18
VODOVOD I KANALIZACIJA d.o.o. SPLIT

VODOVOD I KANALIZACIJA d.o.o. SPLIT · VODOVOD I KANALIZACIJA d.o.o. SPLIT CHALLENGES - WASTE WATER SEWERAGE IMPROVEMENT OF EXISTING SEWERAGE SYSTEMS WASTEWATER TREATMENT STATUS:

  • Upload
    others

  • View
    22

  • Download
    0

Embed Size (px)

Citation preview

Page 1: VODOVOD I KANALIZACIJA d.o.o. SPLIT · VODOVOD I KANALIZACIJA d.o.o. SPLIT CHALLENGES - WASTE WATER SEWERAGE IMPROVEMENT OF EXISTING SEWERAGE SYSTEMS WASTEWATER TREATMENT STATUS:

VODOVOD I KANALIZACIJA d.o.o. SPLIT

Page 2: VODOVOD I KANALIZACIJA d.o.o. SPLIT · VODOVOD I KANALIZACIJA d.o.o. SPLIT CHALLENGES - WASTE WATER SEWERAGE IMPROVEMENT OF EXISTING SEWERAGE SYSTEMS WASTEWATER TREATMENT STATUS:

VODOVOD I KANALIZACIJA d.o.o. SPLITFIGURES & FACTS

470 employees Second biggest water

utility in Croatia; Service area includes 4

cities and 9 municipalities; Main services: water

supply, collection andtreatment of wastewater;

Water is catched from riverJadro and Rimski bunar;

By the end of 2018., ViKadopted DevelopmentStrategy untilđ 2030.

Page 3: VODOVOD I KANALIZACIJA d.o.o. SPLIT · VODOVOD I KANALIZACIJA d.o.o. SPLIT CHALLENGES - WASTE WATER SEWERAGE IMPROVEMENT OF EXISTING SEWERAGE SYSTEMS WASTEWATER TREATMENT STATUS:

VODOVOD I KANALIZACIJA d.o.o. SPLITFIGURES & FACTS

PROJECT PORTFOLIO

under the Sector for Investment and Development, ViK prepares and implements many projects.

There are 3 main groups of them:

1. ViK’s investments (financed mostly from develoment fee)2. EU-financed smaller projects; financed out of: INTERREG (4 research projects); RURAL DEVELOMENT (2 smaller infrastructure

projects) and CEF (financed out of INEA)3. Projects of agglomerations KAŠTELA-TROGIR and SPLIT-SOLIN

(EC-Cohesion fund)4. Drinking water conditioning plant (in preparation).

Page 4: VODOVOD I KANALIZACIJA d.o.o. SPLIT · VODOVOD I KANALIZACIJA d.o.o. SPLIT CHALLENGES - WASTE WATER SEWERAGE IMPROVEMENT OF EXISTING SEWERAGE SYSTEMS WASTEWATER TREATMENT STATUS:

VODOVOD I KANALIZACIJA d.o.o. SPLITCHALLENGES - WATER SUPPLY

DRINKING WATER SOURCES TRANSMISSION EXISTING WASTER SUPPLY NETWORK

STATUS: Sensibility of Jadro and Žrnovnica; over-exploitation of water

source Jadro

STATUS: Losses in water delivery at Jadro, pollution risk, overflow at PS

Ravne Njive

STATUS: High apparent losses in distrubution system, high real losses

in system, low system autonomy

TARGET: Subterranean water protection, rationalisation of water

catchment at Jadro source.

TARGET: To improve water-body of Jadro, to minimize potential risk

pollution, to minimize the overflow losses.

TARGET: Reduction of apparent losses due to unappropriate

watermeters and unauthorised water consumption, progressive reduction

of real losses (short-term at app. 35% i long term at max. 25%.), leackage

reduction in network, improvement of operational stability, increase of

capacity of water tanks.

Page 5: VODOVOD I KANALIZACIJA d.o.o. SPLIT · VODOVOD I KANALIZACIJA d.o.o. SPLIT CHALLENGES - WASTE WATER SEWERAGE IMPROVEMENT OF EXISTING SEWERAGE SYSTEMS WASTEWATER TREATMENT STATUS:

VODOVOD I KANALIZACIJA d.o.o. SPLIT

CHALLENGES - WASTE WATER

SEWERAGE IMPROVEMENT OF EXISTING SEWERAGE SYSTEMS

WASTEWATER TREATMENT

STATUS: Connection at WW system not compliant with Council Directive

91/271/EEC.

STATUS: Bad condition of part of existing network (14 km),

improvement of existing wastewater system aiming to reduce the

infiltration of subterranean waters and sea and discharge of WW in

underground.

STATUS: Existing WWT not compliant with Council Directive

91/271/EEC

TARGET: To achieve the compliance with 91/271/EEC by increase of

connection to public sewerage at 97%.

TARGET: To improve the existing network in order to minimize the a.m.

pollution risks.

TARGET: To achieve compliance with 91/271/EEC by upgrade of WWTP at II

grade.

Page 6: VODOVOD I KANALIZACIJA d.o.o. SPLIT · VODOVOD I KANALIZACIJA d.o.o. SPLIT CHALLENGES - WASTE WATER SEWERAGE IMPROVEMENT OF EXISTING SEWERAGE SYSTEMS WASTEWATER TREATMENT STATUS:

Project implementation area:

Cities of KAŠTELA (59 %), TROGIR (13 %) and SPLIT(5 %)

and municipalities

OKRUG (12 %) and SEGET (11 %)

IMPROVEMENT of the WATER COMMUNAL INFRASTRUCTURE OF KAŠTELA-TROGIR AGGLOMERATION

Page 7: VODOVOD I KANALIZACIJA d.o.o. SPLIT · VODOVOD I KANALIZACIJA d.o.o. SPLIT CHALLENGES - WASTE WATER SEWERAGE IMPROVEMENT OF EXISTING SEWERAGE SYSTEMS WASTEWATER TREATMENT STATUS:

Investment value of Project (eligible costs):

1.151.030.595,12 HRK/ € 151,451,394.10

whereof

- 69,95% amounting to 803.222.768,51 HRKwill be financed from EC-CF,

equal amounts of

- 139.123.130,64 HRK shall be ensured by national budget and Hrvatske vode and

residual 69.561.565,33 HRK by ViK as beneficiary.

Based of IQR approval from 31 July, Financing decision has been brought up by Ministry for environment and energy on 19

August 2019., and Contract for award of grant funds was signed on 3 October 2019.

PROJECTS’ INDICATORS:

PUBLIC WATER SUPPLY

- 59,86 km new water supply pipelines,

- reconstruction of 65,40 km existing water supply network;

- construction of 4 PS, 2 water reservoirs (500m³) and 1.640 new connctions.

PUBLIC SEWERAGE ANDWASTWATER TREATMENT

- 215 km new constructed pipelines,

- reconstruction of 4,04 km sewerage pipelines;

- construction of 6,03 km pressurized pipelines, 640 incident overflows, 13 PSand 8.613 new connections;

- upgrade of existing WWTP Divulje from I. to II. grade (mechanical tobiologicat treatment), increasing capacity from 40.000 PE to 100.000 PE;

- new construction of WWTP Čiovo II. grade treatment capacity 25.000 PE.

IMPROVEMENT of the WATER COMMUNAL INFRASTRUCTURE OF KAŠTELA-TROGIR AGGLOMERATION

Page 8: VODOVOD I KANALIZACIJA d.o.o. SPLIT · VODOVOD I KANALIZACIJA d.o.o. SPLIT CHALLENGES - WASTE WATER SEWERAGE IMPROVEMENT OF EXISTING SEWERAGE SYSTEMS WASTEWATER TREATMENT STATUS:

IMPROVEMENT of the WATER COMMUNAL INFRASTRUCTURE OF KAŠTELA-TROGIR AGGLOMERATION

Page 9: VODOVOD I KANALIZACIJA d.o.o. SPLIT · VODOVOD I KANALIZACIJA d.o.o. SPLIT CHALLENGES - WASTE WATER SEWERAGE IMPROVEMENT OF EXISTING SEWERAGE SYSTEMS WASTEWATER TREATMENT STATUS:

LOOKUP CARD of PROJECT

Page 10: VODOVOD I KANALIZACIJA d.o.o. SPLIT · VODOVOD I KANALIZACIJA d.o.o. SPLIT CHALLENGES - WASTE WATER SEWERAGE IMPROVEMENT OF EXISTING SEWERAGE SYSTEMS WASTEWATER TREATMENT STATUS:

WWTP Divulje

CURRENT

CAPACITY: 40.000 PE

Currently are crude and fine impurities removed, aswell as percipitating and floating stuff. Extractedtechnological waste is haded over at sanitay landfillKarepovac.

AFTER PROJECT IMPLEMENTATION

CAPACITY: 100.000 PE and an upgrade from I. to II.grade treatment. After works within 2nd package ofworks has been completed, organic load expected is87.000 PE or 87% total capacity tending to raise at100.000 PE until 2030. and capacity for acceptancewastwater from Marina agglomeration.

Page 11: VODOVOD I KANALIZACIJA d.o.o. SPLIT · VODOVOD I KANALIZACIJA d.o.o. SPLIT CHALLENGES - WASTE WATER SEWERAGE IMPROVEMENT OF EXISTING SEWERAGE SYSTEMS WASTEWATER TREATMENT STATUS:

PROCUREMENT PLAN KAŠTELA - TROGIR AGGLOMERATION

Contract TD Type of contractEstimated procurement value

(HRK)Published at EOJN

End of evaluation

bidsSigning of contract

A0Izgradnja dijela vodoopskrbe i odvodnje Grada Kaštela

(K.Sućurac, K.Gomilica, K.Kambelovac) i Grada Trogira (Plano) WORKS 108.828.400 11/19 04/20 05/20

A1Izgradnja dijela sekundarne kanalizacijske i vodovodne mreže na

području Grada Kaštela (južno od državne ceste D8 do mora)WORKS 199.885.100 08/19 04/20 05/20

A2Izgradnja sekundarne i kanalizacijske mreže na području Grada

Trogira WORKS 94.161.100 12/19 05/20 06/20

A3 UPOV Divulje WORKS 116.108.000 02/20 07/20 08/20

A4 SDNU SERVICE 1.500.000 02/19 05/20 06/20

A5 Nadzor nad izgradnjom (paketa ugovora A) SERVICE 21.288.000 11/19 04/20 05/20

A6 Upravljanje projektom (vanjski stručnjaci) SERVICE 5.677.054 12/19 05/20 06/20

A7 Vidljivost i promidžba SERVICE 2.395.000 11/19 10/20 12/20

B1Izgradnja sustava odvodnje i vodoopskrbne mreže podsustavi

Kaštela, Trogir Seget, Okrug i Slatine (4 grupe)WORKS 346.550.400 06/20 05/20 06/20

B2 UPOV Čiovo WORKS 62.809.267 07/20 12/20 01/21

B3 Nabava opreme GOODS 15.925.000 07/19 12/20 01/20

B4 Usluga izrade i poboljšanja baze podataka SERVICE 800.000 08/20 10/20 11/20

B5 Nadzor nad izgradnjom (paketa ugovora B) SERVICE 15.688.000 06/20 11/20 12/20

Page 12: VODOVOD I KANALIZACIJA d.o.o. SPLIT · VODOVOD I KANALIZACIJA d.o.o. SPLIT CHALLENGES - WASTE WATER SEWERAGE IMPROVEMENT OF EXISTING SEWERAGE SYSTEMS WASTEWATER TREATMENT STATUS:

IMPROVEMENT of the WATER COMMUNAL INFRASTRUCTURE OF SPLIT-SOLIN AGGLOMERATION

Ugovor

A7

Investment value of Project (eligible costs):

1.419.408.482,10 HRK/ € 186,764,273.96

whereof

- 68,71% amounting to 975.315.032,88 HRKwill be financed from EC-CF,

equal amounts of

- 162.826.863,16 HRK shall be ensured by both national budget and Hrvatske vode and

residual 118.439.722,90 HRK by ViK as beneficiary.

Based of IQR approval from 30 September, Financing decision has been brought up by Ministry for environment and energy on 9 October 2019. Contracts for award of grant

funds shall be signed latest by 22 November.

PROJECTS’ INDICATORS:

PUBLIC WATER SUPPLY

- 60,65 km new water supply pipelines,

- reconstruction of 4,28 km existing water supply network;

- construction of 14 PS, 14 water reservoirs (20.350 m³) and 1.243 newconnections.

PUBLIC SEWERAGE ANDWASTWATER TREATMENT

- 93,55 km new constructed pipelines,

- reconstruction of 1,85 and rehabilitation of 13,61 km sewerage pipelines;

- construction of 14,76 km pressurized pipelines, construction of 26,69 km cabelsewerage (SDNU), construction of 4,28 km undersea discharge, 32 PS,reconstruction of 3 PS, 7 retention basins and 2.593 new connections;

- upgrade of existing WWTP Stupe from I. to II. grade (mechanical to biologicaltreatment), increasing capacity from to 275.000 PE.

Page 13: VODOVOD I KANALIZACIJA d.o.o. SPLIT · VODOVOD I KANALIZACIJA d.o.o. SPLIT CHALLENGES - WASTE WATER SEWERAGE IMPROVEMENT OF EXISTING SEWERAGE SYSTEMS WASTEWATER TREATMENT STATUS:

IMPROVEMENT of the WATER COMMUNAL INFRASTRUCTURE OF SPLIT-SOLIN AGGLOMERATION

Ugovor

A7

Project implementation area:

Cities of SPLIT (67%) and SOLIN (12%);

municipalities

KLIS (9%), DUGOPOLJE (6%) and PODSTRANA (6%).

Page 14: VODOVOD I KANALIZACIJA d.o.o. SPLIT · VODOVOD I KANALIZACIJA d.o.o. SPLIT CHALLENGES - WASTE WATER SEWERAGE IMPROVEMENT OF EXISTING SEWERAGE SYSTEMS WASTEWATER TREATMENT STATUS:

IMPROVEMENT of the WATER COMMUNAL INFRASTRUCTURE OF SPLIT-SOLIN AGGLOMERATION

Ugovor

A7

Systematic construction of sewerage system Split- Solin started

1997. with puting in function following facilities:

Part of plant Katalinića Brig with crude and fine grid and

undersea discharge (L= 1.300 m; DN 800 mm);

Part of WWTP Stupe with mechanical pre-treatment (crude

and fine grid, aerated sand- and grease catcher, and undersea

discharge (dužine L= 2.750m; DN 1000 mm);

Hydrotechnical tunnel Stupe, (L= 2.512 m , 2 pipes: DN 1200

mm).

Main PS wastewater systems within this agglomeration are:

o Dujmovača (kapaciteta Qmax= 595,0 l/s)

o Šine (kapaciteta Qmax= 240,0 l/s)

o Solin (Qmax= 280,0 l/s).

Entire wastewater system od Split-Solin agglomeration consists of

8 catchment areas.

Page 15: VODOVOD I KANALIZACIJA d.o.o. SPLIT · VODOVOD I KANALIZACIJA d.o.o. SPLIT CHALLENGES - WASTE WATER SEWERAGE IMPROVEMENT OF EXISTING SEWERAGE SYSTEMS WASTEWATER TREATMENT STATUS:

WWTP STUPE – now

Ugovor

A7

CAPACITY: 138.000 PE

DETAILS: Built and operatonal I st

stage; basic equipment for pre-

treatment mixed watewaters installed:

crude and fine grid, aerated sand-

catcher, building for accaptance of

septics discharge and bio-filter.

Page 16: VODOVOD I KANALIZACIJA d.o.o. SPLIT · VODOVOD I KANALIZACIJA d.o.o. SPLIT CHALLENGES - WASTE WATER SEWERAGE IMPROVEMENT OF EXISTING SEWERAGE SYSTEMS WASTEWATER TREATMENT STATUS:

WWTP STUPE

Ugovor

A7

After project implementation

275.000 PE

12. PS for primary percipitation pits

13. Primary percipitation pits

14. Aeration basins

15. Secundary percipitation pits

16. Exit control shaft

17. Equalizing basin of septics acceptancespot

17a. Building for compressor of egalizingbasins

18. Pump site of sludge surplus

19. Pump site of reversible sludge

20. Primary sludge adsorption with PS

20a. PS for acceptance of sludge fromDivulje and Čiovo

21. Machinery space of decomposition spotand CHP

22. Heated decomposition

23. Vertical Scrubber

24. Dehydration of condensated sludge

25. Sludge drying device

26. Biogass cleaning

27. Gass storage

28. Gass torch

29. Air-commpresoor building

30. Administrative building

31. Technological water

32. Entrance

Page 17: VODOVOD I KANALIZACIJA d.o.o. SPLIT · VODOVOD I KANALIZACIJA d.o.o. SPLIT CHALLENGES - WASTE WATER SEWERAGE IMPROVEMENT OF EXISTING SEWERAGE SYSTEMS WASTEWATER TREATMENT STATUS:

PROCUREMENT PLAN SPLIT - SOLIN AGGLOMERATION

Ugovor

A7

Contract TD Type of contract

Estimated

procurement value

(HRK)

Published at EOJN End of evaluation Signing of contract

0A Radovi na izgradnji sekundarne kanalizacijske mreže naselja Srinjine WORKS 13.310.000 11/19 01/20 02/20

0BStručni nadzor nad radovima izgradnje sekundarne kanalizacijske

mreže naselja SrinjineSERVICE 341.000 11/19 01/20 02/20

1Spoj sustava odvodnje južnog sliva na UPOV Stupe i dogradnja

podmorskog ispusta StobrečWORKS 222.654.842 05/20 10/20 11/20

2 Odvodnja i vodoopskrba dijela grada Splita (Žrnovnica, Korešnica) WORKS 113.205.669 04/20 09/20 10/20

3

Optimalizacija spoja sustava odvodnje sjevernog sliva sa

rekonstrukcijom i dogradnjom sustava vodoopskrbe i odvodnje Grada

Splita

WORKS 190.757.059 12/19 04/20 05/20

4Rekonstrukcija i dogradnja sustava odvodnje i vodoopskrbe Grada

Solina i općina Podstrana, Klis i DugopoljeWORKS 267.767.381 12/20 05/20 06/20

5 SDNU i regulacija dovoda vode izvorište Jadro – CS Ravne Njive SERVICE 22.242.000 09/20 03/21 04/21

6 Projektiranje i dogradnja UPOV-a Stupe 275.000 ES WORKS 445.500.000 12/19 06/20 08/20

7 Nabava opreme za održavanje mreže GOODS 25.723.500 12/19 05/20 06/20

8 Nadzor nad izgradnjom za Ugovore 1-6 SERVICE 47.635.500 11/19 03/20 04/20

9 Promidžba i vidljivosti SERVICE 2.702.700 11/19 02/20 02/20

10Tehnička pomoć za pripremu programa smanjenja gubitaka u

vodoopskrbnoj mrežiSERVICE 9.075.000 06/20 12/20 01/21

11 Upravljanje projektom (Vanjski stručnjaci) SERVICE 7.678.058 12/19 05/20 06/20