Welcome to the
State Highway 9 (SH 9)Public Information
Meeting
March 18, 2010
8/9/2019 Hwy. 9 Frisco to Breckenridge meeting
2/12
WelcomePlease Sign In Here
8/9/2019 Hwy. 9 Frisco to Breckenridge meeting
3/12
SH 9 Corridor Information
Who: CDOT Region 1 in cooperation with Summit County, the Town ofBreckenridge, the Town of Frisco, and various other agencies.
What: Widening SH 9 from Frisco to Breckenridge. The corridor isbeing designed and constructed in accordance with the StateHighway 9 Environmental Impact Statement (EIS) and Record ofDecision (ROD), in phases as CDOT identifies funding opportunities.
Previous Design Projects
Tiger Road to Agape Church Previous Construction Projects
Park Avenue in Breckenridge Agape Church to Swan Mountain Road
Current Construction Project Valley Brook Street to Coyne Valley Road
Current Design Projects Final design Coyne Valley Road to Tiger Road
Future Project Design and construction for the widening of SH 9 north of Swan
Mountain Road to Frisco will continue as CDOT identifies fundingopportunities to implement the commitments made in the EIS and ROD
When: CDOT is currently implementing commitments made in the EIS andROD.
Current Design Projects Valley Brook Street to Swan Mountain Road
Future Projects unknown (based on funding availability)
Where: SH 9 between Frisco and Breckenridge
Why: Improvements are needed to increase safety and mobility withinthe corridor.
8/9/2019 Hwy. 9 Frisco to Breckenridge meeting
4/12
WE ARE
HERE
SH 9 CorridorHistory and Schedule
1999-2004
Prepare SH 9 Environmental Impact Statement (EIS) and publish signed Record of Decision(ROD) approving widening of SH 9 between Frisco and Breckenridge
Fall 2004
Begin construction of the Park Avenue in Breckenridge Project continuingthrough 2006
May 2005
Begin design of SH 9 between Valley Brook Street and Swan Mountain Road
December 2005
SH 9 Public Information Meeting
August 2006Complete construction of the Park Avenue in Breckenridge Project
October 2006
SH 9 Public Information Meeting
May 2007
Complete design of two projects on SH 9 Valley Brook Street to Coyne Valley Road Agape Church to Swan Mountain Road
February 2008
SH 9 Public Information MeetingSpring - Fall 2008
Constuct SH 9 between Agape Church and Swan Mountain Road Complete design between Tiger Road and Agape Church
Spring 2009
SH 9 Public Information meeting
Summer 2009 - Fall 2010
Construct SH 9 between Valley Brook Street and Coyne Valley Road (two construction season
Spring 2010
Public Information Meeting
Complete design between Coyne Valley road and Tiger Road
Fall 2010 - Fall 2011
Potentially begin constuction of SH 9 between Tiger Road and Agape Church (dependent
upon available funding)
8/9/2019 Hwy. 9 Frisco to Breckenridge meeting
5/12
Access Management Plan
The SH 9 corridor has an Access Management Plan which providesguidance for agency review regarding access permit applications andfuture access decisions. The plan should preserve and support thecurrent and future functional integrity of the highway. The purpose othe access management plan is to achieve:
Improved traffic flow
Improved traffic safety
Reduced traffic conflicts
Provisions for appropriate access to adjacent land uses
In some cases, driveway access may be limited to a right-in and aright-out onto the highway. This may impact driver behavior patternand generate use of U-turns at designated breaks in the median.
A copy of the Access Management Plan is provided on the tablebelow.
For more information contact:
Nick Dickens
Access Manager
CDOT Region 1
18500 East Colfax AvenueAurora, CO 80111
(303) 365-7307
8/9/2019 Hwy. 9 Frisco to Breckenridge meeting
6/12
Key Project Areas
Agape Church toSwan Mountain Road
Construction complete
Construction cost$6.2 Million
Tiger Road to AgapeChurch Design 100% complete
Estimated constructioncost $7.0 Million
Coyne Valley Road to
Tiger Road Design 90% complete
Estimated constructioncost $4.0 Million
Valley Brook Street toCoyne Valley Road
Construction 50%complete
Estimated constructioncost $7.2 Million
M
MainSt.
SummitBlvd.
FRISCO
BRECKENRIDGE
DillonReservoir
RevetteD
r.
Airp o rtRd
70INTERSTATE
Dillon
Dam
Rd.
Swan
Mt.Rd.
Agape Church
Approach
Valley Brook St.
TigerRd.
Coyne Valley Rd
BreckenridgeGolf Club
8/9/2019 Hwy. 9 Frisco to Breckenridge meeting
7/12
New Highway Widening
Maintenance of traffic during construction is a major concern.The highway is being designed so that two-way traffic can bemaintained on a paved surface.
Grades and alignments are being maximized so that the majorityof the construction can be accomplished adjacent to the existinghighway, and then traffic will be transferred over to a completedsection while upgrading the old roadway surface.
4-Lane, Depressed Median Typical Section
4-Lane, Raised Median with Curb and Gutter Typical Section
(Urban Sections)
8/9/2019 Hwy. 9 Frisco to Breckenridge meeting
8/12
Fairview Boulevard Roundabout
Artistic Illustration
8/9/2019 Hwy. 9 Frisco to Breckenridge meeting
9/12
Fairview Boulevard Roundabout
Approximatelocation ofwater quality pond
Approximatelocation ofnoise wall
SH9
Northb
ound
FairviewBlvd
FairviewBlvd
SH9
Southb
ound
8/9/2019 Hwy. 9 Frisco to Breckenridge meeting
10/12
COLORADO PROJECT NO. STA 0091-031
SH 9Valley Brook Street toCoyne Valley Road
CONTRACTOR
Zak Dirt, Inc.
CONTRACT BID
$7.2 million
START DATE
June 15, 2009
ANTICIPATED COMPLETION DATE
Fall 2010Two construction seasons
8/9/2019 Hwy. 9 Frisco to Breckenridge meeting
11/12
We want your input!
Ask questions of the project team members.
Complete a comment sheet andleave in the comment box below.
Or, mail your comments:
Or, email your comments:
Thank you for your feedback!
PBS&J
4601 DTC Boulevard
Suite 700
Denver, CO 80237
CDOT Region 1
Mountain Residency
P.O. Box 399
Dumont, CO 80828
8/9/2019 Hwy. 9 Frisco to Breckenridge meeting
12/12
Thank you
for attending theSH 9 Sound Wall Information Meeting!
For more information please contact:
Wes Goff, P.E., Senior Project ManagerPBS&J
4601 DTC Boulevard, Suite 700
Denver, CO 80237
1-800-497-5529
Tyler Weldon, P.E., CDOT Project EngineerCDOT Region 1
Mountain ResidencyP.O. Box 399
Dumont, CO 80828
303-512-5682
Or visit the project website:
www.hwy9friscotobreck.com
Information from todays meeting will be posted to the
website in approximately 2 weeks.