19
Prepared by Sunil Kumar Corrtech Energy Ltd., Ahmedabad (India) [email protected]

Business Plan: Biomass Power Plant

  • Upload
    sunilzon

  • View
    17.735

  • Download
    8

Embed Size (px)

DESCRIPTION

 

Citation preview

  • 1. Prepared by Sunil Kumar Corrtech Energy Ltd., Ahmedabad (India) [email_address]

2. Contents

  • Project Description
  • Market & Growth Drivers
  • Potential of Bagasse based power generation
  • Bagasse based power plant policies
  • Technology /Processes
  • Suggested project
  • Project cost
  • Funding
  • Returns

3. Continue

  • Parties Involved
  • Risk & Risk Mitigation
  • Players in the market

4. Project Description

  • The proposed project is to set up bagasse based Grid connected Advanced Cogeneration Power Plant at existing sugar mill
  • Private or cooperative sugar plants has accepted the importance of cogeneration power plant for exporting surplus power
  • Gujarat as one of the leading sugar producers has great potential for cogen plant
  • The plant will generate required steam for the plant and electricity for the plant and for exporting to the grid

5. Market & Growth Drivers

  • Global Warming & depleting petroleum resources is forcing to generate from renewable source of energy
  • Energy deficit in the peak hours is to the tune of 13%
  • 3% Purchase Obligation of State Utility i.e. at least 3% of total power purchased by distribution company must come from Renewable Energy
  • Government policies and subsidies to promote Renewable Energy
  • CDM benefits makes the investment even more attractive

6. Potential of Bagasse based Co-Gen Power Plants in Gujarat

  • Gujarat has 17 sugar mills in operation with crushing capability of more than 10 million MT per year
  • Bagasse production is 30% of total crushing of sugarcane which creates a potential of 250-300 MW power generation
  • So far only two sugar plants of all have gone for execution of cogeneration power plant, rest are waiting for capable partners

7. Bagasse based power plant policies

  • Supply of biomass, in principal agreement
  • Subsidy to the tune of Rs. 14 crores for 21 MW Plant
  • Open access to the Grid
  • Flat Tariff of Rs. 3.00 for 20 years
  • Transmission / Wheeling charge of 5%
  • Tax exemption for first 10 years
  • Revenue from Carbon Trading to the tune of Rs. 7.5 crores per annum for 21 years
  • Interest subsidy to the tune of 3% from IREDA

8. Technology/ Processes 9. Suggested project

  • Mahua Sugar Plant
  • Capacity: 4000 TCD
  • Bagasse generated (28%): 1120 Tons / Day
  • Self consumption of bagasse in the process & for power generation of 6 MW: 1000 Tons/ Day
  • Days of operation: 190 (from Oct. to March)
  • Amount of bagasse required to generate 1 kwh = 2.2 kg
  • Power generation possible from bagasse (during the season): 27.4 MW

10. Salient Features of the Project

  • Proposed Power plant Capacity: 21 MW
  • Total energy generation in a year:156.37 MU
  • Net energy available for export: 94.61 MU
  • Price of Bagasse: Rs. 250 per ton (special rate)
  • Price of Biomass: Rs. 1200 per ton,
  • Mills additional benefit from selling bagasse to us at special rate is Rs. 2.87 cr. a year
  • Mills will give us land and water at free of cost and bagasse at special rate
  • Mill we get its Power and Steam requirement for free
  • The cogeneration power plant will be handed over toSugar Mill after 20 years of it operation at free of cost

11. Project Snapshot

  • Project cost: Rs. 88 Crore @ Rs. 4 crore / MW
  • Long Term Loan (70 % of the project) at 13%: Rs. 58.8 cr.
  • Subsidy: Rs. 14.2 crores (directly credited to lender)
  • Equity Required: Rs. 26.56 cr.
  • Project Completion Time: 18 months
  • Debt Service Coverage Ratio: Avg. 2.05, Min. 1.72
  • IRR on equity: 23.7 56%

12. Financials(without CDM benefit) Particulars Year 1 Year 2 Year 3 Year 4 Year 5 Energy available for sale94.61 MU 94.61 MU 94.61 MU 94.61 MU 94.61 MU Revenue @ Rs. 3 per unit 2838.2 lacs 2838.2 lacs 2838.2 lacs 2838.2 lacs 2838.2 lacs Fuel, O&M, Insurance, Interest, Depr. 2309.7 lacs 2224.7 lacs 2229.5 lacs 2205.7 lacs 2184.9 lacs PAT 528.5 lacs 613.5 lacs 608.7 lacs 632.5 lacs 653.3 lacs 13. Financials(with CDM benefit) Particulars Year 1 Year 2 Year 3 Year 4 Year 5 Energy available for sale94.61 MU 94.61 MU 94.61 MU 94.61 MU 94.61 MU Revenue @ Rs. 3 per unit 3595.9 lacs 3595.9 lacs 3595.9 lacs 3595.9 lacs 3595.9 lacs Fuel, O&M, Insurance, Interest, Depr. 2309.7 lacs 2224.7 lacs 2229.5 lacs 2205.7 lacs 2184.9 lacs PAT 1286.2 lacs 1371.2 lacs 1366.4 lacs 1390.2 lacs 1411.0 lacs 14. Financial Ratios

  • Without considering CDM benefit:
  • Return on Capital Employed: 12.4%
  • Average Return on Equity: 24.2 % (10 years average)
  • IRR on Equity: 23.7 %
  • Payback Period: Less than 4 years
  • Considering CDM benefit:
  • Return on Capital Employed: 23.3 %
  • Average Return on Equity: 52.8 % (10 years average)
  • IRR on Equity: 56.0 %
  • Payback Period: Less than 2 years

15. Parties Involved

  • Ministry of New & Renewable Energy
  • Gujarat Energy Development Agency (GEDA)
  • Gujarat Electricity Regulatory Commission
  • Sugar Factory Co-operative society
  • Biomass suppliers
  • Lenders: IREDA, PFC, Banks
  • Equity partners
  • Equipment Suppliers:
  • Thermax, Triveni, BHEL, SS Engineers, etc.

16. Risk & Risk Mitigation

  • Funding: Presently liquidity crunch is there
  • Fuel Supply & Prices fluctuation
  • Location disadvantages:
  • CDM Process takes long time

17. Players in the market

  • Kalpataru Power Transmission Ltd.
  • Surya Chamble Power Ltd.
  • Amrit Envi. Tech Pvt. Ltd.
  • Birla Corporation Ltd.
  • Transend Green Power Ltd.
  • Sambhav Energy Ltd.
  • J K Laxmi Cement Ltd.
  • Sathyam Power Ltd.
  • Star Biomass Power Pvt. Ltd.

18. Success Stories

  • As of December, 2004 cumulate to432.53 MWfrom56projects. Additional capacity of about322.97 MWfrom36projects in various stages of construction.
  • Devenagere Sugar Co. Ltd., Karnatka
  • SCM Sugar Ltd., Hyderabad
  • Shree Doodhganga Krishna Sahakari Sakkare Karkhane Niyamit, Karnatka
  • Ref: MITCON, Pune

19. Thanks

  • Sunil Kumar
  • Business Development
  • Corrtech Energy Ltd.
  • Shed No. 7, Survey No. 407, SP-3
  • New Ahmedabad Industrial Estate
  • Sarkhej Bavla Highway, Changodar
  • Ahmedabad 382213, Gujarat (India)
  • Tel: +91 2717 304100