Floor coverings
Unit 207: Carry out first fix flooring and roofing
Level 2 Diploma in Site Carpentry
© 2013 City and Guilds of London Institute. All rights reserved. 2 of 6
Types of floor coveringsChipboard flooring Tongue-and-grooved flooring
Images courtesy of www.shutterstock.com. Reproduced with permission.
Level 2 Diploma in Site Carpentry
© 2013 City and Guilds of London Institute. All rights reserved. 3 of 6
Floor fixingsNails should be 2½ times the thickness of the floorboard.
Seeking permission‘Secret nails’ method
Level 2 Diploma in Site Carpentry
© 2013 City and Guilds of London Institute. All rights reserved. 4 of 6
Floor fixings continuedFloorboards can also be screwed down. This can reduce the noise from a loose or squeaky board.
Image courtesy of www.shutterstock.com. Reproduced with permission.
Level 2 Diploma in Site Carpentry
© 2013 City and Guilds of London Institute. All rights reserved. 5 of 6
Services under floorElectrical wires should be through the middle of the joist.
Pipework is generally notched on the top of a joist.