Set Work In Progress Limits
Kanban - Chapter 10
Limits for tasks• set Work in Progress (WiP) limits in the
team• WiP are individually for the producer, pair,
team• WiP can be adapted any times in the team
Limits for queues• queues should be as small as possible• necessity: variability can be restricted and
the workflow are maintained
Buffer and bottlenecks
• buffer should be as small as possible• buffer and queues increase the whole WIP
limit• buffer > WiP > lead time
Size of the input queue
• the size of the input queue is given by the prioritization meeting
• input queue should be refilling as fast as possible
• idle time is to avoid
Unlimited sections• theory of constraints „Drum Buffer Rope“
allows partly no WiP
• Kanban provides WiP per column, but sometimes with exceptions (e.g. queue column)
Do not put pressure on team
• small WiP limits causes pressure on the team - results is that the project stops
• use idle times for optimization • J-curve effect
Mistake: not set WiP limit
• if WiP limit is set identify process errors • without WiP limits -
result: no continuous improvement for the process and team
Allocation of capacity• define WiP limit for the whole Kanban board• define WiP limits for the service level
agreements• define capacities for each service level
agreement
Conclusion
• define WiP limits per board, column, person
• individually adaption of the WiP• use positive tension of the WiP limits