    ASME B31.3 Process Piping

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    2/30

    Whats Different in B31.1

    ScopeOrganization of the Code

    F!id Ser"ice #e$!ire%ents

    Bases for Ao&a'e StressesMateria #e$!ire%ents

    Press!re Design #e$!ire%ents

    (a"e #e$!ire%entsFa'rication and )nstaation

    )nspection* E+a%ination and ,esting

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    3/30

    B31.1 Scope

    #!es for this Code Section ha"e 'een

    de"eoped considering the needs for

    appications &hich inc!de piping t-pica-

    fo!nd in eectric po&er generating

    stations* ind!stria and instit!tiona pants*

    geother%a heating s-ste%s and centra

    and district heating and cooing s-ste%s.1//.10

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    4/30

    B31.1 Scope

    Po&er piping s-ste%s as co"ered '- this Code

    app- to a piping and their co%ponent parts

    ,he- inc!de '!t are not i%ited to

    2 Stea%2 Water

    2 Oi

    2 as2Air

    41//.1.56

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    5/30

    Boier E+terna Piping BEP0

    7 enera- defined as piping 'et&een the

    'oier and the first 'oc8 "a"e.

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    6/30

    Boier E+terna Piping

    ,echnica re$!ire%ents are in accordance&ith B31.1

    Ad%inistrati"e re$!ire%ents are defined inASME B9P( Code Section ) and inc!dere$!ire%ents for2 B9P( Code sta%p

    2 Data reports2 :!ait- contro

    2 )nspection

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    7/30

    Organization of the Code

    ) Scope and Definitions

    )) Design

    ))) Materias)( Di%ensiona #e$!ire%ents

    ( Fa'rication* Asse%'-* and Erection

    () )nspection* E+a%ination and ,esting

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    8/30

    Organization of the Code

    7 Appendices si%iar to B31.3 e+cept

    7 )) #!es for Design of Safet- (a"e

    )nstaations7 )( Corrosion Contro

    7 ( #eco%%ended Practice for Operation*

    Maintenance and Modification7 ()) Design of #estrained ;ndergro!nd

    Piping

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    9/30

    Organization of the Code

    7 B31.1 pro"ides specific re$!ire%ents for

    2 Boier E+terna Piping Stea%* Feed&ater*Bo&off* Bo&do&n and Drains0

    2 Bo&off and Bo&do&n Piping

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    10/30

    Organization of the Code

    7 B31.1 pro"ides specific re$!ire%ents for2 Piping for Fa%%a'e or Co%'!sti'e >i$!ids

    2 Piping for Fa%%a'e ases and ,o+ic F!ids

    2 Piping for Corrosi"e F!ids

    2 ,e%porar- Piping

    2 Stea% ,rap Piping

    2 P!%p S!ction and Discharge Piping2 District ?eating and Stea% Distri'!tion

    S-ste%s

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    11/30

    F!id Ser"ice #e$!ire%ents

    B31.1 does not define specific f!id

    ser"ices* '!t does ha"e i%itations for

    piping s-ste%s handing certain f!ids

    Specific re$!ire%ents for co%ponents and

    @oints are descri'ed in paras. 1/=11.

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    12/30

    Pipe F!id Ser"ice #e$!ire%ents

    F!rnace '!tt &eded pipe is not per%itted

    for fa%%a'e* co%'!sti'e or to+ic f!ids

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    13/30

    oint F!id Ser"ice #e$!ire%ents

    Soc8et &eding size i%ited for BEP and to+ic

    f!ids

    ,hreaded @oints size i%ited '- te%perat!re and

    press!re e+a%pe %a+i%!% press!re for

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    14/30

    More oint F!id Ser"ice #e$!ire%ents

    OD t!'ing co%pression and fared t!'ingi%ited to 5 in. / %%0

    Brazed @oint %a- not 'e !sed for

    fa%%a'e or to+ic f!ids in fire hazardareas

    Sodered @oints %a- not 'e !sed for

    fa%%a'e or to+ic f!idsSodered @oints %a- not 'e !sed in piping

    s!'@ect to "i'ration

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    15/30

    Fanged oint #e$!ire%ents

    7 B31.1 has detaied re$!ire%ents for

    fanged @oints. #e$!ire%ents inc!deH

    2 Cass 1/ stee fanges 'oted to Cass 15

    cast iron fanges are re$!ired to 'e fat

    facedgas8et re$!ired to 'e f! face

    2 Boting di%ensions for 'oth ;S c!sto%ar-

    and %etric 'oting2 Bot %ateria re$!ire%ents as a f!nction of

    fanges and gas8ets

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    16/30

    Bases for Design Stresses

    Most Materials2 %aterias other than gra-

    iron* %aea'e iron and 'oting0 'eo& the creep

    range* the o&est of

    2 the specified %ini%!% tensie strength di"ided '- 3.2 1I3 of tensie strength at te%perat!re

    2 5I3 of specified %ini%!% -ied strength

    2 5I3 of -ied strength at te%perat!re e+cept for

    a!stenitic stainess stees and nic8e ao-s &ithsi%iar 'eha"ior* J/K of -ied strength at te%perat!re

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    17/30

    Bases for Design Stresses

    AS,M A1/L rade B Car'on Stee ;S C!sto%ar- ;nits0

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    18/30

    B31.1 Materia #e$!ire%ents

    Materias for BEP %!st %eet ASME

    B9P( Code re$!ire%ents !nisted%aterias %a- not 'e !sed

    ;nisted %aterias %a- 'e !sed for ODt!'ing co%pression and fared t!'e fittings

    ;se at te%perat!res a'o"e %a+i%!% in

    stress ta'es genera- not per%itted

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    19/30

    Press!re Design

    ,he r!es for press!re design are

    essentia- the sa%e as for B31.3* '!t the-

    are not identica.

    ,he t&o Section Co%%ittees are &or8ing

    to %a8e the re$!ire%ents the sa%e.

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    20/30

    Design Press!re 9 ,e%perat!re

    allowance for pressure and

    temperature variation: ,he Code ao&s

    the design press!re to 'e set 'eo& the

    %ost se"ere coincident press!re andte%perat!re for the foo&ing "ariationsH

    2 Can e+ceed ao&a'e '- 5/K for no %ore

    than 1 hrIe"ent and no %ore than / hrI-ear2 Can e+ceed ao&a'e '- 1K for no %ore

    than hrIe"ent and nor %ore than // hrI-ear

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    21/30

    Design Press!re 9 ,e%perat!re

    allowance for pressure and temperature

    variation = conditionsH

    2 E+cept as i%ited '- co%ponent standards

    2 E+cept as i%ited '- %an!fact!rers2

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    22/30

    (a"e #e$!ire%ents

    Standard Valves Can 'e !sed &ithin their

    press!re=te%perat!re ratings and an-

    additiona i%itations descri'ed in the

    Code

    Nonstandard Valves Sha 'e of a

    design &hich the %an!fact!rer

    reco%%ends for the ser"ice

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    23/30

    (a"e #e$!ire%ents

    All Valves

    7 %!st ha"e 'o&=o!t proofN ste%s

    7 OS9 re$!ired for

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    24/30

    Fa'rication and )nstaation

    Weder 9 'razer $!aification and 'ending 9

    for%ing re$!ire%ents are "er- si%iar '!t not

    identica

    Preheating and heat treat%ent re$!ire%ents aredifferent

    2 B31.3 re$!ires neither preheating or heat treat%ent

    for car'on stee &ith thic8ness ess than or e$!a to

    3I in. 1J./ %%02 B31.1 re$!ires preheating to 5//GF JGC0 or

    2 heat treat%ent for the sa%e thic8ness range

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    25/30

    Fa'rication and )nstaation

    Mini%!% soc8et &ed size is 1./J ti%es

    no%ina &a thic8ness "ers!s B31.3

    re$!ire%ent for 1.5 ti%e press!re design

    thic8ness

    Fange faces are re$!ired to 'e fitted so

    that gas8et contact s!rfaces 'ear

    !nifor%- on the gas8et

    Bots %!st 'e threaded tro!gh the n!t

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    26/30

    )nspection* E+a%ination and ,esting

    Si%iar distinction 'et&een inspection ande+a%ination* '!t no specific o&nersinspectorN

    A!thorized inspector re$!ired for 'oiere+terna piping* ASME B9P( Code*Section )

    B31.1 does not inc!de the concept ofrando% &ith progressi"e e+a%inationeither 1//K or none

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    27/30

    )nspection* E+a%ination and

    ,esting

    7 E+a%ination is as re$!ired '- ,a'e 13L.H

    Over 750F

    (400C)

    Over 1025 psig(70 bar)

    and 350 to 750F(175 to 400C)

    All Others

    (is!a p!s

    For P

    For

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    28/30

    )nspection* E+a%ination and ,esting

    (is!a e+a%ination is re$!ired for a &eds

    &ith para. 13L..5 acceptance criteria

    2

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    29/30

    )nspection* E+a%ination and ,esting

    BEP re$!ires h-drotest in accordance &ithASME B9P( Code* Section )

    ines open to the at%osphere do not re$!iretesting

    oints %!st 'e e+posed for e+a%ination d!ringea8 testing* e+cept that ins!ated s-ste%s %a-'e tested '- f!id oss o"er ti%e %ethod

  • 7/23/2019 Whats Different in B31.1.pdf.ppt

    30/30

    )nspection* E+a%ination and ,esting

    Press!re %!st 'e hed a %ini%!% of 1/%in!tes* and then %a- 'e red!ced to designpress!re for ea8 e+a%ination period

    Stress d!ring h-drotest is i%ited to J/K S*rather than 1//K S

    ?-drotest press!re is 1. ti%es the designpress!reno te%perat!re correction

    Pne!%atic testing re$!ires o&ners appro"aPne!%atic test press!re is 1.5 to 1. ti%es the

    design press!re