13

Click here to load reader

Raji final frnd page project

Embed Size (px)

Citation preview

Page 1: Raji final frnd page project

“TO INTRODUCE ABC INVENTORY CONTROL TECHNIQUE

IN SARK CABLES PVT.LTD, KANJIKODE, PALAKKAD”

Minor project Report

Submitted to University of Calicut

By

Rajeswari.B, (Reg. No LCAL MBA 056) IIIrd

Semester MBA (2011-

13),

LEAD College of Management, Palghat

Name of Guide

Mr.Arun.V

Assistant Professor,

LEAD College of Management, Palghat

November 2012

Page 2: Raji final frnd page project

“TO INTRODUCE ABC INVENTORY CONTROL TECHNIQUE

IN SARK CABLES PVT.LTD, KANJIKODE, PALAKKAD”

Minor project Report

Submitted to University of Calicut

By

Rajeswari.B, (Reg. No LCAL MBA 056) IIIrd

Semester MBA (2011-

13),

LEAD College of Management, Palghat

Name of Guide

Mr.Arun.V

Assistant Professor,

LEAD College of Management, Palghat

November 2012

Page 3: Raji final frnd page project

DECLARATION

I, hereby declare that this dissertation entitled “TO INTRODUCE ABC

INVENTORY CONTROL TECHNIQUE IN SARK CABLES PVT.LTD, KANJIKODE,

PALAKKAD”, submitted in partial fulfillment of Master in Business administration of Calicut

university, It is a record of independent research work carried by me under the guidance of

MrArun.V , Faculty, Lead College of Management, Dhoni, Palakkad

I also declare that this dissertation is a result of my own effort and has not been submitted

earlier for the award of any degree/diploma/associate ship/prize by Calicut University or any

other university

Date: 30/11/2012 RAJESWARI.B

Place: Palakkad (LCALMBA056)

Page 4: Raji final frnd page project

ACKNOWLEDGMENT

I take this opportunity first and foremost to thank god almighty, without whose blessings

and guidance this work would not have been completed.

I have immense pleasure in acknowledging my heartfelt gratitude to Sri. K.V.

Unninarayanan, principal of Lead College of Management, Dhoni Palakkad, for his sound advice

whole hearted support.

I am deeply indebted of thank Sri. Arun Velayudhan, assistant professor of Lead College

of Management, who gave me valuable advice and guidance to make my project a success

I am grateful to the management of Sark Cables Pvt. Ltd., Kanjikode, Palakkad and also

express my gratitude to Mr.Sajeev Kumar (MD), Sark Cables for granting me permission to do

the project work. I am deeply indebted to Mr.K.P.S Padmanabhan HO-HR, and Mr. Rajesh

Production Head of Sark Cables Pvt.Ltd., Kanjikkode for their valuable support assistance in

providing sufficient facilities for the successful completion of the study.

No words could express my thanks to all my friends and all others who helped me in

presenting this report.

Rajeswari.B

Page 5: Raji final frnd page project

TABLE OF CONTENT

CHAPTER

NO. TITLE PAGE NO.

I.

INTRODUCTION

1.1 Company Profile

1.2 Statement of Problem

1.3 Objective of the study

1.4 Research methodology

1-7

II. LITERATURE REVIEW 8-28

III DATA ANALYSIS AND

INTERPRETATIONS 29-42

IV

SUMMARY, FINDINGS, AND

RECOMMENDATIONS

4.1Summary

4.2 Findings

4.3Recommendations

43-45

APPENDIX 46

BIBLIOGRAPHY 47

Page 6: Raji final frnd page project

LIST OF TABLES

SL.NO TITLE PG.NO

1 Table showing the Types of inventory by functions 10

2 Table showing the ABC classification 24

3 Table showing the ABC classification and

importance 25

4 Table showing the Highest inventory of Sark cables 29

5 Table showing the Classification of all kind of

inventory 30

6 Table showing the Lead time 31

7 Table showing the Delay of inventory 32

8 Table showing the Average wastage per week 33

9 Table showing the Calculation of total cost of

inventory 34

10 Table showing the Calculation of total cost in

declining order 35

11 Table showing the Calculation of cumulative cost

of inventory 37

12 Table showing the Classification of Sark cables

inventory 42

Page 7: Raji final frnd page project

LIST OF CHART

SL.NO TITLE PG.NO

1 Chart showing the ABC classification 25

2 Chart showing the highest inventory of Sark

cables 29

3 Chart showing the classification of inventories 30

4 Chart showing the lead time 31

5 Chart showing the delay of inventories 32

6 Chart showing the average wastage per week 33

7 Chart showing the total cost in declining order 35

8 Chart showing the cumulative total cost 38

Page 8: Raji final frnd page project

CHAPTER-1

INTRODUCTION

Page 9: Raji final frnd page project

CHAPTER-2

REVIEW OF LITERATURE

Page 10: Raji final frnd page project

CHAPTER-3

DATA ANALYSIS AND INTERPRETATION

Page 11: Raji final frnd page project

CHAPTER-4

SUMMARY, FINDINGS, AND RECOMMENDATIONS

Page 12: Raji final frnd page project

APPENDIX

Page 13: Raji final frnd page project

BIBLIOGRAPHY