    Table of ContentsChapter 1 ......................................................................................................................................................................................... 1

    INTRODUCTION ........................................................................................................................................................................... 1

    1.1 Background ............................................................................................................................................................................. 2

    Chapter 2 ......................................................................................................................................................................................... 4

    LITERATURE REVIEW ............................................................................................................................................................... 4

    2.2 Studies On White Topping ................. ................ ................. ................ ................. ................ ................. ............... .......... 5

    2.3 The procedure to be adopted for Implementing Whitetopping as Maintenance Strategy ............... .... 6

    2.4 Advantages of White Topping ............... ................. ................ ................. ................ ................. ................ ................ .... 7

    2.5 Scenario of Whitetopping ................ ................. ................ ................ ................. ................ ................. ................ ............ 8

    2.6 Comparisons of Rigid And Flexible Pavement ............... ................ ................ ................. ................ ................ ....... 8

    Chapter 3 ...................................................................................................................................................................................... 10

    DESIGNING AND CONSTRUCTION OF ULTRA THIN WHITETOPPING ............... ................ ................. .............. 10

    3.1 Design Procedure ................ ................ ................. ................ ................. ................ ................ ................. ................ ......... 10

    3.2 Construction Procedure ................ ................. ................ ................. ................ ................. ................ ................ ............ 10

    3.2.1 Surface Preparation ...................................................................................................................................................... 10

    3.2.2 Placing ................................................................................................................................................................................ 11

    3.2.3 Finishing and Texturing ............................................................................................................................................. 12 3.2.4 Curing ................................................................................................................................................................................. 12

    3.2.5 Joint Sawing and Sealing ............................................................................................................................................ 12

    3.3 First UTW Project in Kentucky .............. ................. ................ ................. ................ ................. ................ ................ . 13

    3.4 Factors Affecting UTW Performance ................ ................. ................ ................ ................. ................ ................ .... 14

    3.5 Repair of UTW ................. ................ ................ ................. ................ ................ ................. ................ ................. .............. 14

    3.6 Concrete Mix Design ................ ................ ................ ................. ................ ................ ................. ................ ................ .... 16

    3.7 Life Cycle Cost Analysis ............... ................ ................. ................ ................ ................. ................ ................ ............... 16

    3.8 Advantages of UTW ............... ................. ............... ................. ................ ................. ................ ................ ................ ....... 17

    3.9 Disadvantages of UTW ............... ................ ................ ................ ................. ................ ................. ............... ................. . 17

    Chapter 4 ...................................................................................................................................................................................... 18

    CONCLUSIONS ............................................................................................................................................................................ 18

    REFERENCES .............................................................................................................................................................................. 19

  • 8/10/2019 White Topping Report

    2/21

    WHITETOPPING A Viable and Sustainable Option for Rehabilitation of roads

    Department of Civil engineering, RVCE Page 1

    Chapter 1

    INTRODUCTIONRoad traffic is increasing steadily over the years. This is an international phenomenon. An

    international forecast predicts that such increase will continue in near future. Even in case of

    developed countries, there is a shortage of funds required for new infrastructure projects, both

    for constructing them and more significantly towards their maintenance and repairs. The

    position in the context of a developing country like India is obviously far worse.

    The increasing truck weights and tyre pressures on our pavements in recent years have

    pushed the demand on the performance of our pavements to a higher level. Many asphalt

    pavements have experienced rutting while many others have experienced longitudinal

    cracking. As a result, more and more roads are deteriorating and the existing pavement

    structure as a whole is often found to be inadequate to cope up with the present traffic[1].

    The cost of strengthening and repair by Conventional method of this large network will need

    huge resources both physical and financial which are quite scarce.

    Most of the existing flexible pavements in the network broadly have thin bituminous layers.

    These bituminous pavements, in general, have a problem that they get deteriorated with time.

    Most of our roads exhibit, in general, the following deficiencies: Rutting

    Fatigue cracking

    Block crack (D-cracking)

    Thermo cracking

    One of the possible solutions to this problem is the use of whitetopping (WT), which is a

    cement concrete layer placed over an existing asphalt pavement. Ultra Thin White Topping

    (UTWT) and Thin White Topping (TWT) are being increasingly practised in USA andWest Europe. Whitetopping is stronger than asphalt overlay, and thus more resistant to

    rutting and surface-initiated cracking. Consequently, whitetopping pavements pose

    potential economical and technical benefits. However, they need to be effectively

    evaluated for feasibility and proper application techniques, suitable for India, so that their

    use can provide the maximum benefits to the road users in particular and Indian economy

    at large.Ultra-Thin Whitetopping is an emerging and innovative technology for asphalt

    pavement

  • 8/10/2019 White Topping Report

    3/21

    WHITETOPPING A Viable and Sustainable Option for Rehabilitation of roads

    Department of Civil engineering, RVCE Page 2

    rehabilitation in India. The concrete overlay utilizes closely spaced transverse and

    longitudinal joints to reduce tensile stresses caused by traffic loads and environmental

    conditions such as thermal stresses and curling due to temperature changes[2].

    1.1 BackgroundConcrete Roads were first built by Romans (300 BC 476 AD). They were quite innovative

    in the construction with the use of innovative materials viz., use of `Pozzolana cement from

    the village Pozzouli near Italy, horse hairs as fibres in concrete, admixtures in their primitive

    form (like animal fat, milk & blood). These roads, scientifically designed and constructed had

    a long life and thus lead to the adage all (con crete) roads lead to Rome [3].

    By the mid- 1950s, continuously reinforced concrete pavements (CRCP) started to gain in

    popularity because the design offered the benefit of eliminating joint distress. The cost of the

    steel in CRCP was expansive, and so, to be competitive, CRCP was built 25 to 50 mm

    thinner, leading to premature distress. (The justifications perpetuated for using thinner

    structural slabs are many but are primarily related to comparisons of deflections with jointed

    pavements that had poor load transfer between slabs).

    Also in 1950s, the slip form paver came into use. It reduced paving trains from 100 workers

    down to about 25. Also the economics changed in that materials became cheap and labour

    was more expansive. Hence, this led to a return to uniform thicknesses that could be easily

    placed by the early slip forms [4].

    Prestressed concrete was introduced in the late 1940s and was first used in airport

    paavements. About 1959, two-way prestressed slabs were used at Biggs military airfield in

    Texas. The 24-in (610 mm) plain pavement was replaced with 9-in (230 mm) post tensioned

    slabs. Unfortunately the fear of the unknown, the need to use more skilled labour, and the

    reluctance of mile-a-day slip from contractors to embrace this unproven technology have held

    this concrete saving technology back. About a dozen highways with prestressed concrete

    pavements of various designs were built in the United States between 1970 to 1990 [4].

  • 8/10/2019 White Topping Report

    4/21

    WHITETOPPING A Viable and Sustainable Option for Rehabilitation of roads

    Department of Civil engineering, RVCE Page 3

    Table 1 UTW PROJECTS IN INDIA

    According to National Cooperative Highway Research Program (NCHRP) Synthesis of

    Highway Practice 99, the first recorded use of whitetopping in the United States was in Terre

    Haute, Indiana. On this project, constructed in 1918, a 75 to 100mm jointed reinforced

    concrete overlay was put in place . According to McGhee (1994), from 1918 to 1992,

    approximately 200 white topping projects were done. Among them, 158 were jointed plainconcrete pavement, 14 continuously reinforced concrete, 10 fibre-reinforced concrete, and

    seven were jointed reinforced concrete pavement [5]. Construction of white topping is not

    limited to the U.S. only. Other countries including Belgium, Sweden, Canada, Mexico,

    Brazil, the Republic of (South) Korea, Japan, F Austria, and the Netherlands [6] have

    undertaken recent projects with white topping (Rasmussen and Rozycki, 2004). Agencies are

    widely expected to use white topping as it is a cost-competitive technique, can be constructed

    with minimal interruption of the travelling system, as well as be a means of greenconstruction compared to asphalt concrete overlay. Ultra-thin whitetopping overlay

    technology has been started in India in 2003.Table show various UTW projects in India [7].

    Year Location Thickness (mm)

    2003 Pune ( In front of P.M.C Office) 125

    2004 New Delhi ( CRRI campus road) 40-75

    2006 Ghaziabad (Campus road of HRD centre) 50

    2006 New Delhi (Meetha Pur, Badarpur) 125

    2007 Mumbai ( Mahul Road) 100

    2008 Thane ( In Gaotham Road) 125

    2009 Pune ( Dahanukar Colony, Kothrud) 125

  • 8/10/2019 White Topping Report

    5/21

    WHITETOPPING A Viable and Sustainable Option for Rehabilitation of roads

    Department of Civil engineering, RVCE Page 4

    Chapter 2

    LITERATURE REVIEW

    2.1 Performance Evaluation

    D. R. Jundhare, Dr. K. C. Khare; and Dr. R. K. Jain conducted performance evaluation

    studies to determine functional and structural condition of a whitetopping overlay which has

    the purpose of routine monitoring or planning the corrective action. Following conclusions

    are reached from the detailed study carried out using Benkelman Beam Deflection(BBD) as

    per guidelines given in IRC: 81-1997, as Non Destructive Test(NDT) for determining

    deflection at three critical load positions and Load Transfer Efficiency (LTE) has been

    calculated at the transverse joints of 100 mm thick on in-service UTW overlay constructed in

    Pune city, Maharashtra State (India), for its performance evaluation subjected to various

    traffic and climatic conditions relevant to Indian scenario. The deflections obtained in this

    study after two year is 0.461mm, 0.415 mm and 0.265 mm at the edge, corner and interior

    respectively. These deflection results have been compared with the results of three

    dimensional FE model (Jundhare D. R. et al., 2012), these values show good agreement. LTE

    in the 100 mm thick UTW overlay for this study has been ranging from 88.03% to 100.00 %

    in the 1.00 m x 1.00 m panel size. These results of LTE have been compared with the results

    of 120 mm thick overlay (Cable, J. K. et al., 2006). LTE obtained for their study ranges from

    99.60% to 99.90%. In another study, based on the finite element method using KENSLAB

    computer program (Huang 1985) 84% of LTE value has been observed at transverse joint of

    bonded type of interface. When results of BBD test from this study have been compared with

    the deflection values obtained by three dimensional FE model (Jundhare D. R. et al., 2012)

    and LTE values obtained by Cable, J. K. et al. (2006) as well as KENSLAB computer program, these values show good agreement. Therefore it can be concluded BBD is a useful,

    reliable and alternative tool to Falling Weight Deflectometer(FWD) for the study of

    performance evaluation of UTW overlay.

    D. R. Jundhare, Dr. K. C. Khare; and Dr. R. K. Jain said Following conclusions are the model

    in this study is a simple non-linear type developed by applying static axle loading. Through

    the present study following conclusions have been drawn for the edge loading case, the

    method of Westergaard gives stress 21.81 % and deflection 29.45 % more when compared

  • 8/10/2019 White Topping Report

    6/21

    WHITETOPPING A Viable and Sustainable Option for Rehabilitation of roads

    Department of Civil engineering, RVCE Page 5

    with 3D FEM results. Comparison with ALIZE Method gives stress 2.09 % less. The

    difference between the values from this method and the 2D modeling is due to the various

    assumptions adopted in deriving these theories. It is revealed that, increasing the modulus of

    subgrade reaction (k) of HMA resulted in reducing the stresses and deflections in plaincement concrete overlay. FEM analysis of the whitetopping shows stresses and deflection

    induced in the whitetopping within the safe limits. Therefore unbonded plain cement concrete

    overlays can be an economical and durable rehabilitation option, when the existing pavement

    is severely deteriorated as compared to construction of conventional rigid pavement or HMA

    overlay. This work confirms that the use of ANSYS software has a great potential as a

    powerful tool for a 3D modeling of the conventional unbounded whitetopping.

    D. R. Jundhare, Dr. K. C. Khare; and Dr. R. K. Jain said Following conclusions are reached

    from the detailed study carried out using BBD as per guidelines given in IRC: 81-1997 and

    FWD test as NDT for determining deflection at edge and corner load positions of 320 mm

    thick on in-service conventional whitetopping overlay constructed in Pune city, Maharashtra

    State (India), for its performance evaluation and correlation development subjected to various

    traffic and climatic conditions relevant to Indian scenario. The linear, exponential and

    logarithmic relationship has been developed using Benkelman Beam and FWD deflection

    values on conventional whitetopping overlays. Among of the linear, exponential and

    logarithmic relationships; the exponential relationship gives high R value. R 2 value of the

    three relationships, it is higher in edge loading position than corner loading position. The

    relationships developed are quite fair as R2 values are in between 0.65 to 0.80 which shows

    the good correlation strength between the BBD and FWD deflection values .

    The literature studies has helped us understand the pavement rehabilitation by white topping,

    performs relatively well as compared to the conventional bituminous concrete overlay which

    has been practiced widely even with its higher maintenance cost and lesser durability [8].

    2.2 Studies On White Topping. There has been a renewed interest in whitetopping, particularly on Thin White Topping

    (TWT) and Ultra-Thin White Topping (UTWT) over Conventional White Topping. Based on

    the types of interface provided and the thickness of overlay, classification is as follows:

  • 8/10/2019 White Topping Report

    7/21

    WHITETOPPING A Viable and Sustainable Option for Rehabilitation of roads

    Department of Civil engineering, RVCE Page 6

    Conventional White topping which consists of PCC overlay of thickness 200 mm or

    more, which is designed & constructed without consideration of any bond between

    existing overlay & underlying bituminous layer (without any 1composite action).

    Thin White topping (TWT) which has PCC overlay between 100 200 mm. It is

    designed either considering bond between overlay & underlying bituminous layer or

    without consideration of bond. High strength concrete (M 40 or higher) is normally

    used to take care of flexure requirement. Joints are at shorter spacing of 0.6 to 1.25 m.

    Ultra-Thin White topping (UTWT) which has PCC overlay of less than 100 mm.

    Bonding between overlay & underlying bituminous layer is mandatory . To ensurethis, the existing layer of bitumen is either milled (to a depth of 25 mm) or surface

    scrapped (with a non-impact scrapper) or gently chiseled. Joints are provided at a

    spacing of 0.6 to 1.25 m [3].

    Figure: 1 Conventional (No Bond) V/s Ultra-Thin White Toping (Bond is there)

    2.3 The procedure to be adopted for Implementing Whitetoppingas Maintenance Strategy Design life--should be at least 15 years; 25 to 30 years is often projected for city streets.

    Cost alternatives--define initial construction costs, maintenance costs, and the design life

    of the topping.

    Drainage considerations - define the elevation of crown sections to ensure good drainage.

    Pavement patching--identify areas that require sub grade repair after the milling operation

    Thickness design--considers the thickness of the asphalt pavement, the thickness of the

  • 8/10/2019 White Topping Report

    8/21

    WHITETOPPING A Viable and Sustainable Option for Rehabilitation of roads

    Department of Civil engineering, RVCE Page 7

    topping, traffic loads, and panel layout.

    Longitudinal and transverse joints--determine joint spacing by the overlay pavement

    thickness and the geometrics of the area to be paved. Normal practice is to saw the joints

    in the new pavement; tooled joints are also permitted for some areas. Profile correction--determine joint spacing by the thinnest concrete profile and carry this

    spacing throughout the project.

    Surface texture--texture is specified in relation to the speed of traffic. Drag (burlap or

    boom) textures are good for low-speed facilities; high-speed facilities should use more

    aggressive textures.

    Traffic control--traffic can be detoured, shifted, or otherwise accommodated during

    construction, but there must be a plan before construction starts.

    Construction staging--stage the construction to cause the least disruption [9].

    2.4 Advantages of White Topping Reduced thickness due to thickness of overlay remaining constant for over 2

    decades.

    Fast-Track construction making use of innovations in concrete technology & batch

    mixing, concretes can be designed to have 3 days compressive (& flexural) strength,

    so as to open the road for traffic within 5 days of construction.

    Reduced maintenance as the concrete overlays live for over 2 decades, with least

    maintenance.

    Cost-effective compared to asphalt overlays when Life Cycle Cost is taken into

    consideration.

    Improved service life with better riding quality, improved fuel efficiency of

    vehicles.

    Little pre-overlay repairs.

    Improvement in safety in view of the increased reflection of light particularly on

    city roads, it would save 24 % less electricity compared to flexible pavements.

    Reduction in operational costs and lower absorption of solar energy.

    Improving the environmental benefits as concrete roads are much greener and less

    polluting.

  • 8/10/2019 White Topping Report

    9/21

    WHITETOPPING A Viable and Sustainable Option for Rehabilitation of roads

    Department of Civil engineering, RVCE Page 8

    2.5 Scenario of WhitetoppingBase: Most of the existing, worn asphalt pavement is left in place and serves as a base. Ruts

    in the asphalt are milled down to start with a clean level surface. Ultra-thin white topping

    (UTW) should not be placed over asphalt pavement that shows signs of deep pavementdistress. If potholes, alligator cracking, or deep fissures exist in the asphalt, the concrete will

    not form an adequate bond, resulting in pavement that lacks adequate support. Asphalt

    pavement should be at least 3-inches thick to provide a sufficient base for UTW.

    Many installers mill off the amount that will be replaced by the UTW so that they dont

    change the surface grade. White topping can be placed using conventional paving

    equipment.

    Joints: Joint spacing is critical to a good performing UTW project. Successful projects

    use a short joint spacing to form, in effect, a mini-block paver system. Experience

    indicates that joint spacing should be no more than 12 to 18 inches each way per inch

    of white topping thickness. For example, a 3-inch UTW surface should be jointed into

    3x 3 or 4x4 foot squares. Joints are sawed early to control surface cracking [10].

    2.6 Comparisons of Rigid And Flexible Pavement

    Flexible pavements are the conventional asphalt/bituminous concrete pavements whereas

    rigid pavements are cement concrete pavements. In asphalt pavements grain to grain transfer

    of load takes place, where as in cement concrete pavements layer to layer transfer of loads

    takes place.

    Asphalt pavements consists of sub grade, granulated sub base, base and bituminous concrete

    layers. Whereas the rigid pavements subgrade and base layers.

    Rigid Pavement Flexible Pavement

    Figure: 2.1 Comparisons of Rigid and Flexible Pavement

  • 8/10/2019 White Topping Report

    10/21

    WHITETOPPING A Viable and Sustainable Option for Rehabilitation of roads

    Department of Civil engineering, RVCE Page 9

    T able 1 COMPARISION OF RIGID AND FLEXIBLE PAVEMENTS

    Comparisons Rigid Flexible Strength High Low

    Cost High Low Noise level Low High Safety More Less Environmentally friendly Yes No Ride Smooth Rough Life span More Less Maintenance Less More Heat Reflection Less More

    2.7 Advantages of Rigid Pavement compared to Flexible Pavement

    Longer life cycle of the pavement structure

    Slow rate of deterioration

    Surface deficiencies could be corrected

    Improve skid resistance of the pavement

    To improve ride quality (restores crown)

    Very smooth riding surface

    No excess stone build ups

    No broken windshields from loose aggregate

    Ease of construction, use standard paver

    Minimal construction time

    Dont have to adjust structures

  • 8/10/2019 White Topping Report

    11/21

    WHITETOPPING A Viable and Sustainable Option for Rehabilitation of roads

    Department of Civil engineering, RVCE Page 10

    Chapter 3

    DESIGNING AND CONSTRUCTION OF ULTRA THIN

    WHITETOPPING3.1 Design ProcedureFollowing UTW design procedure is adopted:

    1) Based on traffic data number of equivalent axle loads are obtained. The elastic

    modulus and thickness of the existing asphalt pavement are also obtained.

    2) Allowable tensile stress in asphaltic concrete has been calculated.

    3) Thickness for UTW is assumed. Maximum tensile stress in allowable compression

    due to UTW for both bound and unbound conditions are found out.

    4) Maximum tensile stress in allowable compression is compared with the allowable stress

    5) Maximum tensile stress in UTW due to both axle load and temperature

    differentials has been calculated.

    6) Stress ratio in UTW is obtained and Maximum allowable load repetitions are determined.

    7) If the UTW fatigue criterion indicat es a small number of ESALs, the n UTW thickness

    increased and repeat the steps 4 to 6 [11].

    3.2 Construction Procedure

    3.2.1 Surface Preparation

    A clean surface is required for proper bond. Milling the surface followed by cleaning

    improves bond because it exposes more of the aggregate of the asphalt pavement. The

    milling creates a rough surface that also enhances the bond between the two layers. Ifmilling is not done, water or abrasive blasting should be used to clean the asphalt

    surface. When water blasting is used, the surface must be allowed to air dry before the

    concrete is placed.

    Once a surface is cleaned, it is important to keep it clean until the concrete overlay is

    placed. Dust, dirt and debris that falls or blows onto the asphalt surface must be

    removed as shown in figure 3.1. If the surface is cleaned on the day prior to paving, air

    cleaning may be required on the day of paving to remove dirt and dust. If the traffic is

  • 8/10/2019 White Topping Report

    12/21

    WHITETOPPING A Viable and Sustainable Option for Rehabilitation of roads

    Department of Civil engineering, RVCE Page 11

    allowed on the milled surface, the surface must be re-cleaned prior to paving [12].

    Figure: 3.1 Surface preparation

    3.2.2 PlacingAfter surface preparation, there must be enough asphalt remaining to form a sufficient

    composite section that can carry the load. There must be enough asphalt to minimize

    concrete tensile stresses, and enough concrete to minimize asphalt strains. It is

    recommended that the minimum asphalt thickness after milling exceed 3 inches.

    Paving UTW isnt any different than paving any other concrete pavement.

    Conventional slip-form and fixed-form pavers as shown in figure 3.2, as well as small

    equipment - such as vibrating screeds - have all been used successfully, without major

    modifications.

    Figure: 3.2 Spreading and leveling of UTW over prepared pavement

  • 8/10/2019 White Topping Report

    13/21

    WHITETOPPING A Viable and Sustainable Option for Rehabilitation of roads

    Department of Civil engineering, RVCE Page 12

    3.2.3 Finishing and TexturingTypical concrete finishing and texturing procedures are appropriate for ultra-thin white

    topping. Texturing of the finished UTW pavement surface is required to provide

    adequate surface friction of the roadway. Surface friction is provided by carpet drag or brooming, which also reduces noise as shown in figure 3.3.

    Figure: 3.3 Finishing and Texturing

    3.2.4 CuringProper curing is critical to avoiding shrinkage cracking in the concrete overlay and to

    prevent de-bonding between the asphalt and concrete. Because the overlay is a thin

    concrete slab, it has high surface area to volume ratio and can lose water rapidly due toevaporation. Curing UTW is similar to curing new PCC pavements. It requires curing

    the entire pavement surface and edges as soon as surface conditions permit after the

    finishing operations using either blanket or membrane methods. The most common

    practice is to spray liquid, a membrane curing compound.

    3.2.5 Joint Sawing and SealingSawing is critical to avoid random cracking in white topping. Partial-depth saw cutting

    operations should commence immediately after the concrete has gained enough

    strength to prevent ravelling and spalling of the joint

    Joints should be sawed with lightweight saws as early as possible to control cracking.

    Saw-cut depth should be 1/4 - 1/3 of overlay thickness as shown in figure 3.4.

    Typically, the joints are not sealed. They have performed well without sealant because

    the short joint spacing minimizes joint movement. Performance to date shows no

    benefit from sealant use [13].

  • 8/10/2019 White Topping Report

    14/21

    WHITETOPPING A Viable and Sustainable Option for Rehabilitation of roads

    Department of Civil engineering, RVCE Page 13

    Figure: 3.4 Joint Sawing and Sealing

    3.3 First UTW Project in Kentucky

    The first high- profile UTW project in the United States took place in Louisville, Kentucky,in 1991. I was a landmark in UTW history, demonstrating that ultra thin whitetopping 50 to

    90 mm can carry traffic loads typical of many low volume roads, residential streets, and

    parking lots [14]. The pavement section served as an access road to a disposal facility, which

    was selected to provide performance data on a common distress and failure modes of UTW

    overlays that are subjected to heavy loads similar to those of garbage trucks. The accessed

    roads serviced 400 to 500 trucks 5 days in a week. This was viewed as a suitable site for the

    accelerated testing of the UTW pavement, as the truck loading was 20 to 100 times greaterthan that on an average low volume road. The significant findings from the Louisville UTW

    experiment were that the bond between the UTW and the existing HMA pavement

    significantly reduced the stresses in the concrete section. This allows the section to perform

    as a composite section, corner cracking was the predominant distress and joint spacing has a

    significant effect on the rate of corner cracking. The success of this project led to a number of

    different projects in other states including Georgia, Virginia, Florida and Lowa [15]

    Thin concrete overlay has been used in increasing numbers over hot-mix asphalt (HMA)

    pavements and at intersections as a rapid and economical method of repair. These repairs

    have shown outstanding services in the state of Oklahoma with service lives over 10 years

    when used in areas with moderate truck traffic [16]

  • 8/10/2019 White Topping Report

    15/21

    WHITETOPPING A Viable and Sustainable Option for Rehabilitation of roads

    Department of Civil engineering, RVCE Page 14

    3.4 Factors Affecting UTW Performance a) Concrete Mixture Proportions

    b) Typical Construction Procedures adopted

    c) Traffic loading on the pavements

    d) Pavement Monitoring and maintenance

    3.5 Repair of UTWWhen to repair

    Generally, repairs should be considered when:

    Panels are broken into four or pieces

    Surface irregularities or settlement affect ride quality

    Loose or missing concrete is evident

    Repair procedures

    The repair of UTW pavement involves locating and replacing deteriorated panels. Because

    UTW joint spacing usually creates small panels, the removal and replacement of concrete is

    very simple.

    There are six steps involved in repair of UTW:

    1) Identify the panels to be removed.

    2) The damaged panel is saw cut to the perimeter and to full depth of concrete.

    3) The damaged concrete panel and any deteriorated asphalt pavement beneath is removed

    completely.

    4) The area to be corrected is well prepared and patched accordingly.

    5) Place, finish, and cure the new concrete.

    6) Saw the joints for lateral and longitudinal expansions which takes place during summer

    and open the stretch to traffic.

    Identify and isolate slabs to be removed

    The first step in the repair process for UTW is to determine which panels need to be

    replaced. The panels are usually identified with bright colored paint .cracks in panels

    do not require repair, but if the UTW overlays breaks up begins moving or dislodging,

    repairs are warranted. The entire panel containing the distress should be removed and

    replaced.

  • 8/10/2019 White Topping Report

    16/21

    WHITETOPPING A Viable and Sustainable Option for Rehabilitation of roads

    Department of Civil engineering, RVCE Page 15

    Saw cut panels to bottom of concrete overlay

    The distressed panel should be cut at all joint lines using diamond or abrasive-bladed

    saws to the bottom of the concrete overlay. Care should be taken not to damage the

    underlying asphalt layer. Full-depth sawing to the bottom of the concrete overlayresults in clean cuts, easy removal of the deteriorated concrete, and less joint spalling.

    Remove panels

    There are two ways to remove the deteriorated

    concrete: 1. Break up 2. Full panel removal

    To break up the concrete, jackhammers are used. Care must be taken not to damage

    the adjacent panels with any equipment during removal process.

    Prepare patch area

    Before concrete placement, the asphalt surface should be cleaned by air blasting with

    clean, compressed air. Sand or shot blasting is required if air blasting will not remove

    foreign material from the surface. The asphalt surface must be kept clean prior to the

    placement of new concrete.

    Place new concrete

    The placement of new concrete into the patch areas of the UTW pavement should follow 6

    steps:

    Place the concrete into repair areas

    Consolidate the concrete using a hand held vibrator

    Finish with a straight edge or vibratory screed to meet the existing Grade

    Texture the concrete surface to match the surrounding panels

    Apply curing compound immediately after the bleed water sheen disappears

    Cover with insulating blankets if the ambient temperature falls below about 5 degree

    centigrade within 24 hours of placement

    Saw joints and open to traffic

    Saw joints as soon as possible without revelling the concrete to match the width and location

    of existing and adjacent joints. The repaired pavement can be open to traffic once the

    concrete has reached the specified opening strength, maturity or curing time [17].

  • 8/10/2019 White Topping Report

    17/21

    WHITETOPPING A Viable and Sustainable Option for Rehabilitation of roads

    Department of Civil engineering, RVCE Page 16

    3.6 Concrete Mix Design

    The type of concrete mix for a particular UTW project is often selected based on traffic

    conditions, concrete strength and time requirements for opening to traffic.Many UTW projects have utilized fast track concrete mixes that typically contain

    higher cement content or high early-strength cement. In addition, fast track mixes can

    be adjusted to produce compressive strengths of at least 20 MPa in 24 hours and 28-

    day strengths in excess of 40 MPa.

    Synthetic fibres are often used in UTW mixes to provide additional strength and durability to

    the thin concrete layer. It has also been found that these fibres extend the time window for

    saw-cutting the joints by delaying early plastic shrinkage cracking.

    3.7 Life Cycle Cost AnalysisA recent life cycle cost (LCC) analysis study was conducted in British Columbia to

    evaluate the relative effectiveness of Ultra-Thin Whitetopping versus traditional asphalt

    rehabilitation of deteriorated or rutted asphalt intersections. The study evaluated 150

    intersections in the City of Surrey, B.C. for cost effectiveness of competing

    rehabilitation strategies using five different life cycle costing philosophies. They are:

    1) Maximizing the net Road User Cost savings

    2) Comparing direct agency costs to Road User Cost savings

    3) Minimizing an agencys direct agency costs

    4) Maximizing the resulting pavement quality

    5) Comparing direct agency costs to resulting pavement quality

    Cost effectiveness of UTW depends on existing asphalt thickness, amount of truck

    traffic, base and sub grade support conditions, and pavement condition. The most

    important factors are the existing asphalt thickness and amount of expected truck

    traffic.

    The LCC study in Surrey, BC shows that UTW rehabilitation is extremely dependent

    on site conditions and traffic volume. If a particular site does not have the required

    minimum thickness of asphalt and a fairly high volume of truck traffic that will cause

    rutting of the asphalt, UTW may not be the most cost effective alternative for repair.

    However, if the site conditions do warrant UTW rehabilitation, the benefits can be

    substantial[18].

  • 8/10/2019 White Topping Report

    18/21

    WHITETOPPING A Viable and Sustainable Option for Rehabilitation of roads

    Department of Civil engineering, RVCE Page 17

    3.8 Advantages of UTW Economical cost moderately less than that of conventional asphalt surfacing

    High standard of surface texture giving good skid resistance and reduced water spray

    Reduced noise levels compared to dense-graded asphalt and sprayed seals

    Good ride qualities

    Flexible and tolerant to surface deflections

    Assists waterproofing of the underlying surface

    Thin layer reduces the need for cold planning, etc. to match adjoining surfaces. No

    loose aggregate such as in a spray seal

    3.9 Disadvantages of UTW Higher cost than sprayed seal

    Effective treatment may require preliminary regulation and SAMI treatments

    Low shear resistance may make it unsuitable in areas of high shear forces

    Hence the literature studies has helped us in the technical understanding and the methodology

    involved in the design procedure of UTW and also the process or methodology involved inthe construction of UTW.

  • 8/10/2019 White Topping Report

    19/21

    WHITETOPPING A Viable and Sustainable Option for Rehabilitation of roads

    Department of Civil engineering, RVCE Page 18

    Chapter 4

    CONCLUSIONS

    White topping has emerged as a fast growing technology for pavement rehabilitation.

    White topping has emerged as a fast, competitive remedy for rutted asphalt

    pavements rehabilitation by offering the enhanced performance and durability of

    concrete.

    White topping overlays are bonded to existing asphalt to create a composite section,

    resulting in improved performance and durability at a lower cost.

    Ultra Thin White topping develops the required strength for opening to traffic in as

    little as 24 hours.

    In order to help state highway agencies and contractors better design and apply the

    UTW, well-controlled pavement response and performance data is needed to improve

    and refine the existing UTW design procedures.

    Positive impact on reducing CO 2 emissions resulting from the manufacturing and

    placement of paving materials.

    Based on the advantages and a lesser maintenance cost of white topping it could be

    concluded that rehabilitation of an asphalt pavement by white topping is a viable and

    sustainable technique compared to the bituminous concrete overlay.

  • 8/10/2019 White Topping Report

    20/21

    WHITETOPPING A Viable and Sustainable Option for Rehabilitation of roads

    Department of Civil engineering, RVCE Page 19

    REFERENCES

    1. Mitesh D. Patel, Prof. P.S. Ramanuj, Bhavin Parmar, Akash Parmar , White topping

    as a rehabilitation method: a case s tudy of budhel-ghogha road . IJAERS/Vol.

    I/ Issue IV/July-Sept., 2012/31-35 E-ISSN2249 8974.

    2. D. R. Jundhare, K.C. Khare, and R.K.Jain, Ultra-Thin Whitetopping in India: State-of

    Practice ACEE Int. J. on Transportation and Urban Development, Vol. 2, No. 1,

    April 2012.

    3. Dr. V. Ramachandra, WHITETOPPING A Viable & Sustainable Option for

    Rehabilitation of Urban Roads"

    4. Thomas, J., Pasko., (1998). Concrete Pavements Past, Present and Future. US

    Department of Transportation , Federal Highway Administration, 62(1), 1-9.

    5. McGhee, K.H., NCHRP Synthesis of Highway practice 204: Portland cement

    concrete resurfacing, Transportation Research Board, National Research Council,

    Washington, D.C.,1994, pp.73-82.

    6. American Concrete Pavement Association, Whitetopping state of practice, ACPA

    Publication EB210P , Skokie, Illinois, 1998.

    7. IRC: SP: 76 2008 Tentative guidelines for conventional, thin and ultra - thinwhitetopping, Indian Road Congress , New Delhi. 2008.

    8. B.N. Skanda kumar, Suhas R, Bhavan V , P erformance evaluation on thin-

    whitetopping eISSN: 2319-1163; pISSN: 2321-7308 Volume: 03 Issue: 07 Jul-2014.

    9. Navik, Joe. (2004). Uitra- thin concrete for IDOTs parking lot.

    10. Purvesh Raval, Darsh Belani, Prof. Jayeshkumar Pitroda , A Literature Review on

    UTW Pavements in Indian Context Impact Factor 1.393, Volume 1, Issue 9, October

    2013.11. Missouri Department of Transportation Research, Development and Technology.

    12. IRC: SP-76 (2008). "Tentative Guidelines for Conventional, Thin and Ultra

    Thin Whitetopping." Indian Road Congress, New Delhi .

    13. Chunhua H., "Synthesis of Current Minnesota Practices of Thin and Ultra-Thin

    White topping." http://www.lrrb.org/PDF/200527.pdf. Accessed on July 7,

    2011 .

    14. Synthesis oh Highway Practice 338, Thin and Ultra -Thin White Topping, National

    Cooperative Highway Research Program, Transportation Researcg Board ,

  • 8/10/2019 White Topping Report

    21/21

    WHITETOPPING A Viable and Sustainable Option for Rehabilitation of roads

    Department of Civil engineering RVCE Page 20

    Washington D.C.,2004.

    15. Haifing Wen, Xiajun Li and Wilfung Martono, Performance Assessment of

    Wisconsins Whitetopping and Ultra -thin Whitetopping Projects, March 2010, Report

    No. 10-30, 2010.16. Tyler Ley and Hari R otithor, Performance of Ultra -Thin Whitetopping in

    Oklahoma, Final report FHWA -OK-10-05, 2010.

    17. Smith, T., and Fung, R., "Concrete Overlays Sustainable Pavement Preservation

    Techniques Helping DOTs Adjusting to New Realities of Shrinking Resources."

    www.tac-atc.ca/ conference/smith.

    18. IRC: SP-70 (2005). "Guidelines for the Use of High Performance Concrete ."