APPENDIX 1: METRIC CONVERSION TABLE Length Area Volume Mass Density i inch =25.44 mm [approximately 25 mm], then (mm! 1(0) x 4 = inch 1 ft =304.8 mm (approximately 300 mm) 1 yd =0 .914 m (approximately 910 mm) 1 mile = 1.609 km (approximately It. km) 1 m =3.281 ft = 1.094 yd (approximately 1.1 yd) (10 m = 11 rd approximately) 1 km =0.621 mile (8" mile approximately) 1 ft2 =0.093 m 2 1 yd 2 =0.836 m 2 1 acre =0.405 ha f1 ha (hectare) = 10000 m 2 ] 1 mile 2 = 2.590 1m 2 = 10.764 ft2 = 1.196 yd 2 (approximately 1.2 yd 2 ) 1 ha =2.471 acres (approximately 2-}acres) 1 km 2 =0 .386 mile 2 1 ft 3 =0 .028 m 3 1 yd 3 =0 .765 m 3 1m 3 =35 .315 ft 3 = 1.308 yd 3 (approximately 1.3 yd 3 ) 1 ft 3 =28.32 titres (1000 titres = 1 m 3 ) 1 gal =4 .546 titres . 1 titre =0 .220 gal (approximately 4-} litres to the gallon) 1 Ib =0.454 kg (kilogram) 1 cwt =50.80 kg (approximately 50 kg) 1 ton = 1.016 t (1 tonne = 1000 kf = 0.984 ton] 1 kg = 2.205 Ib (approximately 21" Ib) 1 Ib/ft 3 = 16.019 kglm 3 1 kglm 3 =0 .062 Ib/ft 3 426

APPENDIX 1: METRIC CONVERSION TABLE

Embed Size (px)

Citation preview

APPENDIX 1: METRIC CONVERSION TABLE

Length

Area

Volume

Mass

Density

i inch =25.44 mm [approximately 25 mm] , then (mm!1(0) x 4 = inch

1 ft =304.8 mm (approximately 300 mm)1 yd =0.914 m (approximately 910 mm)

1 mile = 1.609 km (approximately It. km)1 m =3.281 ft = 1.094 yd (approximately 1.1 yd)

(10 m = 11 rd approximately)1 km =0.621 mile (8" mile approximately)

1 ft2 =0.093 m2

1 yd2 =0.836 m2

1 acre =0.405 ha f1 ha (hectare) = 10 000 m2]

1 mile2 = 2.590 km~1 m2 = 10.764 ft2 = 1.196 yd2 (approximately 1.2 yd2)1 ha =2.471 acres (approximately 2-}acres)

1 km2 =0.386 mile2

1 ft3 =0.028 m3

1 yd3 =0.765 m3

1 m3 =35.315 ft3 = 1.308 yd3 (approximately 1.3 yd3)

1 ft3 =28.32 titres (1000 titres = 1 m3)

1 gal =4.546 titres .1 titre =0.220 gal (approximately 4-} litres to the gallon)

1 Ib =0.454 kg (kilogram)1 cwt =50.80 kg (approximately 50 kg)1 ton = 1.016 t (1 tonne = 1000 kf = 0.984 ton]1 kg = 2.205 Ib (approximately 21" Ib)

1 Ib/ft3 = 16.019 kglm3

1 kglm3 =0.062 Ib/ft3

426

Velocity 1 ftls =0.305 mls1 mile/h = 1.609 kmlh

427

Energy 1 therm = lO5.506 MJ (megajoules)1 Btu = 1.055 kJ (kilojoules)

Thermal 1Btulft2 hOF = 5.678 W/m2°C (where W = watt)conductivity

Temperature xOF =t (x - 32tCXO C =sx + 32°FO°C = 32°F (freezing)5°C=41°F

lOoC = 50°F (rather cold)15°C = 59°F20°C = 68°F (quite warm)25°C =77°F30°C = 86°F (very hot)

Pressure 1 lbf/inch? = 0.007 N/mm2 = 6894.8 N/m2

(1 MN/m2 = 1 N/mm2)

1 Ibf/ff =47.88 N/m2 ~newtonslsquare metre)1 tonflinch2 = 15.44 MN/m (meganewtonslsquarc metre)

1 tonflft2 = 107.3 kN/m2 (kilonewtonslsquare metre)

For speedy but approximate conversions:kN/m2 .

1 Ibflft2 = -- hence 40 Ibf/ft2 = 2 kN/m2

20

and tonflft2 = kN/m2 x 10, hence 2 tonflft2 = 20 kN/m2

Floor loadings office floors - general usage: 50 Ibflft2 = 2.50 kN/m2

office floors - data-processing equipment: 70 Ibf/ft2 = 3.50 kN/m2

factory floors: 100 Ibf/ft2 = 5.00 kN/m2

Safe bearingcapacityof soil

Stressesinconcrete

1 tonflft2 = 107.25 kN/m2

2 tonflff =214.50 kN/m2

4 tonf/ft2 =429.00 kN/m2

100 Ibf/in.2 =0.70 MN/m2

lOOO Ibflin.2 =7.00 MN/m2

3000 Ibflin.2 =21.00 MN/m2

6000 Ibflin.2 =41.00 MN/m2

Costs £lIm2 = £O.0921ft2

1 shilling (5p)/ft2 = £O.538/m2

£lIft2 = ~lO.764/m2 (approximately (£11/m2)

£5/ft2 = £54 m2

428

£10/ft2 = £108/m2

£15/ft2 = £161/m2

£20/ft2 = £215/m2

£2S/ft2 = £269/m2

£30/ft2 = £333/m2

£401ft2 = £430/m2

LA

BO

RA

TO

RY

APPE

NDIX

2:OC

CUPA

NCYC

OSTA

NALY

SIS-LA

BORA

TORY

crsm

732

Bui

ldin

gfu

nctio

n:M

edic

alre

sear

chla

bora

tori

esL

ocat

ion:

Cen

tral

Lon

don

Ow

ner/

Occ

upie

r:C

hari

tyor

gani

satio

nD

ate

ofer

ecti

on:

1961

--ex

tend

ed19

72

"..

~

UP

PE

RM

AN

AG

EM

EN

TC

RIT

ER

IAA

ND

BU

DG

ET

PR

OC

ED

UR

E

Mai

ntai

nco

rrec

tro

omte

mpe

ratu

rean

dve

rycl

ean

wor

king

cond

ition

s;en

sure

cont

inui

tyof

alls

ervi

ces

and

faci

litie

sto

prev

enta

nyin

terr

upti

onof

labo

rato

ryac

tiviti

es.P

rese

rve

aca

pita

las

set;

mai

ntai

nth

ebu

ildin

gin

asgo

oda

cond

ition

aspo

ssib

le.

An

anal

ysis

ism

ade

ofth

ebu

dget

duri

ngth

epr

evio

usan

dcu

rren

tbu

dget

year

sto

chec

kon

accu

racy

and

toex

amin

eex

pend

itur

etr

ends

.A

nnua

lm

aint

enan

cebu

dget

isin

clud

edw

ithot

her

depa

rtm

enta

les

timat

esan

dsu

bmit

ted

for

appr

oval

.E

xpen

ditu

rere

view

edm

onth

ly-e

heck

sfo

rlik

ely

over

-exp

endi

ture

.

MA

INT

EN

AN

CE

MA

NA

GE

ME

NT

AN

DO

PE

RA

TIO

N

Sup

erin

tend

ent

engi

neer

,de

puty

engi

neer

,re

cord

scl

erk

and

2se

cret

arie

sre

spon

sibl

efo

rm

aint

enan

ce.

Ann

ual

insp

ectio

nsby

supe

rint

ende

nten

gine

er.

Pain

ting

freq

uenc

y:no

rmal

lyev

ery

5y

ears

-mo

refr

eque

ntly

ifre

quir

ed.

Cos

tsre

cord

edun

der

30bu

dget

head

s-in

divi

dual

mai

nten

ance

job

card

sno

tco

sted

.

Wor

kdo

neby

DE

L50

%an

dco

ntra

cted

out

50%

.D

irec

tly-e

mpl

oyed

labo

ures

tabl

ishm

ent

is5

supe

rvis

ors,

18cr

aft

oper

ativ

esan

d14

labo

urer

s.

Sele

cted

cont

ract

ors

for

min

orw

orks

use

the

orga

nisa

tion'

sow

nco

ntra

ctco

nditi

ons.

Com

peti

tive

tend

ers

for

larg

ew

orks

empl

oyJC

Tor

IMec

hEco

ntra

cts.

Con

trac

tsu

perv

isio

n:da

ilyin

spec

tion

onm

inor

wor

ks;p

rogr

ess

repo

rts

and

inte

rim

paym

ents

onla

rge

wor

ks.

App

endi

x2

cont

'd

BU

ILD

ING

FU

NC

TIO

NA

ND

PA

RA

ME

TE

RS

Med

ical

rese

arch

lab

ora

tory

-lab

ora

tori

es36

%,c

ircu

lati

onar

eas

29%

,pl

ant

room

s16

%,

staf

ffac

ilitie

s14

%,o

ffic

es5

%.

400

occu

pant

s(a

vera

ge).

Des

ign

crite

rion

:so

un

dco

nstr

ucti

onfo

rm

inim

umm

aint

enan

ceto

avoi

din

terr

upti

onof

rese

arch

wor

k.

ti o

Gro

ssfl

oor

area

:14

831

m2

Are

aof

pitc

hed

roof

s(o

np

lan

):­

Are

aof

flat

roof

s(o

npl

an):

9882

Are

aof

exte

rnal

glaz

ing:

1583

m2

Sto

reys

abov

e(a

ndin

clud

ing)

grou

ndfl

oor:

9N

o.F

loor

sbe

low

grou

ndfl

oor:

3N

o.F

loor

toce

iling

heig

ht:

2.70

mge

nera

llyto

unde

rsid

eof

susp

ende

dce

iling

.

FO

RM

OF

CO

NS

TR

UC

TIO

N

Stru

ctur

e:R

einf

orce

dco

ncre

tefr

ame.

Cav

itybr

ick

exte

rnal

wal

ls.T

imbe

rdo

uble

-gla

zed

win

dow

s.R

einf

orce

dco

ncre

tero

ofw

ithsc

reed

and

2-co

atas

phal

tco

veri

ng.

Pla

ster

edbr

ick

inte

rnal

part

itio

nson

grou

ndfl

oor,

else

whe

rege

nera

lly

spec

ial

dem

ount

able

tim

ber

part

itio

ns.

Solid

conc

rete

floo

rs.

Fin

ishi

ngs

and

fittin

gs:

Gra

nite

floo

ring

inen

tran

ceha

ll,al

lro

oms

and

corr

idor

slin

oleu

mco

vere

d,til

ing

inpl

ant

room

and

cloa

kroo

ms.

Tea

kla

bora

tory

benc

hto

ps,

cupb

oard

san

dsh

elvi

ng.

Dec

orat

ion:

Pla

ster

edsu

rfac

esem

ulsi

onpa

inte

d;te

akoi

lon

win

dow

san

dfr

ames

exte

rnal

ly.

Serv

ices

:L

PHW

radi

ator

sfo

rco

rrid

ors

and

stai

rcas

es;

high

velo

city

dual

duet

syst

emw

ithfu

llai

rco

ndit

ioni

ngfo

ral

lro

oms

exce

ptpl

ant

room

san

dcl

oakr

oom

s.3

No.

IO-p

erso

n/15

00lb

pass

enge

rlif

ts30

ftlm

inse

rvin

g11

floo

rs;

3N

o.30

00lb

and

2N

o.15

00lb

good

slif

ts15

0ft

lmin

serv

ing

11fl

oors

.E

mer

genc

ylig

htin

g,co

ldro

oms,

liqui

dni

trog

enpl

ant,

com

pres

sed

air,

CO

2ga

s,et

c.

FIN

AN

CIA

LS

TA

TE

ME

NT

:C

OST

PE

R10

0m

2F

LO

OR

AR

EA

Gro

ssfl

oor

area

:14

831

m2

Ele

men

t19

761T

7vm

m19

78n9

1979

/80

1980

181

o.Im

prov

emen

ts&:

8dap

tatI

omt

294.

62£

369.

07£

642.

39£1

498.

74£2

424.

54

1.D

eco

ntl

oa

1.1

Ext

erna

lde

cora

tion

16.8

118

.99

19.5

524

.79

31.4

11.

2In

tern

alde

cora

tion

97.5

785

.65

103.

5313

3.43

234.

39

Sub-

tota

114.

38t

104.

64£

123.

08£

158.

22£

265.

80

2.F

abri

c2.

1E

xter

nal

wal

ls0.

677.

5217

.90

-31

.33

2.2

Roo

fs1.

356.

502.

023.

372.

3O

ther

stru

ctur

alit

ems

45.1

245

.05

32.0

639

.00

42.9

42.

4Fi

tting

s&

fixt

ures

136.

1817

9.69

116.

8413

4.10

237.

94~

2.5

Inte

rnal

fini

shes

27.4

138

.40

36.5

332

.84

59.1

8w -

Sub-

tota

le

210.

73£

2n

.16

£20

5.35

£20

9.31

£37

1.39

3.S

ervi

ces

3.1

Plum

bing

&in

tern

aldr

aina

ge93

.72

83.0

711

4.95

151.

6823

2.41

3.2

Hea

ting

&ve

ntila

ting

410.

4245

5.74

500.

6783

8.16

806

.13

3.3

Lift

s&

esca

lato

rs45

.08

57.6

353

.15

56.1

678

.32

3.4

Ele

ctri

cpo

wer

&lig

htin

g26

1.99

315.

7330

5.26

400.

5239

5.75

3.5

Oth

erM

&E

serv

ices

258.

8827

9.89

370.

9047

2.33

462.

21

Sub-

tota

l£1

070.

09£1

192.

06£1

344.

93£1

918.

85£1

974.

82

4.C

Iaai

DI

4.1

Win

dow

s12

.31

12.5

812

.40

18.1

318

.29

4.2

Ext

erna

lsu

rfac

es4.

3In

tern

al28

5.03

284.

30.2

73.8

936

1.67

480.

65

Sub-

tota

297.

34£

296.

88e

286.

29£

379.

80£

498.

94

App

endi

x2

cont

'd

s,U

tili

ties

5.1

Gas

11.9

916

.46

12.1

618

.57

239.

245.

2E

lect

rici

ty67

4.84

764.

1368

4.28

1195

.71

1331

.91

5.3

Fuel

Oil

S01.

8346

4.73

512.

62m

.5791

3.57

5.4

Solid

fuel

5.5

Wat

erra

tes

78.1

319

8.66

93.9

013

3.17

137.

355.

6E

ffiu

ents

&dr

aina

gech

arge

s7.(

1234

.05

27.9

035

.34

42.0

7

Sub

-tot

al£1

273.

81£1

478.

03£1

330

.86

£231

2.36

£266

4.14

6.A

clm

iDim

'ativ

eco

sts

6.1

Serv

ices

atte

ndan

ts

~6.

2L

aund

ry46

.65

56.4

558

.30

SS.5

210

5.30

~6.

3P

orte

rage

173.

9218

2.70

208

.59

233.

4028

4.7

4N

6.4

Sec

urit

y20

0.54

211.

SO24

6.0

934

0.56

396.

306.

5R

ubbi

shdi

spos

al2.

953.

437

.47

99.1

412

3.30

6.6

Pro

pert

ym

anag

emen

t55

7.59

636.

2070

6.44

1060

.83

1254

.30

Sub

-tot

al£

981.

65£1

090.

28£1

226.

89£

1819

.45

£216

3.94

7.O

verh

eads

7.1

Pro

pert

yin

sura

nce

87.6

585

.63

56.6

456

.64

BO.5

17.

2R

ates

"27

1.65

456.

8938

0.72

476.

3057

3.1

1

Sub

-tot

al£

359.

30£

542.

52£

437

.36

£53

2.94

£65

3.6

2

TO

TA

L£4

307.

30£4

981.

57£4

954

.76

£733

0.93

£859

2.65

°SO

'rora

tes

redu

ctio

n8S

are

sear

chin

stitu

tion.

~rct

:B

uild

ing

Mai

nlel

l8llC

CIn

form

atio

nL

td.

APPE

NDIX

3:OC

CUPA

NCYC

OSTA

NALY

SIS-HA

U.SOF

RESID

ENCE

HA

LL

SO

FR

ES

IDE

NC

Ecr

sra8

56

Bui

ldin

gfu

nctio

n:St

uden

tres

iden

ial

acco

mm

odat

ion

Loc

atio

n:N

orth

-eas

tE

ngla

ndur

ban

area

Ow

ner/

Occ

upie

r:U

nive

rsity

Dat

eof

erec

tion:

1974

UPP

ER

MA

NA

GE

ME

NT

CR

ITE

RIA

AN

DB

UD

GE

TP

RO

CE

DU

RE

Mai

ntai

nbu

ildin

gin

itsst

ate

with

inth

elim

itsof

the

budg

etal

loca

ted

byth

eFi

nanc

eC

omm

ittee

.

Ove

rall

annu

albu

dget

estim

ate

ispr

epar

edfo

ral

lun

iver

sity

build

ings

and

grou

nds,

split

into

1~lemental

head

s,2a

-wag

esan

dsa

lari

es,2

b-m

ater

ials

and

cont

ract

ing

serv

ices

.The

mai

nten

ance

estim

ate

isco

nsid

ered

alon

gw

ithot

her

depa

rtm

enta

lre

curr

ent

esti

mat

esan

dad

just

edac

cord

ing

toal

loca

tions

.Bud

get

cont

rol

isth

ere

spon

sibi

lity

ofth

em

aint

enan

ceof

fice

rwho

revi

ews

expe

nditu

rem

onth

ly

MA

INT

EN

AN

CE

MA

NA

GE

ME

NT

AN

DO

PE

RA

TIO

Ne W

The

mai

nten

ance

offi

ceri

sre

spon

sibl

efo

rth

em

aint

enan

ceof

all

build

ings

and

grou

nds

assi

sted

byth

esu

perv

isor

yst

aff

(ele

ctri

cal,

mec

hani

cal,

build

ings

and

grou

nds)

,of

fice

man

ager

,se

cret

ary

and

thre

ecl

erks

.

Tot

ales

tate

com

pris

es90

.2he

ctar

esin

clud

ing

seve

ral

smal

lsite

saw

ayfr

omth

em

ain

cam

pus;

1343

19m

2fl

oor

area

teac

hing

and

resi

dent

ial

acco

mm

odat

ion.

Rou

tine

insp

ectio

ns:

regu

lar

visi

tsm

ade

bysu

perv

isor

s.M

aint

enan

ceim

plem

ente

dby

PPM

proc

ess

and

requ

isiti

ons

rais

edby

head

sof

depa

rtm

ents

and

othe

rs.

Pain

ting

freq

uenc

ies:

5ye

arcy

cle

exte

rnal

ly;

2an

d4

year

sin

tern

ally

depe

ndin

gon

desi

gnat

edus

e.

Cos

tre

cord

san

dfe

edba

ck:

indi

vidu

aljo

bsar

eco

stco

ded

acco

rdin

gto

I-bu

ildi

ng,2~lement

subd

ivid

edbe

twee

na-

DE

L,

b-e-

cont

ract

,c-P

PM

.

Wor

kdo

neby

DE

L55

%an

dco

ntra

cted

out

45%

.D

irec

tly-e

mpl

oyed

labo

ures

tabl

ishm

ent

is58

into

tal

incl

udin

g6

char

geha

nds.

Con

trac

ted-

out

wor

kis

ona

dayw

ork

basi

s,la

rger

cont

ract

sus

eun

iver

sity

form

orJC

Tco

ntra

ct.

~ ~

App

endi

x3

cont

'd

BU

ILD

ING

FU

NC

fIO

NA

ND

PA

RA

ME

TE

RS

Res

iden

tial

stud

ent

acco

mm

odat

ion

in8

bloc

ksw

ithst

udy

bedr

oom

san

dsh

ared

cond

ition

san

dsa

nita

ryac

com

mod

atio

n.

Com

mun

alre

adin

gro

om.

95%

stud

ent

acco

mm

odat

ion,

5%an

cilla

rybu

ildin

gs.2

60oc

cupa

nts.

Gro

ssfl

oor

area

:40

36m

2St

orey

sab

ove

(and

incl

udin

g)gr

ound

floo

r:3

No.

Are

aof

pitc

hed

roof

s(o

npl

an):

1714

m2

Floo

rsbe

low

grou

ndfl

oor:

Are

aof

flat

roof

s(o

npl

an):

23m

2Fl

oor

toce

iling

heig

ht:

2.30

mA

rea

ofex

tern

algl

azin

g:46

8m

2H

eigh

tto

ridg

e:10

.00

m

FO

RM

OF

CO

NS

TR

Ucn

ON

Stru

ctur

e:T

radi

tion

alco

nstr

uctio

n.L

oadb

eari

ngbr

ickl

bloc

kca

vity

exte

rnal

wal

ls,

plas

tere

din

tern

ally

.A

lum

iniu

mho

rizo

ntal

slid

ing

win

dow

s;V

elux

roof

light

s.Pi

tche

dro

ofw

ithcl

aypa

ntile

son

batt

ens

and

felt;

flat

roof

with

3-la

yer

felt

onch

ipbo

ard

and

tim

ber

jois

ts.S

mal

lar

eaof

plai

ncl

aytil

eto

addi

tion.

Blo

ckw

ork

inte

rnal

part

itio

ns.

Solid

insi

tuco

ncre

tefl

oor

slab

tose

ctio

nsan

dsu

spen

ded

timbe

rjo

ists

with

tong

ued

and

groo

ved

floo

rbo

ardi

ngto

rem

aind

er.

Fin

ishi

ngs

and

fittin

gs:

Car

pet,

quar

rytil

es,

non-

slip

tiles

,th

erm

opla

stic

tiles

.K

itche

nfi

tting

s,sh

elve

s.

Dec

orat

ion:

Em

ulsi

onpa

int

tow

alls;

stai

nan

dva

rnis

hto

som

ew

oodw

ork,

glos

sto

som

e,in

clud

ing

exte

rnal

ly.

Serv

ices

:Cop

per

wat

erse

rvic

es,

PVC

was

tes,

saltg

laze

ddr

ains

.G

as-f

ired

boile

rs,

one

per

hous

e;1

radi

ator

per

room

18-2

1°C

.K

itch

eneq

uipm

ent.

Lau

ndry

..

FIN

AN

CIA

LS

TA

TE

ME

NT

:C

OS

TP

ER

100

m2

FL

OO

RA

RE

AG

ross

floo

rar

ea:

4036

m2

Ele

me

nt19

7817

919

79/S

O19

8018

119

81/8

219

82/8

3

o.Im

pron

meu

Cs

Itad

apta

tions

£92

.81

£-

£14

.99

£-

£

1.D

ecor

atio

D1.

1E

xter

nal

deco

rati

on-

-1.

418.

280.

371.

2In

tern

alde

cora

tion

103.

6417

.64

157.

5691

.87

136.

92

Sub

-tot

al£

103.

64£

17.6

158.

97£

100.

15£

137.

29

2.Fa

bric

2.1

Ext

erna

lw

alls

2.38

3.77

3.37

6.37

4.16

2.2

Roo

fs9.

543.

449.

099

.12

11.6

52.

3O

ther

stru

ctur

alit

ems

22.6

43.

6915

.12

22.1

866

.40

2.4

Fitt

ings

&fi

xtur

es13

.95

15.8

112

.44

15.5

445

.81

2.5

Inte

rnal

fini

shes

7.88

4.46

8.15

6.24

29.6

9

.. ~S

ub-t

otal

£56

.39

£31

.17

£48

.17

£59

.45

£15

7.71

VI

3.S

en

ka

3.1

Plum

bing

&in

tern

aldr

aina

ge9

.42

24.4

035

.06

24.3

843

.09

3.2

Hea

ting

&ve

ntil

atin

g9.

6118

.19

31.7

139

.56

38.6

03.

3L

ifts

&es

cala

tors

--

--

-3.

4E

lect

ric

pow

er&

ligh

ting

9.96

25.0

560

.46

65.3

459

.94

3.5

Oth

erM

&E

serv

ices

10.2

112

.44

26.8

128

.77

31.7

4

Sub

-tot

al£

39.2

80.0

154.

04£

158.

05£

173.

37

4.C

IeaD

iDI

4.1

Win

dow

s5.

035.

288.

237

.51

9.46

4.2

Ext

erna

lsu

rfac

es4.

3In

tern

al29

0.34

423

.44

422.

5252

0.4

651

6.55

Sub

-tot

al£

295

.37

£42

8.7

430.

75£

527

.97

£52

6.01

App

endi

x3

cont

'd

5.U

tiliti

es5.

1G

as18

9.12

322.

7040

0.02

411.

1744

6.11

5.2

Ele

ctri

city

59.2

797

.40

127.

9414

3.36

162.

365.

3F

uel

Oil

5.4

Solid

fuel

5.5

Wat

erra

tes

25.7

927

.92

27.6

527

.75

25.0

55.

6E

ffiu

ents

&dr

aina

gech

arge

s

Sub

-tot

al£

274.

18£

448.

02£

555.

61£

582.

28£

633.

52

6.-A

dmiD

lstr

atiY

eco

sts

6.1

Serv

ices

atte

ndan

ts6.

2L

aund

ry26

.63

64.7

282

.71

104.

8658

.67

6.3

Por

tera

ge

~6.

4Se

curi

ty1

96.4

112

2.02

138.

5314

6.13

174.

060

\6.

5R

ubbi

shdi

spos

al6.

6P

rope

rty

man

age

ent

85.1

893

.93

117.

1412

0.66

130.

20

Sub

-tot

al£

208.

22£

280.

67e

338.

38£

371.

65£

362.

93

7.O

verh

eads

7.1

Pro

pert

yin

sura

nce

39.5

244

.65

52.5

060

.93

58.8

27

.2R

ates

256

.32

289.

3934

8.81

369.

8040

6.42

Sub

-tot

al£

295.

84£

334.

04£

401.

31£

430.

73£

465.

24

TO

TA

L£1

272.

84£1

620.

34D

JRrl.

23£2

230.

28£2

456.

07

SoI

UU

:B

uild

ing

Mai

nIcJ

laD

celD

form

atio

nU

d.

AC

UT

EH

OSP

ITA

L

APPE

NDIX

4:EN

ERGY

COST

ANAL

YSIS

OFHO

SPITA

L

CII

SfB

412

Bui

ldin

gfu

nctio

n:52

1be

d,m

ainl

yac

ute

hosp

ital.

Loc

atio

n:

. 'E

dmon

ton,

Lon

don

N18

.D

escr

iptio

nof

site

:Sh

elte

red

loca

tion

.G

ross

floo

rar

ea:

6890

0m

2

Gro

sS·i

nter

nal

cube

:23

190

0m

3 ;

Dat

eof

erec

tion:

Old

erbu

ildin

gsor

igin

ally

erec

ted

asa

wor

khou

seda

ted

1840

-198

5w

ithad

ditio

nsda

ted

1899

as~

infi

rmw

ards

.So

me

new

erbu

ildin

gs19

60,

1972

,19

81.

~Fo

rmof

cons

truc

tion

:O

lder

prew

arco

nstr

uctio

nis

bric

kbu

iltw

ithpi

tche

dsl

ate

roof

s;po

stw

arbu

ildin

gsco

ncre

tefr

amed

.M

echa

nica

lan

del

ectr

ical

serv

ices

:5

No.

Lan

cash

ire

boile

rsfi

tted

with

econ

omis

ers

and

all

rate

dat

1000

0Ib

lhou

r.A

vera

geel

ectr

ical

max

imum

dem

and

is82

0kV

Ape

rm

onth

.S

tand

byge

nera

tor

max

imum

ratin

gis

1200

kW.

Hou

rsof

Occ

upat

ion:

Gen

eral

lyw

ards

and

resi

dent

ialb

lock

s 24

hour

sp

erda

y,7

days

;rem

aind

er8

hour

spe

rda

y,5

days

per

wee

k.H

ours

ofhe

atin

g:In

acco

rdan

cew

ithoc

cupa

ncy.

Hou

rsof

light

ing:

Inac

cord

ance

with

occu

panc

yan

dna

tura

llig

ht.

Mea

sure

sun

dert

aken

tore

duce

ener

gyco

nsum

ptio

n:In

stal

latio

nof

auto

mat

icdo

ors;

wal

land

roof

insu

latio

n;st

rict

upke

epof

pipe

and

vent

ilatio

nsy

stem

lagg

ing

and

inst

alla

tion

ofva

riou

she

atre

cove

rysy

stem

s.Im

min

ent

inst

alla

tion

of

abu

ildin

gau

tom

atio

nsy

stem

.

App

endi

x4

cont

'd

EN

ER

GY

US

AG

E19

79/8

019

8018

119

81/8

2

Sour

ceQ

uant

ity

Cos

tQ

uant

ity

Cos

tQ

uant

ity

Cos

t

Gas

1259

3O

2603

21

32

56

OJ

£35

601

1293

6O

32

34

8E

lect

rici

ty·1

828

8O

J£1

2019

41

82

40

OJ

£135

118

1798

6O

J£1

88U

J7Fu

eloi

l(3

500

sec.

)18

300

6O

J£2

96n«

1787

88O

J£4

1228

818

039

0O

J£4

0067

6

Tot

alth

erm

seq

uiva

lent

2tm

221

ther

ms

199

307

2th

erm

s2

002

814

ther

ms

EN

ER

GY

CO

NS

UM

PT

ION

2942

.27

2892

.70

2906

.84

The

rms

per

100

m2

per

annu

m

~E

NE

RG

YU

SA

GE

1982

/83

1983

/84

1984

/85

w 00

Sour

ceQ

uant

ity

Cos

tQ

uant

ity

Cos

tQ

uant

ity

Cos

t

Gas

1226

8O

3749

15

69

2O

3775

18

41

2O

3751

5E

lect

rici

ty22

760

OJ

£225

280

2434

5O

J£2

2987

222

845

OJ

£231

814

Fuel

oil

(350

0se

c.)

1591

49O

J£4

3646

515

7602

OJ

£525

319

1324

09O

J£5

1775

0

Tot

alth

erm

seq

uiva

lent

184

040

9tb

erm

s1

778

443

ther

ms

155

122

6tb

erm

s

EN

ER

GY

CO

NS

UM

PT

ION

UJ7

1.13

2581

.19

2251

.42

The

rms

per

100

m2

per

annu

m

So

uru

:8

MI

Ltd,

Stu

dyo

fEM

rgyi

nB

uild

ings

(198

6).

APPENDIX 5: CLASSIRCAnON OF MAINTENANCE OPERAnONS AND REPAIRS

Primary code

1. External decoration2. Internal decoration3. Main structure

4. Internal construction

5. Finishes and fittings

6. Plumbing and sanitary services

7. Mechanical services including heating andventilation and gas installations

Secondary code

31. Foundations and basements32. Frame33. External walls. chimneys and flues

(excluding boiler flues)34. External windows and doors including

glazing35. Roof structure36. Roof coverings37. Roof lights and glazing38. Gutters and rainwater pipes

41. Ground floors(where not part of foundation slab)

42. Upper floors43. Staircases and steps44. Internal walls and partitions45. Doors and screens including glazing

51. Ceiling finishes52. Wall finishes53. Floor finishes54. Shelves. built-in furniture and miscel­

laneous joinery55. Ironmongery56. Cloakroom and similar miscellaneous

fittings

61. Cold water service pipes. storage tanks.cisterns and valves

62. Hot water service pipes. storage tanksand cylinders. domestic boilers, valvesand insulation

63. Sanitary fittings including taps and traps64. Waste, soil and vent pipes

71. Boilers, firing. instrumentation and auto­matic controls, flues

72. Steam and hot water distribution includ­ing heat exchangers and heating app­liances

439

440 Appendix 5

Primary code SecondJlry code

73. Workshop equipment, lifting appliancesand special industrial equipment

74. External water supply, treatment andstorage plant

75. Lifts76. Air conditioning, ventilation and refrige­

ration77. General utilities78. Gas installations and equipment (except

kitchen equipment)

8. ElectricQI services and kitchen equipment(all typeS)

9. External and civil engineering works

O. Miscellaneous and ancillary works

81. Electrical generation and prime movers82. Electrical transmission and distribution83. Electrical installations (wiring switch and

control gear)84. Electrical appliances and fittings (except

kitchen equipment)85. External lighting and airfield lighting86. Lighting protection, ELV systems and

equipment87. Kitchen equipment

91._ Roads, car parks, parade grounds,hardstandings and runways

92. Paths, playgrounds and general pavedareas

93. Fences, gates and boundary walls94. Drains and ditches95. Sewage disposal96. Water storage tanks and reservoirs97. Railway tracks, platform docks, wharves

and jetties, sea defence walls98. Horticultural and arboricultural works99. Miscellaneous external works

01. Adaptations and minor new works02. Replacement of fire damage03. Routine cleaning

Sourc«: DOE. Mainltnanc~ Manuals/or Buildings. HMSO (1970)

INDEX

Abstracting 26fr8Accounts 342-6, 392-3Advisory bodies for repair and

preservation 323Aggregates for concrete 415Agreement for Minor Building

Works 303, 306-11Agrement certificates 246-7, 250Air bricks 112,259Air conditioning 183--4Air ducts 112Air locks 180Air seasoning 99Air starvation in fires 93Alarm systems 193--4, 196-7Alkali resisting primers 170Alterations

documentation 273--4examples 211-18grants 222-6pricing- 287-9scope 208-18sequence and management 218-20

Aluminium sheeting 74Aluminium windows 146, 147Ambrosia beetles 205Analyses 357-8, 429-38Approved inspectors 320Approximate quantities

estimates 276, 277Architect 304-5Articles of agreement 302-3Asphalt floors 115Asphalt measurement 271Asphalt roofs 127-8Asphalt tanking 50Avoidable maintenance 3

Bad neighbours (building uses) 327Ball valves 175, 178, 179-80

SkevingtonIBRE 178Banwell report 301Bar chart 396Bark beetles 205Bark pocket 101Basements 49-50Bedrock costs 343, 344Billing 268-9Bills of quantities 264-9,304Bills of quantities contracts 298Birds 203Bitumen felt roofs 125-7Bituminous paints 85Blistering of paintwork 166, 422Block plan 326Bloom on paint 167Blowing of plaster 152Boilers 181-2

chimneys 94-5, 181Bonus payments 402, 403- 4, 405Boundaries 336Boundary walls 53Bread beetles 205Breakdown maintenance 346Bricks

clay 56requirements 251-2, 416specification 255-{i, 261-3types 56-7

Brickworkboundary walls 53cracks 63-5defects 5fH>7drying shrinkage 66efflorescence 58-60

441

442 Index

frost action 62-3fumes from cavity foam 67laminated 55lichens 66measurement 270moisture penetration 55mortars 57~, 59pricing 283-5settlement 63specification 261-3stability 63-4stains 60-1, 88sulphate attack 33,61-2supervision 416-17unsound materials . 65-{)

British Standards 242-6Budgeting 342-6Builders' accounts 289-90Bulding Conservation Trust 11Building contracts 295-301Building control 317-31, 334-5Building control officer 306Building decay 29-30Building defects 19,234-5Building incentive schemes 402-5Building lines 332Building lives 17-18Building maintenance

avoidable 3concept 1condition-based 3control 381-97corrective 2costs 2~

definition 1-2economics 28--30emergency 3feedback 12liability 8--10magnitude 5-8nature 1~, 13-17needs 10-11planned 2predictable 3preventive 2priorities 11-12resources 12-13scheduled 3significance 4-5technology 18-20unplanned 2

Building Maintenance Information

Ltd 357-8Building managers 400Building notices 320-1Building operatives 334-5, 401-2Building records 354-5, 425Building regulations 317-22

applications 317-18Building reports 233-5Building Research

Establishment 15-17,63,78, 79Building settlement 40-4Building supervisors 320, 401Building surveyors 13,400Buildings

dangerous 332-3inspection 232-3,334-5setting out 410-11supervision 411-25

Cables 185Calcium silicate bricks 57Carbonation of concrete 73-4Carpentry

supervision 419-20timbers 100, 112-13, 117-18

Carpet beetles 205Carpets 116Catalogues 247, 395-{)Categorisation of repairs 375Cavity walls 81, 133, 417Cellar fungus 104Cement 415Cement rubber latex flooring 115Central maintenance

administration 374-5Ceramic tiles 159Certificates 312Cesspools 190Chain link fences 53Chalking of paint 166Check on timber 101Chestnut pale fences 53Chimneys 90, 93-5Chipboard 113Chipped grain 101Chlorinated rubber paint 85City maintenance structure 375-6Civic Trust 323Claddings 54-6, 72-()Claims 313CLASP 43

Classification of maintenanceoperations and repairs 439-40

Clay bricks 56Clay floor tiles 114Clay soils 34-7, 40Clean Air Act 1956 333-4Cleaning

brickwork 56, 60, 66cycles 200, 350execution 199-200, 398facilities 200-1flooring 201-2graffiti 202kitchens 202sanitary appliances 202schedule 381 !

stonework 71-2windows 201

Clerk of works 306. 374, 407-9diary 408-9reports 409

Climbing plants 66Close boarded fences 52Code for the Measurement of Building

Works in Small Dwellings 269Codes of Practice 245-6Cold roofs 121Colourless stone preservatives 71Colourless water repellent liquids 70,

85-6Colourless waterproofers 85-6Committed costs 343Common furniture beetle 107, 109,

11~11

Common property 397-8Compartmentation 195Component maintenance

procedure 383, 385-7Composite price rates 276, 277Computerised maintenance

management 184, 345-6, 352-4 ,375-6,381 ,383,396-7,404

Concreteaggregates 415cancer 74cladding 73-4, 75curing 415defects 81gauging 414laying 414measurement 269-70mixes 415-16

Index 443

mixing 413-14panels 73-4pricing 282-3reinforcement 74, 81, 414repairs 74specification 255-6stools and ground beams 43supervision 413-16

Concrete beams 414Concrete beds 113Concrete flags 51-2Concrete foundations 38-9, 413-14Concrete frames 76-7Concrete paving 42, 51-2Concrete roof tiles 119Condensation 86-90,91, 118, 121Condition-based maintenance 3Conditions of contract 303Conditions of contract for minor

works 306-11Condominium maintenance

management 397-9Conduits 185Coniophora puteana 104Construction Industry Training

Board 399-400Contingency sum 255Contract

approximate quantities 298bill of quantities 298conditions 303cost plus 296-7design and build 299determination 31~11

form 292-5JCf Conditions 303lump sum 298maintenance 299-301national schedules 300-1parties 304-Qremedies for breach 294-5schedule 297-8target cost 297term 299-300types 296-301validity 293-4

Contract documents 302-4Contract drawings 304Contract for minor works 303,

306-11Contract labour 369-71Contract procedures 311-15

444 Index

Contractor 305Control card 382Controlling cost 34~

Conversionsgrants 222-6scope 216, 217

Copper roofs 128,418Cork tiles 115Corrective maintenance 2Corrosion of metals 66, 74, 76, 77,

81,145-7Cost analyses 357-8, 429-38Cost classification 355-7Cost control 342-6, 392-3Cost discounting 24-7Cost in use 24-8, 365Cost plus contracts 296-7Cost records 354-8Cost yardsticks 20-1Cost-benefit analysis 229-30Covenants to repair 231,232Cowls 94Cracks

asphalt 127brick walls 63-5causes 19concrete and calcium silicate

bricks 57external renderings 153, 157, 158plaster 148, 150reinforced concrete 76shrinkable clay 34, 35, 37wall claddings 41, 75

Critical path 396Cube estimates 275Cupboards 259Curtain walling 72-3Cycles

cleaning 200, 350, 381inspection 347-8maintenance 376,379-81painting 160-1, 162-3,349-50services 350, 352

Damages 294Dampness

causes 80-3, 141, 143treatment 83-6

Damp-proof courses 81, 112,417Damp-proofing

methods 83-5, 113

specification 256, 262-3Dangerous buildings 332-3Data dissemination 354-8Daywork · 312- 13Dead shores 45-7Deadwood 101Death watch beetle 108, 109, 110,

111Decorations 159-71Decorative laminates 159Defective Premises Act 1973 9,334Defects notification 383-4Dehumidifier 90Demolition work 289,332,333,

411-12Departmental structures 373-6Depots 376-8Design and build contracts 299Design of buildings 20-2Determination of contracts 310-11Development 324Development plans 325-6Dew point 87Dilapidations 231-2Dilapidations schedules 232-3, 238-9Dimensions paper 265-6Direct labour organisations 369-73,

·375Disabled people, needs 220-2Discoloration of paint 167Discounting costs 24-7Doors

defects 143-5, 203, 420security 192-3specification 259

Doorway, pricing 287-9Dormers 215Dote in timber 102Double glazed windows 131, 133-4,

171Double vacuum method of timber

preservation 99Dovecote 94Drainage

defects 189-90easements 336French 84inspection 190inspection chambers 190,261,

424-5land 49,84manholes 190, 424-5

Drainage cont'dmeasurement 273sealing old drains 411setting out 423specification 260-1supervision 423testing 424

Drawings 304Dry linings 49, 84Dry rot 102-4, 105, 106, 112, 117,

139

Earwigs 204Easements 335-6Economic life 18Efflorescence 58-60, 151Electrical installations

disconnecting old services 411fire risk 185lighting 186measurement 272prime cost item 260regulations 185,334requirements 184-6

Electrolytic action 177Electro-osmosis damp-proofing 84Elemental classification 439- 40Emergency maintenance 3Employer 304Empty cell timber preservation

process 99Emulsion paint 169Energy cost analysis 437-8Enforcement notices 335Engineered costs 343Engineers 305Environmental works 155Enzymes 102Epoxy resin grouting 74Escape routes 196-7Estimates

approximate 274-7approximate quantities 276, 277arrangements 2n-80cube 275floor area 274-5preparation 274-89schedule of claim 238-9storey enclosure 2nunit zn

Excavationmeasurement 269

Index 445

pricing 281-2supervision 413support 413

External renderings 153-7Extractor fans 89Extraordinary traffic 332

Factories Acts 1-2, 10, 191,323Failures 17,19,76-7,78-80, 120-1Fair wear and tear 231Feedback 12,21 ,358-60,386Fencing

maintenance 52-3measurement 273

Filters (air conditioning) 183-4Final account 315Finishings 159Fire alarms 196-7Fire extinguishers 197Fire fighting arrangements 198-9Fire fighting equipment 196-8Fire hazards 78-9, 195-6Fire insurance 366Fire precautions 195-9Fire Precautions Act 1971 334Fire resisting construction 194-5Fire spread 194Fire stopping' 195Fireplace, closing openings 95Flanking transmission of

sound 129-30Flashings 118Flat roofs 119-29Flood damage 205-6Floor

boarding 112, 113floating 131hardwood strip 115solid 113sound insulation 131specification 258suspended timber 11 1-13, 419thermal insulation 132-3wood block 115

Floor area estimates 274-5Floor cleaning 201-2Floor coverings 113-16Floor levels 411Floor noises 112Floor seals 116Floor strutting 48Floor tiles 114-16

446 Index

Flour beetles 205Fluctuations 313-15Flue linings 94-5Flues 93-5, 181, 187Fluorescent tubes 186Flying shores 47, 48Food cupboards 259Food Hygiene Regulations 334Foreman 305Formwork 414Foundations

concrete 38-9inspection 38levels 411modification 39narrow strip 36, 37pedatified 44problems 34-8short bored pile 36, 37

French drains 84Frost heave 37Frost precautions

brickwork 62-3concrete 39plumbing 176-7

Full cell timber preservationprocess 99

Fumes from cavity foam 66Fungal attack 101-6, 138Fungicidal treatment of timber 141-2Furniture beetle 107, 109, 110-11Furring 180

Gantries 412Gas installations 187General development order 324Glass 171Glass fibre reinforced cement

(GRC) 76Glazing

measurement 272pricing 286requirements 171supervision 422

Good tenantable repair 231Graffiti 202Granolithic floors 113-14Grants

buildings and plant 365-6improvement 222-6payment 226

Grass cutting 52

Gravel 50Grit blasting 71Ground beams 43Grouting 49Gutters 118,419Gypsum plasters 149

Hand pumps 198Health and Safety at Work Act

1974 10, 191,333Heating requirements 89Heating systems 181-2High alumina cement 77Highways Act 1980 331-2Hoardings 412Hospitals 6Hot water supply 180-3House insulation grants 225House longhorn beetle 107, 109Housing 5-6

Association maintenancestructure 376

condition survey 5timber framed 78-80

Hygrometer 88

Improvementenvironmental works 225grants 222-6lines 332scope 208-18

Incentive schemes 402-5Incinerators 189Information systems 354Injunction 295Insect attack to wood 106-11Insecticides 110-11Inspection chambers 190,261,424-5Inspection cycles 347-8, 379Insulation

sound 129-32thermal 89,132-4

Insurance 310, 365-6Intermediate grants 222, 223-4Internal finishings 159Interstitial condensation 86, 90Interwoven fencing 52Inverted roofs 122Iron 147Ironmonger 145Ivy 66

Jacking 44Job order form 388-9Joinery

defects 138-45measurement 271pricing 285, 288supervison 420

Joint Contracts Tribunal 303

Kiln seasoning 99Kitchen cleaning 202Kitchen improvements 210,258-9Knots 100-1Knotting 164, 421

Labourdirect 369-73oncosts 281

Land costs 27Land drains 49, 84Larder beetles 205Lead roofs 128, 129, 418Leaking roofs 80 ,Liability for maintenance 8-10, 379Lichens 66-7, 85Life cycle costs 20-8, 365Lifts 187-9Lighting 186Lime plaster 149Linoleum 115Local Government Operational

Research Unit 11-12, 348Local Government Planning and Land

Act 1980 371-3, 378Local plans 326Loft conversions 215-16,217Luminaires 149Lump sum contracts 298Lyctus power post beetle 108, 109

Made up ground 37Magnesium oxychloride floorings 115Maintenance

avoidable 3breakdown 346budgeting 342-6computerised 184, 345-6, 352-4,

375-6,381,383,396-7,404condition-based 3definition 1-2economics 28-30elemental classification 439-40

Index 447

emergency 3execution by contractor 389-90feedback 12,21, 358-60, 386inspections 347-8, 379magnitude 1-4, 13-17organisation 373-6, 381-97planned 2, 346-54predictable 3preventive 2procedure 387-9research resources 12-13scheduled 3shut down 346significance 4-5standards 341-2supervision 411-25technology 18-20training 399-402unplanned 2

Maintenance contracts 299-301Maintenance cost records 355-7Maintenance cycles 348-54, 379-81Maintenance data 354-8Maintenance departmental

structures 373-6Maintenance depots 376-8Maintenance incentive

schemes 402-5Maintenance liability 8-10, 379Maintenance management 390-2Maintenance manuals 360-5Maintenance needs 10-11Maintenance planning 338-9,379-81Maintenance policy

formulation 339-41Maintenance programme 348-54,

378-81, 396-7Maintenance research 15-17Manholes 190, 424-5Manuals 360-5Masonry paint 85Mastic asphalt 115Measurement procedures 264-74Measurement units 269-74Metalwork

corrosion 66, 74, 76, 81, 145-7measurement 272painting 165, 168

Metrication 122-3, 426-8Micro bore heating systems 182Mining subsidence 37-8; 42-4MOATS 250Mobile depots 377-8

448 Index

Modernisation of dwellings 181,211-16,253-61

Moisture measurement 82-3Mortars 57-8, 59, 416Moulds 66-7,87,92, 151Mycelium 102, 104

National BuildingSpecification 249-50

National House-Building Council 9,80

National schedules 300-1National Trust 323Network analysis 396-7Newtonite 49Noises

floor 112hot water supply 180plumbing 132, 178

Notification of defects 383-4

Occupancy cost analyses 357-8 ,429-36

Occupational charges 24, 27Offices, Shops and Railway Premises

Act 1963 10, 334Operating costs 24, 334Organisation 373-6, 381-97Outline planning applications 327Overflows 175, 180Overheads 281Oxidation 127

Package deal contracts 299Paint primers 164, 165, 168Paint removers 164, 165Painting

blistering 166, 422cycles 160-1defects 160, 161, 162, 166-7discoloration 167maintenance practice 168-9measurement 273pricing 286-7,288,289procedures 159-71processes 164quality 160specification 257supervision 421-2

Painting asbestos cement 170Painting ceilings 169-70Painting masonry 170Painting metalwork 165, 168, 421

Painting walls 169-70, 422Painting woodwork 164-5, 422Paints

bituminous 85chlorinated rubber 85emulsion 169masonry 85

Paperhanging 422Paraffin heaters 87Partitions 131Pattern staining 170-1Pavings 50-2Payment for works 309Pebbledashing 85, 156Pedatified foundations 44Performance specifications 250-1Permitted development 325Pest infestation 202-5Petroleum storage 333Piling 36, 37, 39Pinworm beetles 205Pipes

classification 252drain 190,423-4easements 336service 174

Pitched roofs 117-19, 120Pitchmastic 115Planned corrective maintenance 2,

346-7Planned lighting maintenance 186Planned maintenance 2, 346-54Planned preventive maintenance 2,

346-7Planning

applications 326-8certificates 328control 322-31development plans 325-{)maintenance work 338-9,379-81notices 328 ..permission 323--(jpermitted development 325register 328, 329Use Classes Order 324-6

Plans 321Plant 393, 394Plasterwork

characteristics 149defects 148, 150-3, 421measurement 272painting 169-70pricing 286

Plasterwork cont 'dspecification 25~7supervision 420-1

Plastic repairs to stonework 70Plastics pipes 147, 174Plastics sheeting 75-6Plastics wastes 423Plastics windows 147Plumbing

defects 81, 174-6frost precautions 176-7measurement 272modernising 181noises 132, 178, 180, 181single stack 178-9supervision 422-3

Policy formulation 339-41Polystyrene 134Popping of plaster 152Powder post beetle 108, 109Preambles 268Precast concrete cladding 73-4, 75Predictable maintenance 3Prefabricated building

extensions 216, 218Preliminaries 254-5Preservation of timber 99-100, 102,

138,141-2Price adjustment formula 313-15Price fluctuations 313-15Pricing alterations 287-9Pricing building work 2~7Pricing repairs 238-9Primers 164, 165, 168Programming

cleaning 350costs 343maintenance 348-54,396-7painting 349-50services 350, 352

Proofs of evidence 23~9

Protimeter 82, 88Ptilinus 107, 109Public inquiries 330-1Putty 171PVC tiles 114-15

Quantity surveyor 305Quantum meruit 295

Radiators 182Rainwater goods 81,88,419Raking shores 46,47,48

Index 449

Ramps 220, 221Records

building work 354-5, 425clerk of works 409cost 355-7data 354

Recreational facilities 399Rectification work 14Redevelopment 226Redwood 138Refuse chutes 189Refuse collection from flats 189Rehabilitation

advantages 22~7cost-benefit studies 229-30financing 227-8

Reinforced concrete 73-4, 7~7Reinstatement grants 225Relative humidity 8~7

Relet repairs 387Renderings 49-50,85, 153-7, 158

finishes 15~7mixes 154-5

Renovations 14-15Repairs categorisation 375Repairs grant 222, 225Replacements 14-15, 27-8Reports

clerk of works 409technical 233-5

Rescission 295Research · 15-17Resin pocket 101Retention money 309Ribbing of timber 101Rights

drainage 336light 335-6support 336way 336

Rindgall 101Ring mains 184-5Rising damp 81-5Rodents 203, 204Roofs

asphalt 127-8bitumen felt 125-7copper 128, 418flashings 118flat, construction 119-21flat, defects 122-5flat, design 120-2gutters 118

450 Index

lead 128, 129, 418measurement 271metal flat 128moisture penetration 118-19pitched, coverings 118-19pitched, timbers 117-18,419-20polymer 128pricing 285slates 118-19, 120, 418supervision 418-19thatch 119thermal insulation 134,419tiles 118-19, 418zinc 129, 418

Roughcast 85, 156-7Rubber flooring 115Running costs 24, 27

Safety 190-2, 332-3, 412Sand 415Sanitary appliances 177, 179-80,422Sapwood 138, 139Sawflies 204Schedule contracts 297-8Scheduled maintenance 3Schedules of condition 233School conversion 216-17Seasoning timber 98-9Security 192-4,398Selective tendering 301-2Self-siphonage 178SerpuJa lacrymans 102-4, 105, 106,

112, 117, 139Services

improvement 210-11maintenance 174-90, 398programming 350, 352

Servicing 14Setting out 410-11Settlement 40-8, 63Shakes in timber 101Sheeriness in paint 167Shoring 41,45-8Showers 180Shrinkable clay 34-7, 40Shrinkage

brickwork 66clay 34-7,40paint 166plaster 150, 151timber 79

Shut down maintenance 346Silicone treatment 49, 84, 85-6

Silverfish 204Single stack plumbing 178-9,423Site arrangements 278-80Site boundaries 336Site conditions 32-3Site huts 279Site investigations 32-3Site meetings 410Site plans 326SkevingtonlBRE ball valve 178Skirtings, hollow detachable 185Skirtings to flat roofs 125Slates 1l~19, 120, 418Slenderness ratio 63Small bore heating systems 182Smoke detectors 197Smoky chimneys ' 90, 93-4Socket outlets 185Soils 33-8Solar protection 121, 123Sound insulation 129-32Special grants 224Specific performance 294Specification

drafting 251-3format 247-51National Building 249-50performance 250-1pu~se 241, 303sources ·of information 241-7typical 253--63

Split timber 101Sprinklers 198Stability of brick walls 63-4Stable conversion 216,217Stainless steel 146Stains 60-1,88,95, 152Staircases 116-17, 195Standard Method of Measurement of

Building Works 265, 269Standard times 403Standards of maintenance 341-2States of asphalt 127Statutory requirements 9-10, 309-10Steel reinforcement 74,414Steelwork

demolition 412frames 76-8measurement 272painting 165, 168, 421setting out 410treatment 145-6weathering 78, 145

Stock control 394-QStonework

cleaning 71-2colourless treatments 70-1defects 67-9measurement 270repairs 170

Stop notice 335Storage tanks 177Stores, computerised 394-QStores requisitions 395Storey enclosure estimates 277Structural frames 76-8Structural life 18Structural reports 234Structure plans 325-6Sub-contractors 305Sulphate attack 61-2, 157Supervision of maintenance

work 411-25Surface condensation 86, 87Suspended floors 111-13

Taking off 265-6Tanking 50Tanks 177Target cost contracts 297Target times 403-4Tarmacadam 50-1Taxation 29,365-6Technicalofficers 374Tell tales 41Tenants' request cards 384Tendering 301-2, 311Term contracts 299-300Terotechnology 19-20Terrazzo floors 114Testing of bricks 416Testing of cement 415Testing of drains 424Testing of sand 415Thatch roofs 119Thermal insulation 89, 132-4, 419Thermoplastic floor tiles 114-15Throat restrictor to fireplace 93Tie rods 64Tiles

external wall 86, 157-9internal wall 257roof 118-19, 418

Timberdefects 100--11, 117-18

Index 451

moisture content 99nature 98preservation 99-100, 102, 138,

141-2seasoning 98-9specification 256strength 100treatment 110-11types 98

Timber cladding 76Timber floors 111-13, 115Timber framed housing 78-80Timber roofs 117-18, 120Timber staircases 116-17Tonged and grooved boarding 113Tom grain 101Total building costs 23-8Trade catalogues 247Training, industrial 399-400Training, managers 400Training, operatives 401-2Training, supervisors 401Tree roots 34, 35, 37, 42Trench timbering 413Trussed rafters 420Tyrolean 157

Underpinning 39,40,41,43,417Unit estimates 277Unplanned maintenance 2Unvented hot water supply

systems 182-3Upstands to roofs 125Urban regeneration 8Urea formaldehyde foam 133Use classes 324-QV-value 89, 132

Valuation tables 25-7Vandalism 193Vapour barrier 78,90, 122, 123Variations 312Varnish 165Ventilation 89-90, 95Vertical tile hanging 86Vibration 134-5

Wallsboundary 53brick 56-67cavity 81, 133concrete cladding 73--4

452 Index

defects 54-6, 81-3external tiling 86, 157-9insulation 131, 132-3light clad dings 72-3rubble 270setting out 410stone 67-72ties 63-4vegetation on external faces 85waterproofing 85-6

Waney edge 101Warm roofs 121-2Warp 101Wash basins 180Waste pipes 178-9, 423Water buckets 197Water by-laws 334Water closets 179-80Water hammer 178Water spraying 71Water test 424Waterproofing basements 49-50Waterproofing walls 85-6Weatherboarding 76, 86Weathering steels 78Wet rot 104-5, 117Windows

aluminium 146, 147cleaning 201

decay 139-41defects 138-13,420double glazing 131, 133-4plastics 147security 193sound insulation 131specification 257, 259steel 145-6thermal insulation 133wood 139-43

Wiring 185Wood block flooring 115Wood boring beetles 106-11Wood lice 204Wood stains 86, 165Wood wasps 205Woodworm 107, 109, 110-11Work sections 248Work study 403Working up 266-7Wrinkling of paint 167

Yardsticks 20-1

Zinc chromate primer 168, 171Zinc roofs 129, 418