PIPE RAMMING METHODPRESENTER(S) NAMES
What is Pipe Ramming?
A pneumatic hammer installs an open ended steel casing that is cleaned out during and after completion of pipe installation.
CU
LVE
RT
INS
TALL
AT
ION
AN
D R
EP
LAC
EM
EN
T
PIP
E R
AM
MIN
G
PIPE RAMMING APPLICATIONS
•Steel casing installation•Culvert replacement •Ram and swallow•Slick boring•Piling•HDD Assist
–Wash-over casings–Stuck Bores–Removal of drill stem–Hydro-locked casings
CU
LVE
RT
INS
TALL
AT
ION
AN
D R
EP
LAC
EM
EN
T
PIP
E R
AM
MIN
G
Advantages
• Trenchless• Able to swallow rock as large as the
inside diameter of the casing• Method does not remove soil until
casing is installed• Minimizes voids
–Roads–Railroads
• Reduced soil compaction
CU
LVE
RT
INS
TALL
AT
ION
AN
D R
EP
LAC
EM
EN
T
PIP
E R
AM
MIN
G
Preferred for Adverse Soil Conditions
• Free flowing sand• Cobble conditions• Large rock formations• Excessive ground water
CU
LVE
RT
INS
TALL
AT
ION
AN
D R
EP
LAC
EM
EN
T
PIP
E R
AM
MIN
G
SWALLOWS LARGE OBSTRUCTIONS
• Rock swallowed during ram• Spoil removed post ram
54” Casing
CU
LVE
RT
INS
TALL
AT
ION
AN
D R
EP
LAC
EM
EN
T
PIP
E R
AM
MIN
G
CULVERT SWALLOWING
An oversized casing is rammed over existing culvert. After installation is complete, old culvert and spoil is removed. Steel casing can serve as the drainage culvert or as a carrier pipe for another pipe inserted within.
CU
LVE
RT
INS
TALL
AT
ION
AN
D R
EP
LAC
EM
EN
T
PIP
E R
AM
MIN
G
TELESCOPING METHODFOR LONGER DISTANCES
An oversized pipe is rammed over the existing culvert until production ceases and is cleaned out. Further progress is made with smaller casings installed within the oversized pipe in the same manner.
CU
LVE
RT
INS
TALL
AT
ION
AN
D R
EP
LAC
EM
EN
T
PIP
E R
AM
MIN
G
METHOD IMPLEMENTATIONTrenchless Culvert Replacement Under Railways with the Pipe Ramming Method
RAM SITE LAYOUT
Note: Follow local regulations for sloping or shoring of pit.
CU
LVE
RT
INS
TALL
AT
ION
AN
D R
EP
LAC
EM
EN
T
PIP
E R
AM
MIN
G
SITE PREP: CASING PLACEMENTC
ULV
ER
T IN
STA
LLA
TIO
N A
ND
RE
PLA
CE
ME
NT
PIP
E R
AM
MIN
G
Rail system I-beam Pipe Mule™ Leveling System
STEEL CASING PREPC
ULV
ER
T IN
STA
LLA
TIO
N A
ND
RE
PLA
CE
ME
NT
PIP
E R
AM
MIN
GLUBRICATION
External Shoe
Steel Casing
Internal Shoe
SOIL SHOE
Supplies lubricating fluid to OD and ID of casing during installation.
Reinforces lead casing and provides an annulus for lubrication.
COLLETS AND RAMMERC
ULV
ER
T IN
STA
LLA
TIO
N A
ND
RE
PLA
CE
ME
NT
PIP
E R
AM
MIN
G Install Pushing Collets/Collars Install Rammer
The rammer is locked into the collets when the tool is started.
Collets and collars help to distribute the ramming force to the face of the pipe.The collets also lock the rammer into place.
SPOIL REMOVALC
ULV
ER
T IN
STA
LLA
TIO
N A
ND
RE
PLA
CE
ME
NT
PIP
E R
AM
MIN
G Spoil removal for >30” and/or large spoil/culverts
Spoil removal <30” Casing
Air and/or water pressure. Seal kit for air pressure removal.
Manual excavation, HDD culvert cleaning tools, jet washing, auger boring wherever applicable.
Seal kit
PIPE RAMMING CASE STUDIESHIGHWAY & RAILROAD CULVERT INSTALLATION & REPLACEMENT WITH PIPE RAMMING
NEW INSTALLATION – ROCKVILLE, MN
• Project–2 – drainage culverts under railroad
• Pipe sizes–1-60” Casing–1-32” Casing
• Equipment–24” Rammer
• Ram distance–1 @ 90’–1@ 195’
• Free flowing sand• Holding grade
CU
LVE
RT
INS
TALL
AT
ION
AN
D R
EP
LAC
EM
EN
T
PIP
E R
AM
MIN
G
NEW INSTALLATION – GRAND ISLAND, NEC
ULV
ER
T IN
STA
LLA
TIO
N A
ND
RE
PLA
CE
ME
NT
PIP
E R
AM
MIN
G• Project
–1 – drainage culvert under railroad
• Pipe sizes–1-24” Casing
• Equipment–24” Rammer
• Ram distance–1 @ 250’
• Free flowing sand with loose coal dust and other materials
• Installed with 2% grade
NEW INSTALLATION – COUER D’ALENE, IDC
ULV
ER
T IN
STA
LLA
TIO
N A
ND
RE
PLA
CE
ME
NT
PIP
E R
AM
MIN
G• Project
–2 – drainage culverts under RR and Highway
• Pipe sizes–2 - 48” casings
• Equipment–23” Rammer
• Ram distance–1 @ 190’–1@ 195’
NEW INSTALLATIONS – MARICOPA CTY, AZC
ULV
ER
T IN
STA
LLA
TIO
N A
ND
RE
PLA
CE
ME
NT
PIP
E R
AM
MIN
G• New culvert installation under rail
bed.• 84” steel casing• 24” HammerHead Pipe Rammer
TELESCOPING METHOD – ALASKAC
ULV
ER
T IN
STA
LLA
TIO
N A
ND
RE
PLA
CE
ME
NT
PIP
E R
AM
MIN
G• Replacement of 84” dia. culvert
drain with telescoping method• 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer
Collapsed 7’ casing, 164 feet long
TELESCOPING METHOD – ALASKAC
ULV
ER
T IN
STA
LLA
TIO
N A
ND
RE
PLA
CE
ME
NT
PIP
E R
AM
MIN
G• Replacement of 84” dia. culvert
drain with telescoping method• 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer
First section of pipe installed.
TELESCOPING METHOD – ALASKAC
ULV
ER
T IN
STA
LLA
TIO
N A
ND
RE
PLA
CE
ME
NT
PIP
E R
AM
MIN
G• Replacement of 84” dia. culvert
drain with telescoping method• 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer
Swallowing and removing sections.
TELESCOPING METHOD – ALASKAC
ULV
ER
T IN
STA
LLA
TIO
N A
ND
RE
PLA
CE
ME
NT
PIP
E R
AM
MIN
G• Replacement of 84” dia. culvert
drain with telescoping method• 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer
Telescoping 60 feet down sized sections.
TELESCOPING METHOD – ALASKAC
ULV
ER
T IN
STA
LLA
TIO
N A
ND
RE
PLA
CE
ME
NT
PIP
E R
AM
MIN
G• Replacement of 84” dia. culvert
drain with telescoping method• 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer
Trenchless telescoped pipe.
NEW INSTALLATION – DALTON HWY, AK
• Drainage culvert• Glacial til/new road bed• Service hwy between Prudhoe
Bay oil reserves & Fairbanks
CU
LVE
RT
INS
TALL
AT
ION
AN
D R
EP
LAC
EM
EN
T
PIP
E R
AM
MIN
G
NEW INSTALLATION – DALTON HWY, AKC
ULV
ER
T IN
STA
LLA
TIO
N A
ND
RE
PLA
CE
ME
NT
PIP
E R
AM
MIN
G• Project
–1 – drainage culvert under service highway
• Pipe sizes–1 - 36” casing
• Equipment–24” Rammer
• Ram distance–1 @ 160’
NEW INSTALLATION – DALTON HWY, AK
• Project–1 – drainage culvert under service
highway
• Pipe sizes–1 - 36” casing
• Equipment–24” Rammer
• Ram distance–1 @ 160’C
ULV
ER
T IN
STA
LLA
TIO
N A
ND
RE
PLA
CE
ME
NT
PIP
E R
AM
MIN
G
HDD ASSIST METHODS
PIPE RAMMING
HDD RAM ASSIST
• When problems arise while horizontal directional drilling (HDD) costs begin to add up with each tick of the clock.
• Quick reaction time and expert technical support are critical to salvaging a bore gone bad.
• The percussive power of pipe rammers can help free stuck product pipes, drill stems, and help remove product pipes on failed bores.
PIP
E R
AM
MIN
G
HD
D A
SSIS
T
FOUR METHODS
•Washover casings•Pull back assist•Pipe extraction•Drill stem recovery
PIP
E R
AM
MIN
G
HD
D A
SSIS
T
WASHOVER CASING METHODP
IPE
RA
MM
ING
HD
D A
SSIS
T
• Used as a pilot for large HDD projects• Casings are rammed through difficult soil
conditions to rock or solid soil
• Makes a guide down hole for mud motors• Casing provides a path for drill fluid
recycling and reduces the loss of fluids in surface soils
ON THE JOB: WASHOVER CASINGS
• Hong Kong, China–Wash over casing
• Pipe sizes–2 – 54” casings
• Equipment–24” Rammer
• Ram distance–2 @ 66’
PIP
E R
AM
MIN
G
HD
D A
SSIS
T
PULL BACK ASSIST METHODP
IPE
RA
MM
ING
HD
D A
SSIS
T
• Assist HDD when pullback is not possible and machine still has rotation capabilities
• Rammer attached to product pipe
• Percussive power frees immobilized product pipes.
PULLBACK ASSIST
Rammer is locked into steel casing via collets. Steel casing is installed using pullback force of HDD and percussive force of the rammer.
PIP
E R
AM
MIN
G
HD
D A
SSIS
TCONNECTION METHOD STEEL
PULLBACK ASSSIST
Rammer is locked into steel casing via collets. The steel casing is connected to the HDPE product pipe via steel to HDPE flange compression kit. HDD pull force is used in conjunction with the rammer to install the pipe.
PIP
E R
AM
MIN
G
HD
D A
SSIS
TCONNECTION METHOD HDPE(OPTION 1)
PULLBACK ASSIST
Rammer is locked into steel casing via collets. Steel casing is welded to steel ring that is flush with HDPE face, and welded to steel sleeve. Steel sleeve is bolted to HDPE product pipe. HDD pull force is used in conjunction with the rammer to install the pipe.
PIP
E R
AM
MIN
G
HD
D A
SSIS
TCONNECTION METHOD HDPE(OPTION 2)
ON THE JOB: PULLBACK ASSIST
• Normangee, TX–Pullback Assist (pipe stuck for 4
days before start of assist)
• Reason for pullback failure – excessive flooding in area caused collapsed entry pit and hole.
• HDD Rig–500,000 lb pullback
• Pipe–2,800’ of 36” casing
• Equipment–24” Rammer
PIP
E R
AM
MIN
G
HD
D A
SSIS
T
ON THE JOB: PULLBACK ASSIST
• Stewart, FL–HDPE Pullback Assist, pipe sat
for more than two weeks before assist could be started due to excessive hurricane season.
• HDD Rig–1.2 M lb custom drill rig
• Pipe size–4,500’ of 24” HDPE pipe 80’ deep
• Equipment–24” Rammer
PIP
E R
AM
MIN
G
HD
D A
SSIS
T
PIPE EXTRACTION METHODP
IPE
RA
MM
ING
HD
D A
SSIS
T
• Remove stuck product pipe and bore again
• Rammer is attached to product pipe by fabricating an adaptor
• Percussive action along with static tension pulls product pipe, removing it from the bore
PIPE EXTRACTION
Rammer is locked into steel casing that is welded onto the product casing. Static pull force is used in conjunction with the rammer to extract the product casing.
PIP
E R
AM
MIN
G
HD
D A
SSIS
TCONNECTION METHOD FOR STEEL CASING
PIPE EXTRACTION
Rammer is locked into steel casing that is welded onto the steel sleeve. Steel sleeve is bolted to HDPE product pipe. Static pull force is used in conjunction with the rammer to extract the product casing.
PIP
E R
AM
MIN
G
HD
D A
SSIS
TCONNECTION METHOD FOR HDPE
ON THE JOB: PIPE EXTRACTION
• Orlando, FL–HDPE Pipe Extraction
• Pipe size–850’ extraction of 30” HDPE pipe
• Equipment–16” Rammer
PIP
E R
AM
MIN
G
HD
D A
SSIS
T
DRILL STEM RECOVERY METHODP
IPE
RA
MM
ING
HD
D A
SSIS
T
• Recover expensive stuck drill rod• Rammer is attached the to drill rod by
fabricating an adaptor
• Kinetic energy is used to assist in pulling or pushing rod out of the ground with the assist of static tension
ON THE JOB: DRILL STEM RECOVERYP
IPE
RA
MM
ING
HD
D A
SSIS
T
RECOMMENDED HAMMERSP
IPE
RA
MM
ING
HD
D A
SSIS
TRammer
SizeHDD Class
Impact Rate BPM
Calculated Impact Force
at 1 ft/min*
Pipe Diameter Range
7” 24,000 lbs 295 184,000 lbs 8” – 16”
8”24,000; 33,000;
50,000 lbs223 252,000 lbs 8” – 24”
12”33,000; 50,000;
80,000 lbs271 744,000 lbs 12” – 36”
16” 80,000 lbs 231 1,094,000 lbs 12” – 48”
20”80,000;
150,000 lbs190 1,740,000 lbs 20” – 54”
24”150,000 lbs and larger
177 2,020,000 lbs 24” – 72”
*The numbers shown here are based on calculation and are for comparative purposes only between various models of HammerHead Rammers. The numbers are not intended for engineering applications.