USD 320 Wamego-Phase 2-Bid Package 2- Multipurpose Building Addendum 2 Issue Date: 9-22-17 Architect: BBN Architects Inc. MEP: Orazem & Scalora Engineering, P.A. Civil Engineer: SMH Consultants Construction Manager: Coonrod & Associates Construction Co., Inc. Owner: USD 320 Wamego The attached documents and / or items below shall hereby become part of the Construction Documents for the referenced project above. 2-1: In specification section 133419-Metal Building Systems, add Nucor Building Systems as an approved manufacturer. 2-2: REPLACE the following sheets with the attached updated sheets: A001-GENERAL INFORMATION A102-FLOOR PLAN A202-BUILDING SECTIONS ME101-MEP SITE PLAN 2-3: Please use the attached bid form. USD 320 WAMEGO- PHASE 2, BP 2 ADDENDUM 2 09/22/17 Page 1 of 7

USD 320 Wamego-Phase 2-Bid Package 2- Multipurpose …coonrod.com/wp-content/uploads/2018/04/PH2BP2-Addendum-2.pdfgypsum wall board, 8'-0" high of impact resistant gyp. bd., moisture

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: USD 320 Wamego-Phase 2-Bid Package 2- Multipurpose …coonrod.com/wp-content/uploads/2018/04/PH2BP2-Addendum-2.pdfgypsum wall board, 8'-0" high of impact resistant gyp. bd., moisture

USD 320 Wamego-Phase 2-Bid Package 2- Multipurpose

Building

Addendum 2

Issue Date: 9-22-17

Architect: BBN Architects Inc.

MEP: Orazem & Scalora Engineering, P.A.

Civil Engineer: SMH Consultants

Construction Manager: Coonrod & Associates Construction Co., Inc.

Owner: USD 320 Wamego

The attached documents and / or items below shall hereby become part of the

Construction Documents for the referenced project above.

2-1: In specification section 133419-Metal Building Systems, add Nucor Building

Systems as an approved manufacturer.

2-2: REPLACE the following sheets with the attached updated sheets:

• A001-GENERAL INFORMATION

• A102-FLOOR PLAN

• A202-BUILDING SECTIONS

• ME101-MEP SITE PLAN

2-3: Please use the attached bid form.

USD 320 WAMEGO- PHASE 2, BP 2 ADDENDUM 209/22/17

Page 1 of 7

Page 2: USD 320 Wamego-Phase 2-Bid Package 2- Multipurpose …coonrod.com/wp-content/uploads/2018/04/PH2BP2-Addendum-2.pdfgypsum wall board, 8'-0" high of impact resistant gyp. bd., moisture

USD 320 WAMEGO- PHASE 2, BP 2 ADDENDUM 209/22/17

Page 2 of 7

Page 3: USD 320 Wamego-Phase 2-Bid Package 2- Multipurpose …coonrod.com/wp-content/uploads/2018/04/PH2BP2-Addendum-2.pdfgypsum wall board, 8'-0" high of impact resistant gyp. bd., moisture

FINISHFLOOR

ROOFPURLIN

CEILING

U.N.O

.

8"

5/8" TYPE XGYPSUM WALLBOARD, 8'-0"HIGH OFIMPACTRESISTANTGYP. BD.,MOISTURERESISTANTGYP. BD. ONWET WALLCONDITIONS.

6" METALSTUDS AT16" O.C.

3-5/8"METALSTUD AT16" O.C.

8" METALSTUD AT16" O.C.

DEFLECTIONANGLES ATWALLSPERPENDICULARTO PURLINSL6X4X3/8CONTINUOUS

DEFLECTIONTRACK ATRIDGEATTACHED TOSTEEL STRAPSBETWEENPURLINS

5/8" TYPE XGYPSUM WALLBOARD, 8'-0"HIGH OFIMPACTRESISTANTGYP. BD.,MOISTURERESISTANTGYP. BD. ONWET WALLCONDITIONS.

5/8" TYPE XGYPSUMWALLBOARD,8'-0" HIGH OFIMPACTRESISTANTGYP. BD.,MOISTURERESISTANTGYP. BD. ONWET WALLCONDITIONS.

MIN

.2 1

/2"

MIN

.2 1

/2"

2"

MIN

.

6"

S1 S2 S3 S4

1

BBN ARCHITECTS INC228 POYNTZ AVENUE

MANHATTAN, KANSAS 66502PH: 785-776-4912 - FAX: 785-776-0944

WWW.BBNARCHITECTS.COM

Sheet:

Of:

Sheet Title:

Project Number:

Date:

Project Address:

Project Name:

Information provided on the drawings regarding existing conditions has beenobtained from the best sources available, but cannot be guaranteed in all

respects. Contractor shall verify all such information prior to proceeding with anynew work that may be affected. Include as part of the contract all work required

to produce the indicated result. All drawings and written material appearingherein constitute the original and unpublished work of the Architect, and same

may not be duplicated, used or disclosed without the written consent of theArchitect.

2

B

C

D

1345

A

GENERALINFORMATION

A001

17036

9/1/17

USD 320MULTIPURPOSE

BUILDING

WAMEGO HIGH SCHOOL801 LINCOLN

WAMEGO, KS 66547

NORTH

0

#o@

&

TITLE

0 2 84 16

3'-0"

VENDOR/DISPENSER DRYERTOWEL DISPENSER

2'-0

"

38"-

48"

A.F

.F. TO

OPER

AB

LE

PAR

T

SOAP

G

15"

WATERCLOSETSTANDARDD

HANDPAPER

H I J

STANDARDURINAL

E

24"

SANITARY NAPKINDISPOSAL @ WOMENS.

15" M

IN.

DISPOSAL @ WOMENS.SANITARY NAPKIN

(SEE 'K')

ACCESSIBLEWATERCLOSET

A

18"

12" MAX 3'-6" MIN

(SEE 'K')

BURINALACCESSIBLE

3'-0

"

3'-0"

16"-18"

17" M

AX

6"

STATIONCHANGING

25" -

30

" A.F

.F.

DISPOSAL

K L

34" M

AX.

TO

OPEN

HO

RIZ

. SUR

FACE

34" M

AX.

40"

TO

BO

TTO

M O

FR

EFLECTIV

ESUR

FACE

9" M

IN.

27"

MIN

.

6" MAX.TYPICALLAVATORY

C

8" MIN.

SOAP DISP.

(SEE 'G')

34" M

AX

15"

MIRROR

17" MIN.

SCALE

ELEVATION DESCRIPTION

SHEET REFERENCED

DETAIL REFERENCED

WINDOW TYPE (SEE WINDOW ELEVATIONS)

1. THE FIRST NUMERAL OF A ROOM NUMBER ACTS AS A FLOOR LEVELINDICATOR. STARTING WITH '0' AT THE BASEMENT LEVEL AND WORKINGNUMERICALLY UP.

SHEET REFERENCED

DETAIL REFERENCED

ACCESSORY REFERENCED (SEE 'ACCESSORY KEY')

SHEET REFERENCED

DETAIL REFERENCED

SPECIFICATION SECTION NUMBER

TELEVISIONTVHARDWAREHDW.

WINDOW MULLION

UNLESS NOTED OTHERWISE

HDWD.H.M.HORIZ.HT.

IN.I.D.

INFO.INSUL.INT.

L.W.C.LT. (LTG.)L

LIGHT/LIGHTING

LIGHTWEIGHT CONCRETE

LONG/LENGTH

HARDWOOD

HEIGHTHORIZONTALHOLLOW METAL

INSIDE DIAMETER/DIMENSION

INTERIORINSULATIONINFORMATIONINCH

WEIGHTWT.

TYPICAL

VERTICAL

WINDOW

WITHWITHINWITHOUTWOODWD.

W/IW/

WDW.

W/O

TYP.

U.N.O.

VERT.

4. WHEN ONE JAMB IS LOCATED BY A COLUMN, THEFOLLOWING DIAGRAM APPLIES:

4" TYPICAL FOR STUD PARTITIONS

G. STUD PARTITIONS ARE DIMENSIONED FROM THE FACE OF ONE UNIT TO THEFACE OF ANOTHER UNIT. AT EXTERIOR WALLS DIMENSIONS ARE FROM FACE OFSHEATHING TO FACE OF ANOTHER UNIT.

H. MASONRY PARTITIONS ARE DIMENSIONED FROM THE NOMINAL FACE OF C.M.U.,BRICK OR STONE TO THE FACE OF ANOTHER UNIT.

COL.

COL.

PARTITION

COLUMN

(U.N.O.)

DOOR AS SCHEDULED P. ACCESSORY REFERENCE SYMBOL:

Q. WALL PARTITION TYPE SYMBOL: (SEE WALL TYPES)

CONSTRUCTION/SIZE

WALLTYPE

E. PARTITIONS WITH FINISHED FACE ON THE COLUMN OR GRID LINES WILL NOT BEDIMENSIONED ON THE PLANS, BUT WILL BE DRAWN ACCORDINGLY:

1. WHEN ONE OCCURS AT A COLUMN OR GRID LINE, NO DIMENSIONS WILL BESHOWN ON THE PLANS, THE OPENING WIDTH WILL BE ESTABLISHED BY EITHERCRITERIA OR SCHEDULES.

2. WHEN NEITHER JAMB OCCURS AT A PARTITION INTERSECTION, AT ACOLUMN OR GRID LINE; ONE JAMB WILL BE LOCATED DIMENSIONALLY BYTHE DETAIL.

3. WHEN ONE JAMB IS LOCATED BY AN INTERSECTING PARTITION, THEFOLLOWING DIAGRAM APPLIES:

4" TYPICAL FOR STUD PARTITIONS(U.N.O.), 0" FOR C.M.U. PARTITIONS.

F. FOR OPENINGS IN PARTITIONS OR WALLS:

INTERSECTIONPARTITION

DOOR AS SCHEDULED

PARTITION

COLUMN CENTERLINE

COLUMN CENTERLINE

PARTITION

M. DETAIL REFERENCE SYMBOL:

SHEET REFERENCE

DETAIL REFERENCE

N. WINDOW REFERENCE SYMBOL:

O. ROOM NUMBER/NAME SYMBOL:

AREA TO BE DETAILED

J. INTERIOR ELEVATION REFERENCE SYMBOL:

K. BUILDING SECTION REFERENCE SYMBOL:

SHEET REFERENCED

DETAIL REFERENCED

L. DETAIL REFERENCE SYMBOL:

SOLID CORE OR SEALED CONCRETE

THE FOLLOWING LIST OF ABBREVIATIONS MAY BE USED INTHE CONTRACT DOCUMENT DRAWINGS.

OUTSIDE DIAMETER/DIMENSION

OPNG. OPENINGCENTERLINE

GL.GALV.GA.

FL.FIN.

E.W.

CH.

CONSTR.

DR.DN.DIM.DIA.DBL.

CONN.

CTR.CONTR.CONT.

C.M.U.

CONC.COL.

CLG.C.J.

EA.

DWG.

EQUIP.EQ.ELEV.ELEC.EL.

EXP.EXIST.EXT.

E.F.

E.S.

GYP. BD.G.S.

FURR.FT.FR.F.O.S.F.O.F. FACE OF FINISH

GALVANIZED

GYPSUM BOARDGROUT SOLID

FACE OF STUD

FOOT OR FEETFURRING

GAUGE

GLASS

FRAME

EACH WAY

EQUIPMENT

ELEVATOR

EXPANSION

EXTERIOREXISTING

EACH SIDE

FINISHFLOOR

EQUAL

STO. STORAGE

TEMPORARYTELEPHONE

SQUARE YARDSTRUCTURAL

TREAD

SYSTEM

TOP OF SLAB/STEELTOP OF WALL

TOP OFTOP OF DECK

TEL.TEMP.

T.O.D.

T.O.W.T.O.S.

T.O.

STRUCT.SQ. YD.SYS.

T

STEELSTANDARDSTAINLESS STEEL

SCHEDULE

SQUARE FOOT

SPECIFICATION(S)SPRINKLER HEAD

SIMILAR

SQUARE

SECTION

SHEET

STD.STL.

SP. HD.SQ.S.S.

SCHED.SECT.

SHT.

SPEC.SIM.

S.F.

DOUBLE

DIMENSIONDIAMETER

DRAWING

ELEVATIONELECTRICAL

EACH FACEEACH

DOWNDOOR

CHANNEL

CONCRETE MASONRY UNIT

CONTROL JOINT

CONSTRUCTIONCONNECTION

CONTINUOUSCONTRACTORCENTER

CEILING

COLUMNCONCRETE

RISER OR RADIUSREFLECTED CEILING PLANREFERENCECONNECTION

REVISION OR REVERSED

ROUGH OPENINGROOM

REQUIRED

QUANTITY

S.C.

REV.

R.O.

REQ'D.

RM.

R.C.P.

REINF.

QTY.

R

RE.

PLUMBING

OVERHEAD

PLYWOODPOLISHEDPAIR

PAINTEDPOINT

PLATE

OUNCE

PLYWD.POL.

PTD.

PR.PT.

PLBG.

OVHD.

PL.

OZ.

APPROX.

ACOUST.ADJ.

BD.

BLKG.BLDG.

ARCH.

ALUM.A.F.F.

B.S.BRG.B.O.

ABOVE FINISHED FLOOR

ARCHITECTURAL

BUILDINGBLOCKING

ALUMINUMAPPROXIMATE

BOTH SIDESBEARINGBOTTOM OF

BOARD

ADJUSTABLE

NUMBER OR POUNDDIAMETER

ACOUSTICAL

ATANGLEAND

MTL. METAL

OPPOSITE HAND

ON CENTER

NOT APPLICABLENOT IN CONTRACT

NOMINAL PIPE STANDARDNOT TO SCALE

NOMINALNUMBER

N.P.S.

O.H.

O.C.O.D.

N.T.S.

N/AN.I.C.

NOM.NO.

MOUNTED

MIRROR/MIRROREDMISCELLANEOUS

MANUFACTURINGMANUFACTURER

MECHANICAL

MINIMUM

MAXIMUM

MFG.

MISC.MTD.

MIR.

MFTR.MIN.

MAX.MECH.

C. PARTITIONS WITH THE FINISHED FACE FLUSH WITH THE COLUMN OR GRID LINE WILLNOT BE DIMENSIONED ON THE PLANS, BUT WILL BE DRAWN ACCORDINGLY:

D. PARTITIONS CENTERED ON WINDOW MULLIONS WILL NOT BE DIMENSIONED ONPLANS, BUT WILL BE DRAWN ACCORDINGLY:

COL.

COL.

COLUMN CENTERLINE

PARTITION

COLUMN

COL.

B. PARTITIONS CENTERED ON COLUMN OR GRID LINES WILL NOT BE DIMENSIONED ONTHE PLANS, BUT DRAWN ACCORDINGLY:

COL.

COLUMN

COLUMN CENTERLINE

PARTITION

G. SPOT ELEVATION SYMBOL:

H. ELEVATION REFERENCE SYMBOL:

I. DETAIL REFERENCE SYMBOL:

ELEVATION

NEW ELEVATIONEXISTING ELEVATION

C. CENTERLINE SYMBOL:

D. BAR GRAPH SYMBOL:

F. SPECIFICATION SECTION REFERENCE SYMBOL:

E. NORTH ARROW:

COL.

A. COLUMN GRIDS ARE DRAWN ACCORDINGLY:

COL.

COLUMN CENTERLINE

COLUMN

A. COLUMN AND/OR GRID LINES:

B. FLOOR PLAN MATCHLINE SYMBOL:

A

2

2 HOUR FIRE RATED

SEMI-RECESSED CABINET W/ FIRE EXTINGUISHER

SURFACE MOUNTED CABINET W/ FIRE EXTINGUISHER

SURFACE MOUNTED BRACKET W/ FIRE EXTINGUISHER

SUPPLY DIFFUSER

RETURN AIR GRILLE OR EXHAUST

LINEAR LIGHT FIXTURE

FIRE SPRINKLER HEAD

2 X 2 ACOUSTICAL CEILING TILE AND GRID

GYPSUM BOARD CEILNG OR SOFFIT

V. FIRE EXTINGUISHER IDENTIFICATION SYMBOLS:

RECESSED CABINET W/ FIRE EXTINGUISHER

W. CEILING IDENTIFICATION SYMBOLS:1. SEE M.E.P. DRAWINGS FOR FIXTURE SPECIFICATIONS.

CONSTRUCTION

CONSTRUCTION

4 HOUR FIRE RATED

3 HOUR FIRE RATED

CONSTRUCTION

REVISION NUMBER

DETAIL NOTE NUMBER

S. REVISIONS SYMBOLS:

REVISED AREA/ITEM

U. RATED WALL CONSTRUCTION SYMBOLS:

T. DETAIL NOTE SYMBOL:

1 HOUR FIRE RATED

CONSTRUCTION

1. NONE TO ALL OF THE LISTED CRITERIA, SYMBOLS, ETC. MAYOR MAY NOT BE USED IN THIS SET OF CONSTRUCTIONDOCUMENTS.

2. THE CONTRACTOR IS RESPONSIBLE FOR PRODUCINGWEATHER-TIGHT CONSTRUCTION, DETAILS AND OMISSIONS TOTHE DRAWINGS NOTWITHSTANDING.

3. ALL FINISH COLORS, TEXTURE, AND PATTERNS TO BESELECTED BY THE ARCHITECT AND APPROVED PRIOR TOINSTALLATION.4. ANY PIPE OR CONDUIT PENETRATION THRU EXTERIORCONSTRUCTION SHALL BE SEALED AT BOTH SIDES FOR AWATER-TIGHT CONDITION, OR FOR FIRE STOP ASSEMBLIESTHROUGH RATED WALLS.

5. ALL FLOORS WITH DRAINS SHALL HAVE A MINIMUM OF1/8" PER FOOT SLOPE TO DRAIN, U.N.O..

6. CONTRACTOR SHALL INVESTIGATE, VERIFY, AND BERESPONSIBLE FOR ALL EXISTING CONDITIONS AND NEWDIMENSIONS OF THE PROJECT AND CONFIRM SUCH TO BEAPPROPRIATE AND COMPATIBLE WITH NEW CONSTRUCTION. THECONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANYDISCREPANCY FOR CLARIFICATION OR ABOUT ANY CONDITIONREQUIRING MODIFICATION OR CHANGE BEFORE PROCEEDINGWITH THE WORK.

7. ALL EXPOSED C.M.U. CORNERS TO BE BULL NOSE.COORDINATE EXCEPTIONS WITH ARCHITECT.

X.X

000'-0"000'-0"

000'-0"TEXT

XAX.X

XAX.X

XAX.X

XAX.X

XAX.X

XAXXX

X

001ROOMNAME

X

0.0

DISCONTINUOUS LUMBER

BLANKET INSULATION

PLYWOOD

GYPSUM BOARD

RIGID INSULATION

CONTINUOUS LUMBER

STEEL

EARTH

CONCRETE

CONCRETE MASONRY UNITS

PRECAST CONCRETE

FINISHED WOOD

X. CEILING REFERENCE SYMBOLS:

CEILING HEIGHTXX'-XX"

GRAPHIC SYMBOLS/STANDARDS:

MATERIAL IDENTIFICATION KEY:

ABBREVIATIONS: DIMENSIONING CRITERIA:

TOILET ACCESSORIES KEY:

CL

GRANULAR FILL

METAL STUD FRAMING

WOOD STUD FRAMING

CL

CL

CL

CL

CL

CL

CL

CL

F.D. FLOOR DRAIN

7"-9"

48" M

AX

GENERAL NOTES:

11" MIN.

25" MAX.

X1

RECESSED LIGHT, SEEELECTRICAL DRAWINGS

SUSPENDED LIGHT FIXTURE, SEEELECTRICAL DRAWINGS

2 X 2 TROFFER

SUSPENDED DECORATIVE LIGHT ABOVE COUNTERS

R. EXISTING ASSEMBLY

ALL DRAWINGS ARE INTENDED TO BE COMPLIMENTARY. NOTIFY THE ARCHITECTOF ANY DIMENSIONING DISCREPANCY PRIOR TO PROCEEDING.

DIMENSIONS ARE AS IDENTIFIED ON THE DOCUMENTS AND AS ESTABLISHED BYCRITERIA. THIS INVOLVES ESTABLISHING TYPICAL RULES GOVERNING PARTITIONLOCATIONS AND THEN DIMENSIONING ONLY THE EXCEPTION TO THESE RULES.TYPICAL DIMENSIONING CRITERIA ARE OUTLINED BELOW.

COLUMN IDENTIFICATION DETAILS WILL GOVERN ALL DIMENSIONS AND FEWDIMENSIONS WILL BE SHOWN ON THE SMALL SCALE PLANS.

DISPENSER

Y. PLAN SYMBOLS:

MASONRY CONTROL JOINT

ALTERNATE DESIGNATIONS FOLLOWINGREPRESENT SPECIAL RATINGS OF WALLS

1" = 1'-0"A001B1 WALL TYPES

REV DESCRIPTION DATE1 Addendum 2 9/21/17

USD 320 WAMEGO- PHASE 2, BP 2 ADDENDUM 209/22/17

Page 3 of 7

Page 4: USD 320 Wamego-Phase 2-Bid Package 2- Multipurpose …coonrod.com/wp-content/uploads/2018/04/PH2BP2-Addendum-2.pdfgypsum wall board, 8'-0" high of impact resistant gyp. bd., moisture

A201

C5

A201 B5

A201

D5

A201A5

ENTRANCE101

JAN/MECH106OFFICE

107

STORAGE108

WRESTLING109

RESTROOM102

RESTROOM103 OFFICE

104

SYNTHETICTURF, SEE TURF

PLAN

POWER RACKSBY OWNER

POWER RACKSBY OWNER

19' - 3" 6' - 0" 11' - 0" 3' - 0" 8' - 8"2' - 4" 2' - 4"

11' - 8" 11' - 0" 25' - 3"

27' - 3" 8' - 4" 7' - 4" 7' - 4" 7' - 4"

1' - 7"

7' - 6" 8' - 4" 25' - 6"

5' -

0"

13' -

11"

118' -

6"

4' - 9" 30' - 3" 40' - 0" 30' - 3" 13' - 7"

100' - 6"

100' - 6"

118' -

3"

21' -

9"

6' -

3"

12' -

6"

6' -

3"

6' -

3"

12' -

6"

6' -

3"

6' -

3"

12' -

6"

6' -

3"

6' -

3"

15' -

3"

21' -

9"

6' -

3"

12' -

6"

6' -

3"

6' -

3"

12' -

6"

6' -

3"

6' -

3"

12' -

6"

6' -

3"

6' -

3"

15' -

3"

11' -

11"

A5

A202

D5

A202

F

E

D

C

B

1' -

9"

1' -

9"

A

21' -

6"

25' -

0"

25' -

0"

25' -

0"

21' -

6"

1 4 7

A101B5

A1022S1

S1

S1

S1

S2

S1

S2 S2

S2

104103102

C

109B

108 107

106

WEIGHTS105

105A

SEALEDCONCRETE

SPORTSFLOOR(SF1)

SPORTSFLOOR (SF1)

EXISTINGRETAINGING WALL

CONCRETE PAD

CONCRETESIDEWALK

GRAVELRUNNINGTRACK CONCRETE

SIDEWALKCONCRETESIDEWALK

STAIR

A203A5 D5

B5

B3A204 A5

C3

D5

C5

2 3

19' - 0" 20' - 0" 11' - 0" 11' - 0" 20' - 0" 19' - 0"

5 6

B B

A

A

A

A

A

A

AA

A

A

A

A

A

A

A A

UP 8R AT6" = 4'-0"

109A

101

C

WALK-OFFCPT

109C 105B

S3 S3S3 S3

8'-4"

S3

8'-4"8'-4"8'-4"10'-0"

S4

SPORTS FLOOR-RED (SP2), TYP.

SPORTS FLOOR-RED (SP2), TYP.

SPORTS FLOOR-RED (SP2), TYP.

WALK-OFFCPT

SEALEDCONCRETE

SEALEDCONC.

WALL PAD WALL PAD

WALL PAD

WALL PAD

WALL PAD

WALL PAD

WALL PAD

WALL PAD

SEALED CONCRETE

A102C4

SEALEDCONCRETE

SEALEDCONCRETE

TRANSFORMERAND PAD

GASMETERMOW STRIP

LADDER

CORNER GUARD

S2

A102 3

A1024W.H.

SERV.SINK

ELE.

A102C4

Sim

A102C4

Sim

A102C4

Sim

MIRRORS MIRRORS

MIRRORSMIRRORS

INSULATED METAL PANEL

INSULATED METAL PANEL

KNOX BOX

1

1 1

1

1

1

1

1

1

A

4

3"2' - 4" 3' - 8" 1' - 4"

1' - 7"1' - 10" 3' - 2" 2' - 6" 2' - 2" 3' - 8" 2' - 6"

2' -

2"

10' -

0"

1' -

4"

6' -

4"

1' -

6"

2' -

2"

1' -

4"

3' -

0"

3' -

4"

1' -

6"

S1

C

S3

S3

S3S3

S2

S1S1

S2

S1102 103104

OFFICE104

RESTROOM103RESTROOM

102

6" 6"

6"6"

5

S3 S3

B

URINAL,SEEPLUMB

TLT.

G.B.

G.B.

LAVLAV

TLT. G.B.

MIRRORMIRROR

G.B.

4" X 4" X 1/4"POWDER COATEDCORNER GUARD(C.G.), 7'-8" TALL

4" X 4" X 1/4"POWDER COATEDCORNER GUARD(C.G.), 7'-8" TALL

CORNERGUARD (C.G.) CORNER GUARD (C.G.)

S1

DRINKINGFOUNTAINS, SEEPLUMB

INDICATES FULLCAVITY ACOUSTICBATT INSULATION

A102 3

A1024

1

11

1 1

1

3' -

0"

3' -

0"

3' -

0" TYP.

4"3' - 0"

8' - 4"

3' - 0"4"

15' - 0"

15' -

0" TYP.

4" TYP.

4" TYP.

96' -

0"

3' -

0"

3' -

0"

RED

RED

GREEN

GREEN

GREEN

GREEN

GREEN

GREEN

ALL 4" WIDELINES WHITE

INSULATED METAL PANELS

COLUMN

3-5/8" METALSTUDS

GYP. BD.

WALL PAD

GYP. BD,

5" X 5" DOWNSPOUT

METAL CORNERTRIM

7"

1" GIRTBELOW

GIRTBELOW

8"

FLOOR LEVEL0"

2' -

10

"

3' -

0"

1' -

7"

1' - 6"

3' - 0" 6"

MIRROR

SOAP DISPENSER,PAPER TOWELSDISPENSER, TOILETPAPER, SANITARYNAPKIN DISPOSALPROVIDED BYOWNER, INSTALLEDBY CONTRACTOR,FOLLOW ADAMOUNTINGREQUIREMENTS

1'-3"MIN.

3' -

0"

3' -

4"

SOAP PAPER TOWELS

2' - 0"

FLOOR LEVEL0"

SOAP DISPENSER,PAPER TOWELSDISPENSER, TOILETPAPER, PROVIDEDBY OWNER,INSTALLED BYCONTRACTOR,FOLLOW ADAMOUNTINGREQUIREMENTS

MIRRORSOAP PAPER TOWELS

3' -

0"

1' -

7"

3' - 0"6"

1'-3"MIN.

1' -

5"

2' -

10

"

3' -

4"

3' -

0"

1' - 6"

2' - 0"

BBN ARCHITECTS INC228 POYNTZ AVENUE

MANHATTAN, KANSAS 66502PH: 785-776-4912 - FAX: 785-776-0944

WWW.BBNARCHITECTS.COM

Sheet:

Of:

Sheet Title:

Project Number:

Date:

Project Address:

Project Name:

Information provided on the drawings regarding existing conditions has beenobtained from the best sources available, but cannot be guaranteed in all

respects. Contractor shall verify all such information prior to proceeding with anynew work that may be affected. Include as part of the contract all work required

to produce the indicated result. All drawings and written material appearingherein constitute the original and unpublished work of the Architect, and same

may not be duplicated, used or disclosed without the written consent of theArchitect.

2

B

C

D

1345

A

FLOOR PLAN

A102

17036

9/1/17

USD 320MULTIPURPOSE

BUILDING

WAMEGO HIGH SCHOOL801 LINCOLN

WAMEGO, KS 66547

NORTH

1/8" = 1'-0"

FLOOR PLAN

NORTH

1/4" = 1'-0"

RESTROOM ENLARGED PLAN

1/8" = 1'-0"A102D5 SYNTHETIC TURF PLAN

ROOM FINISH SCHEDULE

NUMBER NAME FLOOR BASENORTH EAST SOUTH WEST CEILING

MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL HEIGHT

101 ENTRANCE WOC R GYP EP GYP EP GYP/SF EP GYP EP APC-2 9' - 6"102 RESTROOM SC R GYP EP GYP EP GYP EP GYP EP APC-2 8' - 0"103 RESTROOM SC R GYP EP GYP EP GYP EP GYP EP APC-2 8' - 0"104 OFFICE SC R GYP P GYP P GYP P GYP P APC-2 8' - 0"105 WEIGHTS SC/SF1/SF2/ST R IMP --- GYP/IMP/MR P/MR GYP/IMP P GYP EP L106 JAN/MECH SC R GYP EP GYP EP GYP EP GYP EP L107 OFFICE SC R GYP P GYP P GYP P GYP P APC-2 8' - 0"108 STORAGE SC R GYP P GYP P GYP P GYP P L109 WRESTLING SC R GYP/IMP/WP EP GYP/WP EP GYP/WP EP GYP/IWP/WP EP L

FINISH SCHEDULE KEY:

FLOOR FINISH:SC - SEALED CONCRETEWOC - WALK OFF CARPETSF1 - SPORTS FLOOR- GRAYSF2 - SPORTS FLOOR- REDST - SYNTHETIC TURF

BASE FINISH:R - RUBBER BASE

WALL MATERIAL:GYP - GYPSUM WALL BOARDIMP - INSULATED METAL PANELWP - WALL PADMR - MIRRORSF - STOREFRONT

WALL FINISH:EP - EPOXY PAINTP - PAINT (LATEX)MR - MIRROR

CEILING FINISH:L - LINER (METAL BUILDING)APC-2 - ACOUSTIC PANEL CEILING- TYPE 2

1" = 1'-0"A102C4 METAL BUILDING CORNER TRIM

NOTES:

ALL GYP BELOW 8'-0" TO BE IMPACT RESISTANT TYPE X GYPSUM WALLBOARD. ALL GYP BOARD ON WET WALL CONDITIONS TO BE MOISTURERESISTANT.

1/4" = 1'-0"A1023 RESTROOM 102 ELEVATION

1/4" = 1'-0"A1024 RESTROOM 103 ELEVATION

REV DESCRIPTION DATE1 Addendum 2 9/21/17

USD 320 WAMEGO- PHASE 2, BP 2 ADDENDUM 209/22/17

Page 4 of 7

Page 5: USD 320 Wamego-Phase 2-Bid Package 2- Multipurpose …coonrod.com/wp-content/uploads/2018/04/PH2BP2-Addendum-2.pdfgypsum wall board, 8'-0" high of impact resistant gyp. bd., moisture

1 4 7

A202D3

A202D4

A202C2

2 3 5

1" / 12" 1" / 12"

DUCTWORK, SEEMECH. DWG.

WALL PADS

GYP. BD.

LIGHTS, SEE ELEC. DWG.

METALBUILDINGFRAME

PURLINMETAL ROOFINGINSULATION

GUTTER

DOWNSPOUTBEYOND DUCTWORK,

SEE MECH.DWG.

DUCTWORK,SEE MECH.DWG.

8" METAL STUDS AT16" O.C., GYP. BD.EACH SIDE

WALL PADMIRROR

5' -

0"

2' -

0"

4"

5' -

8"

LIGHTS, SEEELEC. DWG.

METALBUILDINGFRAME

METAL ROOFINGPURLIN INSULATION

MIRROR

A

INSULATEDMETALPANEL

GUTTER

DOWNSPOUTBEYOND

A

INSULATEDMETAL PANEL

CONCRETE SLABOVER VAPORBARRER, SEESTRUCTURAL DWG.

CONCRETE SLABOVER VAPORBARRER, SEESTRUCTURAL DWG.

COLUMNFOUNDATIONBEYOND

COLUMNFOUNDATIONBEYOND

COLUMNFOUNDATIONBEYOND

FLOOR LEVEL0"

EAVE HEIGHT15' - 0"

A

1" /

12"

A104A4

COLUMN BEYOND

'Z' GIRT

3" INSULATEDMETAL PANEL

MOW STRIPCONCRETE SLAB

CONCRETE FOUNDATION,SEE STRUCTURAL

METAL BUILDINGFRAME

RAKE TRIM

A202D2

FLOOR LEVEL0"

EAVE HEIGHT15' - 0"

7

1" / 12"

A104B4

A703A5

A703C5

GYPSUMWALL BOARD

WALL MIRROR

3 5/8"METALSTUDS

CONCRETE FOUNDATION,SEE STRUCTURAL

CONCRETE SLAB EXTERIORCONCRETESIDEWALK

3" INSULATEDMETAL PANEL

ALUMINUMSTOREFRONT

METAL BUILDINGFRAME BEYOND

FLOOR LEVEL0"

EAVE HEIGHT15' - 0"

1

A703A5

A703C5

1" / 12"

A104B4

PAINTED, FIREPROOFPLYWOOD CAP ATCOLUMNS

HIGH IMPACT GYPSUMWALL BOARD

3 5/8" METAL STUDS

3" INSULATEDMETAL WALL PANEL

4" DOWNSPOUT

EXTERIORCONCRETESIDEWALK

CONCRETE FOUNDATION,SEE STRUCTURAL

CONCRETE SLAB

WALL PADS

6" METALGUTTER

ALUMINUMSTOREFRONT

4

1" / 12" 1" / 12"

RIDGE VENT METAL ROOF PANEL

UPPER INSULATIONTHERMAL BLOCKS

THERMALBLOCKS

PURLIN

LINER

LOWERINSULATION

8" METAL STUDS AT16" O.C. WITH 5/8" GYP.BD. ON BOTH SIDES.,CUT IN AROUNDBUILDING FRAME

DEFLECTION TRACK,FINISH GYP. WITH J-MOLD AND SOUNDSEALANT AT TOP

LOWER INSULATION

14 GA. - 3" WIDEMETAL STRAP FROMPURLIN TO PURLIN AT48" O.C. FORATTACHMENT OFMETAL STUD TRACK.

1

3" TO

10

"

INSULATEDWALL PANEL

BUILDING ANGLE

METAL FLASHING

SIDEWALK/MOW STRIP

FOUNDATIONINSULATION2'-0" DOWN

INSULATED CONCRETEEDGE FORM

COLUMN BEYOND

EXPANSIONJOINT

8"

END WALLCOLUMN BEYOND

INSULATED METALPANEL

BUILDING ANGLE

METAL FLASHING

SIDEWALK

FOUNDATIONINSULATION2'-0" DOWN

EXPANSION JOINT

CONCRETEFOUNDATION, SEESTRUCTURAL

CONCRETE SLABWITH VAPORBARRIOR BELOW

BBN ARCHITECTS INC228 POYNTZ AVENUE

MANHATTAN, KANSAS 66502PH: 785-776-4912 - FAX: 785-776-0944

WWW.BBNARCHITECTS.COM

Sheet:

Of:

Sheet Title:

Project Number:

Date:

Project Address:

Project Name:

Information provided on the drawings regarding existing conditions has beenobtained from the best sources available, but cannot be guaranteed in all

respects. Contractor shall verify all such information prior to proceeding with anynew work that may be affected. Include as part of the contract all work required

to produce the indicated result. All drawings and written material appearingherein constitute the original and unpublished work of the Architect, and same

may not be duplicated, used or disclosed without the written consent of theArchitect.

2

B

C

D

1345

A

BUILDINGSECTIONS

A202

17036

9/1/17

USD 320MULTIPURPOSE

BUILDING

WAMEGO HIGH SCHOOL801 LINCOLN

WAMEGO, KS 66547

1/4" = 1'-0"A202A5 BUILDING SECTION

1/2" = 1'-0"A202D5 WALL SECTION

1/2" = 1'-0"A202D3 WALL SECTION

1/2" = 1'-0"A202D4 WALL SECTION

1" = 1'-0"A202C2 RIDGE DETAIL

1 1/2" = 1'-0"A202D2 DETAIL @ TYPICAL FOUNDATION

1 1/2" = 1'-0"A202D1 DETAIL @ NORTH FOUNDATION

CONCRETESLAB WITHVAPORBARRIERBELOW

CONCRETEFOUNDATION, SEESTRUCTURAL

REV DESCRIPTION DATE1 Addendum 2 9/21/17

USD 320 WAMEGO- PHASE 2, BP 2 ADDENDUM 209/22/17

Page 5 of 7

Page 6: USD 320 Wamego-Phase 2-Bid Package 2- Multipurpose …coonrod.com/wp-content/uploads/2018/04/PH2BP2-Addendum-2.pdfgypsum wall board, 8'-0" high of impact resistant gyp. bd., moisture

Sub-Contract / Material Supplier Bid Form

Project:

Architect: BBN Architects Inc.

MEP Engineer: Orazem & Scalora Engineering, P.A.

Civil Engineer: SMH Consultants

Owner: USD 320 Wamego

Construction Manager: Coonrod & Associates Construction Co., Inc.

Date:

Bidder Company Name:

Bidder Address:

Bidder Contact Name:

Bidder Contact Phone Number:

Bidder Contact Email:

Scope of Work / Bid Scope (Reference Bid Scopes issued by CM):

Scope clarifications may be attached to this bid form.

Base Bid:

Dollars

($ )

USD 320 Wamego- Phase 2-Bid Package 2-

Multipurpose BuildingWamego, KS

In compliance with the Instructions to Bidders, plans, specifications / project manual and any and all

addenda for this project, the undersigned agrees to fully furnish all material and equipment and perform all

labor for above scope of work and/or bid package designated, for the lump sum of

USD 320 Wamego- Phase 2, Bid Package 1

Page 1 of 2USD 320 WAMEGO- PHASE 2, BP 2 ADDENDUM 209/22/17

Page 6 of 7

Page 7: USD 320 Wamego-Phase 2-Bid Package 2- Multipurpose …coonrod.com/wp-content/uploads/2018/04/PH2BP2-Addendum-2.pdfgypsum wall board, 8'-0" high of impact resistant gyp. bd., moisture

Unit Prices:

$ $ /

$ $ /

$ $ /

Bid Alternates:

ADD DEDUCT

IF ADDED BY ADDENDUM

Alternate # $ $< >

Alternate # $ $< >

Alternate # $ $< >

Alternate # $ $< >

In compliance with the Instructions to Bidders, plans, specifications and any and all addenda for this project,

the undersigned agrees to fully furnish all material and equipment and perform all labor for above scope of

work and/or bid package designated as it pertains to the alternates, for the lump sum of