A8 The width of the working space in front of the electric equipment shall be the width of the equipment or 750mm (30 in.), whichever is greater. NFPA 70, Sec. 110.26 (a) (2) SAES-P-104 Sec. 3.2 A7 In existing bldgs. Where electrical equipment is being replaced, condition 2 working clearance shall be permitted between dead-front switchboards, Panelboards, or motor control centers located along the aisle from each other where condition of maintenance and supervision ensure that written procedures have been adopted to prohibit equipment on both sides of the aisle from being open at the same time. NFPA 70, Sec. 110.26 (a) (1)(c) SAES-P-104 Sec. 3.2 A6 By special permission smaller working spaces shall permitted where all uninsulated parts operate at not greater than 30V rms, 42V peak, or 60V DC. NFPA 70, Sec. 110.26 (a) (1)(b) SAES-P-104 Sec. 3.2 A5 Working space shall not be required at the back or sides of assemblies, such as dead front switchboards or motor control centers, where all connections and all renewable or adjustable parts, such as fuses or switches, are accessible from locations other than the backsides. NFPA 70, Sec. 110.26 (a) (1)(a) SAES-P-104 Sec. 3.2 A4 Condition 3 - Exposed live parts on both sides of the work space (not guarded as provided in Condition 1) with the operator between. NFPA 70, Sec. 110.26 (a) (1) SAES-P-104 Sec. 3.2 A3 Condition 2 - Exposed live parts on one side and grounded parts on the other side. Concrete, brick, or tile walls shall be considered as grounded. NFPA 70, Sec. 110.26 (a) (1) SAES-P-104 Sec. 3.2 A2 Notes: Where the conditions are as follows: Condition 1 - Exposed live parts on one side and no live or grounded parts on the other side of the working space, or exposed live parts on both sides effectively guarded by suitable wood or other insulating materials. Insulated wire or insulated bus bars operating at not over 300V to ground shall not be considered live parts. NFPA 70, Sec. 110.26 (a) (1) SAES-P-104 Sec. 3.2 A1 The depth of the working space in the direction of live parts shall not be less than that specified in Table 110.26(A)(1) unless the requirements of 110.26(a)(1)- (a), (b), or (c) are met. Distances shall be measured from the exposed live parts or from the enclosures or opening if the live parts are enclosed. NFPA 70, Sec. 110.26 (a) (1) SAES-P-104 Sec. 3.2 SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004) SAUDI ARAMCO TEST REPORT SAIC NUMBER DATE APPROVED QR NUMBER PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR General Electrical Workspace Clearances SAIC-P-3023 1-Oct-05 ELECT- PLANT NO. EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. SCHEDULED INSPECTION DATE & TIME LAYOUT DRAWING NUMBER TRAVEL TIME QUANTITY INSP. WORK PERMIT REQUIRED? ACTUAL INSPECTION DATE & TIME SAUDI ARAMCO USE ONLY MH's SPENT FAIL N/A CONTRACTOR INSPECTION LEVEL RE-INSP DATE ITEM No. ACCEPTANCE CRITERIA REFERENCE PASS SAUDI ARAMCO INSPECTION LEVEL EC / PMCC / MCC NO. REV. NO. PURCHASE ORDER NUMBER SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER Page 1 of 3

SAIC-P-3023 REV 0

  • Upload
    jwoch

  • View
    4

  • Download
    0

Embed Size (px)

DESCRIPTION

saic 3023

Citation preview

Page 1: SAIC-P-3023 REV 0

A8The width of the working space in front of the electric equipment shall bethe width of the equipment or 750mm (30 in.), whichever is greater. NFPA 70, Sec. 110.26 (a) (2)

SAES-P-104Sec. 3.2

A7

In existing bldgs. Where electrical equipment is being replaced, condition2 working clearance shall be permitted between dead-front switchboards,Panelboards, or motor control centers located along the aisle from eachother where condition of maintenance and supervision ensure thatwritten procedures have been adopted to prohibit equipment on bothsides of the aisle from being open at the same time. NFPA 70, Sec. 110.26 (a) (1)(c)

SAES-P-104Sec. 3.2

A6

By special permission smaller working spaces shall permitted where alluninsulated parts operate at not greater than 30V rms, 42V peak, or 60VDC. NFPA 70, Sec. 110.26 (a) (1)(b)

SAES-P-104Sec. 3.2

A5

Working space shall not be required at the back or sides of assemblies,such as dead front switchboards or motor control centers, where allconnections and all renewable or adjustable parts, such as fuses orswitches, are accessible from locations other than the backsides. NFPA 70, Sec. 110.26 (a) (1)(a)

SAES-P-104Sec. 3.2

A4Condition 3 - Exposed live parts on both sides of the work space (notguarded as provided in Condition 1) with the operator between.NFPA 70, Sec. 110.26 (a) (1)

SAES-P-104Sec. 3.2

A3Condition 2 - Exposed live parts on one side and grounded parts on theother side. Concrete, brick, or tile walls shall be considered as grounded.NFPA 70, Sec. 110.26 (a) (1)

SAES-P-104Sec. 3.2

A2

Notes: Where the conditions are as follows:Condition 1 - Exposed live parts on one side and no live or groundedparts on the other side of the working space, or exposed live parts onboth sides effectively guarded by suitable wood or other insulatingmaterials. Insulated wire or insulated bus bars operating at not over300V to ground shall not be considered live parts.NFPA 70, Sec. 110.26 (a) (1)

SAES-P-104Sec. 3.2

A1

The depth of the working space in the direction of live parts shall not beless than that specified in Table 110.26(A)(1) unless the requirements of110.26(a)(1)- (a), (b), or (c) are met. Distances shall be measured fromthe exposed live parts or from the enclosures or opening if the live partsare enclosed. NFPA 70, Sec. 110.26 (a) (1)

SAES-P-104Sec. 3.2

SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAUDI ARAMCO TEST REPORT SAIC NUMBER DATE APPROVED QR NUMBER

PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

General Electrical Workspace Clearances SAIC-P-3023 1-Oct-05 ELECT-

PLANT NO.EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID.

SCHEDULED INSPECTION DATE & TIME

LAYOUT DRAWING NUMBER

TRAVEL TIMEQUANTITY INSP.

WORK PERMIT REQUIRED?

ACTUAL INSPECTION DATE & TIMESAUDI ARAMCO USE ONLY

MH's SPENT

FAIL N/A

CONTRACTOR INSPECTION LEVEL

RE-INSP DATEITEM No. ACCEPTANCE CRITERIA REFERENCE PASS

SAUDI ARAMCO INSPECTION LEVEL

EC / PMCC / MCC NO.REV. NO. PURCHASE ORDER NUMBER

SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER

Page 1 of 3

Page 2: SAIC-P-3023 REV 0

C11

SAES-P-104Sec. 3.2

Illumination shall be provided for all working spaces about serviceequipment, switchboards, Panelboards, or motor control centers installedindoors. NFPA 70, Sec. 110.26 (d)

SAES-P-104Sec. 3.2

C13

Saudi Aramco

4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the manufacturer

PMT Representative

indicates compliance with appropriate standards or performance in a specified manner.

Construction Representative*

1. Schedule Q -- Quality Requirements (Pro Forma Contract), November 20032. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), July 1993

4. SAES-P-104 -- Wiring Methods and Materials, 1/28/043. SAES-P-116 -- Switchgear and Control Equipment, 1/28/04

REFERENCE DOCUMENTS:

C10

Working space shall not be used for storage. When normally enclosedlive parts are exposed for inspections or servicing, the working space, ifin a passageway or general open space, shall be suitably guarded. NFPA 70, Sec. 110.26 (b)

SAES-P-104Sec. 3.2

C12

All switchboards, Panelboards, or motor control centers shall be locatedin dedicated space and protected from damage. NFPA 70, Sec. 110.26 (f)

REMARKS:

C14No piping, ducts, leak protection apparatus, or other equipment foreignto the electrical installation shall be located in this zone. NFPA 70, Sec. 110.26 (f) (1)

SAES-P-104Sec. 3.2

C15

Outdoor electrical equipment shall be installed in suitable enclosures and shall be protected from accidental contact by unauthorized personnel, orby vehicular traffic, or by accidental spillage or leakage from pipingsystems. NFPA 70, Sec. 110.26 (f) (2)

SAES-P-104Sec. 3.2

ITEM No. ACCEPTANCE CRITERIA REFERENCE

At least one entrance of sufficient area shall be provided to give accessto working space about electrical equipment.NFPA 70, Sec. 110.26 c

SAES-P-104Sec. 3.2

C9

Height of working space shall be clear and extend from the grade floor orplatform, the minimum headroom of working spaces about serviceequipment, switchboards, Panelboards, or motor control centers shall be2mtrs. (6 1/2 ft.). NFPA 70, Sec. 110.26 (a) (3)(e)

SAES-P-104Sec. 3.2

Contractor / Third-Party

5. NFPA 70 --National Electrical Code, 2002

3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing

6. NETA ATS -- Acceptance Testing Specification for Electrical Power Distribution Equipment and Systems, 1999

PASS FAIL N/A RE-INSP DATE

PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

General Electrical Workspace Clearances SAIC-P-3023 1-Oct-05 ELECT-

SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAUDI ARAMCO TEST REPORT SAIC NUMBER DATE APPROVED QR NUMBER

NOTES:1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).

that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified

Page 2 of 3

Page 3: SAIC-P-3023 REV 0

ITEM No. ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE

PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

General Electrical Workspace Clearances SAIC-P-3023 1-Oct-05 ELECT-

SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAUDI ARAMCO TEST REPORT SAIC NUMBER DATE APPROVED QR NUMBER

Name, Initials and Date:Work is Complete and Ready for Inspection:

Name, Initials and Date:Work VerifiedT&I Witnessed QC Record Reviewed

QC Supervisor Proponent and Others

Performed Inspection Work / Rework May ProceedQC Inspector

Name, Organization,Initials and Date:

T&I Witnessed Work Verified

Name, Initials and Date:Name, Initials and Date:

PID Representative

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

QC Record Reviewed

Work Verified

Name, Sign and Date: Quality Record Approved:

T&I Witnessed QC Record Reviewed

Page 3 of 3