Upload
mao-hua
View
37
Download
0
Tags:
Embed Size (px)
Citation preview
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 1
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN FOUNDATION IN NATURAL & BUILT ENVIRONMENT (FNBE)
Introduction to Construction Industry (QSB310105)
FINAL PROJECT : PROJECT PROPOSAL
Project Proposal: Recreational Area
STUDENT NAME : LAU MAO HUA | 0320249
DEENIE H’YATT | 0319719
TUTOR NAME : MISS ANN SEE PENG
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 2
Content
No. Description Page Number
1 Introduction of the project 3
2 Introduction of the site
Location Plan and Key Plan 4
Site Plan 5
Site Context 6-7
3 Site Inventory & Analysis 8-9
4 Rationale, Benefit & Impact of project 10-11
5 Proposal A : Lau Mao Hua 12-15
Proposal B : Deenie H’yatt 16-21
6 Other Related Information -
7 References List 22
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 3
Introduction
In this final project for the module Introduction to Construction Industry, a
group of two students are assigned to find a specific empty land to initiate a
small construction project. The size of the land should between 900m2 to
1200m2.
We selected a site which is near Taylor’s University Lakeside Campus
which is located at Jalan PJS 9/1. We decided to propose recreational area
on the site. We need to come out with two proposals and compile them in a
report. We need to carry out site visit and collecting data from the site. We
also need to determine the rationale, benefit and impacts of our project to
the client and end user.
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 4
Introduction to Site
Address: No.793, Jalan PJS 9/1 ,Mukim Damansara ,47500 Petaling Jaya,Selangor.
Location plan
Key Plan
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 5
Site Plan
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 6
Site Context
Near the main road
Opposite Sunway Quay
Residential Area
Lagoon Perdana Apartment
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 7
Sunway A’Marine Residensi Laguna
Shop Lot nearby
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 8
Site Inventory & Analysis
A. Location
-Near the main road
-Near Sunway Quay
-Near residential area (Sunway A’Marine, Residensi Laguna, Lagoon Perdana Apartment)
-Shop lots are available nearby
* Poor air quality due to the site is near the main road. Plant more trees in the site to
enhance the air quality.
*Good place to propose recreational area because no recreational area nearby the area and
it is located at the centre of the residential area (easy to access).
B. Drainage
At the end of the site
C. Traffic
-Traffic is quite active especially in the morning and afternoon because it is the way out from
Taylor’s University and the way to Sunway Medical Centre.
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 9
D. Existing Structure
Not much existing structure available.
-2 telephone wiring pole
*Reallocate the position of the telephone
pole to the side of the site.
E. Topography
Flat Area
*Good place to design a small
construction
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 10
Benefit and Impacts of project to the community
A. Benefits
- The community will no longer facing a problem to find a recreational park within the
area.
There are no any other park that can be found within the area.
- The community area will have a green space that can be shared together
Most of the park in the area are small, vandalised and non-accessible.
- The park can be located at the middle of the area
The park are located near the South Quay which is the main road that was
usually used by community to go to any other places such as Sunway
Medical Centre and Sunway Pyramid Shopping Mall.
- The community will have a place to relax and spending time with their family
The proposing of this site will provide the community a place for them to
spend their quality time without having to travel outside from the residential
area to find another good place.
- The community will be able to spend their time and money wisely
This will save time for the community to find a place for them to go and spend
their weekend. It will also save their money for their petrol as they are
travelling.
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 11
B. Impact
- Decreasing in the rate of traffic congestion
The community will take a short walk to go to the park instead of travelling
with cars to go other park. Thus, this will reduce the traffic congestion
especially during the weekend.
- Connecting the community together
The park can be used to hold an event to get the community to be united.
This can also be done by an individual on any other normal day as they are
communicating with others will spending their time at the park.
- Decreasing in the rate of air pollution
The method of planting trees around the park will improve the air circulation.
This can also be supported when there will be lees cars on the road
especially during the weekend.
- One the of the main attraction and pit stop in the community area
The concept of green design in the park will attract the community to go there
The park will be packed and crowded in the future.
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 12
Proposal A by Lau Mao Hua
Zoning plan of the proposal
Images of the concept/ ideas
A) Children Playground
Quantity Needed: 1
-Provide playground facilities for children under 12 years old
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 13
B) Seating
Quantity Needed: 5 Quantity Needed: 5
-Place around the children playground
-Provide place to sit for the adult especially those who take care of the children.
C) Jogging Path
Walking / Jogging Path.
-Made from running track to reduce the
chance of injury.
D) Stage
Stage for small scale event such as small
gathering or activities in the neighbourhood.
E) Pond
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 14
Pond with Waterfall
-Welcoming the people to come to the park.
F) Parking Lot
-For the convenient of the people to come to this
park.
G) Vegetation
-Trees
-Flowering pots
H) Other facilities
- Rubbish Bin to keep the environment clean.
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 15
Costing ( Proposal A )
Item Description Unit Quantity Rate(RM) Amount(RM)
1 Children Playground No. 1 100000 100000
2 Seating No. 10 700 7000
3 Jogging Path m2 200 100 20000
4 Stage No. 1 15000 15000
5 Pond No. 1 7000 7000
6 Parking Lot m2 120 40 4800
7 Tree No. 15 300 4500
8 Flowering Pot No. 10 230 2300
9 Turf m2 350 20 7000
10 Rubbish Bin No. 10 100 1000
11 Construction Work N/A N/A N/A 50000
TOTAL 218,600
*Maintenance Fee RM2000 / Month
*Environmental Impact Assessment (EIA) is needed to prevent environmental problems due
to an action. EIA should be submitted to the Director General of Environment Quality.
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 16
Proposal B by Deenie H’yatt
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 17
Image of the Concept and Ideas
1. Main Attraction of the Park
- Fish Pond and Gazebo
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 18
2. Seating
How my bench looks like?
Why does it designed this way?
- To allow someone to sit and lay down with comfort
- To watch the sky and the stars at night
- To sleep in a good posture
Quantity needed : 3
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 19
3. Existing Structures and Facilities
- Gazebo
Quantity : 1
For relaxation and a place to spend a quality time with families and friends
- Lamp Post
Quantity : 8
To enlighten the park at night
As a decoration to make the park look more harmonious
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 20
- Water Hydrant
Quantity : 1
Act as a safety equipment
To prevent the fire from burning the whole park
- Overhead
To allow pedestrians to cross the road safely
An overhead in the garden concept (inspired by nature)
4. Extra Information about the park
- The park elevation increase from the jogging track to the gate entrance
Why? – To give the park a nice mini hill view instead of just a flat ground park.
- The curvy slope was designed to allow cyclist to cycle at a higher and steeper slope.
- The trees and shrubberies were planted in a way that it can transform the park in to
a secret garden.
- There’s only 3 entrance to the park ( The gate entrance from the pangsapuri, the
main entrance from the 30m jogging track and the overhead.
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 21
COSTING ( PROPOSAL B )
Item Description Unit Quantity Rate(RM) Amount(RM)
1 Gazebo No. 1 8000 8000
2 Seating No. 3 1000 3000
3 Jogging Path m2 30 100 3000
4 Street lamp (Lamp Post) No. 3 1000 3000
5 Street lamp (2 Lamp Post) No. 5 1500 7500
6 Tree No. 34 300 10200
7 Construction Work No. N/A N/A 80000
8 Purple Turf m2 250 150 3750
9 Rubbish Bin No. 4 120 480
10 Water Hydrant No. 1 350 350
TOTAL 119280
*Maintenance Fee RM1000 / Month
INTRODUCTION TO CONSTRUCTION INDUSTRY | FINAL PROJECT | PROJECT PROPOSAL | FNBE0814
LAU MAO HUA | DEENIE H’YATT 22
References List
Site Analysis. (n.d.). Retrieved November 16, 2014, from
http://faculty.ksu.edu.sa/selattar/SiteAnalysis1/SiteAnalysisChecklist.aspx
Children Schoolyard. (n.d.). Retrieved November 16, 2014, from
http://www.shutterstock.com/s/children+schoolyard/search.html?page=1&inline=113763238
Garden and Park Benches - Creative Pipe, Inc. (n.d.). Retrieved November 16, 2014, from
http://www.creativepipe.com/benches.htm
15 Creative and Unique Benches. (n.d.). Retrieved November 16, 2014, from
http://www.toxel.com/inspiration/2010/07/19/15-creative-and-unique-benches/
Landscape Design: Analyzing Site Conditions.(n.d.). Retrieved November 16, 2014, from
http://edis.ifas.ufl.edu/pdffiles/EP/EP42600.pdf
About Running Track Surfaces. (2013, November 4). Retrieved November 16, 2014, from
http://www.livestrong.com/article/89533-running-track-surfaces/
Piedmont Park Conservancy - Walking and Jogging Paths. (n.d.). Retrieved November
16, 2014, from http://www.piedmontpark.org/do/walks.html
Landscape Waterfalls Photos Gallery. (n.d.). Retrieved November 16, 2014, from
http://landscapewaterfalls.info/2013/09/small-pond-with-fountain-and-waterfall/
EIA Procedure and Requirements in Malaysia. (n.d.). Retrieved November 17, 2014, from
http://www.doe.gov.my/eia/wp-content/uploads/2013/06/EIA-Procedure-and-Requirements-
in-Malaysia.pdf