C. Manajemen Waktu

F. Kurva S

RAB

NoUraian PekerjaanSATVolumeHarga SatuanJumlah HargaAPEKERJAAN PERSIAPANPersentasejumlah persentase01Pengukuran/Pasangan BouwpbankLsLsRp250,000.00Rp250,000.000.292%02AdministrasiLsLsRp650,000.00Rp650,000.000.759%3Penyediaan Air KerjaLsLsRp250,000.00Rp250,000.000.292%4Penyedian Barak KerjaLsLsRp450,000.00Rp450,000.000.526%Rp1,600,000.001.869%BPEKERJAAN TANAH DAN PASIR1Galian Tanah PondasiM320,700Rp24,500.00Rp507,150.000.592%2Urungan Tanah KembaliM36,900Rp6,125.00Rp42,262.000.049%3Urungan Tanah DidatangkanM34,787Rp152,300.00Rp729,060.000.852%4Urungan Pasir bawah lantaiM34,787Rp309,800.00Rp1,483,012.001.732%Rp2,761,484.003.226%CPEKERJAAN PASANGAN DAN BETON1Pasangan Batu kosongM35,175Rp406,000.00Rp2,101,050.002.454%2Pasangan pondasi batu gunungM314,878Rp637,960.00Rp9,491,568.0011.087%3pasangan batu bata 1 Pc : 5 PsrM311,865Rp834,365.00Rp9,899,740.0011.564%4Pekerjaan beton sloof 1 Pc : 2 Psr : 3 KrlM30,863Rp4,561,510.00Rp3,934,302.004.596%5Pekerjaan Beton Kolom 1 Pc : 2 Psr :3 KrlM30,827Rp4,561,510.00Rp3,772,368.004.407%6Pekerjaan Beton ring Balk 1 Pc : 2 Psr :3 KrlM30,848Rp4,561,510.00Rp3,868,160.004.519%7Pekerjaan Plasteran 1 Pc : 5 PsrM223,730Rp34,918.00Rp828,604.000.968%8Pekerjaan Acian Beton 1 Pc : 8 KprM223,730Rp15,150.00Rp359,509.000.420%Rp34,255,301.0040.015%DPEKERJAAN KUSEN,PINTU,JENDELA DAN ALAT PENGGANTUNG1Pekerjaan kusen pintu/jendela dan ventilasi Kls 1M3Rp4,245,600.00Rp1,502,942.001.756%2Pekerjaan pasangan daun pintu panil jatiRp450,500.00Rp3,785,101.004.421%3Pekerjaan pasangan bingkai jendela jatiRp450,500.00Rp4,655,016.005.438%4Pasangan Engsel pintuRp7,500.00Rp37,500.000.044%5Pasangan engsel jendelaRp7,500.00Rp60,000.000.070%6Pasangan Hak anginRp4,500.00Rp54,000.000.063%7Pasangan grendel pintuRp17,500.00Rp87,500.000.102%8Pasangan grendel jendelaRp12,500.00Rp100,000.000.117%9Pasangan kunci tanaman 2 X slagRp105,000.00Rp840,000.000.981%10Pekerjaan pasangan jalusi miringRp100,700.00Rp604,200.000.706%11Pasangan kaca 5 mmRp97,250.00Rp282,219.000.330%Rp12,008,478.0014.027%EPEKERJAAN KAP DAN RANGKA ATAS1Pekerjaan kuda-kuda dan konsul kayu kelas IIRp3,907,250.00Rp5,616,671.006.561%2Pekerjaan gording dan pengaku gonding kayu kelas IIRp3,400,860.00Rp1,834,763.002.143%3Pekerjaan pasangan baut dan mur dan beugelRp2,750.00Rp68,750.000.080%4Pekerjaan list Plank kayu kelas IIRp102,950.00Rp717,355.000.838%5Pekerjaan atap sakurarufRp87,455.00Rp2,798,560.003.269%6pekerjaan pasangan topi lisplankRp21,500.00Rp184,040.000.215%7Pekerjaan pasangan nok sakuraRp112,675.00Rp815,203.000.952%Rp12,035,342.0014.059%FPASANGAN LANTAI/BABAT,KM/WC1Pekerjaan rabat lantai 1Pc:3Psr:5KrlRp980,250.00Rp612,656.000.716%2Pasangan tegel keramik 30 x 30 cmRp123,102.00Rp3,247,009.003.793%3Pasangan tegel porseling 11 x 11 cmRp303,911.00Rp8,730,630.0010.198%4Pasangan kloset jongkokRp350,000.00Rp350,000.000.409%5Pasangan foor drainRp15,000.00Rp30,000.000.035%916Pekerjaan saluran air keliling bangunanRp66,740.00Rp1,801,980.002.105%7Pasangan bak kontrolRp65,000.00Rp65,000.000.076%Rp14,837,275.0017.332%GPEKERJAAN RANGKA PLAFOND DAN PLAFOND1Pekerjaan rangka plafond kayu kelas IIRp47,237.00Rp1,988,984.002.323%2Pekerjaan pasangan plafond tripleks 3 mmRp30,550.00Rp1,286,353.001.503%3Pekerjaan list plafondRp6,500.00Rp339,907.000.397%Rp3,615,244.004.223%HPEKERJAAN PENGECATAN DAN FINISHING1Pekerjaan cat tembokRp13,425.00Rp159,287.000.186%2Pekerjaan cat plafondRp13,425.00Rp565,279.000.660%3pekerjaan cat kilap,kusen,jalusi,list plank 3 XRp31,925.00Rp171,660.000.201%4Pekerjaan vernis daun pintu dan bingkai jendelaRp9,165.00Rp85,853.000.100%5Pekerjaan sealcoat atap 3 XRp21,840.00Rp349,440.000.408%6Pekerjaan residu/rangka atasRp200,000.00Rp200,000.000.234%7Pembarsian akhirRp350,000.00Rp350,000.000.409%Rp1,881,519.002.198%IPEKERJAAN INSTALASI LISTRIK1Pasangan titik dayaRp90,000.00Rp450,000.000.526%2Pasangan saklar tunggal Rp27,500.00Rp82,500.000.096%3Pasangan saklar gandaRp35,000.00Rp70,000.000.082%4Pasangan stop kontakRp42,500.00Rp170,000.000.199%5Pasangan lampu TL 5 WattRp25,000.00Rp150,000.000.175%6Pasangan lampu pijar 11 WattRp32,000.00Rp64,000.000.075%7Kabel listrik NYA/NYN/NYY 2,5 mmRp30,000.00Rp750,000.000.876%8Pipa bang (PCV) ConduitRp9,500.00Rp427,500.000.499%9ImbowRp2,500.00Rp12,500.000.015%10Fitting lampu pijarRp21,500.00Rp86,000.000.100%11Pasangan box MCBRp350,000.00Rp350,000.000.409%JUMLAHRp2,612,500.003.052%Jumlah KomulatifRp85,607,143.00100.000%

RekapitulasiREKAPITULASI BIAYA

APEKERJAAN PERSIAPANRp1,600,000.00BPEKERJAAN TANAH DAN PASIRRp2,761,484.00CPEKERJAAN PASANGAN DAN BETONRp34,255,301.00DPEKERJAAN PASANGAN KUSEN,PINTU,JENDELA,DAN ALAT PENGGANTUNGRp12,008,478.00EPEKERJAAN KAP DAN RANGKA ATASRp12,035,342.00FPEKERJAAN LANTAI DAN RABATRp14,837,275.00GPEKERJAAN PLAFOND DAN RANGKA PLAFONDRp3,615,244.00HPEKERJAAN PENGECATAN DAN FINISHINGRp1,881,519.00IPEKERJAAN INSTALASI LISTRIKRp2,612,500.00REAL COSTRp85,607,143.00JASA PERENCANAAN DAN PENGAWASANIMB 2%JUMLAHDIBULATKAN

Perencanaan ProyekManajemen Waktu Perencanaan Proyek Rumah Type 41NOKEGIATANDURASI% HariBULAN IBULAN IIBULAN IIIBULAN IVBULAN VBULAN VIBULAN VIIBULAN VIII12345678910111213141516171819202122232425262728293031APEKERJAAN PERSIAPAN1Pengukuran/Pasangan Bouwpbank31.5002Administrasi31.5003Penyediaan Air Kerja21.0004Penyedian Barak Kerja31.500

BPEKERJAAN TANAH DAN PASIR1Galian Tanah Pondasi73.5002Urungan Tanah Kembali63.0003Urungan Tanah Didatangkan52.5004Urungan Pasir bawah lantai52.500

CPEKERJAAN PASANGAN DAN BETON1Pasangan Batu kosong73.5002Pasangan pondasi batu gunung52.5003pasangan batu bata 1 Pc : 5 Psr63.0004Pekerjaan beton sloof 1 Pc : 2 Psr : 3 Krl52.5005Pekerjaan Beton Kolom 1 Pc : 2 Psr :3 Krl73.5006Pekerjaan Beton ring Balk 1 Pc : 2 Psr :3 Krl63.0007Pekerjaan Plasteran 1 Pc : 5 Psr63.0008Pekerjaan Acian Beton 1 Pc : 8 Kpr52.500

DPEKERJAAN KUSEN,PINTU,JENDELA DAN ALAT PENGGANTUNG1Pekerjaan kusen pintu/jendela dan ventilasi Kls 121.0002Pekerjaan pasangan daun pintu panil jati10.5003Pekerjaan pasangan bingkai jendela jati10.5004Pasangan Engsel pintu10.5005Pasangan engsel jendela10.5006Pasangan Hak angin10.5007Pasangan grendel pintu10.5008Pasangan grendel jendela10.5009Pasangan kunci tanaman 2 X slag10.50010Pekerjaan pasangan jalusi miring10.50011Pasangan kaca 5 mm10.500

EPEKERJAAN KAP DAN RANGKA ATAS1Pekerjaan kuda-kuda dan konsul kayu kelas II52.5002Pekerjaan gording dan pengaku gonding kayu kelas II42.0003Pekerjaan pasangan baut dan mur dan beugel42.0004Pekerjaan list Plank kayu kelas II52.5005Pekerjaan atap sakuraruf63.0006pekerjaan pasangan topi lisplank52.5007Pekerjaan pasangan nok sakura31.500

FPASANGAN LANTAI/BABAT,KM/WC1Pekerjaan rabat lantai 1Pc:3Psr:5Krl42.0002Pasangan tegel keramik 30 x 30 cm31.5003Pasangan tegel porseling 11 x 11 cm42.0004Pasangan kloset jongkok21.000

6Pasangan foor drain42.0007Pekerjaan saluran air keliling bangunan31.5008Pasangan bak kontrol31.500

GPEKERJAAN RANGKA PLAFOND DAN PLAFOND1Pekerjaan rangka plafond kayu kelas II42.0002Pekerjaan pasangan plafond tripleks 3 mm31.5003Pekerjaan list plafond21.000

HPEKERJAAN PENGECATAN DAN FINISHING1Pekerjaan cat tembok42.0002Pekerjaan cat plafond21.0003pekerjaan cat kilap,kusen,jalusi,list plank 3 X31.5004Pekerjaan vernis daun pintu dan bingkai jendela21.0005Pekerjaan sealcoat atap 3 X31.5006Pekerjaan residu/rangka atas21.0007Pembarsian akhir31.500

IPEKERJAAN INSTALASI LISTRIK1Pasangan titik daya31.5002Pasangan saklar tunggal 31.5003Pasangan saklar ganda31.5004Pasangan stop kontak21.0005Pasangan lampu TL 5 Watt21.0006Pasangan lampu pijar 11 Watt10.5007Kabel listrik NYA/NYN/NYY 2,5 mm21.0008Pipa bang (PCV) Conduit21.0009Imbow31.50010Fitting lampu pijar10.50011Pasangan box MCB21.000200100Hari28.5714285714Minggu20000

Kurva SNOURAIAN PEKERJAANBOBOT PEKERJAAN% HariBULAN IBULAN IIBULAN IIIBULAN IVBULAN VBULAN VIBULAN VIIBULAN VIII12345678910111213141516171819202122232425262728293031grafikAPEKERJAAN PERSIAPAN1001Pengukuran/Pasangan Bouwpbank0.292%1.3950.292%991.395983administrasi0.759%1.3950.759%974Penyediaan Air Kerja0.292%0.9300.292%965Penyedian Barak Kerja0.526%1.3951.3950.526%950.9301.39594BPEKERJAAN TANAH DAN PASIR931Galian Tanah Pondasi0.592%3.2560.592%922Urungan Tanah Kembali0.049%2.7913.2560.049%913Urungan Tanah Didatangkan0.852%2.3260.852%904Urungan Pasir bawah lantai1.732%2.3262.7911.732%892.3262.32688CPEKERJAAN PASANGAN DAN BETON871Pasangan Batu kosong2.454%3.2562.454%862Pasangan pondasi batu gunung11.087%2.3263.25611.087%853pasangan batu bata 1 Pc : 5 Psr11.564%2.7912.32611.564%844Pekerjaan beton sloof 1 Pc : 2 Psr : 3 Krl4.596%2.3262.7914.596%835Pekerjaan Beton Kolom 1 Pc : 2 Psr :3 Krl4.407%3.2562.3264.407%826Pekerjaan Beton ring Balk 1 Pc : 2 Psr :3 Krl4.519%2.7913.2564.519%817Pekerjaan Plasteran 1 Pc : 5 Psr0.968%2.7912.7910.968%808Pekerjaan Acian Beton 1 Pc : 8 Kpr0.420%2.3262.7910.420%792.32678DPEKERJAAN KUSEN,PINTU,JENDELA DAN ALAT PENGGANTUNG77DPekerjaan kusen pintu/jendela dan ventilasi Kls 11.756%1.8601.756%762Pekerjaan pasangan daun pintu panil jati4.421%0.9304.421%753Pekerjaan pasangan bingkai jendela jati5.438%1.3955.438%744Pasangan Engsel pintu0.044%0.4651.8600.044%735Pasangan engsel jendela0.070%0.4650.9300.070%726Pasangan Hak angin0.063%1.3951.3950.063%717Pasangan grendel pintu0.102%0.4650.102%708Pasangan grendel jendela0.117%0.4650.117%699Pasangan kunci tanaman 2 X slag0.981%1.3950.4650.981%6810Pekerjaan pasangan jalusi miring0.706%1.8600.4650.706%6711Pasangan kaca 5 mm0.330%0.9301.3951.3950.330%660.4651.8600.93065EPEKERJAAN KAP DAN RANGKA ATAS0.465641Pekerjaan kuda-kuda dan konsul kayu kelas II6.561%2.3266.561%632Pekerjaan gording dan pengaku gonding kayu kelas II2.143%2.7912.3262.143%623Pekerjaan pasangan baut dan mur dan beugel0.080%1.8600.080%614Pekerjaan list Plank kayu kelas II0.838%2.3262.7910.838%605Pekerjaan atap sakuraruf3.269%2.7911.8602.3263.269%596pekerjaan pasangan topi lisplank0.215%2.3262.7910.215%587Pekerjaan pasangan nok sakura0.952%1.3950.952%572.32656FPASANGAN LANTAI/BABAT,KM/WC1.395551Pekerjaan rabat lantai 1Pc:3Psr:5Krl0.716%1.8600.716%1.860542Pasangan tegel keramik 30 x 30 cm3.793%1.3953.793%0.930533Pasangan tegel porseling 11 x 11 cm10.198%1.8601.86010.198%524Pasangan kloset jongkok0.409%0.9301.3950.409%51506Pasangan foor drain0.035%1.8600.035%497Pekerjaan saluran air keliling bangunan2.105%1.3952.105%488Pasangan bak kontrol0.076%1.3951.8600.076%471.3951.39546GPEKERJAAN RANGKA PLAFOND DAN PLAFOND451Pekerjaan rangka plafond kayu kelas II2.323%1.8602.323%442Pekerjaan pasangan plafond tripleks 3 mm1.503%1.3951.8601.503%433Pekerjaan list plafond0.397%0.9300.397%421.3950.93041HPEKERJAAN PENGECATAN DAN FINISHING0.9301.395401Pekerjaan cat tembok0.186%1.8600.186%0.930392Pekerjaan cat plafond0.660%0.9301.8600.660%383pekerjaan cat kilap,kusen,jalusi,list plank 3 X0.201%1.3950.201%374Pekerjaan vernis daun pintu dan bingkai jendela0.100%0.9300.100%365Pekerjaan sealcoat atap 3 X0.408%1.3950.408%356Pekerjaan residu/rangka atas0.234%0.9300.234%347Pembarsian akhir0.409%1.3950.409%331.3951.39532IPEKERJAAN INSTALASI LISTRIK0.9301.395311Pasangan titik daya0.526%1.3951.3950.526%302Pasangan saklar tunggal 0.096%1.3950.096%0.465293Pasangan saklar ganda0.082%1.3950.082%0.930284Pasangan stop kontak0.199%0.9300.199%0.930275Pasangan lampu TL 5 Watt0.175%0.9300.175%1.395266Pasangan lampu pijar 11 Watt0.075%0.4651.3950.075%257Kabel listrik NYA/NYN/NYY 2,5 mm0.876%0.9300.9300.876%248Pipa bang (PCV) Conduit0.499%0.9300.9300.499%0.465239Imbow0.015%1.3950.015%0.9302210Fitting lampu pijar0.100%0.4650.100%2111Pasangan box MCB0.409%0.9300.409%20100%10000%1.343%1.118%0.901%1.732%2.454%11.087%11.564%4.596%4.407%4.519%0.968%12.035%0.396%1.687%6.891%2.224%0.838%3.269%1.167%4.509%10.607%2.140%2.399%1.900%0.186%0.961%1.051%0.622%0.456%1.465%0.509%Jumlah Akumulatif 11.34%2.46%3.36%5.09%7.55%18.64%30.20%34.80%39.20%43.72%44.69%56.72%57.12%58.81%65.70%67.92%68.76%72.03%73.20%77.70%88.31%90.45%92.85%94.75%94.94%95.90%96.95%97.57%98.03%99.49%100.00%Jumlah Akumulatif 23.7214.6515.1162.3263.2562.3262.7912.3263.2562.7912.7916.5123.2563.2563.2564.6512.3262.7913.7213.2562.7913.2563.2562.3261.8603.2563.7212.7913.2563.7211.3953.7218.37213.48815.81419.07021.39524.18626.51229.76732.55835.34941.86045.11648.37251.62856.27958.60561.39565.11668.37271.16374.41977.67480.00081.86085.11688.83791.62894.88498.605100.000

Sheet2KODEDESKRIPSIDURASIAKTIVITASHARIUraian Pekerjaandurasiprodecessor2PEKERJAAN PERSIAPANAPEKERJAAN PERSIAPAN3Pengukuran/Pasangan Bouwpbank31Pengukuran/Pasangan BouwpbankLsLs4administrasi3APEKERJAAN PERSIAPAN5Penyediaan Air Kerja211Pengukuran/Pasangan Bouwpbank33administrasiLsLs6Penyedian Barak Kerja322administrasi34Penyediaan Air KerjaLsLs43Penyediaan Air Kerja25Penyedian Barak KerjaLsLs7PEKERJAAN TANAH DAN PASIR34Penyedian Barak Kerja38Galian Tanah Pondasi7BPEKERJAAN TANAH DAN PASIR9Urungan Tanah Kembali61Galian Tanah PondasiM3M310Urungan Tanah Didatangkan52Urungan Tanah KembaliM3M311Urungan Pasir bawah lantai5BPEKERJAAN TANAH DAN PASIR3Urungan Tanah DidatangkanM3M351Galian Tanah Pondasi74Urungan Pasir bawah lantaiM3M312PEKERJAAN PASANGAN DAN BETON13Pasangan Batu kosong7CPEKERJAAN PASANGAN DAN BETON14Pasangan pondasi batu gunung52Pasangan pondasi batu gunungM3M316Pekerjaan beton sloof 1 Pc : 2 Psr : 3 Krl53pasangan batu bata 1 Pc : 5 PsrM3M317Pekerjaan Beton Kolom 1 Pc : 2 Psr :3 Krl74Pekerjaan beton sloof 1 Pc : 2 Psr : 3 KrlM3M318Pekerjaan Beton ring Balk 1 Pc : 2 Psr :3 Krl67Pekerjaan Plasteran 1 Pc : 5 PsrM2M2164Urungan Pasir bawah lantai511Pasangan kaca 5 mm33PEKERJAAN KAP DAN RANGKA ATAS192Pekerjaan pasangan daun pintu panil jati234Pekerjaan kuda-kuda dan konsul kayu kelas II5203Pekerjaan pasangan bingkai jendela jati3EPEKERJAAN KAP DAN RANGKA ATAS35Pekerjaan gording dan pengaku gonding kayu kelas II6214Pasangan Engsel pintu11Pekerjaan kuda-kuda dan konsul kayu kelas II36Pekerjaan pasangan baut dan mur dan beugel4225Pasangan engsel jendela12Pekerjaan gording dan pengaku gonding kayu kelas II37Pekerjaan list Plank kayu kelas II511236Pasangan Hak angin33Pekerjaan pasangan baut dan mur dan beugel38Pekerjaan atap sakuraruf623247Pasangan grendel pintu14Pekerjaan list Plank kayu kelas II39pekerjaan pasangan topi lisplank530258Pasangan grendel jendela1Jalur Kritis5Pekerjaan atap sakuraruf40Pekerjaan pasangan nok sakura334269Pasangan kunci tanaman 2 X slag3KODEDESKRIPSIDURASI6pekerjaan pasangan topi lisplank112710Pekerjaan pasangan jalusi miring4AKTIVITASHARI7Pekerjaan pasangan nok sakura41PASANGAN LANTAI/BABAT,KM/WC172811Pasangan kaca 5 mm23Pengukuran/Pasangan Bouwpbank342Pekerjaan rabat lantai 1Pc:3Psr:5Krl45Galian Tanah Pondasi7FPASANGAN LANTAI/BABAT,KM/WC43Pasangan tegel keramik 30 x 30 cm3EPEKERJAAN KAP DAN RANGKA ATAS6Pasangan Batu kosong71Pekerjaan rabat lantai 1Pc:3Psr:5Krl44Pasangan tegel porseling 11 x 11 cm4291Pekerjaan kuda-kuda dan konsul kayu kelas II57Pasangan pondasi batu gunung52Pekerjaan pasangan plafond tripleks 3 mm383Pasangan tegel porseling 11 x 11 cm410Pekerjaan beton sloof 1 Pc : 2 Psr : 3 Krl53Pekerjaan list plafond53PEKERJAAN PENGECATAN DAN FINISHING394Pasangan kloset jongkok211Pekerjaan Beton Kolom 1 Pc : 2 Psr :3 Krl754Pekerjaan cat tembok412Pekerjaan Beton ring Balk 1 Pc : 2 Psr :3 Krl61Pekerjaan cat tembok56pekerjaan cat kilap,kusen,jalusi,list plank 3 X3417Pekerjaan saluran air keliling bangunan313pasangan batu bata 1 Pc : 5 Psr62Pekerjaan cat plafond57Pekerjaan vernis daun pintu dan bingkai jendela2428Pasangan bak kontrol314Pekerjaan Plasteran 1 Pc : 5 Psr63pekerjaan cat kilap,kusen,jalusi,list plank 3 X58Pekerjaan sealcoat atap 3 X315Pekerjaan Acian Beton 1 Pc : 8 Kpr54Pekerjaan vernis daun pintu dan bingkai jendela59Pekerjaan residu/rangka atas2GPEKERJAAN RANGKA PLAFOND DAN PLAFOND45Pekerjaan cat tembok45Pekerjaan sealcoat atap 3 X60Pembarsian akhir3431Pekerjaan rangka plafond kayu kelas II462Pembarsian akhir310Fitting lampu pijarJUMLAH HARI126531Pasangan titik daya3Jumlah Hari6411Pasangan box MCB542Pasangan saklar tunggal 3553Pasangan saklar ganda3564Pasangan stop kontak2KODEDESKRIPSIDURASIPRODECESSOR575Pasangan lampu TL 5 Watt2AKTIVITASHARI586Pasangan lampu pijar 11 Watt11Pengukuran/Pasangan Bouwpbank30587Kabel listrik NYA/NYN/NYY 2,5 mm22administrasi30608Pipa bang (PCV) Conduit23Penyedian Barak Kerja30619Imbow34Penyediaan Air Kerja236210Fitting lampu pijar15Galian Tanah Pondasi716311Pasangan box MCB26Pasangan Batu kosong757Pasangan pondasi batu gunung568Urungan Tanah Kembali679Urungan Tanah Didatangkan5810Pekerjaan beton sloof 1 Pc : 2 Psr : 3 Krl5711Pekerjaan Beton Kolom 1 Pc : 2 Psr :3 Krl71012Pekerjaan Beton ring Balk 1 Pc : 2 Psr :3 Krl61113pasangan batu bata 1 Pc : 5 Psr61214Pekerjaan Plasteran 1 Pc : 5 Psr61315Pekerjaan Acian Beton 1 Pc : 8 Kpr51416Urungan Pasir bawah lantai5917Pekerjaan kusen pintu/jendela dan ventilasi Kls 14018Pekerjaan pasangan daun pintu panil jati21719Pekerjaan pasangan bingkai jendela jati31820Pasangan Engsel pintu11921Pasangan engsel jendela12022Pasangan Hak angin32123Pasangan grendel pintu12224Pasangan grendel jendela12325Pasangan kunci tanaman 2 X slag31726Pekerjaan pasangan jalusi miring42527Pasangan kaca 5 mm22628Pekerjaan kuda-kuda dan konsul kayu kelas II5029Pekerjaan gording dan pengaku gonding kayu kelas II62830Pekerjaan pasangan baut dan mur dan beugel42931Pekerjaan list Plank kayu kelas II53032Pekerjaan atap sakuraruf63133pekerjaan pasangan topi lisplank53234Pekerjaan pasangan nok sakura33335Pekerjaan rabat lantai 1Pc:3Psr:5Krl41636Pasangan tegel keramik 30 x 30 cm33537Pasangan tegel porseling 11 x 11 cm43638Pasangan kloset jongkok2039Pasangan foor drain43840Pekerjaan saluran air keliling bangunan33941Pasangan bak kontrol34042Pekerjaan rangka plafond kayu kelas II43443Pekerjaan pasangan plafond tripleks 3 mm34244Pekerjaan list plafond24345Pekerjaan cat tembok41446Pekerjaan cat plafond24447pekerjaan cat kilap,kusen,jalusi,list plank 3 X32427,,3148Pekerjaan vernis daun pintu dan bingkai jendela24749Pekerjaan sealcoat atap 3 X33450Pekerjaan residu/rangka atas24951Pasangan titik daya3052Pasangan saklar tunggal 35153Pasangan saklar ganda35254Pasangan stop kontak25355Pasangan lampu TL 5 Watt25456Pasangan lampu pijar 11 Watt15557Kabel listrik NYA/NYN/NYY 2,5 mm25658Pipa bang (PCV) Conduit25759Imbow35860Fitting lampu pijar15961Pasangan box MCB26062Pembarsian akhir32,14,36,,41,45,46,48,50,61

JALUR KRITISKODEDESKRIPSIDURASIAKTIVITASHARI2PEKERJAAN PERSIAPAN3Pengukuran/Pasangan Bouwpbank34administrasi35Penyediaan Air Kerja26Penyedian Barak Kerja3

7PEKERJAAN TANAH DAN PASIR8Galian Tanah Pondasi79Urungan Tanah Kembali610Urungan Tanah Didatangkan511Urungan Pasir bawah lantai5

12PEKERJAAN PASANGAN DAN BETON13Pasangan Batu kosong714Pasangan pondasi batu gunung516Pekerjaan beton sloof 1 Pc : 2 Psr : 3 Krl517Pekerjaan Beton Kolom 1 Pc : 2 Psr :3 Krl718Pekerjaan Beton ring Balk 1 Pc : 2 Psr :3 Krl6

33PEKERJAAN KAP DAN RANGKA ATAS34Pekerjaan kuda-kuda dan konsul kayu kelas II535Pekerjaan gording dan pengaku gonding kayu kelas II636Pekerjaan pasangan baut dan mur dan beugel437Pekerjaan list Plank kayu kelas II538Pekerjaan atap sakuraruf639pekerjaan pasangan topi lisplank540Pekerjaan pasangan nok sakura3

41PASANGAN LANTAI/BABAT,KM/WC42Pekerjaan rabat lantai 1Pc:3Psr:5Krl443Pasangan tegel keramik 30 x 30 cm344Pasangan tegel porseling 11 x 11 cm4

53PEKERJAAN PENGECATAN DAN FINISHING54Pekerjaan cat tembok456pekerjaan cat kilap,kusen,jalusi,list plank 3 X357Pekerjaan vernis daun pintu dan bingkai jendela258Pekerjaan sealcoat atap 3 X359Pekerjaan residu/rangka atas260Pembarsian akhir3JUMLAH HARI126

jelek bede

1567891635362

10111213141545314

17181920212223244748

2526273839404162

2829303132333442434446

4950

5152535455565758596061