Page 1: Baltic SCOPE joint map - ENERGY vs ENVIRONMENT *

D e n m a r kD e n m a r k

S w e d e nS w e d e n

P o l a n dP o l a n dG e r m a n yG e r m a n y

Offshore Windfarmsoperationalunder constructionauthorisedapplication submitted (in PL some holding permits)denied (DE)

Offshore Windfarms Swedenoperationalunder constructionpermissionpermission, appealedpermission, not for connecting to land)applicationinvestigation before applicationdismantlingSE: Area_of_national_interest_for_wind_energy

High Voltage Cables (status not shown correctly for all) in useunder constructionapprovedplanned

PipelinesPipeline, PlannedPipeline, inUse

Data CablesDataCable

Oil and Gas extractionSE: Areas_of_interest_for_Oil_and_Gas_extraction

IMO Shipping Routes/AreasTrafficSeparationSchemePrecautionaryAreaDeepWaterRouteRouteRecommendedInshoreTrafficZoneRestrictedArea

AIS Year201415717

0

Mineral ResourcesSand and Gravel ExtractionSE: Area_of_interest_for_Sand_extraction

Conservation AreasNatura2000 SCINatura2000 SPA

Bathymetry-500-400-300-200-100-50-20-10

BoundariesTerritorial SeaEEZ_corr_26052014

D e n m a r kD e n m a r k

Odrabank

Middle Bank

Kriegers FlakAdlergrund

Mercator (54°N), WGS84BSH/M5 28.10.2015

South-West Baltic Case - Focus Areas ENERGY

Recommended