BIOGAS PLANT VRBAS
EBA Conference 2014
2
INVESTOR Mirotin Energo d.o.o., member of the Mirotin Group
In Numbers: 1.100 employees 5.000 ha agricultural land 2.200 dairy cows
→One bigges agricultural and trade companies in Serbia (1992) → Production • Crops produciton (grains/wheat) • Milk production and cattle breeding • Oil and fat production • Mill → Trade • Oil products • Grains • Industrial crops • Feedstock for nitrogen fertilizers • Artificial fertilizers →Export Slovenia, Croatia, Macedonia, Montenegro, Italy, Hungaria, Germany
3
PROJECT Vrbas, Wojvodina
ü First biogas project in Serbia ü Located in Wojvodina ü Installed power 1,5 MW el. ü Construction in two phases ü 1st phase (1MW): Construction start in October 2011 ü 1st phase (1MW): Start-up in June 2012 ü 2nd phase (500kW): Construction start in August 2013 ü 2nd phase (500kW): Start-up in Dezember 2013 ü 2013: 712 hrs of full operation, 96% availability ü Future development 2014: heat utilisation (glasshouse)
4
Feed
er
Capacity 80m3
Total volume 8.044 m3 Main D. -‐ 5.104m3 Secondary D. -‐2.940m3
Capacity 3.100m3
Capacity 5000m3
PLANT
5
PLANT
6
FEEDSTOCK DM% oDM% Amount t/a
Cattle manure 27 85 26.000,00 44,83% Sugar beet residues 18 90,5 10.000,00 17,24% Catte slurry 10 85 9.000,00 15,52% Maize silage 35 95 8.000,00 13,79% Whey 7 90 5.000,00 8,62%
44.83%
17.24%
15.52%
13.79%
8.62%
Ca3le manure
Sugar beet residues
Ca3e slurry
Maize silage
Whey
Waste feedstock 86,21% Energy crops 13,79%
7
FEEDSTOCK
Cattle manure 40,29% Maize silage 31,06% Sugar beet residues 19,43% Catte slurry 5,24% Whey 3,97%
Waste feedstock 68,94% Energy crops 31,06%
40.29%
31.06%
19.43%
5.24% 3.97%
Ca3le manure
Maize silage
Sugar beet residues
Ca3e slurry
Whey
8
Thank you for your attention