JSC Yamal LNG
Job Specification for Supply - Welding & NDE of Piping Shop and Field
- /
Rev./.
02R
Document / 3300-E-000-MC-SPE-63002-00-D Page / 2Contractor document number / : 61402S-000-JSS-6300-00002
Table of Contents
1. GENERAL 5
1.1
INTRODUCTION 5
1.2
GENERALPROJECTDESCRIPTION 5
1.3
SCOPE 5
1.4
DEFINITIONS 6
1.5
ORDEROFPRECEDENCE 7
1.6
LANGUAGES 7
2.
CODES AND STANDARDS 8
2.1 APPLICABLESTANDARDS 82.2 PROJECTSPECIFICATIONS 10
3.
EXCEPTION AND DEVIATIONS 11
4. STORAGE AND HANDLING OF MATERIALS 11
4.1
GENERAL 11
4.2
AUSTENITIC STAINLESS STEEL MATERIALS - ADDITIONALREQUIREMENTS 12
5.
FABRICATION 13
5.1
BENDS 13
5.2
BRANCHCONNECTIONS 135.3 ORIFICERUNS 145.4 GALVANIZEDPIPING 145.5 FLANGEBOLTHOLES 145.6
SLIP-ONFLANGES 15
5.7 FABRICATIONTOLERANCES 155.8 ATTACHMENTS 18
6. WELD JOINT PREPARATION AND FIT-UP 18
6.1
CUTTING 18
6.2
LOCATIONOFWELDS 19
6.3 JOINTPREPARATION 20
1. 5
1.1 5
1.2
5
1.3
5
1.4
6
1.5
7
1.6
7
2.
8
2.1 82.2 10
3.
11
4. 11
4.1
11
4.2
12
5.
13
5.1
13
5.2 13
5.3 145.4 145.5 145.6
15
5.7 155.8 18
6. 18
6.1
18
6.2 19
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
3/90
JSC Yamal LNG
Job Specification for Supply - Welding & NDE of Piping Shop and Field
- /
Rev./.
02R
Document / 3300-E-000-MC-SPE-63002-00-D Page / 3Contractor document number / : 61402S-000-JSS-6300-00002
6.4 THREADEDCONNECTIONS 226.5 TACKWELDS 236.6
TEMPORARYWELDS 236.7
BRANCHCONNECTIONS 24
6.8 SOCKETWELDS 256.9 ATTACHMENTS 266.10
PIPESUPPORTS 26
7.
WELDING 27
7.1
GENERAL 27
7.2
WELDINGDATABOOK 287.3 WELDKEYFORM 287.4 WELDLOGBOOK 297.5 WELDINGPROCEDURESPECIFICATION(WPS) 297.6 WELDINGPROCEDUREQUALIFICATIONTESTS 317.6.1 General 317.6.2 Hardness tests 337.6.3
Ferrite 35
7.6.4
Impact Testing 367.7
WELDERSQUALIFICATIONS 37
7.8
WELDINGPROCESSES 39
7.8.1
General 39
7.8.2
Requirements for specific welding process: 40
7.9
WELDINGCONSUMABLES 44
7.9.1
General 44
7.9.2 Carbon / Low Alloy / Ferritic Steels 477.9.3 Austenitic Stainless Steel 477.9.4 Dissimilar Materials 48
7.9.5
Ferritic to Stainless Steel 507.9.6
Consumables Storage 51
8.
WELD REPAIRS 53
9. PREHEATING INTERPASS TEMPERATURE HEAT INPUT 55
9.1
PREHEATING 55
9.2 INTERPASSTEMPERATURE 569.3 HEATINPUT 57
6.3 206.4 226.5
236.6
23
6.7 246.8 256.9
26
6.10 26
7.
27
7.1 27
7.2 287.3 287.4 297.5 297.6 317.6.1 317.6.2
33
7.6.3
357.6.4
36
7.7
37
7.8
39
7.8.1
39
7.8.2
40
7.9 44
7.9.1 447.9.2 // 477.9.3 47
7.9.4
487.9.5
50
7.9.6
51
8.
53
9.
55
9.1 55
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
4/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
5/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
6/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
7/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
8/90
JSC Yamal LNG
Job Specification for Supply - Welding & NDE of Piping Shop and Field
- /
Rev./.
02R
Document / 3300-E-000-MC-SPE-63002-00-D Page / 8Contractor document number / : 61402S-000-JSS-6300-00002
Russian language/or in any other language, in the event of any discrepancybetween the English and Russian version or other version(s), the English versionshall always prevail.
2. CODES AND STANDARDS
2.1 APPLICABLE STANDARDS
The following Codes and Standards, to the extent specified herein, form a part ofthis Specification. Edition or revision of the regulations, codes, norms andstandards current on the 1st of April 2013 shall apply. In case of new edition orrevision of the above mentioned documents, VENDOR shall informCONTRACTOR immediately.
(ASME) AMERICAN SOCIETY OF MECHANICAL ENGINEERS
Section II, Part C Welding Rods, Electrodes, and Filler Metals
Section V Non-destructive Examination
Section IX Welding and Brazing Qualifications
B31.3 Process Piping
(ASNT) AMERICAN SOCIETY OF NONDESTRUCTIVE TESTING:
SNT-TC-1A Recommended Practice for Non-destructive Testing PersonnelQualification and Certification
- () ,.
2.
2.1 : , , 1 2013 . .
-(ASME)
II, C ,
V
IX
B31.3
(ASNT)
SNT-TC-1A
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
9/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
10/90
JSC Yamal LNG
Job Specification for Supply - Welding & NDE of Piping Shop and Field
- /
Rev./.
02R
Document / 3300-E-000-MC-SPE-63002-00-D Page / 10Contractor document number / : 61402S-000-JSS-6300-00002
EN ISO 11699-1 Classification of film for industrial radiography
EN ISO 9712
(former EN 473): Qualification and Certification of NDT personnel.
EN 719 Welding coordination -Tasks and responsibilities
EN ISO 11699-1 Classification of film for industrial radiography
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO 8249: Welding - Determination of Ferrite Number (FN) in austenitic andduplex ferritic-austenitic Cr-Ni stainless steel weld metals
PIPE FABRICATION INSTITUTE (PFI)
ES-3 Fabricating Tolerances
2.2 PROJECT SPECIFICATIONS
The following PROJECT Specifications shall be used with their amendments:
61402S-000-3300-E-000-MC-SPE-63003-00 / 61402S-000-JSS-6300-00003 Positive Material Identification
61402S-000-3300-E-000-MC-SPE-63004-00 / 61402S-000-JSS-6300-00004 Certification and markingof material
EN ISO 11699-1
EN ISO 9712
(EN 473): .
EN 719 .
EN ISO 11699-1
(ISO)
ISO 8249 . , -
(PFI)
ES-3
2.2
:
61402S-000-3300-E-000-MC-SPE-63003-00 / 61402S-000-JSS-6300-00003
61402S-000-3300-E-000-MC-SPE-63004-00 / 61402S-000-JSS-6300-00004
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
11/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
12/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
13/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
14/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
15/90
JSC Yamal LNG
Job Specification for Supply - Welding & NDE of Piping Shop and Field
- /
Rev./.
02R
Document / 3300-E-000-MC-SPE-63002-00-D Page / 15Contractor document number / : 61402S-000-JSS-6300-00002
5.6 SLIP-ON FLANGES
Slip-on flanges, when permitted, shall be double welded and vented though thehub with a 3mm diameter pre-drilled vent hole. The flanges shall be positioned sothat the distance from the face of the flange to the pipe shall be about equal to thenominal pipe wall thickness plus 3 mm. The welds shall be applied in a mannerthat will not require re-facing of the flange.
5.7 FABRICATION TOLERANCES
PIPING CONTRACTOR is responsible for fabricated dimensions that agree withpiping drawingsand applicable codes.
Where not otherwise specified, dimensional tolerances shall conform to thoseshown in table 1
All angular dimensions of bends and branches shall be maintained within + 1degree.
, .
5.6
, , 3 . , 3 . .
5.7
.
,
1. +1 .
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
16/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
17/90
J
SC Yamal LN
ocument / ontractor document
rotating th
3300-Enumber /
e pipe/fitting for
Job
-000-MC-SPE-6300
best fit whilst
Specification
-00-D: 61402S-000-JSS-
or Supply - W
-
300-00002
elding & NDE
/
(3)
of Piping Sho
,
and Field
/.
Page /
Rev./.
02R
17
,
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
18/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
19/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
20/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
21/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
22/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
23/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
24/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
25/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
26/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
27/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
28/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
29/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
30/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
31/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
32/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
33/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
34/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
35/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
36/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
37/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
38/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
39/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
40/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
41/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
42/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
43/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
44/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
45/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
46/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
47/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
48/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
49/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
50/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
51/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
52/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
53/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
54/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
55/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
56/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
57/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
58/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
59/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
60/90
JSC Yamal LNG
Job Specification for Supply - Welding & NDE of Piping Shop and Field
- / Rev./.
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
61/90
- /
02R
Document / 3300-E-000-MC-SPE-63002-00-D Page / 61Contractor document number / : 61402S-000-JSS-6300-00002
Subcontractor shall advise Contractor of the number of weldments that arecompleted and available for non-destructive inspection on a daily basis
12.2 EXTENT OF NON DESTRUCTIVE EXAMINATION (NDE)
The minimum extent of NDE shall be in accordance with table 6.
Table 6 EXTEND of NDT as per ASME B31.3EXTENT OF NDT (%)
Notes 1
MATERIAL SERVICE
ANS
I
Class
Butt and
mitter
groovewelds
Branch
welds
Seal /fillet
welds
Socket
weld
Carbon Steel(ASME IX P N1)
Austeniticstainless Steel(ASME IX P N8)
Category D 150 5 %RT NA NA NA
Duplex stainlesssteel
Category DSteam out slop
150 5 %RT NA NA NA
Carbon Steel(ASME IX P N1to 3)
All OtherServices
150 -600
5 %RT 5 %UT(3)5
%MT/DP(4,5)
NA 5%RT (7)
900 10%RT 10%UT(3)10%MT/DP(
5,6)
NA 5%RT (7)
.
.
, .
12.2 ()
6.
6. ASME B31.3(%)
1
ANSI
/
(P =1 ASME IX)
(P =
8 ASME IX)
D 150 5% / / /
D
150 5% / / /
(P =1-3 ASME IX)
150-600
5% 5% (3)
5% /(4, 5)
/ 5% (7)
JSC Yamal LNG
Job Specification for Supply - Welding & NDE of Piping Shop and Field
- / Rev./.
02R
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
62/90
/
02R
Document / 3300-E-000-MC-SPE-63002-00-D Page / 62Contractor document number / : 61402S-000-JSS-6300-00002
Category M Allrating
20%RT 20%UT(3)20%MT/DP(
4,5)
NA 5%RT (7)
All services >1500
100%RT 100%UT(3)100%MT/DP
(4,5)
NA 5%RT (7)100%MT/D
P
Austeniticstainless Steel(ASME IX P N
8)
All services(exceptcategory D)
150 -600
10%RT 10%UT(3)10%DP(4)
10%DP
5%RT (7)
10%
DP
>900
100%RT 100%UT(3)100%DP(4)
100%DP
5%RT (7)
100%DP
Austeniticstanless steelwith MDMT
< -104C
All Services Allratings
100%RT 100%UT(3)100%DP(4)
100%DP
5%RT (7)
100%DP
Ferritic Alloy
Steel (ASME IXP N 4,5,6)
All Services All
ratings
100%RT 100%UT(3)
100%MT/DP(4,5)
100%
MT/DP
5%
RT (7)100%MT/D
PAusteniticstainless Steel(grade H).
Nickel base alloy(ASME IX P N41 to 45)
All Services 150 -600
100%RT 100%UT(3)100%DP(4)
100%DP
5%RT (7)100%
DP
Dissimilarmaterials
Connectionbetween existinglines to new lines
All Services Allratin
gs
100%RT 100%UT(3)100%MT/DP
(4,5)
10%MT/DP
5%RT (7)
100%MT/D
P
All materials Severe cyclicService
Allratings
100%RT 100%UT(3)100%MT/DP
(4,5)
10%MT/DP
5%RT (7)100%MT/D
P
900 10% 10% (3)10% /
(5, 6)
/ 5% (7)
M
20% 20% (3)
20% /(4, 5)
/ 5% (7)
> 1500 100% 100% (3)
100% /(4, 5)
/ 5% (7)
100%/
(P =8 ASME IX)
(D)
150-600
10% 10% (3)
10% (4)
10% 5% (7)
10%
> 900 100% 100% (3)
100% (4)
100% 5% (7)
100%
< -104C
100% 100% (3)100%(4)
100% 5% (7)
100%
(P =4, 5, 6 ASMEIX)
100% 100% (3)
100% /(4, 5)
100%/
5% (7)
100%/
(H).
(P = 41-45ASME IX)
150-
600
100% 100% (3)
100% (4)
100% 5%
(7)100%
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
63/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
64/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
65/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
66/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
67/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
68/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
69/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
70/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
71/90
JSC Yamal LNG
Job Specification for Supply - Welding & NDE of Piping Shop and Field
- /
Rev./.
02R
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
72/90
Document / 3300-E-000-MC-SPE-63002-00-D Page / 72Contractor document number / : 61402S-000-JSS-6300-00002
calculating parameters For each film : density / film used / IQI seen versus IQI required
Names and qualification reference of radiographer and radiographicinterpreter.
For field activities, procedures shall be compliant with Russian ionisationregulations. Radiographic technique used shall be demonstrated to be effective.
; ; ;; ; ; ; ; ; ; (, . .); ; ;; /;
; ; ; ; ; .
, , ,:
/
, : /
: / /
. .
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
73/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
74/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
75/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
76/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
77/90
JSC Yamal LNG
Job Specification for Supply - Welding & NDE of Piping Shop and Field
- /
Rev./.
02R
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
78/90
Document / 3300-E-000-MC-SPE-63002-00-D Page / 78Contractor document number / : 61402S-000-JSS-6300-00002
actual load tension shall be brought to Contractor's attention for proper resolution.When bolting gasketed flanged connections, the gasket shall be uniformlycompressed to at least the minimum torques as per table below:
0,2 .
d. . . ().
e. .
.
f. . .
g. . .
.
, , .
JSC Yamal LNG
Job Specification for Supply - Welding & NDE of Piping Shop and Field
- /
Rev./.
02R
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
79/90
Document / 3300-E-000-MC-SPE-63002-00-D Page / 79Contractor document number / : 61402S-000-JSS-6300-00002
RECOMMENDED MINIMUM BOLTING TORQUES
BOLT DIA. FT-LBS N-M
1/2 40 55
5/8 80 109
3/4 140 190
7/8 220 300
1 330 450
1 1/8 470 640
1 1/4 670 910
1 3/8 870 1,180
1 1/2 1150 1,560
1 5/8 1400 1,900
1 3/4 1800 2,440
1 7/8 2100 2,850
2 2700 3,660
Flanged connections shall be bolted up by incrementally tightening diagonallyopposite bolts in a clock or anticlockwise order so that an even gasket seatingresults, on large piping it may be necessary to make up flanged connections withconstruction gaskets before welding or post weld heat treatment to ensure that nomisalignment occurs during these operations.
All flanged connections shall be made using fully threaded stud bolts and nuts. Aminimum of one and a maximum of three complete full form threads shall protrudefrom the nut after completion of tightening.
Threads on bolts and nuts shall be protected by a suitable nickel or copper base
, - -
1/2 40 55
5/8 80 109
3/4 140 190
7/8 220 300
1 330 450
1 1/8 470 640
1 1/4 670 910
1 3/8 870 1180
1 1/2 1150 1560
1 5/8 1400 1900 1 3/4 1800 2440
1 7/8 2100 2850
2 2700 3660
. , ,
, .
.
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
80/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
81/90
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
82/90
JSC Yamal LNG
Job Specification for Supply - Welding & NDE of Piping Shop and Field
- /
Rev./.
02R
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
83/90
Document / 3300-E-000-MC-SPE-63002-00-D Page / 83Contractor document number / : 61402S-000-JSS-6300-00002
Date of welding, Welder identification, WPS used, Type and date of each Non-Destructive Examination performed with
inspection results, Records of heat treatment date, parameters and heat treatment charts (if
applicable), Repairs and subsequent Non Destructive Examination performed, Welding inspection report, Hardness test measurements (if applicable), Positive Material Identification results (if applicable)
Radiograph locations shall be carefully indicated on all the isometric drawings.
CONTRACTOR shall be provided with these documents when the work iscompleted.
, , () () ().
.
.
JSC Yamal LNG
Job Specification for Supply - Welding & NDE of Piping Shop and Field
- /
Rev./.
02R
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
84/90
Document / 3300-E-000-MC-SPE-63002-00-D Page / 84Contractor document number / : 61402S-000-JSS-6300-00002
18. ATTACHMENT 1 : PIPING WELDING KEY FORM
PROJECT:
QUALITY CONTROL CLIENT :
PIPING WELDING KEY FORM PROJ. No.: REV. SH. ___OF ___
PIPING SUBCONTRACTOR :
PIPING
CLASS
(ES)
PQR
THK
range
(mm)
No .
Heat
Treatme
Ch.
Prehea
t C
PROCESS
ANDFILLER
SMAW
GTAW
Weld N
o.
WPS N
o.
Base
Mater
ial
INSPECTORS PIPING SUBCONTRACTOR PURCHASER CLIENT AUTHORITY
NAME
SIGNATURE
18. 1:
:
:
: . . ___ ___
:
()
C
C
JSC Yamal LNG
Job Specification for Supply - Welding & NDE of Piping Shop and Field
- /
Rev./.
02R
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
85/90
Document / 3300-E-000-MC-SPE-63002-00-D Page / 85Contractor document number / : 61402S-000-JSS-6300-00002
DATE
QUALITY CONTROL PROJECT: CLIENT :
PIPING WELDING KEY FORM PROJ. No.: REV. SH.__OF__
VENDOR :
: :
: . . ____
:
JSC Yamal LNG
Job Specification for Supply - Welding & NDE of Piping Shop and Field
- /
Rev./.
02R
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
86/90
Document / 3300-E-000-MC-SPE-63002-00-D Page / 86Contractor document number / : 61402S-000-JSS-6300-00002
.
J
SC Yamal LN
Job
Specification
or Supply - W
-
elding & NDE
/
of Piping Sho
and Field
Rev./.
02R
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
87/90
19. AP
A
B
C
Nt
ocument / ontractor document
TTACHMENT 2IPING WELDS
Two circumf
Branch connOlets) and ci
Two adjatent
ote 1: add centrget spool lengt
3300-Enumber /
: MINIMUM AN
Type of Weld
rential welds on
ections (with orcumferential wel
fillet weld
e line of weld to
-000-MC-SPE-6300
PREFERED DI
piping or tubing
without pads orld
edge of weld di
-00-D: 61402S-000-JSS-
ISTANCE BET
Minimudistanc(the larges
50 mm or 3
50 mm or 3
50 mm or 3
ensions to A,
300-00002
EEN
of)
T
T
T
or C
19.
A
B
C
1.
2:
(/
:
.
)
1
Page /
(
50
50
50
A, B
87
)
C
JSC Yamal LNG
Job Specification for Supply - Welding & NDE of Piping Shop and Field
- /
Rev./.
02R
20 ATTACHMENT 3: WELD LOG BOOK
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
88/90
Document / 3300-E-000-MC-SPE-63002-00-D Page / 88Contractor document number / : 61402S-000-JSS-6300-00002
20. ATTACHMENT 3: WELD LOG BOOK
A B A B A B A B C1 C2 C3 C4 VT PT MT RT UT TOFD R1 R2 CutOut VT PT MT RT UT TOFD
01 CA 0 B 01 01 Pipe Pipe
03 LE 1 D 30 30 Elbo lbow
06 SA 2 F 50 5 0 Tee Tee
09 SD 6 S 60 6 0 etc. etc.
15 SH 70 70
Pipingsystem
PIDNum
ber
ISONum
ber
WPSnum
ber
Componenttype
Componentheat
num
ber
Length
%ferritereport
Hardnessreport
Pressuretestreport
PWHTreport
Paintingreport
NDEa
fterPWHT
reports
ISOFo
lioNum
ber
Pipingclass
basicmateria
l
Corrosiona
llowance
Endconnection
/Joint
Type
PMIreport
Repair
We
ldingConsuma
ble
num
ber
Cumu
latelength
NDEbe
forePWHT
reports
We
lderidentification
Sequentia
lnum
bering
/Specia
lRequirement
We
ldNum
ber
Diameter
(mm
)
Wa
lltickness
'mm
)
PCM
DesignCodeand
pressureRating
JSC Yamal LNG
Job Specification for Supply - Welding & NDE of Piping Shop and Field
- /
Rev./.
02R
20 3:
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
89/90
Document / 3300-E-000-MC-SPE-63002-00-D Page / 89Contractor document number / : 61402S-000-JSS-6300-00002
20. 3:
PID
ISO
ISO
PCM
/
/
()
()
%
A B A B A B A B C1 C2 C3 C4 R1 R2
01 CA 0 B 01 01-
-
03 LE 1 D 30 30-
-
06 SA 2 F 50 50-
-
09 SD 6 S 60 60 . . . .
15 SH 70 70
JSC Yamal LNG
Job Specification for Supply - Welding & NDE of Piping Shop and Field
- /
Rev./.
02R
APPENDIX HISTORICAL REVISION CHANGE DETAILS
7/21/2019 (Welding) 3300-E-000-MC-SPE-63002-00-D_02R
90/90
Document / 3300-E-000-MC-SPE-63002-00-D Page / 90Contractor document number / : 61402S-000-JSS-6300-00002
APPENDIX HISTORICAL REVISION CHANGE DETAILS
Rev Location of Change Brief Description of Change
02R 2.1 Modification of applicable codes to alignwith PSTS
02R 2.2 Correction of specification numbers
02R 5.7 Modification of tolerances for assembly
02R 7.6.3.1 Modification of ferrite content andtemperatures
02R 7.6.4 Modification of impact test requirement02R 11 Modification of scope of test coupons
02R 12.2 Modification of extend of NDE
02R 19 Modification of minimum distances betweenwelds
.
02R 2.1
(PSTS)
02R 2.2
02R 5.7
02R 7.6.3.1
02R 7.6.4
02R 11
02R 12.2
02R 19