Scrum & Kanban – Better Together? Some Scrum/Kanban Myths & What Professional Scrum+Kanban can look like…
Dave WestProduct Owner & [email protected]@DavidJWest
Yuval YeretEnterprise Lean/Agile Consultant/[email protected]@YuvalYeret
© 1993-2017 Scrum.org, All Rights Reserved 2
© 1993-2017 Scrum.org, All Rights Reserved 3
We’re privileged – We can mix colors!
© 1993-2017 Scrum.org, All Rights Reserved
Survey
4
© 1993-2017 Scrum.org, All Rights Reserved
Scrum
5
• Strength: Optimized for value delivery; well defined
• Weakness: mini-waterfall
© 1993-2017 Scrum.org, All Rights Reserved
Kanban
6
• Strength: Optimized for flow
• Weakness: No rules; deferred value delivery
© 1993-2017 Scrum.org, All Rights Reserved
It’s about being Professional
7
Scrum
Professional
© 1993-2017 Scrum.org, All Rights Reserved 8
So what is Professional Scrum?
© 1993-2017 Scrum.org, All Rights Reserved 9
© 1993-2017 Scrum.org, All Rights Reserved 10
So Why Kanban?
We set out to help practitioners figure out how to do *Professional* Kanban within a *Professional* Scrum context
© 1993-2017 Scrum.org, All Rights Reserved
Kanban Core Practices – This is what *Professional* Kanban looks like…
1. Visualize
2. Limit Work-in-Progress
3. Actively Manage Items in Progress
4. Make Policies Explicit
5. Improve Collaboratively
11
© 1993-2017 Scrum.org, All Rights Reserved
1. Visualize + 2. Limit Work in Progress
• work items• workflow• how Work In
Progress is limited• Visualization of a
Service Level Expectation (SLE)• Visualization of
process policies
12
© 1993-2017 Scrum.org, All Rights Reserved
3. Actively Manage Items in Progress - Required Metrics
• To actively manage work in progress you must track when work begins and when work begins and when work is done.
•Cycle Time: The elapsed time between when works starts and when work finishes.
•Work item age: The time between when works starts and the current time.
•Throughput: The total number of items of items finished per unit of time.
13
© 1993-2017 Scrum.org, All Rights Reserved
4. Make Policies Explicit
Explicit policies ensure process transparency and enable inspection and adaptation
14
© 1993-2017 Scrum.org, All Rights Reserved
5. Improve Collaboratively
15
© 1993-2017 Scrum.org, All Rights Reserved 16
Myth / Truth?
Where are the PEOPLE in Kanban?
© 1993-2017 Scrum.org, All Rights Reserved 17
kanban doesn't encourage creating effective teams
© 1993-2017 Scrum.org, All Rights Reserved 18
kanban is all about manufacturing, software isn't manufacturing
© 1993-2017 Scrum.org, All Rights Reserved 19
Isn’t Scrum just Kanban with a bigger batch size?
© 1993-2017 Scrum.org, All Rights Reserved 20
Scrum is for … Kanban is for …
kanban is all about manufacturing, software isn't manufacturing
© 1993-2017 Scrum.org, All Rights Reserved 21
Our Scrum team has evolved to become a Kanban team.
© 1993-2017 Scrum.org, All Rights Reserved 22
We do Kanban because we can't plan out for an entire Sprint.
© 1993-2017 Scrum.org, All Rights Reserved 23
Scrum is revolutionary; Kanban is evolutionary.
Kanban always starts with what you got
© 1993-2017 Scrum.org, All Rights Reserved 24
kanban always starts with what you got
© 1993-2017 Scrum.org, All Rights Reserved 25
Kanban accepts and reinforces command and control / waterfall mindset
© 1993-2017 Scrum.org, All Rights Reserved 26
Where are the PEOPLE in Kanban?
© 1993-2017 Scrum.org, All Rights Reserved 27
Myth / Truth?
Where are the PEOPLE in Kanban?
© 1993-2017 Scrum.org, All Rights Reserved
Changes you can try in your Scrum teams
28
© 1993-2017 Scrum.org, All Rights Reserved
Use a Kanban Board as your Sprint Backlog
29
© 1993-2017 Scrum.org, All Rights Reserved
Make more of your process Transparent by making more policies explicit
30
THE Definition of Done:• Asdcasdc• Asdcasdca• sdcasdca
• Asdcasdc
• Asdcasdca
• sdcasdca
• Asdcasdc• Asdcasdca• sdcasdca
• Asdcasdc• Asdcasdca• sdcasdca
© 1993-2017 Scrum.org, All Rights Reserved
Work Item Age / Fighting Zombies
31
© 1993-2017 Scrum.org, All Rights Reserved
The Banana Peel Technique
32
© 1993-2017 Scrum.org, All Rights Reserved
Flow-based Sprint Planning
• Leverage the Sprint Goal• You don’t need to plan out the entire Sprint• You can begin unplanned work part way through the Sprint• Work can flow across Sprint boundaries
33
© 1993-2017 Scrum.org, All Rights Reserved
Flow-based Sprint Planning• Work planned for the first days of the Sprint by the Development Team is
decomposed by the end of this meeting, often to units of one day or less.• The Sprint Goal gives the Development Team some flexibility regarding
the functionality implemented within the Sprint. The selected Product Backlog items deliver one coherent function, which can be the Sprint Goal. The Sprint Goal can be any other coherence that causes the Development Team to work together rather than on separate initiatives.• As the Development Team works, it keeps the Sprint Goal in mind. In
order to satisfy the Sprint Goal, it implements the functionality and technology. If the work turns out to be different than the Development Team expected, they collaborate with the Product Owner to negotiate the scope of Sprint Backlog within the Sprint.
34
© 1993-2017 Scrum.org, All Rights Reserved
Flow-based Sprint Planning
35
© 1993-2017 Scrum.org, All Rights Reserved
Flow-based Daily Scrums
36
• Flow/Pull/Hebrew-mode – Work the Kanban board right to left
• Focus on stories rather than going person by person• What work is blocked?
• What work is about to violate our SLE?
• What work are we not visualizing?
• Where’s the bottleneck ?
© 1993-2017 Scrum.org, All Rights Reserved
Flow-based Sprint Reviews
• What is our current throughput?• How does this impact items in our
Product Backlog?• Has our SLE changed?• What is our lead time?
37
© 1993-2017 Scrum.org, All Rights Reserved
Flow-based Retrospectives
Stop
Start
MoreLess
Keep
• Is our cycle time decreasing?• Did we meet our SLAs?
• Ad Hoc (SLA violation)
38
© 1993-2017 Scrum.org, All Rights Reserved
Helping more Scrum teams be Professional using Kanban, Helping Kanban teams be more Professional
39
ScrumProfessional
KanbanProfessional• scrum.org/resources/blog/kanban-primer-scrum-teams
• scrum.org/resources/blog/scrum-and-kanban-stronger-together
• scrum.org/resources/blog/scrum-primer-kanban-teams• agilesparks.com/solutions/kanban/
• Professional Kanban Guide – WIP• Scrum.Org Professional Kanban for Scrum Teams - TBA
© 1993-2017 Scrum.org, All Rights Reserved
Thank You
40
© 1993-2017 Scrum.org, All Rights Reserved
Connect with the Scrum.org & AgileSparks community
Twitter@scrumdotorg
LinkedInLinkedIn.com
/company/Scrum.org
FacebookFacebook.com
/Scrum.org
Blog
ForumsScrum.org
/Community
RSSScrum.org/RSS
41
Insights from AgileSparks’steam of Agile Coaches/Consultants