35
1

C&ess presentation performance review 2016 (copy 1)

Embed Size (px)

Citation preview

Page 1: C&ess presentation  performance review 2016 (copy 1)

1

Page 2: C&ess presentation  performance review 2016 (copy 1)

May , 2016

2

CONSTRUCTION AND CONSTRUCTION AND ENGINEERING SUPPORT ENGINEERING SUPPORT SERVICES DEPARTMENTSERVICES DEPARTMENT

Page 3: C&ess presentation  performance review 2016 (copy 1)

INTRODUCTION

3

C&ESS Department is responsible to provide Civil construction, Field Gathering lines & Mechanical fabrication services to Drilling, Production, Process, Store & other client Departments.

Two Division:1- Civil Engineering2- Mechanical Engineering

Page 4: C&ess presentation  performance review 2016 (copy 1)

1. Pre-Drilling Civil Works. 2. Metalled Roads, Field Roads & Right of Ways3. Field Camps, Boundary Walls & Fencing4. Ware Houses, Workshops, Storage sheds etc.5. Dispensaries6. Water Supply Systems, Water & Sewage Treatment Plants7. Laying of Gathering Lines8. Fabrication and installation of Well Head Assemblies.9. Installations for Pig Launching Assemblies10. Fabrication and repair of Oil Storage Tanks and Caravans.11. Maintenance of baseline field machinery.

Functions Functions

4

Page 5: C&ess presentation  performance review 2016 (copy 1)

5

Cost estimates are based on MES Schedule of Rates.

Engineering Works Procedure:• Cost estimate and AFE approvals.• Tender documents preparation and contract administration.• Departmental works utilizing available resources.• Procurement of material & services as per PPRA & PEC.

Working MethodologyWorking Methodology

Page 6: C&ess presentation  performance review 2016 (copy 1)

CIVIL ENGINEERINGCIVIL ENGINEERINGCivil Engineering consists of Three sections1.Engineering Operations North

• Engineering Field Party No. 2• Engineering Field Party No. 3

2.Engineering Operations South• Engineering Field No. 1• Engineering Field No. 4• Engineering Field No. 5

3.Contracts & Consultancy Services

6

Mechanical Engineering consists of two sections1.Equipment and Field Machinery

• Workshop and Transport Section• Base Workshop, I-9, Islamabad• Base Workshop, KBW, Karachi

2.Fabrication and Pipeline• Field Gathering Construction Party No. 1• Field Gathering Constuction Party No. 2

MECHANICAL ENGINEERINGMECHANICAL ENGINEERING

Page 7: C&ess presentation  performance review 2016 (copy 1)

Party Location District Province

EFP-1 Uch Dera Bugti Baluchistan

EFP-2 Kot Adu Muzaffar Garh Punjab

EFP-3 Fateh Jang Attock Punjab

EFP-4 Qadirpur Ghotki Sindh

EFP-5 Hyderabad Hyderabad Sindh

FGCP-1 Multan Multan Punjab

FGCP-2 Hyderabad Hyderabad Sindh

Present Locations of EFPs and FGCPsPresent Locations of EFPs and FGCPs

7

Page 8: C&ess presentation  performance review 2016 (copy 1)

8

ENGG.WORKS DETAILENGG.WORKS DETAILPre Drilling Engineering Works

Description 2011-12 2012-13 2013-14 2014-15 2015-16

Completed 20 22 22 24 28In progress - - - - 9In Tender process

- - - 2

Page 9: C&ess presentation  performance review 2016 (copy 1)

9

ENGG.WORKS DETAILENGG.WORKS DETAILCivil Works for Work Over Jobs

Description 2011-12 2012-13 2013-14 2014-15 2015-16

Completed 8 7 5 14 16In progress - - - - 2In Tender process

- - - - 3

Page 10: C&ess presentation  performance review 2016 (copy 1)

10

Works carried out by EFP-I Works carried out by EFP-I During Last 05 Years

PDEW Work Over Job at Field Development WorksS.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks

1 Nashpa#4 Completed 1 Kal#2 Complete. 1 Permanent Fencing at Nashpa#1. Completed.

2 Nashpa#5 Completed 2 Kal#3 Complete. 2 Permanent Fencing at Nashpa#2. Completed.

3 Nashpa#6 Completed 3 Missa Kiswal#3 Complete. 3 Permanent Fencing at Nashpa#4. Completed.

4 Nashpa#7 Completed 4 Chak Naurang#5A Complete. 4 Well operator and security guard room at Nashpa#4. Completed.

5 Mela#4 Completed 5 Chak Naurang South#1 5 PCC hardstanding at stock material at Nashpa. Completed.

6 Mela#5 in progress 6 Rajian#1 in progress 6 F.C. accomodation at Nashpa. Completed.

7 Chanda#4 in progress 7 Rajian#4A Complete. 7 Internal Road at Nashpa. Completed.

8 Shawa#1 Completed 8 Rajian#2 in progress 8 RCC Boundary wall at Nashpa. Completed.

9 Naurang Shah#1 Completed 9 Field development works at Nashpa. Completed.

10 Kurrum#1 Completed 10 Hardstanding for extension of existing filling gantry. Completed.

11 Shaikhanwala#1 Completed 11 RCC Water storage tank at Nashpa. Completed.

12 Surqamar#1 Completed 12 Temporary camps construction for LPG plant extension at Nashpa Completed.

13 Khawaja#1 (Re-entry) Completed 13 Fencing and watch towers at plant extension area at Nashpa. Completed.

14 Kohat#1 Completed 14 API pit/Skimmer tank at Nashpa. in progress

Page 11: C&ess presentation  performance review 2016 (copy 1)

11

Works carried out by EFP-I Works carried out by EFP-I During Last 05 Years

15 Jabbi#1 Completed 15 Pre-casted wall at LPG plant area at Nashpa. Completed.

16 Jand#1 Completed 16 Double gate, road blocker and hydraulic barrier at Nashpa. Completed.

17 Jand#2 Completed 17 Dyke walls and flooring around crude storage tanks at Nashpa. Completed.

18 Dakhni Deep #5. Completed 18 Admin building at Nashpa. Completed.

19 Dakhni#7 Completed 19 02 class rooms with veranda for Govt. Primary School at Awaji Banada, Nashpa. Completed.

20 Dakhni#8 Completed 20 One way road and parking shed at Nashpa. in progress

21 Dakhni#12 Completed 21 Infra structure works at Chanda. Completed.

22 Ajuwala#1 Completed 22 Internal road at Mela. Completed.

23 Soghari#1 Completed 23 TST of internal roads at Chanda. Completed.

24 Soghari#2 Completed 24 Production office building at Dakhni. Completed.

25 Chak Naurang# X-1 Completed 25 Plice Check Post at Dakhni well #3. Completed.

26 Rajian#6 Completed 26 Metalled road (7Km) from Social welfare dispensary to Dakhni #6. Completed.

27 Rajian#7 Completed 27 RCC Hardstanding for Logistic work shop area at Kot Sarang. Completed.

Page 12: C&ess presentation  performance review 2016 (copy 1)

12

Works carried out by EFP-II Works carried out by EFP-II During Last 05 Years

PDEW Work Over Job at Field Development WorksS.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks

1 Kup#1 Completed 1 Bahu#5 Completed. 1

Construction of metal road, boundry wall & cement concrete stone paving, additional work for annaxe at R.O Multan

Completed

2 Kalchas#1 Completed 2 Bahu#7 Completed. 2Construction of hard standing(flooring) at kot addu field store

Completed

3 Bahu#5 Completed 3 Punjpir Completed. 3 Repair of fencing at Bahu-5,6,7,8 Completed

4 Bahu#6 Completed 4 Pre-drilling civil work at Barkat wala(Heto) Completed

5 Bahu#7 Completed 5 Water supply scheme for locals at kalchas Completed

6 Bahu#8 Completed 6 Evaporation pond at SS Well no 1 Completed

7 Sohni wala No-1 Completed 7 Construction of officer rest house Annexe at R.O Multan Completed

8 Dhodak Deep #2 A Completed 8 Renovation of banglow A-1 officer rest house kotaddu field Completed

9 Dhodak Deep #1 Completed 9Construction of engine driver room at kotaddu log field,hard standing and roof treatment of Masjid

Completed

10 Muhammad test well No-1(multan north -1) Completed 10

Blasting/removing of crocked mountain along approach road near chapper DDK field.

Completed

11 DDk Rubly x-1 in progress 11 Repair and mantenence of store shed at kotaddu field. Completed

Page 13: C&ess presentation  performance review 2016 (copy 1)

13

Works carried out by EFP-II Works carried out by EFP-II During Last 05 Years

PDEW Work Over Job at Field Development WorksS.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks

12 Renovation/partition of banglow B-2 at log field kotaddu Completed

13Urgent construction of security post,rooms for BMP one at mari top dera bugti.

Completed

14 Tuff tiles at nandpur/punjpeer dehydration plant Completed

15 Boundry wall at ss-1 nandpur Completed

16 Re construction of boundry wall at RO-Multan Completed

17 Const of metal road shujabaad canal at ss-1 nandpur Completed

18 Distemper/weather shield paint officer & camp building(EFP_2) Completed

19 Tiles flooring for staff transit camp at RO-multan Completed

20 Dismentling of punjpeer Completed

21 Comst of hardstanding around admin building efp-2 kotaddu Completed

22 Const of washroom at bahu-2 Completed

23 Re-habitation of admin block log-field kotaddu Completed

24 Civil work of const of masjid at dhodak colony multan Completed

25 Renovation work of staff and officer transit camp at RO- multan Completed

26Bahu well no 4 bahu gas field develment at bahu well no 4 hydraulic work

Completed

Page 14: C&ess presentation  performance review 2016 (copy 1)

14

Works carried out by EFP-III Works carried out by EFP-III During Last 05 Years

PDEW Work Over Job at Field Development WorksS.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks

1 Nashpa#4 Completed 1 Kal#2 Complete. 1 Permanent Fencing at Nashpa#1. Completed.

2 Nashpa#5 Completed 2 Kal#3 Complete. 2 Permanent Fencing at Nashpa#2. Completed.

3 Nashpa#6 Completed 3 Missa Kiswal#3 Complete. 3 Permanent Fencing at Nashpa#4. Completed.

4 Nashpa#7 Completed 4 Chak Naurang#5A Complete. 4 Well operator and security guard room at Nashpa#4. Completed.

5 Mela#4 Completed 5 Chak Naurang South#1 5 PCC hardstanding at stock material at Nashpa. Completed.

6 Mela#5 in progress 6 Rajian#1 Completed. 6 F.C. accomodation at Nashpa. Completed.

7 Chanda#4 in progress 7 Rajian#4A Completed 7 Internal Road at Nashpa. Completed.

8 Shawa#1 Completed 8 Rajian#2 in progress 8 RCC Boundary wall at Nashpa. Completed.

9 Naurang Shah#1 Completed 9 Field development works at Nashpa. Completed.

10 Kurrum#1 Completed 10 Hardstanding for extension of existing filling gantry. Completed.

11 Shaikhanwala#1 Completed 11 RCC Water storage tank at Nashpa. Completed.

12 Surqamar#1 Completed 12 Temporary camps construction for LPG plant extension at Nashpa Completed.

13 Khawaja#1 (Re-entry) Completed 13 Fencing and watch towers at plant extension area at Nashpa. Completed.

14 Kohat#1 Completed 14 API pit/Skimmer tank at Nashpa. in progress

Page 15: C&ess presentation  performance review 2016 (copy 1)

15

Works carried out by EFP-III Works carried out by EFP-III During Last 05 Years

PDEW Work Over Job at Field Development WorksS.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks

15 Jabbi#1 Completed 15 Pre-casted wall at LPG plant area at Nashpa. Completed.

16 Jand#1 Completed 16 Double gate, road blocker and hydraulic barrier at Nashpa. Completed.

17 Jand#2 Completed 17 Dyke walls and flooring around crude storage tanks at Nashpa. Completed.

18 Dakhni Deep #5. Completed 18 Admin building at Nashpa. Completed.

19 Dakhni#7 Completed 1902 class rooms with veranda for Govt. Primary School at Awaji Banada, Nashpa.

Completed.

20 Dakhni#8 Completed 20 One way road and parking shed at Nashpa. in progress

21 Dakhni#12 Completed 21 Infra structure works at Chanda. Completed.

22 Ajuwala#1 Completed 22 Internal road at Mela. Completed.

23 Soghari#1 Completed 23 TST of internal roads at Chanda. Completed.

24 Soghari#2 Completed 24 Production office building at Dakhni. Completed.

25 Chak Naurang# X-1 Completed 25 Plice Check Post at Dakhni well #3. Completed.

26 Rajian#6 Completed 26 Metalled road (7Km) from Social welfare dispensary to Dakhni #6. Completed.

27 Rajian#7 Completed 27 RCC Hardstanding for Logistic work shop area at Kot Sarang. Completed.

Page 16: C&ess presentation  performance review 2016 (copy 1)

16

Works carried out by EFP-III Works carried out by EFP-III During Last 05 Years

PDEW Work Over Job at Field Development WorksS.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks

28 Rajian#8 Completed 28 Crude storage tanks foundation and dyke walls at Rajian#5. Completed.

29 Rajian#9 Completed 29 Extension in social welfare dispansary at Rajian. Completed.

30 Govt. Rural Dispansary, at Dina, Jehlum. Completed.

31Repair/maintenance of road from Mohri Rajgan to Chak Treda at Jehlum.

Completed.

32 Repair of main road to Rajian Oil Field. Completed.

33 Hard standing around weigh bridge and RCC culvert at Mela. Completed.

34 Cosndtruction of weigh bridge foundation at Mela. Completed.

35 Cosndtruction of weigh bridge foundation at Nashpa Completed.

36 Cosndtruction of weigh bridge foundation at Rajian. Completed.

37 New waste pit with skimmer tank at Kal. Completed.

38 Repair/upgradation of road from Shakardra to Kharapa More, Kohat. Completed.

39 Worshop shed at Dakhni. Completed.

40 Store shed at Dakhni. in progress

Page 17: C&ess presentation  performance review 2016 (copy 1)

17

Works carried out by EFP-III Works carried out by EFP-III During Last 05 Years

PDEW Work Over Job at Field Development WorksS.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks

41 New residential rooms at Rajian. in progress

42 Const. of civil works for utilization of weigh bridge at Rajian. in progress

43 Improvement of existing Tarally Bridge Road at Chanda. in progress

44 Supply of utility water at Nashpa Plant for year 2014. in progress

45 Supply of utility water at Nashpa Plant for year 2015. Completed.

46Construction of dyke wall and PCC hardstanding for crude storage tanks at Mela.

Completed.

47

Construction of RCC hard standing for installation of 20000 BPD Capacity new Separation Battery at Nashpa

Completed.

48 Construction of internal Road at chanda plant Completed.

49 Repair of (0.8 km)Road at Ratta Mohara Rajian oil field. Completed.

50 Modification of New store shed at dakhni Plant. Completed.

Page 18: C&ess presentation  performance review 2016 (copy 1)

18

Works carried out by EFP-III Works carried out by EFP-III During Last 05 Years

PDEW Work Over Job at Field Development WorksS.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks

51

Construction of One Rcc under ground water reservior at water source Mela # 01

Completed.

52Construction of well Operator and security Guard Rooms at Nashpa well # 03.

Completed.

53Construction of Foundation for Proplane Bullet at Chanda Plant

Completed.

54 Concrete Flooring at Chanda Plant Completed.

55 New Dehydration Plant at Nashpa Completed.

56 Construction of Room for Mechanical at Chanda Plant Completed.

57Civil Works for Re-installation of TOC at Sheikhan Plant

Completed.

58 Construction of Building of Mela Dehydration Plant Completed.

Page 19: C&ess presentation  performance review 2016 (copy 1)

19

Works carried out by EFP-III Works carried out by EFP-III During Last 05 Years

PDEW Work Over Job at Field Development WorksS.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks

59

Construction of Boundary Wall & Provision of steel Stairs for WatchTower at Sheikhan

Completed.

60 Laying of Water Line at Village Nandrakka Completed.

61 Compressor Foundation at Sadqal Completed.

62Renovation of MD Office and Entrance Lobby at Head Office

Completed.

63 Renovation of OGTI Room at Islamabad Completed.

64Improvement of Water Supply Scheme (Social Welfare) Kal Oil Field

Completed.

65

Laying of Sand Cushion / Supply & Installation of Geomembrane at Chak Naurang

Completed.

66 Re-surfacing / Wide laying of Access Road at Rajian#5 Completed.

67 Hardstanding at Chak Naurang Yard Completed.

68 Construction of Block at Govt. High School Rajian Completed.

Page 20: C&ess presentation  performance review 2016 (copy 1)

20

Works carried out by EFP-III Works carried out by EFP-III During Last 05 Years

PDEW Work Over Job at Field Development WorksS.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks

69 RCC Approach Road Action yard to Main Gate Completed.

70Construction of 02 Rooms for Store Office at Chak Naurang

Completed.

71 Rising of Boundary Wall at Dakhni Completed.

72Construction of Woven Mesh Fencing & Watch Tower at Chak Naurang Logistic Base

Completed.

73 Construction of Boundary Wall at I-9 Base Store Completed.

74Construction of Civil Works for Installation of LPG/DPR Unit at Dakhni

Completed.

75 Civil Work for Installation of Bullet at Dakhni Plant Completed.

76 Civil Works for Well Head at Dakhni#2 Completed.

77 Repair of Retaining Wall Inside Dakhni Plant Completed.

78 Store Shed at Dakhni Plant Completed.

Page 21: C&ess presentation  performance review 2016 (copy 1)

21

Works carried out by EFP-III Works carried out by EFP-III During Last 05 Years

PDEW Work Over Job at Field Development WorksS.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks

79Earth Filling RCC Road PCC Hardstanding at Dakhni Plant

Completed.

80Bathroom with Open Space & Boundary Wall Officers Camp EFP-III

Completed.

81 Semi-covered Shed at I-9 Base Store Completed.

82 08 Number Living Rooms at Dakhni Colony Completed.

83Glazed Tiles for Corridores & Stairs Masood Mansion, F-8 Markaz, Islamabad

Completed.

84 Repair of Bhal Syedan Road under Social Welfare Completed.

Page 22: C&ess presentation  performance review 2016 (copy 1)

22

Works carried out by EFP-IV Works carried out by EFP-IV During Last 05 Years

PDEW Work Over Job at Field Development WorksS.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks

1 PDCW well Badar # 02 Completed 1 Work Over Job QP#21 Completed 1 Rasing of Boundary Wall at

QP PlantCompleted.

2 HRL#3 Completed 2 Work Over Job QP#32 Completed 2 Wire Mesh Fencing QP # 37 Completed.

3 HRL#4 Completed 3 Work Over QP #11 Completed 3

Approach Road /ROWs from Eastern Pig Launcher station to QP Gas Field

Completed.

4 HRL#5 Completed     4 Hard Standing Cable Tranches QP Plant

Completed.

5 HRL#6 Completed     5 Repair of Fencing at QP plant

in progress

6 HRL#7 Completed     6Hard Standing and Parking Shed in front of Admin Block QP Plant

Completed.

7 HRL#8 Completed     7 Refencing of QP # 30 Completed.

8 HRL#9 Completed 8 Raised Platform at well QP# 17 Completed.

9 HRL#10 Completed 9 Construction of Office Chowkidar Room and Store Shed at Maru#01 Completed.

10 HRL#11 Completed     10 Relocation of 50MMSCED De Hydration at QP PEL Plant Completed.

11 PDCW QP # 48 Completed     11 Raising & repair of approach roads of well sites Completed.

Page 23: C&ess presentation  performance review 2016 (copy 1)

23

Works carried out by EFP-IV Works carried out by EFP-IV During Last 05 Years

PDEW Work Over Job at Field Development WorksS.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks

12 PDCW ERW QP # 47 Completed     12 Flood Fighting Arrangment

of OGDCL Bund.Carried out yearly.

13 PDCW Sara # 04 Completed     13 Repair & Reconstruction of QP Internal Road Completed.

14 PDCW QP 49-A Completed 14 Well Head Assemblies of Maru 1,2,3 Reti # 01 Completed.

15 PDCW QP#46 Completed   15 Raised Platform QP#36 Completed.

16 Civil Work related to stacking of Rig N#03 Completed 16 Permanent Fencing QP33 Completed

.

17 PDCW QP#45 Completed 17 Repair of Works QP#24 Completed.

18 PDCW HRL#06 Completed 18   Completed.

19 PDCW Hadra (Raja#01) Completed     19   Completed

.

20 PDCW QP#35 Completed     20 Repair of Fencing at QP#23& 27 Completed.

21 PDCW QP#44 Completed     21 Relocation Pirkoh Commpressor QP Plant Completed.

22 PDCW Maru South # 01 Completed 22 Fencing of QP # 40 Completed.

23 PDEW QP#42 (ERW-03) Completed 23 Raising/Strengthning of OGDCL Bund. in progress

Page 24: C&ess presentation  performance review 2016 (copy 1)

24

Works carried out by EFP-IV Works carried out by EFP-IV During Last 05 Years

PDEW Work Over Job at Field Development WorksS.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks

24 Reti#2 Completed

25 Ismail#1 Completed

26 Thal East#1 Completed

27 ThalEast#3 In progress

 

28 Thal West #1Completed

 

Page 25: C&ess presentation  performance review 2016 (copy 1)

25

Works carried out by EFP-V Works carried out by EFP-V During Last 05 Years

PDEW Work Over Job at Field Development WorksS.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks

1 Dhacharapur#2. Completed 1 Sona#8 Completed 1 Const. of admin building , warehouse & Sec. Office Building C-I Kunnar Sindh Completed

2 Saand#01 Completed 2 Thora#4 Completed 2 Const. of foundation for de-hydration plant at Bobi Completed

3 Aradin#1 Completed 3 Tando Alam#20 Completed 3 Const. Up-gradation and widening of Kunner-Pasaki Road Distt. Hyderabad, Sindh Completed

4 Pasaki#1 Completed 4 Tando Alam#16-A Completed 4 Field development civil works at Dacharapur # 2 distt Hyderabad Sindh Completed

5 Pasaki#9 Completed 5 Nim West#1 Completed 5 Const. of Water tank for drinking purpose Tando Alam Oil Complex Sidh Hyderabad Completed

6 Bobi#10 Completed 6 Lashari Center #5 Completed 6 Const. of Ploice post at Sinjhoro Completed

7 Tando Qaiser#1 Completed 7 Moolan North#1 Completed 7 Const. of Workshop Office, MP.E&I workshop etc. Kunnar C-2 Completed

8 Jakhro West#1 Completed 8 Tando Alam#20 Completed 8 Const. of Well Head Assembly works for 09 wells at Sinjhoro in progress

9 Patafi#1/Hanif Saddiqi#1 Completed 9 Lashari#5 Completed 9 Const. of remaining civil works at rangers

camp at TOC Hyderabad Sindh Completed

10 Kunner Deep#9 Completed 10 Kunner#2 Completed 10 Const. of Mosque at Daru Plant at Hyderabad Sindh Completed

11 Manna#1 Completed 11 Thora East#1 Completed 11 Const. of social welfare dispensary at Bobi plant sanghar Sindh Completed

12 Chak Dim 5 #2 Completed 12 Tando Alam#17. Completed

13 Chak 25 C#1 Completed 13 Chak 66 North East #1 Completed

14 Pasaki Deep #4 Completed 14 Kunner #2 Completed

15 Saand #2 Completed 15 Thora East#1 Completed

16 Palli Deep#1 Completed 16 Thora#6 Completed

17 Kunner#9 Completed 17 Lashari#3 Completed 18 Jarwar#1 Completed 18 Kunner #4 Completed

Page 26: C&ess presentation  performance review 2016 (copy 1)

26

Works carried out by EFP-V Works carried out by EFP-V During Last 05 Years

PDEW Work Over Job at Field Development WorksS.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks

19 Pasaki Deep#5 Completed 19 Kunner#8 Completed

20 Pasaki #10 Completed 20 Pasakhi#7 Completed

21 Chak 3 Dim#3 Completed 21 Kunner#5 Completed

22 Kunner Deep#10 Completed 22 Aradin#1 Completed

23 Sinjhoro#X-1 Completed 23 Dars Deep#1 Completed

24 Buzdar North #2 Completed 24 Chak 2 #3 Completed

25 Tando Allah Yar East#1. Completed 25 Sono#4 Completed

26 Suleman#2 Completed 26 Chak 2 #2 Completed

27 Bitrism West#2 Completed 27 Tando Alam#17. Completed

28 Bachani#1 Completed 28 Tando Alam #18 Completed

29 Kunner #10. Completed 29 Thora Deep#1 Completed

30 Kunner Deep#11. Completed 30 Thora#3 Completed

31 Pasakhi Deep #6. Completed 31 Thora#4 Completed

32 Khewari E.L.(X-1) Completed 32 Kunner#6 Completed

33 Kunner #11 Completed 33 Nim West #1 Completed

34 Palli#2 Completed 34 Thora East #1 Completed

35 Soomro#1 (Daru Deep#1) Completed 35 Pasakhi North#1 Completed

36 Dachrapur#3 Completed 36 Pali Deep#1 in progress 37 Gundanwari#1 in progress

Page 27: C&ess presentation  performance review 2016 (copy 1)

E&FM Section an integral part of C&ESS Department is committed:

• To Plan, co-ordinate & execute repair & maintenance of all field machinery & equipment of the C&ESS Department

• To provide feed back services to EFPs for smooth functioning of their field workshops & water supply.

• To plan & co-ordinate major overhauling of the machinery/equipment at Base workshops.• To plan & co-ordinate for smooth water supply to fields & Rigs sites.

05 Numbers Field Workshops under the administrative control of respective Party Chiefs:EFP-1EFP-IIEFP-IIIEFP-IVEFP-V02 Nos Base Workshops:I-9 Base Workshops at Islamabad.Karachi Base Workshop, its administrative control lies with RC Karachi.

27

WORKSHOPS:

 E&FM Section

Page 28: C&ess presentation  performance review 2016 (copy 1)

During Last 03 Years• PERMANENT WORKS• (Majority works done through tender after approval of Engineering Works Procedure-2013)• • 1- COMPLETED WORKS 40• • 2- UNDER CONSTRUCTION WORKS 32 • • 3- WORKS IN TENDERING STAGE 104.• (Bid documents, Tech. Evaluation, Fin. Evaluation, • Competent authority approval, Contract agreement • & Work order stage)• 4- ANNULED / CLOSED CASES/ RETENDERED- 41• • TOTAL WORKS 217• • • PREDRILLING ENGINEERING WORKS • (PDEWs done through tender after approval of Engineering Works Procedure-2013)• • 5. Tendered & awarded PDEWs 115• 6. TOTAL PDEWs tendered & awarded of work - 115• • 7. TOTAL PERMANENT & PDEWs 332

• 28

Works Processed by Contract Section

Page 29: C&ess presentation  performance review 2016 (copy 1)

# JOBS FGCP-I FGCP-II TOTAL

QTY CostMillion Rs

QTY CostMillion Rs

QTY CostMillion Rs

1 Laying of Oil & Gas Pipeline 4”, 6”, 8”, 10”, 16”, 26”, 30” (& Retrival)

273 KM 750 257 KM 861.877 530 KM’s

1612

2 Installation of well head facility 37 Nos 55 25 Nos 24.69 62 Nos 117

3 Crude storage Tanks 3000, 5000, 6000, 12000, 20000 BBLS

06 Nos 8.2 17 Nos 29.75 23 Nos 38

4 Fab / Renovation of living caravans 28 Nos 20 -- -- 28 Nos 20

5 Installation of CO2 removal plant / glycol unit / tie-in of compressor

-- -- 03 Nos 17.812 03 Nos 17.812

6 ATA’s 06 Nos 34 09 Nos 3.962 15 Nos 38

7 Installation of separation batteries (HP/MP/LP) 12 Nos80

14 Nos90

26 Nos170

8 Misc Pipeline repair, installation of knock out vessels, gathering headers, steel structures, pipe supports

200 Nos 76 Nos 276 Nos

TotalRs 2013 Million

Page 30: C&ess presentation  performance review 2016 (copy 1)

# JOBS QTY Cost Rs(Million)

1 Installation of Flow line 56 KM’s 424

2 Well Head Assembly 10 Nos 15

3 Repair of Storage Tank 06 Nos 32

4 Relocation of Flare stack 01 Job 1.5

5 Repair / Renovation of Living Caravans 05 Nos 4.0

Total 476.5

Page 31: C&ess presentation  performance review 2016 (copy 1)

During Last 03 Years• PERMANENT WORKS• (Majority works done through tender after approval of Engineering Works Procedure-2013)• • 1- COMPLETED WORKS 40• • 2- UNDER CONSTRUCTION WORKS 32 • • 3- WORKS IN TENDERING STAGE 104.• (Bid documents, Tech. Evaluation, Fin. Evaluation, • Competent authority approval, Contract agreement • & Work order stage)• 4- ANNULED / CLOSED CASES/ RETENDERED- 41• • TOTAL WORKS 217• • • PREDRILLING ENGINEERING WORKS • (PDEWs done through tender after approval of Engineering Works Procedure-2013)• • 5. Tendered & awarded PDEWs 115• 6. TOTAL PDEWs tendered & awarded of work - 115• • 7. TOTAL PERMANENT & PDEWs 332

• 31

Works Processed by Contract Section

Page 32: C&ess presentation  performance review 2016 (copy 1)

STATE OF FIELD MACHINERY / EQUIPMENT

32

Bulldozers = 18 NoMotor Graders = 10 NoShovel Loaders = 08 NoRoad Rollers = 08 NoFarm Tractors = 12 NoFork Lifter = 05 NoWater Drilling Rigs = 02 NoGenerators = 24 NoWelding Plants = 21 NoPrime movers with trailers = 08 NoDumpers = 21 NoWater Bouzers = 25 NoTrucks = 18 NoDouble cabin Pickups = 08 NoGaso Pumps = 54 NoMisc Water pumps = 57 NoCrane Mounted Trucks = 05 NoLight Trucks 4x2 = 12 No Total = 316 No

Page 33: C&ess presentation  performance review 2016 (copy 1)

IssuesIssuesS. No Issues Solution

1. Identification of locations and land acquisition.

Timely identification & un-conditional acquisition of land to start civil works.

2. Approval of AFEs. Quick approval for timely remittance of funds for execution of works.

3. Shortage of equipment base.

Strengthen equipment base by induction of new machines and through hiring where possible.

4. Shortage of qualified engineers and supervisory staff.

Induction of Engineers/Techs. When the situation permits.

5. Lack of motivation. Transparent career planning of engineers.

6. Financial discipline in field parties.

Monthly audit of field imprest.

33

Page 34: C&ess presentation  performance review 2016 (copy 1)

Supply of water to Production sites = 08.93 million gallons monthlySupply of water to Process & Plants = 76.11 million gallons monthly

Supply of water to Drilling sites = 19.22 million gallons monthly

Total water supplied for one month =104.26 million gallons

Water Supply SectionWater Supply Section

34

Page 35: C&ess presentation  performance review 2016 (copy 1)

35

Vehicle Repaired at I-9 &KBW Base WorkshopVehicle Repaired at I-9 &KBW Base WorkshopS. No. Period Service Minor

RepairMajor Repair

Engine Overhauling

1 2011 – 2012 1177 1279 37 05

2 2012 –2013 982 1082 18 05

3 2013 – 2014 929 1036 18 06

4 2014 – 2015 971 1102 17 02

5 2015 - 2016 849 889 13 03

Total 4908 5388 103 21