20
Xilinx Space Heritage Jeff Wetch Aerospace and Defense [email protected]

Xilinx Space Heritage Jeff Wetch Aerospace and Defense [email protected]

Embed Size (px)

Citation preview

Xilinx Space Heritage

Jeff WetchAerospace and Defense [email protected]

Xilinx ConfidentialNASA meeting 6/26/06 2

Xilinx in SpaceXilinx in Space• Flight Heritage

– GRACE (NASA+DLR)– FedSat (Univ. Southern Australia)– OPTUS-C1 (Raytheon)– MARS2003 Lander (JPL)– MARS2003 Rover (JPL)– Venus Express (TU Braunschweig)– HiRise (Ball Aerospace) for MRO

• ~75 additional programs in various design phases

Xilinx ConfidentialNASA meeting 6/26/06 3

GRACE / NASA + DLRGRACE / NASA + DLR, USA + Germany, USA + GermanySensorsSensors

PROM

Mitigation techniques:

• None

• Grace= Gravity Recovery And Climate Experiment• Twin Probes to map Earth’s gravity.•They will use a microwave beam, depicted by red lines, to track each other.• LEO orbit (500kms)

XQR4036XL

Launched 17mar02 from Plesetsk Cosmodrome / Nth Russia

Xilinx ConfidentialNASA meeting 6/26/06 4

FEDSAT / USA UniversityFEDSAT / USA UniversityRe-configurable ComputerRe-configurable Computer

XQR4062XL

Readback Controller

PROM Mitigation Techniques:

• Embedded configuration SEU detection based on Readback Controller

• Australian Scientific satellite• It represents the world’s 1st application of this technology in the harsh environment of outer space• “Self Healing Satellite Computer”• Near Polar LEO Orbit

• Altitude: 800 km•58 Kg MicroSat

Launched 14dec02 from Tanagashima, Japan

Xilinx ConfidentialNASA meeting 6/26/06 5

OPTUS-C1 / RaytheonOPTUS-C1 / Raytheon, USA, USADSP applicationsDSP applications

18v04

RH

Voter

Mitigation Techniques:Device Redundancy• System Voting and Design

Expansion• Single source configuration• Reconfigure on functional Vote

XQVR300

XQVR300 XQVR300

• UHF payload designed and manufactured by Raytheon St Peterburg, Florida.• Largest hybrid Commercial & Defense Communications satellite.• GEO orbit at 156 E Longitude• Virtex FPGAs are used to apply Signal Process algorithms to communications data coming from Earth.

Launched 6nov03

Xilinx ConfidentialNASA meeting 6/26/06 6

Mars 2003 Lander & RoverMars 2003 Lander & Rover• Mars 2003 Lander & Rover

– Xilinx used for Mission-critical systems

– Lander: Pyrotechnics, retro-rockets, parachute deployment, & explosive bolts.

– Rover: All motor controllers– Operated through worst Solar

Flare ever measured

Launched in Jul03

Xilinx ConfidentialNASA meeting 6/26/06 7

Example: MER Pyro ControlExample: MER Pyro Control

Launched in Jul03

Xilinx ConfidentialNASA meeting 6/26/06 8

MER 2003 Lander / JPLMER 2003 Lander / JPL, USA, USAPyrotechnic boardPyrotechnic board

XQR4062XL

Readback Controller

XQR4062XL

Readback Controller

XQR4062XL

Readback Controller

XQR4062XL

Readback Controller

Pyro

Relay

Relay

Relay

Relay

1701L 1701L

Launched in Jul03

Xilinx ConfidentialNASA meeting 6/26/06 9

MER 2003 ROVER / JPLMER 2003 ROVER / JPL, USA, USAMotor ControllerMotor Controller

XQVR1000

-4CG560V

PROM PRC

Mitigation Techniques:

System cycled once per Martian Evening

• Readback for SEU detection

• Scrubbing for SEU correction

Operating successfully since the 04jan2004Launched in Jul03

Xilinx ConfidentialNASA meeting 6/26/06 10

MRO 2005 HiRise CameraMRO 2005 HiRise Camera

XQVR300E

-4CB228M

PROM

Mitigation Techniques:

• System cycled periodically

• Readback for SEU detection

• Scrubbing for SEU correction

Launched in Jul03

PRC

Xilinx ConfidentialNASA meeting 6/26/06 11

Venus ExpressVenus ExpressTU BraunschweigTU Braunschweig, Germany, Germany

Image ProcessingImage Processing(VMC (VMC VVenus express enus express MMonitoring onitoring CCamera)amera)

Mitigation Techniques: XQVR600-4CB228M

• EDAC + TMR + Scrubbing

Customer paper:Customer paper:« To maintain correct operation in the presence of SEU errors, extensive EDAC functions are implemented. All application specific functional blocks are implemented using TMR design. The most important measure is to scrub the configuration in short time intervals to eliminate the SEU effects. A complete processor reconfiguration is scheduled every hour to avoid accumulation of persistent errors… ».

Launched 09nov05 from Baikonour

Xilinx ConfidentialNASA meeting 6/26/06 12

CIBOLA CIBOLA / Los Alamos & SSTL/ Los Alamos & SSTL, USA & England, USA & England

Remote SensingRemote Sensing

PROM Comp.PRC

Mitigation Techniques:

• Dual Redundancy for error detection

• Partial Configuration error detection and correction

• Instrument used to monitor ionospheric and lightning effects on UHF VHF radio spectra

• LEO Orbit

• Part of DoD STP-1 spacecraft scheduled to launch in mid 2006

Launch expected by Mid-06

Xilinx ConfidentialNASA meeting 6/26/06 13

ISS-Columbus payloadISS-Columbus payloadFSL / VerhaertFSL / Verhaert, Belgium, Belgium

PROMMitigation techniques:

• None

• FSL= Fluid Science lab• LEO orbit (400kms)

XQR4013XL

Launched expected Mid-07

Xilinx ConfidentialNASA meeting 6/26/06 14

ISS-Columbus payloadISS-Columbus payload EuTEMP / EFACEC EuTEMP / EFACEC, Portugal, Portugal

PROM

EuTEMP mission: Mission: to develop a system capable of monitor and record the temperature of the pallet experiences EuTEF during the transfer from the Space Shuttle to the ISS (Columbus external pallet).

LEO orbit (400kms)

XQ4036XL

Launched expected Mid-07

Xilinx ConfidentialNASA meeting 6/26/06 15

ISS / EADS AstriumISS / EADS Astrium, Germany, GermanyCamera SystemCamera System

PROMMitigation techniques:

• None

• LEO orbit (400kms)

XQR4036XL

Launched expected Mid-07

Xilinx ConfidentialNASA meeting 6/26/06 16

ATV / EADS-STATV / EADS-ST, France, France

PROM

Mitigation techniques:

• None

• ATV= Automated Transfer Vehicle• LEO orbit (400kms)• 1st Flight expected 2006

XQR4013XL

Launch OF 1st ATV « Jules Verne » expected by mid-07

Xilinx ConfidentialNASA meeting 6/26/06 17

ComSAT2 & SarLUPE ComSAT2 & SarLUPE / OHB System/ OHB System, Germany, Germany

Image ProcessingImage Processing

PROM

Mitigation Techniques:

• Readback

XQVR300/600

Xilinx ConfidentialNASA meeting 6/26/06 18

General DynamicsGeneral Dynamics, USA, USAClassified Project/ApplicationClassified Project/Application

PROM PRC

Mitigation Techniques:

• TMR used for state-machine logic only.

Xilinx ConfidentialNASA meeting 6/26/06 19

CMIS / BoeingCMIS / Boeing, USA, USAImage ProcessingImage Processing

Virtex-II

PROM

Mitigation Techniques:

• System cycled once per minute

• Boeing has contract for 2-4 CMIS instruments

• CMIS (Conical Microwave Imager Sounder)

• Part of NPOESS Program owned by DoD and NOAA

• First instrument delivered in 2005, second in 2007

• LEO Orbit

Launch expected by 2008

Xilinx ConfidentialNASA meeting 6/26/06 20

Xilinx in SpaceXilinx in Space• Next to launch

– CrIs (ITT)• XQR2V6000

– Birch (ITT)• XQR2V6000

– Hifes (Sandia)• XQR2V3000

– Cayman (Boeing)• XQVR300

– DRP (General Dynamics)• XQR2V3000

Etc…..

+ Other Classified Projects+ Other Classified Projects