APPENDIX 1: METRIC CONVERSION TABLE
Length
Area
Volume
Mass
Density
i inch =25.44 mm [approximately 25 mm] , then (mm!1(0) x 4 = inch
1 ft =304.8 mm (approximately 300 mm)1 yd =0.914 m (approximately 910 mm)
1 mile = 1.609 km (approximately It. km)1 m =3.281 ft = 1.094 yd (approximately 1.1 yd)
(10 m = 11 rd approximately)1 km =0.621 mile (8" mile approximately)
1 ft2 =0.093 m2
1 yd2 =0.836 m2
1 acre =0.405 ha f1 ha (hectare) = 10 000 m2]
1 mile2 = 2.590 km~1 m2 = 10.764 ft2 = 1.196 yd2 (approximately 1.2 yd2)1 ha =2.471 acres (approximately 2-}acres)
1 km2 =0.386 mile2
1 ft3 =0.028 m3
1 yd3 =0.765 m3
1 m3 =35.315 ft3 = 1.308 yd3 (approximately 1.3 yd3)
1 ft3 =28.32 titres (1000 titres = 1 m3)
1 gal =4.546 titres .1 titre =0.220 gal (approximately 4-} litres to the gallon)
1 Ib =0.454 kg (kilogram)1 cwt =50.80 kg (approximately 50 kg)1 ton = 1.016 t (1 tonne = 1000 kf = 0.984 ton]1 kg = 2.205 Ib (approximately 21" Ib)
1 Ib/ft3 = 16.019 kglm3
1 kglm3 =0.062 Ib/ft3
426
Velocity 1 ftls =0.305 mls1 mile/h = 1.609 kmlh
427
Energy 1 therm = lO5.506 MJ (megajoules)1 Btu = 1.055 kJ (kilojoules)
Thermal 1Btulft2 hOF = 5.678 W/m2°C (where W = watt)conductivity
Temperature xOF =t (x - 32tCXO C =sx + 32°FO°C = 32°F (freezing)5°C=41°F
lOoC = 50°F (rather cold)15°C = 59°F20°C = 68°F (quite warm)25°C =77°F30°C = 86°F (very hot)
Pressure 1 lbf/inch? = 0.007 N/mm2 = 6894.8 N/m2
(1 MN/m2 = 1 N/mm2)
1 Ibf/ff =47.88 N/m2 ~newtonslsquare metre)1 tonflinch2 = 15.44 MN/m (meganewtonslsquarc metre)
1 tonflft2 = 107.3 kN/m2 (kilonewtonslsquare metre)
For speedy but approximate conversions:kN/m2 .
1 Ibflft2 = -- hence 40 Ibf/ft2 = 2 kN/m2
20
and tonflft2 = kN/m2 x 10, hence 2 tonflft2 = 20 kN/m2
Floor loadings office floors - general usage: 50 Ibflft2 = 2.50 kN/m2
office floors - data-processing equipment: 70 Ibf/ft2 = 3.50 kN/m2
factory floors: 100 Ibf/ft2 = 5.00 kN/m2
Safe bearingcapacityof soil
Stressesinconcrete
1 tonflft2 = 107.25 kN/m2
2 tonflff =214.50 kN/m2
4 tonf/ft2 =429.00 kN/m2
100 Ibf/in.2 =0.70 MN/m2
lOOO Ibflin.2 =7.00 MN/m2
3000 Ibflin.2 =21.00 MN/m2
6000 Ibflin.2 =41.00 MN/m2
Costs £lIm2 = £O.0921ft2
1 shilling (5p)/ft2 = £O.538/m2
£lIft2 = ~lO.764/m2 (approximately (£11/m2)
£5/ft2 = £54 m2
428
£10/ft2 = £108/m2
£15/ft2 = £161/m2
£20/ft2 = £215/m2
£2S/ft2 = £269/m2
£30/ft2 = £333/m2
£401ft2 = £430/m2
LA
BO
RA
TO
RY
APPE
NDIX
2:OC
CUPA
NCYC
OSTA
NALY
SIS-LA
BORA
TORY
crsm
732
Bui
ldin
gfu
nctio
n:M
edic
alre
sear
chla
bora
tori
esL
ocat
ion:
Cen
tral
Lon
don
Ow
ner/
Occ
upie
r:C
hari
tyor
gani
satio
nD
ate
ofer
ecti
on:
1961
--ex
tend
ed19
72
"..
~
UP
PE
RM
AN
AG
EM
EN
TC
RIT
ER
IAA
ND
BU
DG
ET
PR
OC
ED
UR
E
Mai
ntai
nco
rrec
tro
omte
mpe
ratu
rean
dve
rycl
ean
wor
king
cond
ition
s;en
sure
cont
inui
tyof
alls
ervi
ces
and
faci
litie
sto
prev
enta
nyin
terr
upti
onof
labo
rato
ryac
tiviti
es.P
rese
rve
aca
pita
las
set;
mai
ntai
nth
ebu
ildin
gin
asgo
oda
cond
ition
aspo
ssib
le.
An
anal
ysis
ism
ade
ofth
ebu
dget
duri
ngth
epr
evio
usan
dcu
rren
tbu
dget
year
sto
chec
kon
accu
racy
and
toex
amin
eex
pend
itur
etr
ends
.A
nnua
lm
aint
enan
cebu
dget
isin
clud
edw
ithot
her
depa
rtm
enta
les
timat
esan
dsu
bmit
ted
for
appr
oval
.E
xpen
ditu
rere
view
edm
onth
ly-e
heck
sfo
rlik
ely
over
-exp
endi
ture
.
MA
INT
EN
AN
CE
MA
NA
GE
ME
NT
AN
DO
PE
RA
TIO
N
Sup
erin
tend
ent
engi
neer
,de
puty
engi
neer
,re
cord
scl
erk
and
2se
cret
arie
sre
spon
sibl
efo
rm
aint
enan
ce.
Ann
ual
insp
ectio
nsby
supe
rint
ende
nten
gine
er.
Pain
ting
freq
uenc
y:no
rmal
lyev
ery
5y
ears
-mo
refr
eque
ntly
ifre
quir
ed.
Cos
tsre
cord
edun
der
30bu
dget
head
s-in
divi
dual
mai
nten
ance
job
card
sno
tco
sted
.
Wor
kdo
neby
DE
L50
%an
dco
ntra
cted
out
50%
.D
irec
tly-e
mpl
oyed
labo
ures
tabl
ishm
ent
is5
supe
rvis
ors,
18cr
aft
oper
ativ
esan
d14
labo
urer
s.
Sele
cted
cont
ract
ors
for
min
orw
orks
use
the
orga
nisa
tion'
sow
nco
ntra
ctco
nditi
ons.
Com
peti
tive
tend
ers
for
larg
ew
orks
empl
oyJC
Tor
IMec
hEco
ntra
cts.
Con
trac
tsu
perv
isio
n:da
ilyin
spec
tion
onm
inor
wor
ks;p
rogr
ess
repo
rts
and
inte
rim
paym
ents
onla
rge
wor
ks.
App
endi
x2
cont
'd
BU
ILD
ING
FU
NC
TIO
NA
ND
PA
RA
ME
TE
RS
Med
ical
rese
arch
lab
ora
tory
-lab
ora
tori
es36
%,c
ircu
lati
onar
eas
29%
,pl
ant
room
s16
%,
staf
ffac
ilitie
s14
%,o
ffic
es5
%.
400
occu
pant
s(a
vera
ge).
Des
ign
crite
rion
:so
un
dco
nstr
ucti
onfo
rm
inim
umm
aint
enan
ceto
avoi
din
terr
upti
onof
rese
arch
wor
k.
ti o
Gro
ssfl
oor
area
:14
831
m2
Are
aof
pitc
hed
roof
s(o
np
lan
):
Are
aof
flat
roof
s(o
npl
an):
9882
Are
aof
exte
rnal
glaz
ing:
1583
m2
Sto
reys
abov
e(a
ndin
clud
ing)
grou
ndfl
oor:
9N
o.F
loor
sbe
low
grou
ndfl
oor:
3N
o.F
loor
toce
iling
heig
ht:
2.70
mge
nera
llyto
unde
rsid
eof
susp
ende
dce
iling
.
FO
RM
OF
CO
NS
TR
UC
TIO
N
Stru
ctur
e:R
einf
orce
dco
ncre
tefr
ame.
Cav
itybr
ick
exte
rnal
wal
ls.T
imbe
rdo
uble
-gla
zed
win
dow
s.R
einf
orce
dco
ncre
tero
ofw
ithsc
reed
and
2-co
atas
phal
tco
veri
ng.
Pla
ster
edbr
ick
inte
rnal
part
itio
nson
grou
ndfl
oor,
else
whe
rege
nera
lly
spec
ial
dem
ount
able
tim
ber
part
itio
ns.
Solid
conc
rete
floo
rs.
Fin
ishi
ngs
and
fittin
gs:
Gra
nite
floo
ring
inen
tran
ceha
ll,al
lro
oms
and
corr
idor
slin
oleu
mco
vere
d,til
ing
inpl
ant
room
and
cloa
kroo
ms.
Tea
kla
bora
tory
benc
hto
ps,
cupb
oard
san
dsh
elvi
ng.
Dec
orat
ion:
Pla
ster
edsu
rfac
esem
ulsi
onpa
inte
d;te
akoi
lon
win
dow
san
dfr
ames
exte
rnal
ly.
Serv
ices
:L
PHW
radi
ator
sfo
rco
rrid
ors
and
stai
rcas
es;
high
velo
city
dual
duet
syst
emw
ithfu
llai
rco
ndit
ioni
ngfo
ral
lro
oms
exce
ptpl
ant
room
san
dcl
oakr
oom
s.3
No.
IO-p
erso
n/15
00lb
pass
enge
rlif
ts30
ftlm
inse
rvin
g11
floo
rs;
3N
o.30
00lb
and
2N
o.15
00lb
good
slif
ts15
0ft
lmin
serv
ing
11fl
oors
.E
mer
genc
ylig
htin
g,co
ldro
oms,
liqui
dni
trog
enpl
ant,
com
pres
sed
air,
CO
2ga
s,et
c.
FIN
AN
CIA
LS
TA
TE
ME
NT
:C
OST
PE
R10
0m
2F
LO
OR
AR
EA
Gro
ssfl
oor
area
:14
831
m2
Ele
men
t19
761T
7vm
m19
78n9
1979
/80
1980
181
o.Im
prov
emen
ts&:
8dap
tatI
omt
294.
62£
369.
07£
642.
39£1
498.
74£2
424.
54
1.D
eco
ntl
oa
1.1
Ext
erna
lde
cora
tion
16.8
118
.99
19.5
524
.79
31.4
11.
2In
tern
alde
cora
tion
97.5
785
.65
103.
5313
3.43
234.
39
Sub-
tota
l£
114.
38t
104.
64£
123.
08£
158.
22£
265.
80
2.F
abri
c2.
1E
xter
nal
wal
ls0.
677.
5217
.90
-31
.33
2.2
Roo
fs1.
356.
502.
023.
372.
3O
ther
stru
ctur
alit
ems
45.1
245
.05
32.0
639
.00
42.9
42.
4Fi
tting
s&
fixt
ures
136.
1817
9.69
116.
8413
4.10
237.
94~
2.5
Inte
rnal
fini
shes
27.4
138
.40
36.5
332
.84
59.1
8w -
Sub-
tota
le
210.
73£
2n
.16
£20
5.35
£20
9.31
£37
1.39
3.S
ervi
ces
3.1
Plum
bing
&in
tern
aldr
aina
ge93
.72
83.0
711
4.95
151.
6823
2.41
3.2
Hea
ting
&ve
ntila
ting
410.
4245
5.74
500.
6783
8.16
806
.13
3.3
Lift
s&
esca
lato
rs45
.08
57.6
353
.15
56.1
678
.32
3.4
Ele
ctri
cpo
wer
&lig
htin
g26
1.99
315.
7330
5.26
400.
5239
5.75
3.5
Oth
erM
&E
serv
ices
258.
8827
9.89
370.
9047
2.33
462.
21
Sub-
tota
l£1
070.
09£1
192.
06£1
344.
93£1
918.
85£1
974.
82
4.C
Iaai
DI
4.1
Win
dow
s12
.31
12.5
812
.40
18.1
318
.29
4.2
Ext
erna
lsu
rfac
es4.
3In
tern
al28
5.03
284.
30.2
73.8
936
1.67
480.
65
Sub-
tota
l£
297.
34£
296.
88e
286.
29£
379.
80£
498.
94
App
endi
x2
cont
'd
s,U
tili
ties
5.1
Gas
11.9
916
.46
12.1
618
.57
239.
245.
2E
lect
rici
ty67
4.84
764.
1368
4.28
1195
.71
1331
.91
5.3
Fuel
Oil
S01.
8346
4.73
512.
62m
.5791
3.57
5.4
Solid
fuel
5.5
Wat
erra
tes
78.1
319
8.66
93.9
013
3.17
137.
355.
6E
ffiu
ents
&dr
aina
gech
arge
s7.(
1234
.05
27.9
035
.34
42.0
7
Sub
-tot
al£1
273.
81£1
478.
03£1
330
.86
£231
2.36
£266
4.14
6.A
clm
iDim
'ativ
eco
sts
6.1
Serv
ices
atte
ndan
ts
~6.
2L
aund
ry46
.65
56.4
558
.30
SS.5
210
5.30
~6.
3P
orte
rage
173.
9218
2.70
208
.59
233.
4028
4.7
4N
6.4
Sec
urit
y20
0.54
211.
SO24
6.0
934
0.56
396.
306.
5R
ubbi
shdi
spos
al2.
953.
437
.47
99.1
412
3.30
6.6
Pro
pert
ym
anag
emen
t55
7.59
636.
2070
6.44
1060
.83
1254
.30
Sub
-tot
al£
981.
65£1
090.
28£1
226.
89£
1819
.45
£216
3.94
7.O
verh
eads
7.1
Pro
pert
yin
sura
nce
87.6
585
.63
56.6
456
.64
BO.5
17.
2R
ates
"27
1.65
456.
8938
0.72
476.
3057
3.1
1
Sub
-tot
al£
359.
30£
542.
52£
437
.36
£53
2.94
£65
3.6
2
TO
TA
L£4
307.
30£4
981.
57£4
954
.76
£733
0.93
£859
2.65
°SO
'rora
tes
redu
ctio
n8S
are
sear
chin
stitu
tion.
~rct
:B
uild
ing
Mai
nlel
l8llC
CIn
form
atio
nL
td.
APPE
NDIX
3:OC
CUPA
NCYC
OSTA
NALY
SIS-HA
U.SOF
RESID
ENCE
HA
LL
SO
FR
ES
IDE
NC
Ecr
sra8
56
Bui
ldin
gfu
nctio
n:St
uden
tres
iden
ial
acco
mm
odat
ion
Loc
atio
n:N
orth
-eas
tE
ngla
ndur
ban
area
Ow
ner/
Occ
upie
r:U
nive
rsity
Dat
eof
erec
tion:
1974
UPP
ER
MA
NA
GE
ME
NT
CR
ITE
RIA
AN
DB
UD
GE
TP
RO
CE
DU
RE
Mai
ntai
nbu
ildin
gin
itsst
ate
with
inth
elim
itsof
the
budg
etal
loca
ted
byth
eFi
nanc
eC
omm
ittee
.
Ove
rall
annu
albu
dget
estim
ate
ispr
epar
edfo
ral
lun
iver
sity
build
ings
and
grou
nds,
split
into
1~lemental
head
s,2a
-wag
esan
dsa
lari
es,2
b-m
ater
ials
and
cont
ract
ing
serv
ices
.The
mai
nten
ance
estim
ate
isco
nsid
ered
alon
gw
ithot
her
depa
rtm
enta
lre
curr
ent
esti
mat
esan
dad
just
edac
cord
ing
toal
loca
tions
.Bud
get
cont
rol
isth
ere
spon
sibi
lity
ofth
em
aint
enan
ceof
fice
rwho
revi
ews
expe
nditu
rem
onth
ly
MA
INT
EN
AN
CE
MA
NA
GE
ME
NT
AN
DO
PE
RA
TIO
Ne W
The
mai
nten
ance
offi
ceri
sre
spon
sibl
efo
rth
em
aint
enan
ceof
all
build
ings
and
grou
nds
assi
sted
byth
esu
perv
isor
yst
aff
(ele
ctri
cal,
mec
hani
cal,
build
ings
and
grou
nds)
,of
fice
man
ager
,se
cret
ary
and
thre
ecl
erks
.
Tot
ales
tate
com
pris
es90
.2he
ctar
esin
clud
ing
seve
ral
smal
lsite
saw
ayfr
omth
em
ain
cam
pus;
1343
19m
2fl
oor
area
teac
hing
and
resi
dent
ial
acco
mm
odat
ion.
Rou
tine
insp
ectio
ns:
regu
lar
visi
tsm
ade
bysu
perv
isor
s.M
aint
enan
ceim
plem
ente
dby
PPM
proc
ess
and
requ
isiti
ons
rais
edby
head
sof
depa
rtm
ents
and
othe
rs.
Pain
ting
freq
uenc
ies:
5ye
arcy
cle
exte
rnal
ly;
2an
d4
year
sin
tern
ally
depe
ndin
gon
desi
gnat
edus
e.
Cos
tre
cord
san
dfe
edba
ck:
indi
vidu
aljo
bsar
eco
stco
ded
acco
rdin
gto
I-bu
ildi
ng,2~lement
subd
ivid
edbe
twee
na-
DE
L,
b-e-
cont
ract
,c-P
PM
.
Wor
kdo
neby
DE
L55
%an
dco
ntra
cted
out
45%
.D
irec
tly-e
mpl
oyed
labo
ures
tabl
ishm
ent
is58
into
tal
incl
udin
g6
char
geha
nds.
Con
trac
ted-
out
wor
kis
ona
dayw
ork
basi
s,la
rger
cont
ract
sus
eun
iver
sity
form
orJC
Tco
ntra
ct.
~ ~
App
endi
x3
cont
'd
BU
ILD
ING
FU
NC
fIO
NA
ND
PA
RA
ME
TE
RS
Res
iden
tial
stud
ent
acco
mm
odat
ion
in8
bloc
ksw
ithst
udy
bedr
oom
san
dsh
ared
cond
ition
san
dsa
nita
ryac
com
mod
atio
n.
Com
mun
alre
adin
gro
om.
95%
stud
ent
acco
mm
odat
ion,
5%an
cilla
rybu
ildin
gs.2
60oc
cupa
nts.
Gro
ssfl
oor
area
:40
36m
2St
orey
sab
ove
(and
incl
udin
g)gr
ound
floo
r:3
No.
Are
aof
pitc
hed
roof
s(o
npl
an):
1714
m2
Floo
rsbe
low
grou
ndfl
oor:
Are
aof
flat
roof
s(o
npl
an):
23m
2Fl
oor
toce
iling
heig
ht:
2.30
mA
rea
ofex
tern
algl
azin
g:46
8m
2H
eigh
tto
ridg
e:10
.00
m
FO
RM
OF
CO
NS
TR
Ucn
ON
Stru
ctur
e:T
radi
tion
alco
nstr
uctio
n.L
oadb
eari
ngbr
ickl
bloc
kca
vity
exte
rnal
wal
ls,
plas
tere
din
tern
ally
.A
lum
iniu
mho
rizo
ntal
slid
ing
win
dow
s;V
elux
roof
light
s.Pi
tche
dro
ofw
ithcl
aypa
ntile
son
batt
ens
and
felt;
flat
roof
with
3-la
yer
felt
onch
ipbo
ard
and
tim
ber
jois
ts.S
mal
lar
eaof
plai
ncl
aytil
eto
addi
tion.
Blo
ckw
ork
inte
rnal
part
itio
ns.
Solid
insi
tuco
ncre
tefl
oor
slab
tose
ctio
nsan
dsu
spen
ded
timbe
rjo
ists
with
tong
ued
and
groo
ved
floo
rbo
ardi
ngto
rem
aind
er.
Fin
ishi
ngs
and
fittin
gs:
Car
pet,
quar
rytil
es,
non-
slip
tiles
,th
erm
opla
stic
tiles
.K
itche
nfi
tting
s,sh
elve
s.
Dec
orat
ion:
Em
ulsi
onpa
int
tow
alls;
stai
nan
dva
rnis
hto
som
ew
oodw
ork,
glos
sto
som
e,in
clud
ing
exte
rnal
ly.
Serv
ices
:Cop
per
wat
erse
rvic
es,
PVC
was
tes,
saltg
laze
ddr
ains
.G
as-f
ired
boile
rs,
one
per
hous
e;1
radi
ator
per
room
18-2
1°C
.K
itch
eneq
uipm
ent.
Lau
ndry
..
FIN
AN
CIA
LS
TA
TE
ME
NT
:C
OS
TP
ER
100
m2
FL
OO
RA
RE
AG
ross
floo
rar
ea:
4036
m2
Ele
me
nt19
7817
919
79/S
O19
8018
119
81/8
219
82/8
3
o.Im
pron
meu
Cs
Itad
apta
tions
£92
.81
£-
£14
.99
£-
£
1.D
ecor
atio
D1.
1E
xter
nal
deco
rati
on-
-1.
418.
280.
371.
2In
tern
alde
cora
tion
103.
6417
.64
157.
5691
.87
136.
92
Sub
-tot
al£
103.
64£
17.6
4£
158.
97£
100.
15£
137.
29
2.Fa
bric
2.1
Ext
erna
lw
alls
2.38
3.77
3.37
6.37
4.16
2.2
Roo
fs9.
543.
449.
099
.12
11.6
52.
3O
ther
stru
ctur
alit
ems
22.6
43.
6915
.12
22.1
866
.40
2.4
Fitt
ings
&fi
xtur
es13
.95
15.8
112
.44
15.5
445
.81
2.5
Inte
rnal
fini
shes
7.88
4.46
8.15
6.24
29.6
9
.. ~S
ub-t
otal
£56
.39
£31
.17
£48
.17
£59
.45
£15
7.71
VI
3.S
en
ka
3.1
Plum
bing
&in
tern
aldr
aina
ge9
.42
24.4
035
.06
24.3
843
.09
3.2
Hea
ting
&ve
ntil
atin
g9.
6118
.19
31.7
139
.56
38.6
03.
3L
ifts
&es
cala
tors
--
--
-3.
4E
lect
ric
pow
er&
ligh
ting
9.96
25.0
560
.46
65.3
459
.94
3.5
Oth
erM
&E
serv
ices
10.2
112
.44
26.8
128
.77
31.7
4
Sub
-tot
al£
39.2
0£
80.0
8£
154.
04£
158.
05£
173.
37
4.C
IeaD
iDI
4.1
Win
dow
s5.
035.
288.
237
.51
9.46
4.2
Ext
erna
lsu
rfac
es4.
3In
tern
al29
0.34
423
.44
422.
5252
0.4
651
6.55
Sub
-tot
al£
295
.37
£42
8.7
2£
430.
75£
527
.97
£52
6.01
App
endi
x3
cont
'd
5.U
tiliti
es5.
1G
as18
9.12
322.
7040
0.02
411.
1744
6.11
5.2
Ele
ctri
city
59.2
797
.40
127.
9414
3.36
162.
365.
3F
uel
Oil
5.4
Solid
fuel
5.5
Wat
erra
tes
25.7
927
.92
27.6
527
.75
25.0
55.
6E
ffiu
ents
&dr
aina
gech
arge
s
Sub
-tot
al£
274.
18£
448.
02£
555.
61£
582.
28£
633.
52
6.-A
dmiD
lstr
atiY
eco
sts
6.1
Serv
ices
atte
ndan
ts6.
2L
aund
ry26
.63
64.7
282
.71
104.
8658
.67
6.3
Por
tera
ge
~6.
4Se
curi
ty1
96.4
112
2.02
138.
5314
6.13
174.
060
\6.
5R
ubbi
shdi
spos
al6.
6P
rope
rty
man
age
ent
85.1
893
.93
117.
1412
0.66
130.
20
Sub
-tot
al£
208.
22£
280.
67e
338.
38£
371.
65£
362.
93
7.O
verh
eads
7.1
Pro
pert
yin
sura
nce
39.5
244
.65
52.5
060
.93
58.8
27
.2R
ates
256
.32
289.
3934
8.81
369.
8040
6.42
Sub
-tot
al£
295.
84£
334.
04£
401.
31£
430.
73£
465.
24
TO
TA
L£1
272.
84£1
620.
34D
JRrl.
23£2
230.
28£2
456.
07
SoI
UU
:B
uild
ing
Mai
nIcJ
laD
celD
form
atio
nU
d.
AC
UT
EH
OSP
ITA
L
APPE
NDIX
4:EN
ERGY
COST
ANAL
YSIS
OFHO
SPITA
L
CII
SfB
412
Bui
ldin
gfu
nctio
n:52
1be
d,m
ainl
yac
ute
hosp
ital.
Loc
atio
n:
. 'E
dmon
ton,
Lon
don
N18
.D
escr
iptio
nof
site
:Sh
elte
red
loca
tion
.G
ross
floo
rar
ea:
6890
0m
2
Gro
sS·i
nter
nal
cube
:23
190
0m
3 ;
Dat
eof
erec
tion:
Old
erbu
ildin
gsor
igin
ally
erec
ted
asa
wor
khou
seda
ted
1840
-198
5w
ithad
ditio
nsda
ted
1899
as~
infi
rmw
ards
.So
me
new
erbu
ildin
gs19
60,
1972
,19
81.
~Fo
rmof
cons
truc
tion
:O
lder
prew
arco
nstr
uctio
nis
bric
kbu
iltw
ithpi
tche
dsl
ate
roof
s;po
stw
arbu
ildin
gsco
ncre
tefr
amed
.M
echa
nica
lan
del
ectr
ical
serv
ices
:5
No.
Lan
cash
ire
boile
rsfi
tted
with
econ
omis
ers
and
all
rate
dat
1000
0Ib
lhou
r.A
vera
geel
ectr
ical
max
imum
dem
and
is82
0kV
Ape
rm
onth
.S
tand
byge
nera
tor
max
imum
ratin
gis
1200
kW.
Hou
rsof
Occ
upat
ion:
Gen
eral
lyw
ards
and
resi
dent
ialb
lock
s 24
hour
sp
erda
y,7
days
;rem
aind
er8
hour
spe
rda
y,5
days
per
wee
k.H
ours
ofhe
atin
g:In
acco
rdan
cew
ithoc
cupa
ncy.
Hou
rsof
light
ing:
Inac
cord
ance
with
occu
panc
yan
dna
tura
llig
ht.
Mea
sure
sun
dert
aken
tore
duce
ener
gyco
nsum
ptio
n:In
stal
latio
nof
auto
mat
icdo
ors;
wal
land
roof
insu
latio
n;st
rict
upke
epof
pipe
and
vent
ilatio
nsy
stem
lagg
ing
and
inst
alla
tion
ofva
riou
she
atre
cove
rysy
stem
s.Im
min
ent
inst
alla
tion
of
abu
ildin
gau
tom
atio
nsy
stem
.
App
endi
x4
cont
'd
EN
ER
GY
US
AG
E19
79/8
019
8018
119
81/8
2
Sour
ceQ
uant
ity
Cos
tQ
uant
ity
Cos
tQ
uant
ity
Cos
t
Gas
1259
3O
J£
2603
21
32
56
OJ
£35
601
1293
6O
J£
32
34
8E
lect
rici
ty·1
828
8O
J£1
2019
41
82
40
OJ
£135
118
1798
6O
J£1
88U
J7Fu
eloi
l(3
500
sec.
)18
300
6O
J£2
96n«
1787
88O
J£4
1228
818
039
0O
J£4
0067
6
Tot
alth
erm
seq
uiva
lent
2tm
221
ther
ms
199
307
2th
erm
s2
002
814
ther
ms
EN
ER
GY
CO
NS
UM
PT
ION
2942
.27
2892
.70
2906
.84
The
rms
per
100
m2
per
annu
m
~E
NE
RG
YU
SA
GE
1982
/83
1983
/84
1984
/85
w 00
Sour
ceQ
uant
ity
Cos
tQ
uant
ity
Cos
tQ
uant
ity
Cos
t
Gas
1226
8O
J£
3749
15
69
2O
J£
3775
18
41
2O
J£
3751
5E
lect
rici
ty22
760
OJ
£225
280
2434
5O
J£2
2987
222
845
OJ
£231
814
Fuel
oil
(350
0se
c.)
1591
49O
J£4
3646
515
7602
OJ
£525
319
1324
09O
J£5
1775
0
Tot
alth
erm
seq
uiva
lent
184
040
9tb
erm
s1
778
443
ther
ms
155
122
6tb
erm
s
EN
ER
GY
CO
NS
UM
PT
ION
UJ7
1.13
2581
.19
2251
.42
The
rms
per
100
m2
per
annu
m
So
uru
:8
MI
Ltd,
Stu
dyo
fEM
rgyi
nB
uild
ings
(198
6).
APPENDIX 5: CLASSIRCAnON OF MAINTENANCE OPERAnONS AND REPAIRS
Primary code
1. External decoration2. Internal decoration3. Main structure
4. Internal construction
5. Finishes and fittings
6. Plumbing and sanitary services
7. Mechanical services including heating andventilation and gas installations
Secondary code
31. Foundations and basements32. Frame33. External walls. chimneys and flues
(excluding boiler flues)34. External windows and doors including
glazing35. Roof structure36. Roof coverings37. Roof lights and glazing38. Gutters and rainwater pipes
41. Ground floors(where not part of foundation slab)
42. Upper floors43. Staircases and steps44. Internal walls and partitions45. Doors and screens including glazing
51. Ceiling finishes52. Wall finishes53. Floor finishes54. Shelves. built-in furniture and miscel
laneous joinery55. Ironmongery56. Cloakroom and similar miscellaneous
fittings
61. Cold water service pipes. storage tanks.cisterns and valves
62. Hot water service pipes. storage tanksand cylinders. domestic boilers, valvesand insulation
63. Sanitary fittings including taps and traps64. Waste, soil and vent pipes
71. Boilers, firing. instrumentation and automatic controls, flues
72. Steam and hot water distribution including heat exchangers and heating appliances
439
440 Appendix 5
Primary code SecondJlry code
73. Workshop equipment, lifting appliancesand special industrial equipment
74. External water supply, treatment andstorage plant
75. Lifts76. Air conditioning, ventilation and refrige
ration77. General utilities78. Gas installations and equipment (except
kitchen equipment)
8. ElectricQI services and kitchen equipment(all typeS)
9. External and civil engineering works
O. Miscellaneous and ancillary works
81. Electrical generation and prime movers82. Electrical transmission and distribution83. Electrical installations (wiring switch and
control gear)84. Electrical appliances and fittings (except
kitchen equipment)85. External lighting and airfield lighting86. Lighting protection, ELV systems and
equipment87. Kitchen equipment
91._ Roads, car parks, parade grounds,hardstandings and runways
92. Paths, playgrounds and general pavedareas
93. Fences, gates and boundary walls94. Drains and ditches95. Sewage disposal96. Water storage tanks and reservoirs97. Railway tracks, platform docks, wharves
and jetties, sea defence walls98. Horticultural and arboricultural works99. Miscellaneous external works
01. Adaptations and minor new works02. Replacement of fire damage03. Routine cleaning
Sourc«: DOE. Mainltnanc~ Manuals/or Buildings. HMSO (1970)
INDEX
Abstracting 26fr8Accounts 342-6, 392-3Advisory bodies for repair and
preservation 323Aggregates for concrete 415Agreement for Minor Building
Works 303, 306-11Agrement certificates 246-7, 250Air bricks 112,259Air conditioning 183--4Air ducts 112Air locks 180Air seasoning 99Air starvation in fires 93Alarm systems 193--4, 196-7Alkali resisting primers 170Alterations
documentation 273--4examples 211-18grants 222-6pricing- 287-9scope 208-18sequence and management 218-20
Aluminium sheeting 74Aluminium windows 146, 147Ambrosia beetles 205Analyses 357-8, 429-38Approved inspectors 320Approximate quantities
estimates 276, 277Architect 304-5Articles of agreement 302-3Asphalt floors 115Asphalt measurement 271Asphalt roofs 127-8Asphalt tanking 50Avoidable maintenance 3
Bad neighbours (building uses) 327Ball valves 175, 178, 179-80
SkevingtonIBRE 178Banwell report 301Bar chart 396Bark beetles 205Bark pocket 101Basements 49-50Bedrock costs 343, 344Billing 268-9Bills of quantities 264-9,304Bills of quantities contracts 298Birds 203Bitumen felt roofs 125-7Bituminous paints 85Blistering of paintwork 166, 422Block plan 326Bloom on paint 167Blowing of plaster 152Boilers 181-2
chimneys 94-5, 181Bonus payments 402, 403- 4, 405Boundaries 336Boundary walls 53Bread beetles 205Breakdown maintenance 346Bricks
clay 56requirements 251-2, 416specification 255-{i, 261-3types 56-7
Brickworkboundary walls 53cracks 63-5defects 5fH>7drying shrinkage 66efflorescence 58-60
441
442 Index
frost action 62-3fumes from cavity foam 67laminated 55lichens 66measurement 270moisture penetration 55mortars 57~, 59pricing 283-5settlement 63specification 261-3stability 63-4stains 60-1, 88sulphate attack 33,61-2supervision 416-17unsound materials . 65-{)
British Standards 242-6Budgeting 342-6Builders' accounts 289-90Bulding Conservation Trust 11Building contracts 295-301Building control 317-31, 334-5Building control officer 306Building decay 29-30Building defects 19,234-5Building incentive schemes 402-5Building lines 332Building lives 17-18Building maintenance
avoidable 3concept 1condition-based 3control 381-97corrective 2costs 2~
definition 1-2economics 28--30emergency 3feedback 12liability 8--10magnitude 5-8nature 1~, 13-17needs 10-11planned 2predictable 3preventive 2priorities 11-12resources 12-13scheduled 3significance 4-5technology 18-20unplanned 2
Building Maintenance Information
Ltd 357-8Building managers 400Building notices 320-1Building operatives 334-5, 401-2Building records 354-5, 425Building regulations 317-22
applications 317-18Building reports 233-5Building Research
Establishment 15-17,63,78, 79Building settlement 40-4Building supervisors 320, 401Building surveyors 13,400Buildings
dangerous 332-3inspection 232-3,334-5setting out 410-11supervision 411-25
Cables 185Calcium silicate bricks 57Carbonation of concrete 73-4Carpentry
supervision 419-20timbers 100, 112-13, 117-18
Carpet beetles 205Carpets 116Catalogues 247, 395-{)Categorisation of repairs 375Cavity walls 81, 133, 417Cellar fungus 104Cement 415Cement rubber latex flooring 115Central maintenance
administration 374-5Ceramic tiles 159Certificates 312Cesspools 190Chain link fences 53Chalking of paint 166Check on timber 101Chestnut pale fences 53Chimneys 90, 93-5Chipboard 113Chipped grain 101Chlorinated rubber paint 85City maintenance structure 375-6Civic Trust 323Claddings 54-6, 72-()Claims 313CLASP 43
Classification of maintenanceoperations and repairs 439-40
Clay bricks 56Clay floor tiles 114Clay soils 34-7, 40Clean Air Act 1956 333-4Cleaning
brickwork 56, 60, 66cycles 200, 350execution 199-200, 398facilities 200-1flooring 201-2graffiti 202kitchens 202sanitary appliances 202schedule 381 !
stonework 71-2windows 201
Clerk of works 306. 374, 407-9diary 408-9reports 409
Climbing plants 66Close boarded fences 52Code for the Measurement of Building
Works in Small Dwellings 269Codes of Practice 245-6Cold roofs 121Colourless stone preservatives 71Colourless water repellent liquids 70,
85-6Colourless waterproofers 85-6Committed costs 343Common furniture beetle 107, 109,
11~11
Common property 397-8Compartmentation 195Component maintenance
procedure 383, 385-7Composite price rates 276, 277Computerised maintenance
management 184, 345-6, 352-4 ,375-6,381 ,383,396-7,404
Concreteaggregates 415cancer 74cladding 73-4, 75curing 415defects 81gauging 414laying 414measurement 269-70mixes 415-16
Index 443
mixing 413-14panels 73-4pricing 282-3reinforcement 74, 81, 414repairs 74specification 255-6stools and ground beams 43supervision 413-16
Concrete beams 414Concrete beds 113Concrete flags 51-2Concrete foundations 38-9, 413-14Concrete frames 76-7Concrete paving 42, 51-2Concrete roof tiles 119Condensation 86-90,91, 118, 121Condition-based maintenance 3Conditions of contract 303Conditions of contract for minor
works 306-11Condominium maintenance
management 397-9Conduits 185Coniophora puteana 104Construction Industry Training
Board 399-400Contingency sum 255Contract
approximate quantities 298bill of quantities 298conditions 303cost plus 296-7design and build 299determination 31~11
form 292-5JCf Conditions 303lump sum 298maintenance 299-301national schedules 300-1parties 304-Qremedies for breach 294-5schedule 297-8target cost 297term 299-300types 296-301validity 293-4
Contract documents 302-4Contract drawings 304Contract for minor works 303,
306-11Contract labour 369-71Contract procedures 311-15
444 Index
Contractor 305Control card 382Controlling cost 34~
Conversionsgrants 222-6scope 216, 217
Copper roofs 128,418Cork tiles 115Corrective maintenance 2Corrosion of metals 66, 74, 76, 77,
81,145-7Cost analyses 357-8, 429-38Cost classification 355-7Cost control 342-6, 392-3Cost discounting 24-7Cost in use 24-8, 365Cost plus contracts 296-7Cost records 354-8Cost yardsticks 20-1Cost-benefit analysis 229-30Covenants to repair 231,232Cowls 94Cracks
asphalt 127brick walls 63-5causes 19concrete and calcium silicate
bricks 57external renderings 153, 157, 158plaster 148, 150reinforced concrete 76shrinkable clay 34, 35, 37wall claddings 41, 75
Critical path 396Cube estimates 275Cupboards 259Curtain walling 72-3Cycles
cleaning 200, 350, 381inspection 347-8maintenance 376,379-81painting 160-1, 162-3,349-50services 350, 352
Damages 294Dampness
causes 80-3, 141, 143treatment 83-6
Damp-proof courses 81, 112,417Damp-proofing
methods 83-5, 113
specification 256, 262-3Dangerous buildings 332-3Data dissemination 354-8Daywork · 312- 13Dead shores 45-7Deadwood 101Death watch beetle 108, 109, 110,
111Decorations 159-71Decorative laminates 159Defective Premises Act 1973 9,334Defects notification 383-4Dehumidifier 90Demolition work 289,332,333,
411-12Departmental structures 373-6Depots 376-8Design and build contracts 299Design of buildings 20-2Determination of contracts 310-11Development 324Development plans 325-6Dew point 87Dilapidations 231-2Dilapidations schedules 232-3, 238-9Dimensions paper 265-6Direct labour organisations 369-73,
·375Disabled people, needs 220-2Discoloration of paint 167Discounting costs 24-7Doors
defects 143-5, 203, 420security 192-3specification 259
Doorway, pricing 287-9Dormers 215Dote in timber 102Double glazed windows 131, 133-4,
171Double vacuum method of timber
preservation 99Dovecote 94Drainage
defects 189-90easements 336French 84inspection 190inspection chambers 190,261,
424-5land 49,84manholes 190, 424-5
Drainage cont'dmeasurement 273sealing old drains 411setting out 423specification 260-1supervision 423testing 424
Drawings 304Dry linings 49, 84Dry rot 102-4, 105, 106, 112, 117,
139
Earwigs 204Easements 335-6Economic life 18Efflorescence 58-60, 151Electrical installations
disconnecting old services 411fire risk 185lighting 186measurement 272prime cost item 260regulations 185,334requirements 184-6
Electrolytic action 177Electro-osmosis damp-proofing 84Elemental classification 439- 40Emergency maintenance 3Employer 304Empty cell timber preservation
process 99Emulsion paint 169Energy cost analysis 437-8Enforcement notices 335Engineered costs 343Engineers 305Environmental works 155Enzymes 102Epoxy resin grouting 74Escape routes 196-7Estimates
approximate 274-7approximate quantities 276, 277arrangements 2n-80cube 275floor area 274-5preparation 274-89schedule of claim 238-9storey enclosure 2nunit zn
Excavationmeasurement 269
Index 445
pricing 281-2supervision 413support 413
External renderings 153-7Extractor fans 89Extraordinary traffic 332
Factories Acts 1-2, 10, 191,323Failures 17,19,76-7,78-80, 120-1Fair wear and tear 231Feedback 12,21 ,358-60,386Fencing
maintenance 52-3measurement 273
Filters (air conditioning) 183-4Final account 315Finishings 159Fire alarms 196-7Fire extinguishers 197Fire fighting arrangements 198-9Fire fighting equipment 196-8Fire hazards 78-9, 195-6Fire insurance 366Fire precautions 195-9Fire Precautions Act 1971 334Fire resisting construction 194-5Fire spread 194Fire stopping' 195Fireplace, closing openings 95Flanking transmission of
sound 129-30Flashings 118Flat roofs 119-29Flood damage 205-6Floor
boarding 112, 113floating 131hardwood strip 115solid 113sound insulation 131specification 258suspended timber 11 1-13, 419thermal insulation 132-3wood block 115
Floor area estimates 274-5Floor cleaning 201-2Floor coverings 113-16Floor levels 411Floor noises 112Floor seals 116Floor strutting 48Floor tiles 114-16
446 Index
Flour beetles 205Fluctuations 313-15Flue linings 94-5Flues 93-5, 181, 187Fluorescent tubes 186Flying shores 47, 48Food cupboards 259Food Hygiene Regulations 334Foreman 305Formwork 414Foundations
concrete 38-9inspection 38levels 411modification 39narrow strip 36, 37pedatified 44problems 34-8short bored pile 36, 37
French drains 84Frost heave 37Frost precautions
brickwork 62-3concrete 39plumbing 176-7
Full cell timber preservationprocess 99
Fumes from cavity foam 66Fungal attack 101-6, 138Fungicidal treatment of timber 141-2Furniture beetle 107, 109, 110-11Furring 180
Gantries 412Gas installations 187General development order 324Glass 171Glass fibre reinforced cement
(GRC) 76Glazing
measurement 272pricing 286requirements 171supervision 422
Good tenantable repair 231Graffiti 202Granolithic floors 113-14Grants
buildings and plant 365-6improvement 222-6payment 226
Grass cutting 52
Gravel 50Grit blasting 71Ground beams 43Grouting 49Gutters 118,419Gypsum plasters 149
Hand pumps 198Health and Safety at Work Act
1974 10, 191,333Heating requirements 89Heating systems 181-2High alumina cement 77Highways Act 1980 331-2Hoardings 412Hospitals 6Hot water supply 180-3House insulation grants 225House longhorn beetle 107, 109Housing 5-6
Association maintenancestructure 376
condition survey 5timber framed 78-80
Hygrometer 88
Improvementenvironmental works 225grants 222-6lines 332scope 208-18
Incentive schemes 402-5Incinerators 189Information systems 354Injunction 295Insect attack to wood 106-11Insecticides 110-11Inspection chambers 190,261,424-5Inspection cycles 347-8, 379Insulation
sound 129-32thermal 89,132-4
Insurance 310, 365-6Intermediate grants 222, 223-4Internal finishings 159Interstitial condensation 86, 90Interwoven fencing 52Inverted roofs 122Iron 147Ironmonger 145Ivy 66
Jacking 44Job order form 388-9Joinery
defects 138-45measurement 271pricing 285, 288supervison 420
Joint Contracts Tribunal 303
Kiln seasoning 99Kitchen cleaning 202Kitchen improvements 210,258-9Knots 100-1Knotting 164, 421
Labourdirect 369-73oncosts 281
Land costs 27Land drains 49, 84Larder beetles 205Lead roofs 128, 129, 418Leaking roofs 80 ,Liability for maintenance 8-10, 379Lichens 66-7, 85Life cycle costs 20-8, 365Lifts 187-9Lighting 186Lime plaster 149Linoleum 115Local Government Operational
Research Unit 11-12, 348Local Government Planning and Land
Act 1980 371-3, 378Local plans 326Loft conversions 215-16,217Luminaires 149Lump sum contracts 298Lyctus power post beetle 108, 109
Made up ground 37Magnesium oxychloride floorings 115Maintenance
avoidable 3breakdown 346budgeting 342-6computerised 184, 345-6, 352-4,
375-6,381,383,396-7,404condition-based 3definition 1-2economics 28-30elemental classification 439-40
Index 447
emergency 3execution by contractor 389-90feedback 12,21, 358-60, 386inspections 347-8, 379magnitude 1-4, 13-17organisation 373-6, 381-97planned 2, 346-54predictable 3preventive 2procedure 387-9research resources 12-13scheduled 3shut down 346significance 4-5standards 341-2supervision 411-25technology 18-20training 399-402unplanned 2
Maintenance contracts 299-301Maintenance cost records 355-7Maintenance cycles 348-54, 379-81Maintenance data 354-8Maintenance departmental
structures 373-6Maintenance depots 376-8Maintenance incentive
schemes 402-5Maintenance liability 8-10, 379Maintenance management 390-2Maintenance manuals 360-5Maintenance needs 10-11Maintenance planning 338-9,379-81Maintenance policy
formulation 339-41Maintenance programme 348-54,
378-81, 396-7Maintenance research 15-17Manholes 190, 424-5Manuals 360-5Masonry paint 85Mastic asphalt 115Measurement procedures 264-74Measurement units 269-74Metalwork
corrosion 66, 74, 76, 81, 145-7measurement 272painting 165, 168
Metrication 122-3, 426-8Micro bore heating systems 182Mining subsidence 37-8; 42-4MOATS 250Mobile depots 377-8
448 Index
Modernisation of dwellings 181,211-16,253-61
Moisture measurement 82-3Mortars 57-8, 59, 416Moulds 66-7,87,92, 151Mycelium 102, 104
National BuildingSpecification 249-50
National House-Building Council 9,80
National schedules 300-1National Trust 323Network analysis 396-7Newtonite 49Noises
floor 112hot water supply 180plumbing 132, 178
Notification of defects 383-4
Occupancy cost analyses 357-8 ,429-36
Occupational charges 24, 27Offices, Shops and Railway Premises
Act 1963 10, 334Operating costs 24, 334Organisation 373-6, 381-97Outline planning applications 327Overflows 175, 180Overheads 281Oxidation 127
Package deal contracts 299Paint primers 164, 165, 168Paint removers 164, 165Painting
blistering 166, 422cycles 160-1defects 160, 161, 162, 166-7discoloration 167maintenance practice 168-9measurement 273pricing 286-7,288,289procedures 159-71processes 164quality 160specification 257supervision 421-2
Painting asbestos cement 170Painting ceilings 169-70Painting masonry 170Painting metalwork 165, 168, 421
Painting walls 169-70, 422Painting woodwork 164-5, 422Paints
bituminous 85chlorinated rubber 85emulsion 169masonry 85
Paperhanging 422Paraffin heaters 87Partitions 131Pattern staining 170-1Pavings 50-2Payment for works 309Pebbledashing 85, 156Pedatified foundations 44Performance specifications 250-1Permitted development 325Pest infestation 202-5Petroleum storage 333Piling 36, 37, 39Pinworm beetles 205Pipes
classification 252drain 190,423-4easements 336service 174
Pitched roofs 117-19, 120Pitchmastic 115Planned corrective maintenance 2,
346-7Planned lighting maintenance 186Planned maintenance 2, 346-54Planned preventive maintenance 2,
346-7Planning
applications 326-8certificates 328control 322-31development plans 325-{)maintenance work 338-9,379-81notices 328 ..permission 323--(jpermitted development 325register 328, 329Use Classes Order 324-6
Plans 321Plant 393, 394Plasterwork
characteristics 149defects 148, 150-3, 421measurement 272painting 169-70pricing 286
Plasterwork cont 'dspecification 25~7supervision 420-1
Plastic repairs to stonework 70Plastics pipes 147, 174Plastics sheeting 75-6Plastics wastes 423Plastics windows 147Plumbing
defects 81, 174-6frost precautions 176-7measurement 272modernising 181noises 132, 178, 180, 181single stack 178-9supervision 422-3
Policy formulation 339-41Polystyrene 134Popping of plaster 152Powder post beetle 108, 109Preambles 268Precast concrete cladding 73-4, 75Predictable maintenance 3Prefabricated building
extensions 216, 218Preliminaries 254-5Preservation of timber 99-100, 102,
138,141-2Price adjustment formula 313-15Price fluctuations 313-15Pricing alterations 287-9Pricing building work 2~7Pricing repairs 238-9Primers 164, 165, 168Programming
cleaning 350costs 343maintenance 348-54,396-7painting 349-50services 350, 352
Proofs of evidence 23~9
Protimeter 82, 88Ptilinus 107, 109Public inquiries 330-1Putty 171PVC tiles 114-15
Quantity surveyor 305Quantum meruit 295
Radiators 182Rainwater goods 81,88,419Raking shores 46,47,48
Index 449
Ramps 220, 221Records
building work 354-5, 425clerk of works 409cost 355-7data 354
Recreational facilities 399Rectification work 14Redevelopment 226Redwood 138Refuse chutes 189Refuse collection from flats 189Rehabilitation
advantages 22~7cost-benefit studies 229-30financing 227-8
Reinforced concrete 73-4, 7~7Reinstatement grants 225Relative humidity 8~7
Relet repairs 387Renderings 49-50,85, 153-7, 158
finishes 15~7mixes 154-5
Renovations 14-15Repairs categorisation 375Repairs grant 222, 225Replacements 14-15, 27-8Reports
clerk of works 409technical 233-5
Rescission 295Research · 15-17Resin pocket 101Retention money 309Ribbing of timber 101Rights
drainage 336light 335-6support 336way 336
Rindgall 101Ring mains 184-5Rising damp 81-5Rodents 203, 204Roofs
asphalt 127-8bitumen felt 125-7copper 128, 418flashings 118flat, construction 119-21flat, defects 122-5flat, design 120-2gutters 118
450 Index
lead 128, 129, 418measurement 271metal flat 128moisture penetration 118-19pitched, coverings 118-19pitched, timbers 117-18,419-20polymer 128pricing 285slates 118-19, 120, 418supervision 418-19thatch 119thermal insulation 134,419tiles 118-19, 418zinc 129, 418
Roughcast 85, 156-7Rubber flooring 115Running costs 24, 27
Safety 190-2, 332-3, 412Sand 415Sanitary appliances 177, 179-80,422Sapwood 138, 139Sawflies 204Schedule contracts 297-8Scheduled maintenance 3Schedules of condition 233School conversion 216-17Seasoning timber 98-9Security 192-4,398Selective tendering 301-2Self-siphonage 178SerpuJa lacrymans 102-4, 105, 106,
112, 117, 139Services
improvement 210-11maintenance 174-90, 398programming 350, 352
Servicing 14Setting out 410-11Settlement 40-8, 63Shakes in timber 101Sheeriness in paint 167Shoring 41,45-8Showers 180Shrinkable clay 34-7, 40Shrinkage
brickwork 66clay 34-7,40paint 166plaster 150, 151timber 79
Shut down maintenance 346Silicone treatment 49, 84, 85-6
Silverfish 204Single stack plumbing 178-9,423Site arrangements 278-80Site boundaries 336Site conditions 32-3Site huts 279Site investigations 32-3Site meetings 410Site plans 326SkevingtonlBRE ball valve 178Skirtings, hollow detachable 185Skirtings to flat roofs 125Slates 1l~19, 120, 418Slenderness ratio 63Small bore heating systems 182Smoke detectors 197Smoky chimneys ' 90, 93-4Socket outlets 185Soils 33-8Solar protection 121, 123Sound insulation 129-32Special grants 224Specific performance 294Specification
drafting 251-3format 247-51National Building 249-50performance 250-1pu~se 241, 303sources ·of information 241-7typical 253--63
Split timber 101Sprinklers 198Stability of brick walls 63-4Stable conversion 216,217Stainless steel 146Stains 60-1,88,95, 152Staircases 116-17, 195Standard Method of Measurement of
Building Works 265, 269Standard times 403Standards of maintenance 341-2States of asphalt 127Statutory requirements 9-10, 309-10Steel reinforcement 74,414Steelwork
demolition 412frames 76-8measurement 272painting 165, 168, 421setting out 410treatment 145-6weathering 78, 145
Stock control 394-QStonework
cleaning 71-2colourless treatments 70-1defects 67-9measurement 270repairs 170
Stop notice 335Storage tanks 177Stores, computerised 394-QStores requisitions 395Storey enclosure estimates 277Structural frames 76-8Structural life 18Structural reports 234Structure plans 325-6Sub-contractors 305Sulphate attack 61-2, 157Supervision of maintenance
work 411-25Surface condensation 86, 87Suspended floors 111-13
Taking off 265-6Tanking 50Tanks 177Target cost contracts 297Target times 403-4Tarmacadam 50-1Taxation 29,365-6Technicalofficers 374Tell tales 41Tenants' request cards 384Tendering 301-2, 311Term contracts 299-300Terotechnology 19-20Terrazzo floors 114Testing of bricks 416Testing of cement 415Testing of drains 424Testing of sand 415Thatch roofs 119Thermal insulation 89, 132-4, 419Thermoplastic floor tiles 114-15Throat restrictor to fireplace 93Tie rods 64Tiles
external wall 86, 157-9internal wall 257roof 118-19, 418
Timberdefects 100--11, 117-18
Index 451
moisture content 99nature 98preservation 99-100, 102, 138,
141-2seasoning 98-9specification 256strength 100treatment 110-11types 98
Timber cladding 76Timber floors 111-13, 115Timber framed housing 78-80Timber roofs 117-18, 120Timber staircases 116-17Tonged and grooved boarding 113Tom grain 101Total building costs 23-8Trade catalogues 247Training, industrial 399-400Training, managers 400Training, operatives 401-2Training, supervisors 401Tree roots 34, 35, 37, 42Trench timbering 413Trussed rafters 420Tyrolean 157
Underpinning 39,40,41,43,417Unit estimates 277Unplanned maintenance 2Unvented hot water supply
systems 182-3Upstands to roofs 125Urban regeneration 8Urea formaldehyde foam 133Use classes 324-QV-value 89, 132
Valuation tables 25-7Vandalism 193Vapour barrier 78,90, 122, 123Variations 312Varnish 165Ventilation 89-90, 95Vertical tile hanging 86Vibration 134-5
Wallsboundary 53brick 56-67cavity 81, 133concrete cladding 73--4
452 Index
defects 54-6, 81-3external tiling 86, 157-9insulation 131, 132-3light clad dings 72-3rubble 270setting out 410stone 67-72ties 63-4vegetation on external faces 85waterproofing 85-6
Waney edge 101Warm roofs 121-2Warp 101Wash basins 180Waste pipes 178-9, 423Water buckets 197Water by-laws 334Water closets 179-80Water hammer 178Water spraying 71Water test 424Waterproofing basements 49-50Waterproofing walls 85-6Weatherboarding 76, 86Weathering steels 78Wet rot 104-5, 117Windows
aluminium 146, 147cleaning 201
decay 139-41defects 138-13,420double glazing 131, 133-4plastics 147security 193sound insulation 131specification 257, 259steel 145-6thermal insulation 133wood 139-43
Wiring 185Wood block flooring 115Wood boring beetles 106-11Wood lice 204Wood stains 86, 165Wood wasps 205Woodworm 107, 109, 110-11Work sections 248Work study 403Working up 266-7Wrinkling of paint 167
Yardsticks 20-1
Zinc chromate primer 168, 171Zinc roofs 129, 418