A8The width of the working space in front of the electric equipment shall bethe width of the equipment or 750mm (30 in.), whichever is greater. NFPA 70, Sec. 110.26 (a) (2)
SAES-P-104Sec. 3.2
A7
In existing bldgs. Where electrical equipment is being replaced, condition2 working clearance shall be permitted between dead-front switchboards,Panelboards, or motor control centers located along the aisle from eachother where condition of maintenance and supervision ensure thatwritten procedures have been adopted to prohibit equipment on bothsides of the aisle from being open at the same time. NFPA 70, Sec. 110.26 (a) (1)(c)
SAES-P-104Sec. 3.2
A6
By special permission smaller working spaces shall permitted where alluninsulated parts operate at not greater than 30V rms, 42V peak, or 60VDC. NFPA 70, Sec. 110.26 (a) (1)(b)
SAES-P-104Sec. 3.2
A5
Working space shall not be required at the back or sides of assemblies,such as dead front switchboards or motor control centers, where allconnections and all renewable or adjustable parts, such as fuses orswitches, are accessible from locations other than the backsides. NFPA 70, Sec. 110.26 (a) (1)(a)
SAES-P-104Sec. 3.2
A4Condition 3 - Exposed live parts on both sides of the work space (notguarded as provided in Condition 1) with the operator between.NFPA 70, Sec. 110.26 (a) (1)
SAES-P-104Sec. 3.2
A3Condition 2 - Exposed live parts on one side and grounded parts on theother side. Concrete, brick, or tile walls shall be considered as grounded.NFPA 70, Sec. 110.26 (a) (1)
SAES-P-104Sec. 3.2
A2
Notes: Where the conditions are as follows:Condition 1 - Exposed live parts on one side and no live or groundedparts on the other side of the working space, or exposed live parts onboth sides effectively guarded by suitable wood or other insulatingmaterials. Insulated wire or insulated bus bars operating at not over300V to ground shall not be considered live parts.NFPA 70, Sec. 110.26 (a) (1)
SAES-P-104Sec. 3.2
A1
The depth of the working space in the direction of live parts shall not beless than that specified in Table 110.26(A)(1) unless the requirements of110.26(a)(1)- (a), (b), or (c) are met. Distances shall be measured fromthe exposed live parts or from the enclosures or opening if the live partsare enclosed. NFPA 70, Sec. 110.26 (a) (1)
SAES-P-104Sec. 3.2
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO TEST REPORT SAIC NUMBER DATE APPROVED QR NUMBER
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
General Electrical Workspace Clearances SAIC-P-3023 1-Oct-05 ELECT-
PLANT NO.EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID.
SCHEDULED INSPECTION DATE & TIME
LAYOUT DRAWING NUMBER
TRAVEL TIMEQUANTITY INSP.
WORK PERMIT REQUIRED?
ACTUAL INSPECTION DATE & TIMESAUDI ARAMCO USE ONLY
MH's SPENT
FAIL N/A
CONTRACTOR INSPECTION LEVEL
RE-INSP DATEITEM No. ACCEPTANCE CRITERIA REFERENCE PASS
SAUDI ARAMCO INSPECTION LEVEL
EC / PMCC / MCC NO.REV. NO. PURCHASE ORDER NUMBER
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER
Page 1 of 3
C11
SAES-P-104Sec. 3.2
Illumination shall be provided for all working spaces about serviceequipment, switchboards, Panelboards, or motor control centers installedindoors. NFPA 70, Sec. 110.26 (d)
SAES-P-104Sec. 3.2
C13
Saudi Aramco
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the manufacturer
PMT Representative
indicates compliance with appropriate standards or performance in a specified manner.
Construction Representative*
1. Schedule Q -- Quality Requirements (Pro Forma Contract), November 20032. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), July 1993
4. SAES-P-104 -- Wiring Methods and Materials, 1/28/043. SAES-P-116 -- Switchgear and Control Equipment, 1/28/04
REFERENCE DOCUMENTS:
C10
Working space shall not be used for storage. When normally enclosedlive parts are exposed for inspections or servicing, the working space, ifin a passageway or general open space, shall be suitably guarded. NFPA 70, Sec. 110.26 (b)
SAES-P-104Sec. 3.2
C12
All switchboards, Panelboards, or motor control centers shall be locatedin dedicated space and protected from damage. NFPA 70, Sec. 110.26 (f)
REMARKS:
C14No piping, ducts, leak protection apparatus, or other equipment foreignto the electrical installation shall be located in this zone. NFPA 70, Sec. 110.26 (f) (1)
SAES-P-104Sec. 3.2
C15
Outdoor electrical equipment shall be installed in suitable enclosures and shall be protected from accidental contact by unauthorized personnel, orby vehicular traffic, or by accidental spillage or leakage from pipingsystems. NFPA 70, Sec. 110.26 (f) (2)
SAES-P-104Sec. 3.2
ITEM No. ACCEPTANCE CRITERIA REFERENCE
At least one entrance of sufficient area shall be provided to give accessto working space about electrical equipment.NFPA 70, Sec. 110.26 c
SAES-P-104Sec. 3.2
C9
Height of working space shall be clear and extend from the grade floor orplatform, the minimum headroom of working spaces about serviceequipment, switchboards, Panelboards, or motor control centers shall be2mtrs. (6 1/2 ft.). NFPA 70, Sec. 110.26 (a) (3)(e)
SAES-P-104Sec. 3.2
Contractor / Third-Party
5. NFPA 70 --National Electrical Code, 2002
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing
6. NETA ATS -- Acceptance Testing Specification for Electrical Power Distribution Equipment and Systems, 1999
PASS FAIL N/A RE-INSP DATE
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
General Electrical Workspace Clearances SAIC-P-3023 1-Oct-05 ELECT-
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO TEST REPORT SAIC NUMBER DATE APPROVED QR NUMBER
NOTES:1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified
Page 2 of 3
ITEM No. ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
General Electrical Workspace Clearances SAIC-P-3023 1-Oct-05 ELECT-
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO TEST REPORT SAIC NUMBER DATE APPROVED QR NUMBER
Name, Initials and Date:Work is Complete and Ready for Inspection:
Name, Initials and Date:Work VerifiedT&I Witnessed QC Record Reviewed
QC Supervisor Proponent and Others
Performed Inspection Work / Rework May ProceedQC Inspector
Name, Organization,Initials and Date:
T&I Witnessed Work Verified
Name, Initials and Date:Name, Initials and Date:
PID Representative
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED
QC Record Reviewed
Work Verified
Name, Sign and Date: Quality Record Approved:
T&I Witnessed QC Record Reviewed
Page 3 of 3
Recommended