DISTRIBUTION A. Approved for public release: distribution unlimited. 1 1
USMC Hybrid Power Efforts
Joint Service Power Expo
Virginia Beach, VA
May 3, 2017
Justin Govar
APdM-E Expeditionary Power Systems
Marine Corps Systems Command
“Our purpose is clear: equip and sustain our Marine forces with the most capable and cost-effective full-spectrum ground weapon and information technology systems for current and future expeditionary and crisis-response operations.”
-Brig. Gen. Joseph Shrader Commander, Marine Corps Systems Command
DISTRIBUTION A. Approved for public release: distribution unlimited. 2 2
Introduction
• Organizational Overview
• Background on hybrid systems
• Key development areas
• USMC requirements in hybrid systems
• Current hybrid efforts
• Future opportunities
• Conclusion
DISTRIBUTION A. Approved for public release: distribution unlimited. 3 3
Organization Chart
PM NI
Network & Infrastructure
PM CS3 Customer Support &
Strategic Sourcing
PM APPS
Applications
PM INTEL
Intelligence Systems
PM C2 SYSTEMS
Command & Control Systems
PM COMMS Communications
Systems
Sergeant Major
(4/10/2017) Will take effect June 2017
MARCORSYSCOM
Commander
Executive Director
CO MCTSSA Marine Corps
Tactical Systems Support Activity
DIRECTOR Contracts
DEPUTY TO THE COMMANDER Systems Engineering &
Acquisition Logistics
DEPUTY TO THE COMMANDER Resource
Management
DIRECTOR Financial
Management
DIRECTOR Human
Capital Management
DIRECTOR Acquisition Logistics &
Product Support
DIRECTOR Systems
Engineering
DIRECTOR Operations &
Programs
PM ICSSA&O
Ind. & Crew Served Small Arms & Optics
PM IC&CE Individual Clothing
& Combat Equipment
PM F&SAE Fires and Supporting
Arms Equipment
PfM GCES
Portfolio Manager Ground Combat Element Systems
PfM LCES Portfolio Manager Logistics Combat Element Systems
PfM CES
Portfolio Manager Command Element
Systems
PfM SES
Portfolio Manager Supporting
Establishment Systems
PM LAV Program Manager
Light Armored Vehicle
PM TRASYS Program Manager Training Systems
PM ENG SYS
Engineer Systems
PM SUP/MAINT SYS Supply & Maintenance
Systems
PM AMMO Ammunition
Staff Sec
A/CS G-1 Admin
A/CS G-2 Security
A/CS G-4 Facilities, Supply
& Services
A/CS G-6 OCIO
OPAC Office of Public Affairs & Comm
LA Legislative
Affairs
CoS
Chief of Staff
Counsel
Inspector General
International Programs
Small Business
AVTB Amphibious Vehicle
Test Branch
Command Safety
DISTRIBUTION A. Approved for public release: distribution unlimited. 4 4
Current EPS Program Office
Expeditionary Energy
Systems (E2S) Team Advanced Power Team
DISTRIBUTION A. Approved for public release: distribution unlimited. 5 5
Future Program Office
Fuel and Water
Team Power Team
DISTRIBUTION A. Approved for public release: distribution unlimited. 6 6
During Operation Enduring Freedom, fuel and
water accounted for seventy percent of the
logistics required to sustain Marine Corps
expeditionary forces ashore.
Solution
Hybridize existing generators to provide:
• Increased Energy Efficiency (33-60% fuel reduction over fielded generators)
• Extend time between required generator maintenance
Generator run time will be reduced approximately 40%
• Reduced fuel consumption, resupply and total
mission weight for the MAGTF, extending the
Commander’s reach by ~ 73%
Problem
DISTRIBUTION A. Approved for public release: distribution unlimited. 7 7
MEHPS AOA
800kW 60kW 5kW 300W
Small Medium Large Prime Man
Portable
10W MW
Observation
Point (OP)
Patrol Base
(PB)
Vehicle Based
Power
Range
Employment
Time
Hours-
Days Days-Weeks Weeks-Months Months- 1 Year Years
Employment
Vignettes
Patrol Base (PB) Combat Outpost (COP) Village Stability Platform (VSP) Forward Operating Base (FOB) Vehicle Based
Combat Outpost
(COP)
Forward Operating
Base (FOB)
Vehicle Based
CAMP
Dismounted
Observation
Point (OP)
Logistics
Support
Warfighter
carried/
delivered
Warfighter
carried/ delivered
Sling Loaded
HMMWV /
MATV Delivered
Sling Loaded
HMMWV / MATV
Delivered
MTVR Delivered
Forklift 4K and more
MTVR Delivered
LVSR Delivered
Air delivery C-130/
C-17
Air delivery
C-130/ C-17
Hybrid
System
Type
Small genset/
battery/solar
Wearable
distributed
power
Trailer mounted
Containerized
Vehicle Based
Containerized /
Microgrid
Vehicle Based
Containerized
Microgrid
Priority Moderate High Low N/A N/A
Unit Size Fireteam
- Squad
Squad-
Platoon
Company -
Regiment
Division and
Above
Division
and Above
DISTRIBUTION A. Approved for public release: distribution unlimited. 8 8
Silent Watch
Combat Outpost
Stability Operations
Combat Operations
Center
MEHPS-L
MEHPS-L
MEHPS-M MEHPS-M
MEHPS-L
Connect Solar to Grid
MEHPS-L
Disaster Relief
Applications
DISTRIBUTION A. Approved for public release: distribution unlimited. 9
USMC System to be used to augment
existing generators in order to reduce fuel
consumption in expeditionary environments
Technical Description
MEHPS is a hybrid power system that will
consist of:
• Controller/Power Inverter
• Generator
• Battery
• Solar Array
The program will produce Light systems operating
in the 5kw range and Medium systems operating in
the 10kw range
Current Status
• Currently in Engineering & Manufacturing Development
(E&MD) Phase, getting ready to start Developmental Testing
Key System Parameters
• 4 hour silent watch
• 4/6 man lift components
• Reduction of fuel between 30-66%
• High reliability
Program Timeline • Current Program Phase: E&MD
• Developmental Testing begins 3Q FY17
• Limited User Evaluation 1Q FY18
MEHPS
Notional
DISTRIBUTION A. Approved for public release: distribution unlimited. 10
Expeditionary Solar Array
• Lightweight, Compact Composite Panels
• Rugged and rapidly deployable Intelligent Controller
• Software Controls
• Human Interface
• Compact Electronics
Generator • Militarized generator
• Flexible Fuel
• Universal Generator Control
Technology (Remote start/stop)
Battery • High Energy Density
• Modular & Expandable
• Broad Operating Temperature
Range
System Component
Technology
Cables Trailer Power Inverter
• Power and Data Cables
• Environmentally Rugged
• Quick Connect Tech.
• High Efficiency Inverter
• Fully Ruggedized
• 3-Phase Power
• 2-Way DC/DC Converter
• Military HMMWV Trailer
• Trailer Mounting &
Integration Hardware
Development effort focuses on smaller, lighter, more efficient, easily
maintainable systems.
DISTRIBUTION A. Approved for public release: distribution unlimited. 11 11
MEHPS Requirement
Light Hybrid
• 2/4 man lift components
• Uses 5kW AMMPS (T); and
3kW TQG (O)
• Movable by multiple vehicles
• 3 Hours silent watch; 8 hours
(O)
• 3 (T); 2.1 (O) gal/day fuel
• Reliability of 500 hour EFF
Medium Hybrid
• 4/6 man lift components
• 10kW (T); 15kW (O)
• Uses 10kW AMMPS (T); 15kW
AMMPS (O)
• MCC-LTT Mountable
• 3 hours silent watch (T); 8
hours (O)
• 7.2 (T); 5.8 (O) gal/day fuel
• Reliability of 750 EFF (T);
1250 EFF (O)
DISTRIBUTION A. Approved for public release: distribution unlimited. 12 12
Program Schedule
• Received MS B – 2QFY16
• MS C/LRIP – 3QFY19
• Full Rate Production Decision – 2QFY20
• Fielding Decision – 3QFY20
• Initial Operational Capability – 4QFY21
DISTRIBUTION A. Approved for public release: distribution unlimited. 13 13
Current EMD Vendors
• Control
– Basic control logic used
• Energy Storage
– Looking at high voltage and low voltage systems
• Solar Size
– Both are utilizing USMC standard solar panels
• Inverters
– Internally developed (no commercial options)
• Packaging
– Mounting methods, ruggedization approach
DISTRIBUTION A. Approved for public release: distribution unlimited. 14 14
Program Testing Plan
• EMD
– Planned for 3Q FY17
– Electrical & Environmental Performance
• FUE
– Planned for 1Q FY18
– Human factors, operational sufficiency
• PVT
– Planned for 3Q FY19 – 2Q FY20
– Full Requirements Verification
DISTRIBUTION A. Approved for public release: distribution unlimited. 15 15
MEHPS-M (10-15kW System)
MEHPS-L (3-5kW System)
Technology Development
Production & Deployment
Engineering & Manufacturing Development
FY 14 15 16 17 18 19 20 21
FY14 RIF (ONR)
Modularity between 3kW
and 10kW System
Phase II SBIR
(ONR)
10kW Systems
MHEES (MCSC)
10 kW Systems
FY11 RIF (ONR)
3kW System
RSEP FNC (ONR)
3kW System
Fuel Cell Focus
Energy Storage FNC (ONR)
3kW and 10kW Systems
Battery Focus
HESM (ASD R&E)
3kW System
MEHPS S&T Roadmap
AMMPS &
TQG
Generators
Lab Development
NSWC Carderock
MIT Lincoln Labs
Common
Advanced Solar
Panel –
Ruggedized
(CASPR)
DISTRIBUTION A. Approved for public release: distribution unlimited. 16 16
Lessons Learned
• Efficiency
– Efficiency gains will only be found in certain parts of the power curve
– Solar has a bigger impact to this number than expected
• Weight and Volume
– These become huge limiters to your other requirements
• Reliability
– Intelligent control will be needed to increase reliability
– Component reliability does not equal system reliability
• Interoperability
– Failures often caused by interoperability issues.
• Technical Maturity
– Individual components are high (systems are low)
– Inverter systems are lower than other components
DISTRIBUTION A. Approved for public release: distribution unlimited. 17 17
International Cooperation
Program
• A Program Agreement is being completed with
India Ministry of Defense for MEHPS
• Phase I – Technology information exchange
program wraps up 4Q FY17
DISTRIBUTION A. Approved for public release: distribution unlimited. 18 18
Lithium Battery
Maintenance
• Recent Marine Corps study found that vessels caring Marine Corps assets
are inadequate to meet future large format lithium battery storage needs. In
addition garrison battery storage and maintenance capabilities are lacking.
• Problem
– Growth in lithium batteries
– Lack of proper ground and ship based storage
– Million in damaged batteries
– Lack of maintenance capabilities
• Critical Parameters
– Safety
– Electrical Interface (Interoperability)
– Mobility
– Modularity
– Autonomous maintenance
– Environmental Control
– User Feedback
• Planned RFI release in 3QFY17
DISTRIBUTION A. Approved for public release: distribution unlimited. 19 19
Business Opportunities
Title Funding RFP Release
Platoon Water Purification System PMC 4QFY17
Intelligent Power Management System RDT&E 1QFY18
Battery Storage and Maintenance Capability PMC 3-4QFY18
Common Advanced Solar Panel –
Ruggedized
PMC 4QFY18-1QFY19
MEHPS Production PMC 2-3QFY19
DISTRIBUTION A. Approved for public release: distribution unlimited. 20 20
Further Information
Email questions to:
Find more programmatic information:
http://www.marcorsyscom.marines.mil/ProgramOffices/EPSHome.aspx
www.onr.navy.mil
http://www.hqmc.marines.mil/e2o/E2OHome.aspx
Current / Future Solicitations:
www.fedbizopps.gov
Any questions about on-going solicitations:
Must contact the listed Contracting Officer in the solicitation
20
DISTRIBUTION A. Approved for public release: distribution unlimited. 21 21
21