33
HIGHWAY & RAILROAD CULVERT INSTALLATION & REPLACEMENT WITH PIPE RAMMING PRESENTER(S) NAMES

Trenchless Installation of Drainage Culverts with Pipe Ramming Method

Embed Size (px)

Citation preview

HIGHWAY & RAILROAD CULVERT INSTALLATION & REPLACEMENT WITH PIPE RAMMING

PRESENTER(S) NAMES

FACTS ABOUT THE U.S RAIL SYSTEMC

ULV

ER

T IN

STA

LLA

TIO

N A

ND

RE

PLA

CE

ME

NT

PIP

E R

AM

MIN

G• Critical part of US transportation

infrastructure. • More than 150,000 miles of

mainline rail routes.• Moves more freight than any

other rail system in any other country.

• SOURCE: American Association of Railroads

DRAINAGE PROBLEMS

• Lack of maintenance• Lack of inspection programs• Lack of capacity/flow, flooding

and liability• Ponding of water causes

pavement and sub grade deterioration and may lead to washout failures

CU

LVE

RT

INS

TALL

AT

ION

AN

D R

EP

LAC

EM

EN

T

PIP

E R

AM

MIN

G

WASHOUTC

ULV

ER

T IN

STA

LLA

TIO

N A

ND

RE

PLA

CE

ME

NT

PIP

E R

AM

MIN

G

WASHOUTC

ULV

ER

T IN

STA

LLA

TIO

N A

ND

RE

PLA

CE

ME

NT

PIP

E R

AM

MIN

G• The failure rate has the potential

to cause property damage and loss of life.

• Lack of maintenance and delays in repairs has translated into soaring construction expenditures.

PROBLEMS AREN’T LIMITED TO RAILC

ULV

ER

T IN

STA

LLA

TIO

N A

ND

RE

PLA

CE

ME

NT

PIP

E R

AM

MIN

G

What is Pipe Ramming?

A pneumatic hammer installs an open ended steel casing that is cleaned out during and after completion of pipe installation.

CU

LVE

RT

INS

TALL

AT

ION

AN

D R

EP

LAC

EM

EN

T

PIP

E R

AM

MIN

G

PIPE RAMMING APPLICATIONS

Steel casing installation for:• Water• Sewer• Gas• Drainage culverts

CU

LVE

RT

INS

TALL

AT

ION

AN

D R

EP

LAC

EM

EN

T

PIP

E R

AM

MIN

G

Advantages

• Trenchless• Able to swallow rock as large as the

inside diameter of the casing• Method does not remove soil until

casing is installed• Minimizes voids

–Roads–Railroads

• Reduced soil compaction

CU

LVE

RT

INS

TALL

AT

ION

AN

D R

EP

LAC

EM

EN

T

PIP

E R

AM

MIN

G

Preferred for Adverse Soil Conditions

• Free flowing sand• Cobble conditions• Large rock formations• Excessive ground water

CU

LVE

RT

INS

TALL

AT

ION

AN

D R

EP

LAC

EM

EN

T

PIP

E R

AM

MIN

G

SWALLOWS LARGE OBSTRUCTIONS

• Rock swallowed during ram• Spoil removed post ram

54” Casing

CU

LVE

RT

INS

TALL

AT

ION

AN

D R

EP

LAC

EM

EN

T

PIP

E R

AM

MIN

G

CULVERT SWALLOWING

An oversized casing is rammed over existing culvert. After installation is complete, old culvert and spoil is removed. Steel casing can serve as the drainage culvert or as a carrier pipe for another pipe inserted within.

CU

LVE

RT

INS

TALL

AT

ION

AN

D R

EP

LAC

EM

EN

T

PIP

E R

AM

MIN

G

TELESCOPING METHODFOR LONGER DISTANCES

An oversized pipe is rammed over the existing culvert until production ceases and is cleaned out. Further progress is made with smaller casings installed within the oversized pipe in the same manner.

CU

LVE

RT

INS

TALL

AT

ION

AN

D R

EP

LAC

EM

EN

T

PIP

E R

AM

MIN

G

METHOD IMPLEMENTATIONTrenchless Culvert Replacement Under Railways with the Pipe Ramming Method

RAM SITE LAYOUT

Note: Follow local regulations for sloping or shoring of pit.

CU

LVE

RT

INS

TALL

AT

ION

AN

D R

EP

LAC

EM

EN

T

PIP

E R

AM

MIN

G

SITE PREP: CASING PLACEMENTC

ULV

ER

T IN

STA

LLA

TIO

N A

ND

RE

PLA

CE

ME

NT

PIP

E R

AM

MIN

G

Rail system I-beam Pipe Mule™ Leveling System

STEEL CASING PREPC

ULV

ER

T IN

STA

LLA

TIO

N A

ND

RE

PLA

CE

ME

NT

PIP

E R

AM

MIN

GLUBRICATION

External Shoe

Steel Casing

Internal Shoe

SOIL SHOE

Supplies lubricating fluid to OD and ID of casing during installation.

Reinforces lead casing and provides an annulus for lubrication.

COLLETS AND RAMMERC

ULV

ER

T IN

STA

LLA

TIO

N A

ND

RE

PLA

CE

ME

NT

PIP

E R

AM

MIN

G Install Pushing Collets/Collars Install Rammer

The rammer is locked into the collets when the tool is started.

Collets and collars help to distribute the ramming force to the face of the pipe.The collets also lock the rammer into place.

SPOIL REMOVALC

ULV

ER

T IN

STA

LLA

TIO

N A

ND

RE

PLA

CE

ME

NT

PIP

E R

AM

MIN

G Spoil removal for >30” and/or large spoil/culverts

Spoil removal <30” Casing

Air and/or water pressure. Seal kit for air pressure removal.

Manual excavation, HDD culvert cleaning tools, jet washing, auger boring wherever applicable.

Seal kit

PIPE RAMMING CASE STUDIESHIGHWAY & RAILROAD CULVERT INSTALLATION & REPLACEMENT WITH PIPE RAMMING

New Installations – Rockville, MN

• Project–2 – drainage culverts under railroad

• Pipe sizes–1-60” Casing–1-32” Casing

• Equipment–24” Rammer

• Ram distance–1 @ 90’–1@ 195’

• Free flowing sand• Holding grade

CU

LVE

RT

INS

TALL

AT

ION

AN

D R

EP

LAC

EM

EN

T

PIP

E R

AM

MIN

G

New Installations – Grand Island, NEC

ULV

ER

T IN

STA

LLA

TIO

N A

ND

RE

PLA

CE

ME

NT

PIP

E R

AM

MIN

G• Project

–1 – drainage culvert under railroad

• Pipe sizes–1-24” Casing

• Equipment–24” Rammer

• Ram distance–1 @ 250’

• Free flowing sand with loose coal dust and other materials

• Installed with 2% grade

New Installation - Coeur d'Alene, IDC

ULV

ER

T IN

STA

LLA

TIO

N A

ND

RE

PLA

CE

ME

NT

PIP

E R

AM

MIN

G• Project

–2 – drainage culverts under RR and Highway

• Pipe sizes–2 - 48” casings

• Equipment–23” Rammer

• Ram distance–1 @ 190’–1@ 195’

New Installations– Maricopa County, AZC

ULV

ER

T IN

STA

LLA

TIO

N A

ND

RE

PLA

CE

ME

NT

PIP

E R

AM

MIN

G• New culvert installation under rail

bed.• 84” steel casing• 24” HammerHead Pipe Rammer

TELESCOPING METHOD – ALASKAC

ULV

ER

T IN

STA

LLA

TIO

N A

ND

RE

PLA

CE

ME

NT

PIP

E R

AM

MIN

G• Replacement of 84” dia. culvert

drain with telescoping method• 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer

Collapsed 7’ casing, 164 feet long

TELESCOPING METHOD – ALASKAC

ULV

ER

T IN

STA

LLA

TIO

N A

ND

RE

PLA

CE

ME

NT

PIP

E R

AM

MIN

G• Replacement of 84” dia. culvert

drain with telescoping method• 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer

First section of pipe installed.

TELESCOPING METHOD – ALASKAC

ULV

ER

T IN

STA

LLA

TIO

N A

ND

RE

PLA

CE

ME

NT

PIP

E R

AM

MIN

G• Replacement of 84” dia. culvert

drain with telescoping method• 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer

Swallowing and removing sections.

TELESCOPING METHOD – ALASKAC

ULV

ER

T IN

STA

LLA

TIO

N A

ND

RE

PLA

CE

ME

NT

PIP

E R

AM

MIN

G• Replacement of 84” dia. culvert

drain with telescoping method• 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer

Telescoping 60 feet down sized sections.

TELESCOPING METHOD – ALASKAC

ULV

ER

T IN

STA

LLA

TIO

N A

ND

RE

PLA

CE

ME

NT

PIP

E R

AM

MIN

G• Replacement of 84” dia. culvert

drain with telescoping method• 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer

Trenchless telescoped pipe.

New Installation - Dalton Hwy, AK

• Drainage culvert• Glacial til/new road bed• Service hwy between Prudhoe

Bay oil reserves & Fairbanks

CU

LVE

RT

INS

TALL

AT

ION

AN

D R

EP

LAC

EM

EN

T

PIP

E R

AM

MIN

G

New Installation - Dalton Hwy, AKC

ULV

ER

T IN

STA

LLA

TIO

N A

ND

RE

PLA

CE

ME

NT

PIP

E R

AM

MIN

G• Project

–1 – drainage culvert under service highway

• Pipe sizes–1 - 36” casing

• Equipment–24” Rammer

• Ram distance–1 @ 160’

New Installation - Dalton Hwy, AK

• Project–1 – drainage culvert under service

highway

• Pipe sizes–1 - 36” casing

• Equipment–24” Rammer

• Ram distance–1 @ 160’C

ULV

ER

T IN

STA

LLA

TIO

N A

ND

RE

PLA

CE

ME

NT

PIP

E R

AM

MIN

G

THANK YOU

E: [email protected]: 800.331.6653 | INT: +1.262.567.8833 | F: 262.567.5068W: www.hammerheadtrenchless.com

FIRST NAME LAST NAMEPRESENTER TITLE