Issoudun Malt house
7 Key milestones
1893: Opening of the Issoudun site1925: Acquisition by the Cantin family1970: 1st extension from 40 000 to 70,000 t.1994: Acquisition by Axereal (first malting house)2000: Extension to 130,000 t annually.2003: Total capacity of 150,000t / year
4
Cogneneration2002
Barley silorehabilitated in 2010
900 t received/day
Malt silo1970
3600 t shipped/week
Biomass2013
5000 t/year
U11950
U21970-1990
U32000
Production13 000t /month
5
Solar Thermal Central
Supply solar heat to U3 in addition to heat from natural gas, CHP and biomass plant (+-14 % of U3 heat demand, +-8% of total heat site heat demand).
Reduce dependency on gas price fluctuations and future non-commodity price increases (eg TICGN)
Contribute to our Carbon Reduction Roadmap strategy (CO2 reduction)
When built, this will be the largest solar thermal plant in Europe !
6 Footer
Solar Thermal Central
The power of this solar power plant will be around 12 MW. It should provide between 10% and 15% of the malting's energy needs.
The solar comes to complete the cogeneration plant and biomass power station to achieve 50% renewable energy on the site.
Our company consumes a lot of energy for the drying units, and we are committed with our ten factories in Europe to reduce our water consumption by 50% in five years and to increase to 60% renewable energies by 2030
Yvan SchaepmanCEO Boortmalt