUTER LOOP) FROM WEST OF SR-9 (US-331) TO WEST OF CR-39 (WOODLEY RD.), INCLUDES INTERCHANGEATUS-331
Type of Work GRADE AND DRAIN
Project Length in Miles 5.480 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100043314 ACNH 0035 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $526 $131 $657
100043315 ACNH 0035 () RIGHT OF WAY
Approved in a STIP Plan 2049 $9,241 $2,310 $11,551
100043316 ACNH 0035 () UTILITIES
Approved in a STIP Plan 2049 $2,365 $591 $2,956
100043317 ACNH 0035 () CONSTRUCTION
Approved in a STIP Plan 2049 $22,600 $5,650 $28,250
TOTAL COST: $34,732 $8,683 $43,415
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
32 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route SR-108 ProjectDescription
SR-108 (MGM OUTER LOOP) FROM WEST OF SR-9 (US-331) TO WEST OF CR-39 (WOODLEY RD.), INCLUDES INTERCHANGEATUS-331
Type of Work BRIDGE
Project Length in Miles 6.090 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100043318 ACNH 0035 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $230 $58 $288
100043319 ACNH 0035 () CONSTRUCTION
Approved in a STIP Plan 2049 $8,108 $2,027 $10,135
TOTAL COST: $8,339 $2,085 $10,423
Route SR-108 ProjectDescription
SR-108 (MGM OUTER LOOP) FROM WEST OF SR-9 (US-331) TO WEST OF CR-39 (WOODLEY RD.), INCLUDES INTERCHANGEATUS-331
Type of Work BASE AND PAVE
Project Length in Miles 6.090 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100043320 ACNH 0035 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $845 $211 $1,057
100043321 ACNH 0035 () CONSTRUCTION
Approved in a STIP Plan 2049 $42,193 $10,548
$52,741
TOTAL COST: $43,038 $10,760
$53,798
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
33 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route SR-108 ProjectDescription
SR-108 (MGM OUTER LOOP) FROM WEST OF CR-39 (WOODLEY RD) TO SR-6 (US-231), INCLUDES INTERCHANGEATCR-39, CR-39 OVER MOL
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 2.940 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100043323 ACNH 0035 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $210 $53 $263
100043324 ACNH 0035 () UTILITIES
Approved in a STIP Plan 2049 $1,535 $384 $1,918
100043325 ACNH 0035 () CONSTRUCTION
Approved in a STIP Plan 2049 $9,139 $2,285 $11,423
TOTAL COST: $10,883 $2,721 $13,604
Route SR-108 ProjectDescription
SR-108 (MGM OUTER LOOP) FROM WEST OF CR-39 (WOODLEY RD) TO SR-6 (US-231), INCLUDES INTERCHANGEATCR-39, CR-39 OVER MOL
Type of Work BRIDGE
Project Length in Miles 2.940 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100043326 ACNH 0035 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $891 $223 $1,114
100043327 ACNH 0035 () CONSTRUCTION
Approved in a STIP Plan 2049 $17,866 $4,467 $22,333
TOTAL COST: $18,757 $4,689 $23,447
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
34 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route SR-108 ProjectDescription
SR-108 (MGM OUTER LOOP) FROM WEST OF CR-39 (WOODLEY RD) TO SR-6 (US-231), INCLUDES INTERCHANGEATCR-39, CR-39 OVER MOL
Type of Work BASE AND PAVE
Project Length in Miles 2.940 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100043328 ACNH 0035 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $231 $58 $289
100043329 ACNH 0035 () CONSTRUCTION
Approved in a STIP Plan 2049 $7,713 $1,928 $9,642
TOTAL COST: $7,944 $1,986 $9,930
Route SR-108 ProjectDescription
MGM OUTER LOOP FROM SR-6 (US-231) TO CR-85 (CARTER HILL RD)
Type of Work BASE AND PAVE
Project Length in Miles 3.835 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016439 ACNH 0035 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $679 $170 $849
100016427 ACNH 0035 () CONSTRUCTION
Approved in a STIP Plan 2049 $32,110 $8,028 $40,138
TOTAL COST: $32,789 $8,197 $40,986
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
35 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route SR-108 ProjectDescription
MGM OUTER LOOP FROM SR-6 (US-231) TO CR-85 (CARTER HILL RD)
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 3.835 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016443 ACNH 0035 () UTILITIES
Approved in a STIP Plan 2049 $1,136 $284 $1,420
100016428 ACNH 0035 (500) CONSTRUCTION
Approved in a STIP Plan 2049 $37,194 $9,298 $46,492
TOTAL COST: $38,330 $9,582 $47,912
Route SR-108 ProjectDescription
MGM OUTER LOOP FROM CR-85 (OLD CARTER HILL RD) TO SR-110
Type of Work BASE AND PAVE
Project Length in Miles 5.023 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016440 ACNH 0035 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2049 $922 $231 $1,153
100016429 ACNH 0035 () CONSTRUCTION
Approved in a STIP Plan 2049 $36,300 $9,075 $45,375
TOTAL COST: $37,222 $9,306 $46,528
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
36 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route SR-108 ProjectDescription
MGM OUTER LOOP FROM CR-85 (OLD CARTER HILL RD) TO SR-110
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 5.023 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100016430 ACNH 0035 (900) CONSTRUCTION
Approved in a STIP Plan 2049 $78,593 $19,648
$98,242
TOTAL COST: $78,593 $19,648
$98,242
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
37 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route SR-110 ProjectDescription
ADDITIONAL LANES ON SR-110 FROM CHANTILLY PKWY TO CR-294 (BRIDLEBROOK BLVD)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.030 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100043877 STPAA 0110 (501) UTILITIES
Approved in a STIP Plan 2019 $687 $172 $859
100050187 STPAA 0110 (501) CONSTRUCTION
Approved in a STIP Plan 2021 $2,917 $729 $3,647
TOTAL COST: $3,604 $901 $4,505
Route SR-110 ProjectDescription
ADDITIONAL LANES ON SR-110 FROM CR-294 (BRIDLEBROOK BLVD) TO THE OUTER LOOP
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.450 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067733 STPAA 0110 (502) UTILITIES
Approved in a STIP Plan 2019 $687 $172 $859
100043868 STPAA 0110 (502) CONSTRUCTION
Approved in a STIP Plan 2041 $4,841 $1,210 $6,051
TOTAL COST: $5,528 $1,382 $6,910
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
38 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route SR-271 ProjectDescription
INTERSECTION IMPROVEMENTS ON SR-271 (EXIT 9) ONTO I-85 SOUTHBOUND
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067646 STPAA 0271 () CONSTRUCTION
Approved in a STIP Plan 2019 $2,040 $510 $2,550
TOTAL COST: $2,040 $510 $2,550
Route SR-3 ProjectDescription
RESURFACING ON SR-3 (US-31) FROM THE LOWNDES COUNTY LINE TO THE END OF 2-LANE NEAR FISCHER ROAD
Type of Work PAVEMENT MINOR REHABILITATION
Project Length in Miles 12.500 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067904 STPAA 0003 (617) FEDERAL MAINT CN
Approved in a STIP Plan 2019 $4,355 $1,089 $5,444
TOTAL COST: $4,355 $1,089 $5,444
Route SR-6 ProjectDescription
BRIDGE REPLACEMENT ON SR-6 (US-231) AT JENKINS CREEK BIN #000735 STR #6-51-17.5
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.010 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100038170 BR 0006 (563) UTILITIES
Approved in a STIP Plan 2019 $242 $61 $303
100004312 BR 0006 () CONSTRUCTION
Approved in a STIP Plan 2020 $3,981 $995 $4,976
TOTAL COST: $4,223 $1,056 $5,279
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
39 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route SR-8 ProjectDescription
WIDEN AND RESURFACE SR-8 (US-80) FROM THE WAUGH INTERSECTION TO THE MARLER ROAD INTERSECTION
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064153 STPMN 5115 () PRELIMINARY ENGINEERING
Approved in a STIP Plan 2020 $203 $51 $254
100064154 STPMN 5115 () RIGHT OF WAY
Approved in a STIP Plan 2020 $160 $40 $200
100064155 STPMN 5115 () CONSTRUCTION
Approved in a STIP Plan 2021 $1,669 $417 $2,086
TOTAL COST: $2,032 $508 $2,540
Route SR-8 ProjectDescription
TRAFFIC STUDY ON SR-8 (US-80) FROM WAUGH TO MARLER ROAD
Type of Work CORRIDOR STUDY
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100064157 STPMN 5115 () SPECIAL
Approved in a STIP Plan 2020 $96 $24 $120
TOTAL COST: $96 $24 $120
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
40 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route SR-9 ProjectDescription
ADDITIONAL LANES (SB ONLY) SR-9 (US-231) FROM ANDERSON RD TO NEAR JASMINE HILL RD (INCLUDES TALLAPOOSA RIVER BRIDGE REPLACEMENT BIN 005162)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.390 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100054909 NH 0009 (517) CONSTRUCTION
Approved in a STIP Plan 2048 $15,604 $3,901 $19,505
TOTAL COST: $15,604 $3,901 $19,505
Route SR-9 ProjectDescription
SR-9 (US-331) ADDITIONAL LANES FR CR-5 TO STRATA
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 3.650 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100047865 NH 0009 () UTILITIES
Approved in a STIP Plan 2048 $228 $57 $285
100004583 NH 0009 (514) CONSTRUCTION
Approved in a STIP Plan 2048 $25,322 $6,331 $31,653
TOTAL COST: $25,550 $6,388 $31,938
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
41 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route SR-9 ProjectDescription
SR-9 (US-331) ADDITIONAL LANES FROM STRATA TO 2000' SOUTH OF SR-94
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 5.021 Urban Area COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100045971 NHF 0009 (513) UTILITIES
Approved in a STIP Plan 2049 $153 $38 $192
100004582 NHF 0009 (513) CONSTRUCTION
Approved in a STIP Plan 2050 $22,769 $5,692 $28,462
TOTAL COST: $22,923 $5,731 $28,653
Route SR-9 ProjectDescription
EXTEND SEVICE ROAD ALONG SR-9 (NOTHERN BLVD) NORTH BOUND FROM HACKEL DRIVE TO PLANTATION WAY AND SOUTHBOUND FROM LAGOON PARK DRIVE TO THE EXISTING SERVICE ROAD
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 0.760 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100063744 NH 0009 (533) PRELIMINARY ENGINEERING
Approved in a STIP Plan 2023 $69 $17 $87
100050519 NH 0009 () CONSTRUCTION
Approved in a STIP Plan 2025 $1,184 $296 $1,481
TOTAL COST: $1,254 $313 $1,567
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
42 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY
Route SR-9 ProjectDescription
RESURFACING ON SR-9 (US-231) FROM SR-152 (NORTHERN BOULEVARD) TO NORTH OF BROOKS ROAD
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 0.841 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100067903 NH 0009 (567) FEDERAL MAINT CN
Approved in a STIP Plan 2019 $1,059 $265 $1,323
TOTAL COST: $1,059 $265 $1,323
Route SR-NA ProjectDescription
INSTALLATION OF ROUNDABOUTS ON SR-126 AT BOTH I-85 EXIT 16 RAMPS, AND AT SR-126/SR-8 (US-80) INTERSECTION, AND ON SR-8 (US-80) AT MARLER ROAD
Type of Work SAFETY IMPROVEMENTS
Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work STIP Indicator Fiscal Year Federal
State-Other TOTAL
100068811 HSIP 5119 (250) PRELIMINARY ENGINEERING
Approved in a STIP Plan 2019 $217 $24 $241
100068821 HSIP 5119 (250) RIGHT OF WAY
Approved in a STIP Plan 2020 $50 $6 $56
100068820 HSIP 5119 (250) UTILITIES
Approved in a STIP Plan 2020 $159 $18 $177
100068810 HSIP 5119 () CONSTRUCTION
Approved in a STIP Plan 2021 $1,716 $191 $1,906
TOTAL COST: $2,141 $238 $2,379
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION RURAL PLANNING ORGANIZATION REPORT
43 of 43
COUNTY HIGHWAY PROJECTS - MONTGOMERY