What does Henkaten means?

変更 = Henkoo = Changing

点 = Tem = Point

Page 3: Henkaten - Introduction English

What does Henkaten means?

Henkaten is an expression,

formed by joining two

Japanese words creating a third word with

specific meaning.

Page 4: Henkaten - Introduction English

What does Henkaten means?

Henkaten therefore means changing point. Henkaten

management is a methodology used to record and track

changes in the process that may cause deviations, failures and

problems, and may also affect the product or result of this

process.

Page 5: Henkaten - Introduction English

Process Definition

According to ISO 9001 - 2008, the process is: An

activity or set of activities using resources, and

managed in order to enable the transformation

of inputs into outputs.

Page 6: Henkaten - Introduction English

Examples of Processes

Changing a flat tire;

Sharpen a pencil;

Inject plastic part;

Inspect a component;

Shopping.

Page 7: Henkaten - Introduction English

Characteristics of a HenkatenA Henkaten occurs when a

process undergoes for a modification, planned or sudden,

temporary or permanent, of that was originally planned as

the final process directly affecting one of variables of the process.

Page 8: Henkaten - Introduction English

Characteristics of a HenkatenPlanned changes

Preventive Maintenance ;A new employee is starting on the

organization under training;Change the provider of raw material

Update a work instruction; Layout changes.

Page 9: Henkaten - Introduction English

Characteristics of a HenkatenSudden changes

Corrective maintenance;An employee which is absent is replaced

by colleague;Using a component under a deviation;

A new activity is inserted into the process.

Page 10: Henkaten - Introduction English

Characteristics of a Henkaten

Temporary changes and permanent changes

Usually a not planned change is temporary, a

condition to work until the previous and

official condition can be restored, but in

some cases, a temporary change can become

permanent.

Page 11: Henkaten - Introduction English

Characteristics of a Henkaten

Thus a Henkaten will impact one or more

process variables, namely the change will

always occur in one or more than one of the

variables in the process. People, Machine,

Method and or Materials.

Page 12: Henkaten - Introduction English

PROBLEM

METHOD

MEASUREMENT / ENVIRONMENT

MATERIALMANPOWER

MACHINE

Sub-cause Sub-cause Sub-cause

Sub-cause

Sub-cause

Page 13: Henkaten - Introduction English

Characteristics of a Henkaten

What about Measurement and Environment?

Any changing in these two variables, will affect

directly the another variable, for example a new

instrument for measurement will be recorded in

Method and if there is a very cold day, it will affect

directly the people, material or even the machine.

Page 14: Henkaten - Introduction English

Why to manage and control changes?

In every change inside a process there is a

learning period, Hence which more the

process is executed, less time it takes and

higher is its efficiency, until the process

becomes stable.

Page 15: Henkaten - Introduction English

Why to manage and control changes?

INPUT OUTPUTPROCESS

Known process / Stable

INPUT OUTPUTPROCESS INPUT OUTPUTPROCESS

New process / Unstable

? ?? ? ?? INPUT OUTPUTPROCESS

Page 16: Henkaten - Introduction English

Why to manage and control changes?

Every time that a known process or a stable process, undergoes a changing it becomes once again a new process, or unstable, because is quite hard do predict accurately how that modification is going to affect the result of the process, this results will take time to evaluate and judge.

Page 17: Henkaten - Introduction English

Henkaten Management

This material was made thinking in a small organization for didactic purpose, how bigger is the organization also the Henkaten management should be divided accordingly to make easy for the station leader to manage without doing it because if organization politics or his boss has given the order, the station or substation leader must see the Henkaten management as a key tool of management and control or it will be useless, becoming just an ordinary task and a waste of time.

Page 18: Henkaten - Introduction English

Henkaten Management

ManMachineMethodMaterial

Page 19: Henkaten - Introduction English

Henkaten Management

ManFirst activity is to create all the necessary documents, in case if they are not available in the organization, most of the documents are required by best practices and also by ISO standards, the management of Man Henkaten requires a lot of activities by the leadership, and is the most hard to be managed appropriately, because it includes a key point in the changing process management, due the reason is simple, Man will operate the Machine, transforming and handling the Material following a Method and getting information from it. So it is required a good management on that variable. Also because people are not the same (physicaly, behavioral, etc) It requires need for individual training for leveling the operational capacity.

Page 20: Henkaten - Introduction English

ManFor the management of Man Henkaten, are necessary the following documents:

Board for Henkaten Management;Employees skill map;Workstation layout;Record sheet;

Henkaten Management

Page 21: Henkaten - Introduction English

Employees skill map, is a document which must be updated EVERY TIME that a new task is added or planned for employee or for a new employee, this document, gives to the leadership the ability of fast judgement in case of member absence and the replacement strategy for absent positions in the work station.

Manpower Management

Page 22: Henkaten - Introduction English

Manpower ManagementEm

plo

yee’sn

ame

and

ph

oto

s

Act

ivit

ies

/ jo

bp

osi

tio

ns

TR

EMPLOYEE SKILL MAP

MACHINING LINE 02

CAN TRAIN OTHER MEMBER

ON THE ACTIVITY

NO SKILL ON THE ACTIVITY

CAN PERFORM THE ACTIVITY

SUPERVISION IS REQUIRED

TRAINED IS PLANNED

CAN PERFORM THE ACTIVITY NO

SUPERVISION REQUIRED

NIKOLAI PATRYK TEODORCLEITON FRANCISKAARMAND

LEGEND

ASSEMBLE LINE 02

PRESS LINE 02

INJECTION LINE 02

ASSEMBLE LINE 01

MACHINING LINE 01

PRESS LINE 01

INJECTION LINE 01

ACTVIVITY / NAME ANDRZEJ BORYS ELKA

Page 23: Henkaten - Introduction English

Workstation Layout, is a simple diagram showing all the workstations on the shop floor, a scaled drawing of the production lines localization, machines, work stand, and if possible employee’s position on the line or at the machine.

Manpower Management

Page 24: Henkaten - Introduction English

WORKSTATION LAYOUT

1

2

1

INJECTION PRESS

MACHINNING ASSEMBLE

2

1 2

1

2

Manpower Management

Employee’s photos Employee’s photos should be placed by using magnets, making it easy to change positions when necessary.

Page 25: Henkaten - Introduction English

Record Sheet, is a sheet where the leader can make all the necessary registers for keep the changing under control, plan the necessary activities and to make historical data from every changing in his area.

Manpower Management

Page 26: Henkaten - Introduction English

Manpower ManagementThis example sheet was created based on 5W2H, but it could and should modified according with the organization necessities, its culture and internal best practices

RECORDING SHEET OF MANPOWER CHANGING

HOW LONG APPROVED

June 06th 2016 TEODOR

Until August 07th 2016 TEODOR

June 10th 2016 TEODOR

Until August 08th 2016 TEODOR

Line must product during

the lunch timeMachining Line 01 Planned Temporary

Only key itens from PIS first

and last part of the batch

DATE CHANGING REASON LOCATIONPLANNED OR

SUDDEN

PERMANENT OR

TEMPORARYITENS TO CHECK

June 06th 2016Elka is taking Armand

position

Armand is absent due

sicknessInjection Line 01 Sudden Temporary

Only key itens from PIS first

and last part of the batch

Nikolai was assigned for

a new positionPress Line 01June 07th 2016

Nikolai is training with

BorysPlanned Permanent

All PIS itens first and last

part of the batch

June 08th 2016Cleiton is taking Andrzej

position

Franciska is going to take

vacationsAssemble Line 01 Planned Temporary N/AJune 08th 2016

Patryk is trainning

Franciszka position

Page 27: Henkaten - Introduction English

Henkaten Management

MachineFirst activity is to create all the necessary documents, in case if they are not available in the organization, most of the documents are required by best practices and also by ISO standards. Machine management if quite simple if comparing with manpower. This monitoring requires knowledge of the main wearing parts and their life.

Page 28: Henkaten - Introduction English

Machine For the management of Machine Henkaten, are necessary the following documents:

Board for Henkaten Management;Preventive maintenance plan;Workstation layout;Record sheet;

Henkaten Management

Page 29: Henkaten - Introduction English

Preventive maintenance plan, is a document in

which every maintenance programed in advanced for every machine on the shop floor is listed, and this document should contain at least the machine name, position, date for the maintenance and person in charge for the maintenance. It should be most clear that every maintenance, planned in advanced as well the sudden, is a machine Henkaten. Most important on this activity, maintenance department and manufacturing department must act together, but the Henkaten management must be of manufacturing department, because in this relationship, manufacturing department is a customer from maintenance department.

Machine Management

Page 30: Henkaten - Introduction English

WORKSTATION LAYOUT

1

2

1

INJECTION PRESS

MACHINNING ASSEMBLE

2

1 2

1

2

Machine Management

Machine’s position on the shop floor.

Page 31: Henkaten - Introduction English

Record Sheet, is a sheet quite similar with the sheet used to control manpower Henkaten, there are although additional fields on that sheet:

Part produced after changing;

Quantity produced after changing;

Machine Management

Page 32: Henkaten - Introduction English

Machine ManagementThis example sheet was created based on 5W2H, but it could and should modified according with the organization necessities, its culture and internal best practices

RECORDING SHEET OF MACHINE CHANGING

APPROVED

APPROVED

APPROVED

APPROVED

APPROVEDITENS TO CHECK

All PIS itens first and last

part of the batch

Holes position and size

Burrs and surface

appearance

Weld cut check test in the

first and last of the batch

10.000 PARTS / NEXT

CHANGING COME BACK TO

USE THE CORRECT OIL

June 08th 2016 CLEITONChanging of welding

electrodes due the wore out

before the expected time

Assemble Line 01 Planned Temporary PART-12345-126 3000 PARTS

PART-12345-124 1000 PARTS

June 08th 2016 TEODORChanging the cutting oil for

a substitute, due missing of

correct oil

Machining Line 01 Sudden Temporary PART-12345-125

June 07th 2016 ANDRZEJ Changing the guide pin Press Line 01 Sudden Permanent

June 06th 2016 FRANCISKA Die changing Injection Line 01 Planned Permanent PART 12345-123 2000 SHOTS

DATE WHO CHANGING LOCATIONPLANNED OR

SUDDEN

PERMANENT

OR

TEMPORARY

PN PRODUCED AFTER

CHANGING

QTY PRODUCED AFTER

CHANGING

Page 33: Henkaten - Introduction English

Henkaten Management

MethodFirst activity is to create the only 2 necessary documents, in case if they are not available in the organization, one of its of the documents is also requested by best practices and also by ISO standards. Method management is even

more easy than Machine.

Page 34: Henkaten - Introduction English

MethodFor the management of Method Henkaten, are necessary the following documents:

Board for Henkaten Management;Record sheet;Correlation documents list;

Henkaten Management

Page 35: Henkaten - Introduction English

Record Sheet, is exactly the same of Machine, but the contents of records will be different, once the changing in Method will be on documents, process parameters such as velocity, temperature or quantity. what is important to handle parameters as Method Henkaten, not machine, the reason of that is simple, machine modifications are done when mechanical modifications are performed.

Method Management

Page 36: Henkaten - Introduction English

Machine ManagementThis example sheet was created based on 5W2H, but it could and should modified according with the organization necessities, its culture and internal best practices

All PIS itens first and last

part of the batchTEODOR

All PIS itens first and last

part of the batchTEODOR

June 07th 2016 ANDRZEJModification of work

instructionPress Line 1 Planned Permanent 12345-128 1000 parts

ITENS TO CHECK APPROVED

June 06th 2016 CLEITONIncrease of temperare of

injectionInjection Line 1 Sudden Temporary 12345-127 500 shots

RECORDING SHEET OF METHOD CHANGING

DATE WHO CHANGING LOCATIONPLANNED OR

SUDDEN

PERMANENT

OR

TEMPORARY

PN PRODUCED AFTER

CHANGING

QTY PRODUCED AFTER

CHANGING

Page 37: Henkaten - Introduction English

Correlation document list, is a list required by QMS or the ISO standards, in this list there is a correlation between documents, the purpose of this list is to know or to remember what documents are necessary to modify when a new information is added or remove from one document.

Method Management

Page 38: Henkaten - Introduction English

Method Management

PACKING

INSTRUCTION

PFMEA o o o o

DOCUMENT

CHANGED /

DOCUMENT TO

CHECK

PFMEAPROCESS

CONTROL PLAN

WORK

INSTRUCTIONPIS

MACHINE

PARAMETERS

SHEET

CHECK LIST OF

MACHINE

SETUP

INSTRUCTION

PROCESS

CONTROL PLAN o o o oWORK

INSTRUCTION o o o oPIS X X X X

MACHINE

PARAMETERS SHEET oCHECKLIST OF

MACHINE

SETUP

INSTRUCTION o o X X o oPACKING

INSTRUCTION X X X o X X XCOSTUMER

DOCUMENTS o o o o o o o o

DOCUMENTS CORRELATION LIST EXAMPLE

COSTUMER

DOCUMENTS

The only reason of that list exists is to remind people all documents that one changing is applied, if the organization have another mechanism for this activity so it can be used.

Page 39: Henkaten - Introduction English

Henkaten Management

MaterialFirst activity is to create the record sheet, because is the only document necessary, in case if they are not available in the organization, and this document is quite similar to all the other record sheets.

Page 40: Henkaten - Introduction English

Material Management

All PIS itens first and last

part of the batchTEODOR

All visual itens of PIS 5

parts every 30 minutesTEODOR

June 07th 2016 FRANCISKA Thickness of coil Press Line 1 Planned Permanent 12345-130 1000 parts

ITENS TO CHECK APPROVED

June 06th 2016 BORYSMaster Batch supplier

changingInjection Line 1 Sudden Temporary 12345-129 100 shots

RECORDING SHEET OF METHOD CHANGING

DATE WHO CHANGING LOCATIONPLANNED OR

SUDDEN

PERMANENT

OR

TEMPORARY

PN PRODUCED AFTER

CHANGING

QTY PRODUCED AFTER

CHANGING

This example sheet was created based on 5W2H, but it could and should modified according with the organization necessities, its culture and internal best practices

Page 41: Henkaten - Introduction English

Henkaten Management

Visual aidThe visual aid, it simple to apply any visual detection forms to help in fast identification of some information, this way you can also apply the selected color for each 4Ms, to all relevant documents and controls, thus creating a distinction and visualization fast each change that is occuring in the shop floor, this could be trigger to top management to get involved if necessary.

Page 42: Henkaten - Introduction English

Henkaten Management

Man - RedMachine - YellowMethod – GreenMaterial - Blue

Page 43: Henkaten - Introduction English

Thanks for your attention!

Cleiton Morais de Melo [email protected]+55 11 99958-8639