Workflow Verification Project
BY:Toomas KüttFraz TabassamJens Kaae Christensen
AND OR
Check Order
Get Products
Save OrderInformation in Archive
AssembleBundle
TestComputer
TestMonitor
AND
OR
a2_ch a3_cha1_ch
a2_ch
a4_cha5_ch
a5_ch
a8_ch
a7_ch
a9_cha10_cha11_ch
Check Order
Get Products
Save OrderInformation in Archive
AssembleBundle
TestComputer
TestMonitor
a2_cha3_cha1_ch
a2_ch
a4_cha5_ch
a5_ch
a8_ch
a7_ch
a9_cha10_cha11_ch
Variable declarations:
Number of running activity nodesint running;
Resources:int r1, r2, r3, r4, r5, r6;
Global declaration of channels:urgent chan letsstart, a1_channel, a2_channel, a3_channel, a4_channel, a5_channel, a7_channel, a8_channel, a9_channel, a10_channel, a11_channel;
Clocks(local, one for each activity):clock clock1, clock2, clock3, clock4, clock5, clock6;
Node declarations (Communicating Finite Automatas)
Figure 2: ActivityParameters:
- clock &processclock, - const int mintime,- const int maxtime, - int &resource,- urgent chan &in_channel,- urgent chan &out_channel
System declarations:
- CheckOrder = Activity(clock1,1,2,r1, letsstart, a1_channel);
- Split1 = ANDsplit(a1_channel, a2_channel);
- GetProducts = Activity(clock2,1,2,r2, a2_channel, a3_channel);
- SaveOrderInformInArchive = Activity(clock3,1,2, r3, a2_channel, a4_channel);
- Split2 = ORsplit(a3_channel, a5_channel);
- TestComputer = Activity(clock4,1,2, r4, a5_channel,a7_channel);
- TestMonitor = Activity(clock5,1,2, r5, a5_channel, a8_channel);
- Join1 = ORjoin(a7_channel, a8_channel, a9_channel);
- Join2 = ANDjoin(a4_channel, a9_channel, a10_channel);
- AssembleBundle = Activity(clock6, 1, 2, r6, a10_channel, a11_channel);
- end = EndNode(a11_channel);
Answers to questions:• Use UPPAAL to verify that:
1) The end node will always be reached - A<> p: p holds in some state along every path - Query: A<> end.finished
2) When the end node is reached no activities are waiting to get finished - A[] p: p holds in every reachable state - Query: A[] end.finished imply running == 0
3) The workflow is structurally incorrect if the implicit join is modeled as a merge- Query: A<> end.finished (deadlock)
4) Assemble bundle and get products may share a resource without conflict- A[] p: p holds in every reachable state- Query: A[] r6<2 : (property is satisfied)
5) There is a conflict if “get products” and “save order information” share a resource - Query: A[] r2<2 : (property is not satisfied)
6) With time intervals [1,2] the entire workflow can be completed in 8 units - E<> p: p holds in some reachable state.- Query: E<> end.finished and clock1<=8- Query: A<> end.finished and clock1<=8
7) This still holds even if “save order information” gets interval [2,3] (explain why) - Same queries, “save order” set to [2,3]: - Query: E<> end.finished and clock1<=8
8) Show that “get products” is always executed before “assemble bundle” - A[] AssembleBundle.working imply GetProducts.finished
Thank You!