VDC – Virtual Design and Construction
BIM4PLACEMENT 23/2-2017
Gunnar Skeie,VDC Development Manager
www.Kruse-Smith.no
Buildings
Renovations
Infrastructure
Real Estate USD 520 mill. revenue (2016)900 employees (2016)
08
10
14
15
Commitment to BIMISO 9001
17 from Kruse Smith11 from partners
First 2 Certificates
VDC course Stavanger
.
First traces of BIMFirst LEAN Initiatives
4 from Kruse Smith VDC course Stanford
25 from Kruse Smith43 from partners
11+4 certified
VDC course Stavanger
16
17 19+ 23 certified
VDC - VIRTUAL DESIGN AND CONSTRCUTION
• CIFE - Center for Integrated Facility Engineering, Stanford University - California
VDC – Virtual Design & Construction
WHAT• What does the project team
need to achieve?
PROJECT PERFORMANCE• Buildable, Safe, On budget,
On schedule, Quality
WHY• What do the building users need to do?• How does the building support its users?
BUILDING PERFORMANCE• Usable• Sustainable• Operable
HOW• How is the project team
accomplishing the tasks?
PROCESS METRICS• Controllable factors• Production metrics
Client Objectives- Why is the client doing the
project?
- How will the building support it’s users?
- Common objectivescomunicated to all participantsin the project
- Agressive targets More focus More
Project Objectives- What does the project team
need to achieve to meet client objectives?
- Visualization to make sure everyone are updated on status
ICE – Integrated Concurent Engineering- Significant reduction of latency
- All stakeholders in the same room
- Clearly comunicated desiredoutcome and pre-assignmenttas
- Nøye planlagt og gjennomført
- Spesialtilpasset rom
- Utstrakt bruk av visuelle hjelpemidler
BIM – BuildingInformation Model- The first technology that
combines visualization and data
- A game changer for Design and Construction
Process- and Production Management- How do the project team
conduct their tasks?
- LEAN Methods / LEAN Construction
VDC – Virtual Design & Construction
ICE – Integrated Concurent Engineering- Significant reduction of latency
- All stakeholders in the same room
- Clearly comunicated desiredoutcome and pre-assignmenttas
- Nøye planlagt og gjennomført
- Spesialtilpasset rom
- Utstrakt bruk av visuelle hjelpemidler
BIM – BuildingInformation Model- The first technology that
combines visualization and data
- A game changer for Design and Construction
BIM for Visualization
BIM for Information Integration
BIM for Automation
4D - Visual planning
Process- and Production Management- How do the project team
conduct their tasks?
- LEAN Methods / LEAN Construction
LEAN - Last Planner System (LPS)
Phase plan
Lookahead plan
Weekly work plan
Learning
6-8 weeks
1-2 weeks
Daily
SHOULD
CAN
WILL DID
CO
ND
ITIO
NS
REP
OR
TS /
STA
TUS
VDC – Virtual Design & Construction
Digitizing
$++
BIMTIME COST
3D4D “5D”
4D + Last Planner System (LPS)
Phase plan
Lookahead plan
Weekly work plan
Learning
6-8 weeks
1-2 weeks
Daily
SHOULD
CAN
WILL DID
CO
ND
ITIO
NS
REP
OR
TS /
STA
TUS
Look-Ahead
Zone Activity Trade Start Finish SJA
Inform
ation
Material
Crew
Equipm
ent
Space
Outher con
ditio
ns
Previou tasks
Soun
d Ac
tivity
Sone 01 Sør Sprinkler RØR 16.09.2016 29.09.2016 1 1 1 1 1 1 1Sone 01 Sør Hovedføringer VENT. 23.09.2016 06.10.2016 1 1 1 1 1 1 1Sone 01 Sør Føringsveier EL 26.09.2016 30.09.2016 1 1 1 1 1 1 1Sone 01 Sør Oppstart innredning (Tett bygg) 30.09.2016 30.09.2016 1 1 1 1 1 1 1Sone 01 Sør Sentralstøvsuger RØR 30.09.2016 06.10.2016 1 1 1 1 1 1 1Sone 01 Sør Fastvegger og skjørt Systeminnred 30.09.2016 13.10.2016 1 1 1 1 1 1 1Sone 01 Sør Ringledning varme legging + isolering RØR 03.10.2016 19.10.2016 1 1 0 1 1 1 0Sone 01 Sør Kursopplegg EL 03.10.2016 28.10.2016 1 1 1 1 1 1 1Sone 01 Sør Isolering VENT. 07.10.2016 20.10.2016 1 1 1 1 1 1 1Sone 01 Tekn Gjennomføringer gjennom dekke RØR 08.08.2016 12.08.2016 1 1 1 1 1 1 1Sone 01 Tekn Branntetting gjennomførigner Brann 15.08.2016 19.08.2016 1 1 1 1 1 1 1Sone 01 Tekn Innvendige vegger Systeminnred 23.08.2016 29.08.2016 1 1 1 1 1 1 1Sone 01 Tekn Vinyl på gulv Gulv 26.08.2016 30.08.2016 1 1 1 1 1 1 1Sone 01 Tekn Maling av vegger og tak Maler 31.08.2016 06.09.2016 1 0 1 0 0 0 0Sone 01 Tekn Kundesentraler SMI 05.09.2016 09.09.2016 1 1 1 1 1 1 1Sone 01 Tekn Isolering og plating av yttervegg Tømmer 07.09.2016 08.09.2016 1 1 1 1 1 0 0Sone 01 Tekn Montasje/arbeid tekniksrom VENT. 12.09.2016 16.09.2016 1 1 1 1 1 1 1
PREREQ:
Distributes enrichment of plan:• Link to drawings• Work instructions• PO / submittals etc.
Weekly work plan
- We instead of sticky notes could commit to sound activities by selecting objects in the 4d model..
What if..
- using an interactive board..
- in a social collaborative process?
TRADE ConcreteACTIVITY Host V078 Formvork + rebar
ZONE B2‐02PLANNED 24.04.2017
CONSTR. DOCS. Formwork V078Bending Schedule V078Inbeds and voids V078
TRADE ConcreteACTIVITY Host V078 Formvork + rebar
ZONE B2‐02PLANNED 24.04.2017
CONSTR. DOCS. Formwork V078Bending Schedule V078Inbeds and voids V078
TRADE ConcreteACTIVITY Host V078 Formvork + rebar
ZONE B2‐02PLANNED 24.04.2017
CONSTR. DOCS. Formwork V078Bending Schedule V078Inbeds and voids V078
TRADE ConcreteACTIVITY Host V078 Formvork + rebar
ZONE B2‐02PLANNED 24.04.2017
CONSTR. DOCS. Formwork V078Bending Schedule V078Inbeds and voids V078
TRADE ConcreteACTIVITY Host V078 Formvork + rebar
ZONE B2‐02PLANNED 24.04.2017
CONSTR. DOCS. Formwork V078Bending Schedule V078Inbeds and voids V078
TRADE ConcreteACTIVITY Host V078 Formvork + rebar
ZONE B2‐02PLANNED 24.04.2017
CONSTR. DOCS. Formwork V078Bending Schedule V078Inbeds and voids V078
https://vimeo.com/219006060