8/8/2019 Biomass Power Plant 4 MWe Fin_eng
1/21
T E C H N I C A L A N D E C O N O M I C A LP R O J E C T P R E S E N T A T I O N
K O I C K E N E R G E T I C K S P O L O N O S A . S . 2 0 0 9
Biomass power plant 4 MWe
8/8/2019 Biomass Power Plant 4 MWe Fin_eng
2/21
CONFIDENTIALBIOMASS POWER PLANT, KES a.s, Nov-09
Introduction
Koick energetick spolonos a.s. (KES) is well recognized professional company in theenergy sector with excellent know-how in combine production of heat and electricity
KES based on the agreement with VSS a.s. is developing Biomass power plant in areal of VSS
KES obtained license from Ministry Economy to build biomass power plant and approvals fromNational electricity network operator (SEPS) and Distribution electricity operation company
(VSD) for connection to network
Based on the technical-economical feasibility study KES prepared basic design for 4 MWebiomass power plant with heat combine production :
Next main consideration were applied: Size of existing building and space for biomass stock Available biomass capacities in the region Capacity for heat deliveries Sustainability of the project
Based on the engineering studies and pricing by international companies the total investmentis estimated to 15,3 mil. EUR
8/8/2019 Biomass Power Plant 4 MWe Fin_eng
3/21
CONFIDENTIALBIOMASS POWER PLANT, KES a.s, Nov-09
DESIGN LAYOUT
Visualization andfuture view from the near road
2009 KES a.s.
8/8/2019 Biomass Power Plant 4 MWe Fin_eng
4/21
CONFIDENTIALBIOMASS POWER PLANT, KES a.s, Nov-09
LOCATION
Biomass power plantis proposed to be
build in the areal ofVSS, which is locatedin south industrialpart ofKoicewithuse of existing
buildings and
infrastructure to bringmaximum efficiencyinto the project. Theproposed location hasnext strong strongpoints: existingconnection to Centralheating system of city,existing high voltage
22 kV line forelectricity connectionand transport logisticincluding railway line.
2009 KES a.s.
8/8/2019 Biomass Power Plant 4 MWe Fin_eng
5/21
CONFIDENTIALBIOMASS POWER PLANT, KES a.s, Nov-09
Technology
The combine heat and electricity production was selected for the biomass power plant Based on the analysis of sensitivity, the price of biomass was found as most critical The different turbine and boiler manufacturers were included in the pre-tendering procurement phase
including local and international companies Pre-tendering process documentation was prepared with description of supply and main technical
parameters Main technology components:
Biomass fuel handling equipment Fuel warehouse with automatic feeders daily capacity Biomass furnace Steam boiler Condenser and Condensate pumps Air cooler Feed water tank and feed water pumps Water treatment Reduction station Electrostatic precipitator (ESP)
Combustion air fan Flue gas fans Wet bottom ash container Dry fly ash container Transformer station and connection to 22 kV electric cable Stack Control systems Commissioning
8/8/2019 Biomass Power Plant 4 MWe Fin_eng
6/21
CONFIDENTIALBIOMASS POWER PLANT, KES a.s, Nov-09
High pressure steam boiler
BFB (BubblingFluidized Bed) typeof steam output 22t/h at 485 oC and55 bar(a) withefficiency 89%nominal power.The advanceddesign of boilerenabling operate
boiler in the rangebetween 30% -100% and bringingadvantage for the
availableparameters of fuel.
Image is intellectualproperty of MW Power
Image is intellectual property of RENEWA
8/8/2019 Biomass Power Plant 4 MWe Fin_eng
7/21
CONFIDENTIALBIOMASS POWER PLANT, KES a.s, Nov-09
Extraction-Condensing Turbine
Extractioncondensingturbine withmaximum power4 MWe enablingto operate with
heating in theextraction modeand in thecondensingmode. The mainadvantage of
condensingmode is to havepossibility ofoperation powerplant during all
year.
Images are intellectualproperty of MAN TURBO
Image is intellectualproperty of SIEMEN
8/8/2019 Biomass Power Plant 4 MWe Fin_eng
8/21
CONFIDENTIALBIOMASS POWER PLANT, KES a.s, Nov-09
Basic process flow diagram
The energy inlet is expectedin the form of biomass fuel,steam boiler is recoveringenergy from the furnace
burning solid biomass fuelat average calorific value 9MJ/kg. The steam isconnected by piping toextraction condensingturbine and reduction
steam station to havepossibility to by-passturbine. Part of the steamextracted from the turbine
will be used fortechnological process andfor preparation of the hot
water for heating purposesand connection to primarynetwork of central heating
system and to secondaryheating system in theindustrial park of VSS. Theelectricity production wasestimated around 20.000MWh and heat productionaround 200.000 GJ.
Image is intellectual
property of MW POWER
8/8/2019 Biomass Power Plant 4 MWe Fin_eng
9/21
CONFIDENTIALBIOMASS POWER PLANT, KES a.s, Nov-09
List of contacted companiesduring pre-tendering phase
WEISS France MW Power METSO WRTSIL Joint venture MAWERAVIESSMAN group MAXXTEC Germany MAN TURBO - Germany SIEMENS Group
EKOL Czech republic KOVOSTA FLUID Czech republic BRONSWERK HEAT TRANSFER Czech republic SPIG Italy FANS Czech republic Jeffrey Rader Sweden ISTROENERGO Slovakia ABB Group RENEWA Finland TGM KANIS Germany VAS Austria BACOCK WILCOX Denmark KALUGA - Russia
8/8/2019 Biomass Power Plant 4 MWe Fin_eng
10/21
CONFIDENTIAL0 BIOMASS POWER PLANT, KES a.s, Nov-09
Bids and investment structure
Companies make pricing based on the scope of supply, which wasselected by them as it was not strictly limited and therefore wereceived proposals for individual parts of technology for turbine(MAN TURBO) or boiler (WEISS), respectively for technology ofpower plant without civil works, installation cost, supportive systemand ect. (EKOL, RENEWA). Based on their offer and continues
detail engineering works we projected next investment structure:
In the this investment cost are not include investments needed foracquisition of land, buildings and infrastructure from VSS a.s. andpreliminary development costs.
Num. Part 000 EUR in mil. SKK
1 Turbogenerator 4 Mwe and control system 3 100 93 391
2 Fluid steam boiler and flue gas treatment 6 746 203 230
3 Air condenser, electrical transformator and supportive systems 2 300 69 290
4 Fuel handling system 600 18 076
5 Civil works, additional infrastructure, engineering, installation 2 549 76 797
Spolu 15 295 460 783
Investment costs
8/8/2019 Biomass Power Plant 4 MWe Fin_eng
11/21
CONFIDENTIAL1 BIOMASS POWER PLANT, KES a.s, Nov-09
Electricity price
Price regulation num. 7/2009 by national regulationofficeURSO, article.1, B, 1/e/2: production of el. from biomass EUR/MWh 125,980
Price modification based on law 309/2009, 6, 5) basedon supporting from public financial sources (grants) from 30% to 40% .. -8 % from 40% to 50% .. -12 % < 50% -16 %
Price support is based on law 309/2009, 3 forperiod of 15 years.
8/8/2019 Biomass Power Plant 4 MWe Fin_eng
12/21
CONFIDENTIAL2 BIOMASS POWER PLANT, KES a.s, Nov-09
Heating price
Price is calculated based on the regulatoryframework of RSO
Competiveness of price is Based on cost of variable part of heat produced from gas in the
local sources, which represents price around 11 EUR/GJ Heat prices of the plants connected central heating network,
which represent 8,19 EUR/GJ KOSIT a.s. (0049/2009regulated price
Competitive heat price for our project is around 8 EUR/GJ For the first year of operation in our model heat price is
calculated based on regulation rules on the level 8,082EUR/GJ
8/8/2019 Biomass Power Plant 4 MWe Fin_eng
13/21
CONFIDENTIAL3 BIOMASS POWER PLANT, KES a.s, Nov-09
Sales
Prices are estimated based on legislation and assumptions related to local market The total volume is estimated based on technology process flows and specific
conditions for heat supplies Growth indexes were applied due to DCF method used internally.
Sales 2011 2012 2013 2014 2015 2016 2017 2018 2019heat sales in units GJ 0 201 646 201 646 201 646 201 646 201 646 201 646 201 646 201 646
price EUR/GJ 8,00 8,00 8,00 8,00 8,00 8,00 8,00 8,00 8,00
annual growth index index - 1,030 1,042 1,044 1,033 1,044 1,026 1,058 1,058
growth index - 1,000 1,030 1,073 1,120 1,157 1,208 1,240 1,312 1,388
total sales of heat 000 EUR 0,00 1 661,56 1 731,35 1 807,53 1 867,18 1 949,33 2 000,01 2 116,02 2 238,74
electricity sales in units MWh 0 22256 22256 22256 22256 22256 22256 22256 22256
price EUR/MWh 115,9 115,9 115,9 115,9 115,9 115,9 115,9 115,9 115,9
annual growth index index - 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000
growth index - 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000
total sales of electricity 000 EUR 0,00 2 579,54 2 579,54 2 579,54 2 579,54 2 579,54 2 579,54 2 579,54 2 579,54
Sales total 000 EUR 0,00 4 241,11 4 310,89 4 387,07 4 446,72 4 528,87 4 579,56 4 695,56 4 818,29
8/8/2019 Biomass Power Plant 4 MWe Fin_eng
14/21
CONFIDENTIAL4 BIOMASS POWER PLANT, KES a.s, Nov-09
Costs
Costs structure depends mainly on biomass as fuel for the process, what is calculated based on technicalparameters. Other costs are define by legislation (el. service for back up, insurances, structure of wages) othercosts as maintenance and service are on the minimum level due to guarantees and high quality standardsused for production of technology. Some other costs will specified during specification of detail operationmodes .
Costs 2011 2012 2013 2014 2015 2016 2017 2018 2019
biomass consumption t 0 36 363 36 363 36 363 36 363 36 363 36 363 36 363 36 363
biomasss price EUR/t 35,000 35,000 35,000 35,000 35,000 35,000 35,000 35,000 35,000
growth index - 1,000 1,030 1,061 1,093 1,126 1,159 1,194 1,230 1,267
Biomass costs 000 EUR 0,00 1 310,88 1 350,21 1 390,71 1 432,43 1 475,41 1 519,67 1 565,26 1 612,22
el. service kW 0 4000 4000 4000 4000 4000 4000 4000 4000
price of el. service per month EUR/kW 34,400 34,400 34,400 34,400 34,400 34,400 34,400 34,400 34,400
growth index - 1,000 1,030 1,107 1,148 1,182 1,221 1,263 1,316 1,371
Cost of el. service 000 EUR 0 142 152 158 163 168 174 181 189number of employess 0 6 6 6 6 6 6 6 6
average cost pre month EUR 20000 20000 20000 20000 20000 20000 20000 20000 20000
growth index - 1,000 1,030 1,107 1,148 1,182 1,221 1,263 1,316 1,371
Cost of salaries 000 EUR 0 124 133 138 142 147 152 158 165
maintenance EUR 0 100 000 100 000 100 000 150 000 150 000 150 000 200 000 200 000
cost of fuel handling EUR 0 12 000 12 000 12 000 12 000 12 000 12 000 12 000 12 000
other operational cost EUR 459 000 125 000 125 000 125 000 125 000 125 000 125 000 125 000 125 000
sum EUR 459 000 237 000 237 000 237 000 287 000 287 000 287 000 337 000 337 000
growth index - 1,000 1,030 1,107 1,148 1,182 1,221 1,263 1,316 1,371
Total other cos ts 000 EUR 459 244 262 272 339 351 362 443 462
Total costs 000 EUR 459 1 820 1 898 1 959 2 076 2 141 2 207 2 348 2 427
8/8/2019 Biomass Power Plant 4 MWe Fin_eng
15/21
CONFIDENTIAL5 BIOMASS POWER PLANT, KES a.s, Nov-09
Economical summary of project
2011 2012 2013 2014 2015 2016 2017 2018 2019
Depreciation tis. EUR 0 706 706 706 706 515 515 515 515
in 000 EUR 2011 2012 2013 2014 2015 2016 2017 2018 2019
Sales in project total 0,000 4241,105 4310,891 4387,070 4446,719 4528,874 4579,557 4695,558 4818,287
Costs in project total 459,000 1820,319 1897,753 1958,549 2076,002 2140,504 2207,309 2347,564 2427,379
Depreciation assets of project 0,000 706,350 706,350 706,350 706,350 515,100 515,100 515,100 515,100
Profit on project before tax and interest -459,000 1714,436 1706,788 1722,172 1664,367 1873,271 1857,148 1832,893 1875,808
Structure of project financing
Own sources 000 EUR 2 790,00Grant 000 EUR 6 000,00
Bank loan 000 EUR 6 510,00
Depreciation is calculated based on structure of the investment depreciation ,where major part is investment. The total investment used for depreciationcalculation is decreased for the amount of grant.
The project shows good parameters of profitability with grant support. Total investment isprojected on 15,3 mil. EUR. Grant represent 39% and bank loan 43%. The amount of ownfinancial resources was set up based on ratio to bank loan on the level of 30%. For our internalneeds we are working with DCF method and interest rate 7%. Bank loan which we have inmodel has the maturity 6 year with grace period of 1 year.
Parameters in our DCF model for IRR
Interests % 7,0Loan, maturity with 1 year grace period years 6,0
IRR (15 years) % 12,6
8/8/2019 Biomass Power Plant 4 MWe Fin_eng
16/21
CONFIDENTIAL6 BIOMASS POWER PLANT, KES a.s, Nov-09
Sensitivity analysis
In our internal model we make sensitivityanalysis for expected values according legislationand market. Analysis shows to us, that highestsensibility lay on biomass. This was the reasonfor deciding for fluid technology, which enable tous use alternative fuels to wood chips, which arehighly competitive. Fluid boiler is increasing totalinvestment cost, but on the other site, use of fluidtechnology brings to project long term confidencefor profit generation without any bidingagreements with producers or traders with woodchips.
8/8/2019 Biomass Power Plant 4 MWe Fin_eng
17/21
CONFIDENTIAL7 BIOMASS POWER PLANT, KES a.s, Nov-09
Technical assumptions for the model
Data in the figures above are estimated based on the preliminary technicalparameters and expected operation mode, which depend on the possibility
to supply the heat. In the winter season is expected to operate the plant ona full load with delivery within the areal of the VSS and to the network.Based on heat demand in VSS, we can expect, that ratio of this heatsupplies will be 50:50. Dependence on the supplies of heat during thesummer is minimized by condensation turbine and air condenser, which
will allow to operate turbine at maximum 2 MWe.
Month of the year Jan Feb Mar Apr Maj Jun Jul Aug Sep Okt Nov Dec
Days 31 28 31 30 31 30 31 31 30 31 30 31
Heat supply MWt 9 9 9 9 4 3 2 2 3 9 9 9
Electricity supply MWe 4 4 4 4 2 1 1 1 1 4 4 4
Heat supply per month GJ 24106 21773 24106 23328 9641 7662 6108 6601 6783 24106 23328 24106
Total heat supply GJ 201646
Electricity supply per month MWh 2976 2688 2976 2880 1190 946 754 815 837 2976 2880 2976
Consumption MWh 446 269 298 288 119 95 75 81 84 298 288 298
Total e lectricity supply MWh 22256
Energy in biomass per month GJ 39123 35337 39123 37861 15647 12435 9914 10713 11008 39123 37861 39123
Total energy supplied in biomass GJ 327266
8/8/2019 Biomass Power Plant 4 MWe Fin_eng
18/21
CONFIDENTIAL8 BIOMASS POWER PLANT, KES a.s, Nov-09
Grant schema 2.1
Code of call from 26.10.2009 for project is KaHR 21SP 0901, callrepresents amount of 57 mil. EUR dedicated to energy efficiency andexploitation of renewable sources.
Specifically for biomass power plants the limit is max. 10 MWe or 30 MWtthermic energy. In both parameters our projects is well below.
The maximum financial aid for one project is 6 mil. EURor 50% of all eligibleinvestment costs. The maximum of total eligibible cost for project is 25 mil.EUR. The deadline form submitting of proposal is 22.2.2010.
8/8/2019 Biomass Power Plant 4 MWe Fin_eng
19/21
CONFIDENTIAL9 BIOMASS POWER PLANT, KES a.s, Nov-09
Time schedule
To the engineering preparation is dedicated team including 17professionals in cooperation with engineering office ECONS -Koice, which successfully prepared documentation for landapproval in September October 2009.
Time schedule
Indicative proposal from bank to finance project
Closing day of buy contract with VSS
Binding proposal from bank to finance project
Civil construction permission from local authority
Public tender
Grant application preparation
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Decemeber 2010 January 2010 February 2009
8/8/2019 Biomass Power Plant 4 MWe Fin_eng
20/21
CONFIDENTIAL0 BIOMASS POWER PLANT, KES a.s, Nov-09
List of approvals
The list of approvals and agreements added:
Licence to build power plant from Ministry of economy Approval for connection to GRID SEPS a.s. Approval for connection to GRID VSD a.s. Agreement from City Kosice and District Kosice - South Agreement from City Architect Authority Agreement from Regional Environment Authority
The list of approvals agreements obtained and not added to presentation: Civil Aviation Authority of the Slovak republic Regional authority of Fire and Rescue Services Owner of industrial park VSS a.s. Owner of primary heating network in the city TEKO a.s. Regional authority of Public Healthcare Airport Koice District office of civil defend and crisis operation
8/8/2019 Biomass Power Plant 4 MWe Fin_eng
21/21
CONFIDENTIAL1 BIOMASS POWER PLANT, KES a.s, Nov-09
Other attachments and contacts
Other attachment: Architectonic study Bids in the pre-tendering process Commercial register Audited financial results 2008
Contacts:Koick energetick spolonos a.s.
Teplrensk 3/A
042 92 Koice
Statutary representative: Ing. Vladimr DolnContact person: Ing. Miroslav FberTel./Fax: 055 6192836 / 055 - 6192835E-mail: [email protected]