    T E C H N I C A L A N D E C O N O M I C A LP R O J E C T P R E S E N T A T I O N

    K O I C K E N E R G E T I C K S P O L O N O S A . S . 2 0 0 9

    Biomass power plant 4 MWe

  • 8/8/2019 Biomass Power Plant 4 MWe Fin_eng

    2/21

    CONFIDENTIALBIOMASS POWER PLANT, KES a.s, Nov-09

    Introduction

    Koick energetick spolonos a.s. (KES) is well recognized professional company in theenergy sector with excellent know-how in combine production of heat and electricity

    KES based on the agreement with VSS a.s. is developing Biomass power plant in areal of VSS

    KES obtained license from Ministry Economy to build biomass power plant and approvals fromNational electricity network operator (SEPS) and Distribution electricity operation company

    (VSD) for connection to network

    Based on the technical-economical feasibility study KES prepared basic design for 4 MWebiomass power plant with heat combine production :

    Next main consideration were applied: Size of existing building and space for biomass stock Available biomass capacities in the region Capacity for heat deliveries Sustainability of the project

    Based on the engineering studies and pricing by international companies the total investmentis estimated to 15,3 mil. EUR

  • 8/8/2019 Biomass Power Plant 4 MWe Fin_eng

    3/21

    CONFIDENTIALBIOMASS POWER PLANT, KES a.s, Nov-09

    DESIGN LAYOUT

    Visualization andfuture view from the near road

    2009 KES a.s.

  • 8/8/2019 Biomass Power Plant 4 MWe Fin_eng

    4/21

    CONFIDENTIALBIOMASS POWER PLANT, KES a.s, Nov-09

    LOCATION

    Biomass power plantis proposed to be

    build in the areal ofVSS, which is locatedin south industrialpart ofKoicewithuse of existing

    buildings and

    infrastructure to bringmaximum efficiencyinto the project. Theproposed location hasnext strong strongpoints: existingconnection to Centralheating system of city,existing high voltage

    22 kV line forelectricity connectionand transport logisticincluding railway line.

    2009 KES a.s.

  • 8/8/2019 Biomass Power Plant 4 MWe Fin_eng

    5/21

    CONFIDENTIALBIOMASS POWER PLANT, KES a.s, Nov-09

    Technology

    The combine heat and electricity production was selected for the biomass power plant Based on the analysis of sensitivity, the price of biomass was found as most critical The different turbine and boiler manufacturers were included in the pre-tendering procurement phase

    including local and international companies Pre-tendering process documentation was prepared with description of supply and main technical

    parameters Main technology components:

    Biomass fuel handling equipment Fuel warehouse with automatic feeders daily capacity Biomass furnace Steam boiler Condenser and Condensate pumps Air cooler Feed water tank and feed water pumps Water treatment Reduction station Electrostatic precipitator (ESP)

    Combustion air fan Flue gas fans Wet bottom ash container Dry fly ash container Transformer station and connection to 22 kV electric cable Stack Control systems Commissioning

  • 8/8/2019 Biomass Power Plant 4 MWe Fin_eng

    6/21

    CONFIDENTIALBIOMASS POWER PLANT, KES a.s, Nov-09

    High pressure steam boiler

    BFB (BubblingFluidized Bed) typeof steam output 22t/h at 485 oC and55 bar(a) withefficiency 89%nominal power.The advanceddesign of boilerenabling operate

    boiler in the rangebetween 30% -100% and bringingadvantage for the

    availableparameters of fuel.

    Image is intellectualproperty of MW Power

    Image is intellectual property of RENEWA

  • 8/8/2019 Biomass Power Plant 4 MWe Fin_eng

    7/21

    CONFIDENTIALBIOMASS POWER PLANT, KES a.s, Nov-09

    Extraction-Condensing Turbine

    Extractioncondensingturbine withmaximum power4 MWe enablingto operate with

    heating in theextraction modeand in thecondensingmode. The mainadvantage of

    condensingmode is to havepossibility ofoperation powerplant during all

    year.

    Images are intellectualproperty of MAN TURBO

    Image is intellectualproperty of SIEMEN

  • 8/8/2019 Biomass Power Plant 4 MWe Fin_eng

    8/21

    CONFIDENTIALBIOMASS POWER PLANT, KES a.s, Nov-09

    Basic process flow diagram

    The energy inlet is expectedin the form of biomass fuel,steam boiler is recoveringenergy from the furnace

    burning solid biomass fuelat average calorific value 9MJ/kg. The steam isconnected by piping toextraction condensingturbine and reduction

    steam station to havepossibility to by-passturbine. Part of the steamextracted from the turbine

    will be used fortechnological process andfor preparation of the hot

    water for heating purposesand connection to primarynetwork of central heating

    system and to secondaryheating system in theindustrial park of VSS. Theelectricity production wasestimated around 20.000MWh and heat productionaround 200.000 GJ.

    Image is intellectual

    property of MW POWER

  • 8/8/2019 Biomass Power Plant 4 MWe Fin_eng

    9/21

    CONFIDENTIALBIOMASS POWER PLANT, KES a.s, Nov-09

    List of contacted companiesduring pre-tendering phase

    WEISS France MW Power METSO WRTSIL Joint venture MAWERAVIESSMAN group MAXXTEC Germany MAN TURBO - Germany SIEMENS Group

    EKOL Czech republic KOVOSTA FLUID Czech republic BRONSWERK HEAT TRANSFER Czech republic SPIG Italy FANS Czech republic Jeffrey Rader Sweden ISTROENERGO Slovakia ABB Group RENEWA Finland TGM KANIS Germany VAS Austria BACOCK WILCOX Denmark KALUGA - Russia

  • 8/8/2019 Biomass Power Plant 4 MWe Fin_eng

    10/21

    CONFIDENTIAL0 BIOMASS POWER PLANT, KES a.s, Nov-09

    Bids and investment structure

    Companies make pricing based on the scope of supply, which wasselected by them as it was not strictly limited and therefore wereceived proposals for individual parts of technology for turbine(MAN TURBO) or boiler (WEISS), respectively for technology ofpower plant without civil works, installation cost, supportive systemand ect. (EKOL, RENEWA). Based on their offer and continues

    detail engineering works we projected next investment structure:

    In the this investment cost are not include investments needed foracquisition of land, buildings and infrastructure from VSS a.s. andpreliminary development costs.

    Num. Part 000 EUR in mil. SKK

    1 Turbogenerator 4 Mwe and control system 3 100 93 391

    2 Fluid steam boiler and flue gas treatment 6 746 203 230

    3 Air condenser, electrical transformator and supportive systems 2 300 69 290

    4 Fuel handling system 600 18 076

    5 Civil works, additional infrastructure, engineering, installation 2 549 76 797

    Spolu 15 295 460 783

    Investment costs

  • 8/8/2019 Biomass Power Plant 4 MWe Fin_eng

    11/21

    CONFIDENTIAL1 BIOMASS POWER PLANT, KES a.s, Nov-09

    Electricity price

    Price regulation num. 7/2009 by national regulationofficeURSO, article.1, B, 1/e/2: production of el. from biomass EUR/MWh 125,980

    Price modification based on law 309/2009, 6, 5) basedon supporting from public financial sources (grants) from 30% to 40% .. -8 % from 40% to 50% .. -12 % < 50% -16 %

    Price support is based on law 309/2009, 3 forperiod of 15 years.

  • 8/8/2019 Biomass Power Plant 4 MWe Fin_eng

    12/21

    CONFIDENTIAL2 BIOMASS POWER PLANT, KES a.s, Nov-09

    Heating price

    Price is calculated based on the regulatoryframework of RSO

    Competiveness of price is Based on cost of variable part of heat produced from gas in the

    local sources, which represents price around 11 EUR/GJ Heat prices of the plants connected central heating network,

    which represent 8,19 EUR/GJ KOSIT a.s. (0049/2009regulated price

    Competitive heat price for our project is around 8 EUR/GJ For the first year of operation in our model heat price is

    calculated based on regulation rules on the level 8,082EUR/GJ

  • 8/8/2019 Biomass Power Plant 4 MWe Fin_eng

    13/21

    CONFIDENTIAL3 BIOMASS POWER PLANT, KES a.s, Nov-09

    Sales

    Prices are estimated based on legislation and assumptions related to local market The total volume is estimated based on technology process flows and specific

    conditions for heat supplies Growth indexes were applied due to DCF method used internally.

    Sales 2011 2012 2013 2014 2015 2016 2017 2018 2019heat sales in units GJ 0 201 646 201 646 201 646 201 646 201 646 201 646 201 646 201 646

    price EUR/GJ 8,00 8,00 8,00 8,00 8,00 8,00 8,00 8,00 8,00

    annual growth index index - 1,030 1,042 1,044 1,033 1,044 1,026 1,058 1,058

    growth index - 1,000 1,030 1,073 1,120 1,157 1,208 1,240 1,312 1,388

    total sales of heat 000 EUR 0,00 1 661,56 1 731,35 1 807,53 1 867,18 1 949,33 2 000,01 2 116,02 2 238,74

    electricity sales in units MWh 0 22256 22256 22256 22256 22256 22256 22256 22256

    price EUR/MWh 115,9 115,9 115,9 115,9 115,9 115,9 115,9 115,9 115,9

    annual growth index index - 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000

    growth index - 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000

    total sales of electricity 000 EUR 0,00 2 579,54 2 579,54 2 579,54 2 579,54 2 579,54 2 579,54 2 579,54 2 579,54

    Sales total 000 EUR 0,00 4 241,11 4 310,89 4 387,07 4 446,72 4 528,87 4 579,56 4 695,56 4 818,29

  • 8/8/2019 Biomass Power Plant 4 MWe Fin_eng

    14/21

    CONFIDENTIAL4 BIOMASS POWER PLANT, KES a.s, Nov-09

    Costs

    Costs structure depends mainly on biomass as fuel for the process, what is calculated based on technicalparameters. Other costs are define by legislation (el. service for back up, insurances, structure of wages) othercosts as maintenance and service are on the minimum level due to guarantees and high quality standardsused for production of technology. Some other costs will specified during specification of detail operationmodes .

    Costs 2011 2012 2013 2014 2015 2016 2017 2018 2019

    biomass consumption t 0 36 363 36 363 36 363 36 363 36 363 36 363 36 363 36 363

    biomasss price EUR/t 35,000 35,000 35,000 35,000 35,000 35,000 35,000 35,000 35,000

    growth index - 1,000 1,030 1,061 1,093 1,126 1,159 1,194 1,230 1,267

    Biomass costs 000 EUR 0,00 1 310,88 1 350,21 1 390,71 1 432,43 1 475,41 1 519,67 1 565,26 1 612,22

    el. service kW 0 4000 4000 4000 4000 4000 4000 4000 4000

    price of el. service per month EUR/kW 34,400 34,400 34,400 34,400 34,400 34,400 34,400 34,400 34,400

    growth index - 1,000 1,030 1,107 1,148 1,182 1,221 1,263 1,316 1,371

    Cost of el. service 000 EUR 0 142 152 158 163 168 174 181 189number of employess 0 6 6 6 6 6 6 6 6

    average cost pre month EUR 20000 20000 20000 20000 20000 20000 20000 20000 20000

    growth index - 1,000 1,030 1,107 1,148 1,182 1,221 1,263 1,316 1,371

    Cost of salaries 000 EUR 0 124 133 138 142 147 152 158 165

    maintenance EUR 0 100 000 100 000 100 000 150 000 150 000 150 000 200 000 200 000

    cost of fuel handling EUR 0 12 000 12 000 12 000 12 000 12 000 12 000 12 000 12 000

    other operational cost EUR 459 000 125 000 125 000 125 000 125 000 125 000 125 000 125 000 125 000

    sum EUR 459 000 237 000 237 000 237 000 287 000 287 000 287 000 337 000 337 000

    growth index - 1,000 1,030 1,107 1,148 1,182 1,221 1,263 1,316 1,371

    Total other cos ts 000 EUR 459 244 262 272 339 351 362 443 462

    Total costs 000 EUR 459 1 820 1 898 1 959 2 076 2 141 2 207 2 348 2 427

  • 8/8/2019 Biomass Power Plant 4 MWe Fin_eng

    15/21

    CONFIDENTIAL5 BIOMASS POWER PLANT, KES a.s, Nov-09

    Economical summary of project

    2011 2012 2013 2014 2015 2016 2017 2018 2019

    Depreciation tis. EUR 0 706 706 706 706 515 515 515 515

    in 000 EUR 2011 2012 2013 2014 2015 2016 2017 2018 2019

    Sales in project total 0,000 4241,105 4310,891 4387,070 4446,719 4528,874 4579,557 4695,558 4818,287

    Costs in project total 459,000 1820,319 1897,753 1958,549 2076,002 2140,504 2207,309 2347,564 2427,379

    Depreciation assets of project 0,000 706,350 706,350 706,350 706,350 515,100 515,100 515,100 515,100

    Profit on project before tax and interest -459,000 1714,436 1706,788 1722,172 1664,367 1873,271 1857,148 1832,893 1875,808

    Structure of project financing

    Own sources 000 EUR 2 790,00Grant 000 EUR 6 000,00

    Bank loan 000 EUR 6 510,00

    Depreciation is calculated based on structure of the investment depreciation ,where major part is investment. The total investment used for depreciationcalculation is decreased for the amount of grant.

    The project shows good parameters of profitability with grant support. Total investment isprojected on 15,3 mil. EUR. Grant represent 39% and bank loan 43%. The amount of ownfinancial resources was set up based on ratio to bank loan on the level of 30%. For our internalneeds we are working with DCF method and interest rate 7%. Bank loan which we have inmodel has the maturity 6 year with grace period of 1 year.

    Parameters in our DCF model for IRR

    Interests % 7,0Loan, maturity with 1 year grace period years 6,0

    IRR (15 years) % 12,6

  • 8/8/2019 Biomass Power Plant 4 MWe Fin_eng

    16/21

    CONFIDENTIAL6 BIOMASS POWER PLANT, KES a.s, Nov-09

    Sensitivity analysis

    In our internal model we make sensitivityanalysis for expected values according legislationand market. Analysis shows to us, that highestsensibility lay on biomass. This was the reasonfor deciding for fluid technology, which enable tous use alternative fuels to wood chips, which arehighly competitive. Fluid boiler is increasing totalinvestment cost, but on the other site, use of fluidtechnology brings to project long term confidencefor profit generation without any bidingagreements with producers or traders with woodchips.

  • 8/8/2019 Biomass Power Plant 4 MWe Fin_eng

    17/21

    CONFIDENTIAL7 BIOMASS POWER PLANT, KES a.s, Nov-09

    Technical assumptions for the model

    Data in the figures above are estimated based on the preliminary technicalparameters and expected operation mode, which depend on the possibility

    to supply the heat. In the winter season is expected to operate the plant ona full load with delivery within the areal of the VSS and to the network.Based on heat demand in VSS, we can expect, that ratio of this heatsupplies will be 50:50. Dependence on the supplies of heat during thesummer is minimized by condensation turbine and air condenser, which

    will allow to operate turbine at maximum 2 MWe.

    Month of the year Jan Feb Mar Apr Maj Jun Jul Aug Sep Okt Nov Dec

    Days 31 28 31 30 31 30 31 31 30 31 30 31

    Heat supply MWt 9 9 9 9 4 3 2 2 3 9 9 9

    Electricity supply MWe 4 4 4 4 2 1 1 1 1 4 4 4

    Heat supply per month GJ 24106 21773 24106 23328 9641 7662 6108 6601 6783 24106 23328 24106

    Total heat supply GJ 201646

    Electricity supply per month MWh 2976 2688 2976 2880 1190 946 754 815 837 2976 2880 2976

    Consumption MWh 446 269 298 288 119 95 75 81 84 298 288 298

    Total e lectricity supply MWh 22256

    Energy in biomass per month GJ 39123 35337 39123 37861 15647 12435 9914 10713 11008 39123 37861 39123

    Total energy supplied in biomass GJ 327266

  • 8/8/2019 Biomass Power Plant 4 MWe Fin_eng

    18/21

    CONFIDENTIAL8 BIOMASS POWER PLANT, KES a.s, Nov-09

    Grant schema 2.1

    Code of call from 26.10.2009 for project is KaHR 21SP 0901, callrepresents amount of 57 mil. EUR dedicated to energy efficiency andexploitation of renewable sources.

    Specifically for biomass power plants the limit is max. 10 MWe or 30 MWtthermic energy. In both parameters our projects is well below.

    The maximum financial aid for one project is 6 mil. EURor 50% of all eligibleinvestment costs. The maximum of total eligibible cost for project is 25 mil.EUR. The deadline form submitting of proposal is 22.2.2010.

  • 8/8/2019 Biomass Power Plant 4 MWe Fin_eng

    19/21

    CONFIDENTIAL9 BIOMASS POWER PLANT, KES a.s, Nov-09

    Time schedule

    To the engineering preparation is dedicated team including 17professionals in cooperation with engineering office ECONS -Koice, which successfully prepared documentation for landapproval in September October 2009.

    Time schedule

    Indicative proposal from bank to finance project

    Closing day of buy contract with VSS

    Binding proposal from bank to finance project

    Civil construction permission from local authority

    Public tender

    Grant application preparation

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

    Decemeber 2010 January 2010 February 2009

  • 8/8/2019 Biomass Power Plant 4 MWe Fin_eng

    20/21

    CONFIDENTIAL0 BIOMASS POWER PLANT, KES a.s, Nov-09

    List of approvals

    The list of approvals and agreements added:

    Licence to build power plant from Ministry of economy Approval for connection to GRID SEPS a.s. Approval for connection to GRID VSD a.s. Agreement from City Kosice and District Kosice - South Agreement from City Architect Authority Agreement from Regional Environment Authority

    The list of approvals agreements obtained and not added to presentation: Civil Aviation Authority of the Slovak republic Regional authority of Fire and Rescue Services Owner of industrial park VSS a.s. Owner of primary heating network in the city TEKO a.s. Regional authority of Public Healthcare Airport Koice District office of civil defend and crisis operation

  • 8/8/2019 Biomass Power Plant 4 MWe Fin_eng

    21/21

    CONFIDENTIAL1 BIOMASS POWER PLANT, KES a.s, Nov-09

    Other attachments and contacts

    Other attachment: Architectonic study Bids in the pre-tendering process Commercial register Audited financial results 2008

    Contacts:Koick energetick spolonos a.s.

    Teplrensk 3/A

    042 92 Koice

    Statutary representative: Ing. Vladimr DolnContact person: Ing. Miroslav FberTel./Fax: 055 6192836 / 055 - 6192835E-mail: [email protected]