5/21/2018 UMTS Training Program v2
1/18
2006 Lucent Technologies. All Rights Reserved.
UMTS Training Program
Paul C. ChenRegional Readiness Team
11/30/06
V.2
5/21/2018 UMTS Training Program v2
2/18
2006 Lucent Technologies. All Rights Reserved.
Lucent TechnologiesProprietary
Use pursuant to company instruction 2
Issue Change Description Date Author
1 Sent out for comments 11/2/06 P. Chen
2 Updated and incoporated feedbacks 11/30/06 P. Chen
5/21/2018 UMTS Training Program v2
3/18 2006 Lucent Technologies. All Rights Reserved.
Lucent TechnologiesProprietary
Use pursuant to company instruction 3
Summary
Find your name for the potential assignments in Slides 4 - 6.
Identify the specific training roadmap for you in Slide 7 - 8.
Slide 9 contents the info for Columbus UTRAN training.
Slides 10 and 11 are about the UMTS bootcamp.
The rest of the slides are for your reference.
Please note that you must complete
at least one SMS certification program
by either Dec 06 or Mar 06.
(Refer to Slides 7 or 8 for details.)
5/21/2018 UMTS Training Program v2
4/18 2006 Lucent Technologies. All Rights Reserved.
Lucent TechnologiesProprietary
Use pursuant to company instruction 4
Resource PlanAMX Trial (with NPI)
Resource Plan
Assumption(s)
See Note 1 6 mo. 3 mo. 3 mo. 3 mo. 3 mo. See Note 2 See Notes 2 & 3 1 mo. 6 mo. 6 mo.
Resources
Required1 1 2 1 1 1 3 7 2 1 1
Resources
Identified
A.Junco R. Jaurez N. Kucinskas
M. Shim'ro
R. Mir
R. Jaurez J. DeLeon A.Benitez A.Jaurez
G.Gamino
H. Zepeda
M. Hernan'z
A. Ortiz
J.OrnelasA.Goulart
J.Covolan
A. Prado
S. Balla
H.Zepeda P. Chen /
S. Jerger
NPI Support M.Wabner J. Fenk L. Venario
R.Grbdf
C.Carb'er
J. Fenk
R.R'ners
J. Fenk -- -- J. Fenk R.Reiners
Y.Trang.
-- -- --
As of 11/20/2006
Note 2) Assume 14 NodeBs and one RNC for a trial. Additional NodeBs need more manpower or installation/integration can be done sequentially. The installation
assignment will be one month and the integration assignment will be two months for a trial.
Note 3) For UTRAN integration, additional support (one engineer in each of the following areas) is needed regardless using Lucent's core network or other core
network: LSS, LMRS, MGM, SGSN/GGSN/firewall, PSAX, HLR, etc.
Tech. Deputy
RRM/TPM
Note 1) Need a program manager, a project controls manager, a logistic manager, a quality manager, a implementation manager, and a technical director for 6
months. For trials, these positions could be part time jobs.
Network Integration,
Customer AcceptanceTesting,
& Tech Support
Tier1/2
Network
Optimization
Site Material
Engrg
Order Mgmt/
Logistics
Site Loc'n &
Const'n
Installation
American
Movil Trial
Program
Manager
engrg Network Plan
and Design
5/21/2018 UMTS Training Program v2
5/18 2006 Lucent Technologies. All Rights Reserved.
Lucent TechnologiesProprietary
Use pursuant to company instruction 5
Resource PlanAruba SETAR
Resource Plan
Assumption(s)8 mo. 6 mo. 3 mo. 3 mo. 3 mo. 3 mo. 5 mo. 6 mo. 6 mo. 1 mo. 6 mo. 8 mo.
Resources
Required1 2 2 1 1 1 3 7 7 1 1 2
Resources
Identified
A. Venegas
(Prog Mgr)
A. Garcia
(Proj Mgr)
V. Ferran
(CORE/
SDHLR)
R. Perry
(UTRAN)
J. Marelli
(CSS Lead)
N. Kucinskas
(CNDD)
V. Ferran
(CORE/
SDHLR)
R. Perry
(UTRAN)
V. Ferran
(CORE/
SDHLR)
R. Perry
(UTRAN)
A. Garcia
(Proj Mgr)
Omar Arias
(Installation Mgr)
Andy Ortiz
(Core + SDHLR +
RNC)
Jose Rivera
(Node B)
Raul Namur (Core -
LCP/MGM/eMRS/IWF)
Ramesh Babu
(SDHLR/Core)
Jose Zuple
(Packet Core)
Pablo Grassi (SDHLR)
Jose Zuple (UTRAN)
Jose Ayala (UTRAN)
Alberto Ortiz (UTRAN)
Manuel Torres (Overall)
(Notes 1 & 2)
Raul Namur (Core -
LCP/MGM/eMRS/IWF)
Jose Zuple
(Packet Core)
Pablo Grassi (SDHLR)
Jose Zuple (UTRAN)
Jose Ayala (UTRAN)
(Note 1)
Carlos
Moreta
Gustavo Otto P. Chen /
M. Roby
NPI Support TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD
As of 11/20/2006
Note 1) The engineers for CS core integration, CAT and Tech Support and GSM Migration are TBD.
Note 2) The Readiness Team also has the following engineers committed to this project. However, their supervisors indicated that their final commitment is contengent upon
the project schedule: Juliano Miyake and Marcio Matoso Marques (3GMSC, including LCP1800, uMGW, and p-aMGW), Alcedir Goulart and Paulo Martini (RNC), Douglas
Felipe (NodeB).
Order
Mgmt/
Logistics
Site Loc'n
& Const'n
Installation
SetarDeployment
Program
Manager
engrg Network Plan
and Design
Tech. Deputy
RRM/TPM
Network Integration &
Customer Acceptance
Testing
Network
Optimization
Site
Material
Engrg
Tech Support Tier1/2
5/21/2018 UMTS Training Program v2
6/18 2006 Lucent Technologies. All Rights Reserved.
Lucent TechnologiesProprietary
Use pursuant to company instruction 6
Resource PlanAMX Deployment (1/2)
Resource Resource
Rqmt TSS MX BZ VE SCCA Gap2 Luis Alvarez Alice Silva Venegas, Andres 0
2 Raul Jaurez Klaus Christiansen Roger Perry Rojas, Ernesto Luis
Hernandez, Irving
0
3 Nancy Kucinskas
Juan Marelli
Marcelo Shimabukuro 0
8 Raul Jaurez Paulo Marin Roger Perry Rojas, Ernesto Luis
Hernandez, Irving
3
1 Paola Blanco
Jorge De Leon
Ivonne Vigueras
Dora Cachin 0
4 German Leonhart Hugo Sancho Rojas, Ernesto Luis 1
UTRAN
Install'n *
6 Adrian Jaurez
Gustavo Gamino
Paulo Martini
Douglas Felipe
Oliver Sayago
Erick Mateo
Jose Sojo
Juan Francisco Lara
Elio Chourio
Edward Pico
Luimer Delgado
Rivera, Jose
Iraola, Cesar Arturo
Cordova, Rolando
0
CS Install'n 0 Mauro Frana 0
PS Install'n 0 Jose Lorenzo 0
Commitment for Potential Candidates
Program Manager
Engrg
Network Plan and Design
AMX Deployment
Site Material Engrg
Order Mgmt/
Logistics
Site Loca'n & Const'n
Install (infra &
equip)
5/21/2018 UMTS Training Program v2
7/18 2006 Lucent Technologies. All Rights Reserved.
Lucent TechnologiesProprietary
Use pursuant to company instruction 7
Resource PlanAMX Deployment (2/2)Resource Resource
Rqmt TSS MX BZ VE SCCA Gap
Commitment for Potential CandidatesAMX Deployment
RNC Integ'n 6 Juan Ornelas
Hector Zepeda
Benito Araujo
Milton Brito
Paulo Martini
A. Goulart
0
NodeB
Integ'n
12 Juan Ornelas
Felcris Cova
Jose Luis Zupel
Jose Ayala
Jorge Barriga
Luis Barrera
Felipe Ibarguen
Douglas Felipe
Marcio Marques
Juliano Miyaki
Sandro Maza
Alcedir Goulart
0
CS Integ'n 1 Marcos Hernandez
Raul NamurLuizGuilherme **
Antonio Braz **
0
PS Integ'n 1 Gustavo Hernandez
Javier Caparo
Nicolas Cosarinsky
Elmar Rodovalho **
0
Network Optim'n (RF Optim'n) 3 J.Covolan
A.Prado
S. Balla
0
8 Hector Zepeda
Juan Ornelas
Marcos HernandezGustavo Hernandez
Grettel Ojeda
Jose Serrano
Benito Araujo
0
5 Hector Zepeda
Marcos Hernandez
R. Namur
J. Zuple
J. Ayala
P. Grassi
0
** TSS BZ
Customer Accept.
Tech. Support
Tier 1 - 2
Network Integ'n
5/21/2018 UMTS Training Program v2
8/18 2006 Lucent Technologies. All Rights Reserved.
Lucent TechnologiesProprietary
Use pursuant to company instruction 8
Jun 07
Training Program Roadmap (1)
TookSomeWeb-BasedUM
TSClassesor
HaveSomeUMTSDeploym
entExperience
UTRAN
Hands-On
Training
In Columbus
CompleteAtLeast
OneFullUMTSDeploym
entCycle
UTRAN
Integration
Engineer
CS Core
Integn Engr
Network
Dsgn Engr
RF Design
Engineer
Skill Level
SMEReadyIn Pipeline
On The Job
Training (OJT)
RF Optimization
Engineer
CL8302C, LTW830Y,
LTW831Y, LTW833Y, LTW842Y
LTW893Y, LTW010Y
Time Line
Oct 06 Mar 07Dec 06
Alt.
(Integration engineers also conduct the customer
acceptance testing and tier1/tier2 technical support.)
OJT or
Shadow
Assignt
UMTS
Boot
Camp
LTW650Y, LTW841Y,
LTW584Y, LWT063Y,
LWT078Y, LWT097Y
R
espectiveSMSSkillsCertification
(If you are looking for OJT or
Shadow assignment opportunity,
Please contact the Regional Readiness Team.)
UMTS
Boot
CampPS Core
Integn Engr
LTW716Y, LTW764Y,
UM5550, UM5950
UM3520, UM3530,
UM3540, UM7541
V.2
TS100
1WO
ne-Lucent
AR
MProcedure
5/21/2018 UMTS Training Program v2
9/18 2006 Lucent Technologies. All Rights Reserved.
Lucent TechnologiesProprietary
Use pursuant to company instruction 9
Training Program Roadmap (2)
TookSom
eWeb-BasedUMTSClassesor
HaveSom
eUMTSDeploymentExperience
RespectiveSMSSkillsCe
rtification
CompleteAtLeas
t
OneFullUMTSDeploymentCycle
Engineering,
Site Matl
Engineering,Order Mgmt
& Logistics,
Install. Supv.
Skill Level
SMEReadyIn Pipeline
UM1001,
UM1911. LTW829Y
Site Survey,
Site Location
& Construction
Engineer
Time Line
Oct 06 Dec 06 Mar 07
UM1001, UM1911,UM3901, LTW829Y
Program (Project)
Manager
LBP620L,
LBP720WLBP726W,
LBP730WLBP738W
5/21/2018 UMTS Training Program v2
10/18 2006 Lucent Technologies. All Rights Reserved.
Lucent TechnologiesProprietary
Use pursuant to company instruction 10
AR BR CL DO GT MX PE VE Total
1/31/05 8 8 0 0 0 0 0 2 18
2/28/05 0 10 0 0 0 0 0 0 10
3/31/05 0 8 0 0 0 0 0 0 8
4/30/05 0 0 0 0 0 0 0 0 0
5/31/05 0 0 0 0 0 0 0 0 0
6/30/05 0 3 0 0 0 0 0 0 3
7/31/05 0 0 0 0 0 0 0 6 6
8/31/05 0 0 0 0 0 30 2 252 284
9/30/05 0 10 0 0 0 0 3 12 25
10/31/05 0 0 0 0 0 0 0 2 2
11/30/05 0 11 0 0 0 0 0 6 17
12/31/05 0 10 0 0 0 0 0 0 10
1/31/06 0 16 0 0 0 0 0 5 21
2/28/06 0 16 0 0 0 0 0 12 28
3/31/06 0 20 0 0 0 0 0 4 24
4/30/06 8 48 0 0 0 0 0 34 905/31/06 176 9 0 0 0 262 8 0 455
6/30/06 24 394 20 84 0 0 200 2 724
7/31/06 40 728 0 0 0 50 0 98 916
8/31/06 0 16 0 0 2 14 8 92 132
9/30/06 8 14 0 0 0 2 24 142 190
10/31/06 8 2 0 1 2 20 12 132 177
Monthly Training Hours by Countries
5/21/2018 UMTS Training Program v2
11/18 2006 Lucent Technologies. All Rights Reserved.
Lucent TechnologiesProprietary
Use pursuant to company instruction 11
Engineers Taken Most UMTS Trainings
Deployment
OJT
BootCamp
(LWT063)
CB202B
CB201C
CB201B
CB201A
IN0330
IN0333
IN0510
IN1920
IN2215
LTW190V
UM1001W
UM1911W
UM4305
UM4801
Balla
Barrera
Bosso
Carmo
Cheda
Chourio
Cordova
Couto
Covolan
Gamino
Gonzalez
Goulart
Jaurez
Kucinskas
Lara
Lasterra
Mangia
Marques
Mello
Moreira
Namur
Ornelas
Perry
Pico
Sayago
Sojo
Tolaba
Zepeda
Zupel
AR PE BR BR VE VE PE BR BR MX VE BR MX AR DO VE BR BR BR BR AR MX VE VE VE VE AR MX AR
Legend: PS TSS VE MX BR SCCA Source: IP&T Team 11/14/06
5/21/2018 UMTS Training Program v2
12/18 2006 Lucent Technologies. All Rights Reserved.
Lucent TechnologiesProprietary
Use pursuant to company instruction 12
UTRAN Hands-On Training
CB201A December 5-6, 2006CB201B December 7-8, 2006CB201C December 11-12, 2006CB202B December 13-15, 2006
CB201A - UMTS Node-B Configuration and Integration Testing 1.0CB201B - UMTS Node-B Deployment and Integration Testing 1.0CB201C - PSAX Provisioning for the UMTS UTRAN
CB202B - Overview of the UMTS Radio Network Controller and its integration with thenodeBs
Prerequisites for the course are:1.) Attendee must have a valid US B1/B2 visa2.) SABA courses UM1001 and UM1911 are recommended before attendance.3.) Priority will be given to those in roles of RNC integration, given current needs in
the region
Additional information concerning building access, lodging and travel can be found athttp://tssmobility-cb.web.lucent.com/Training/Training_Location/Training_location.htm
5/21/2018 UMTS Training Program v2
13/18 2006 Lucent Technologies. All Rights Reserved.
Lucent TechnologiesProprietary
Use pursuant to company instruction 13
The first Bootcamp was Feb 20-24: 2006 Network Design, Integration & Operations UMTS Bootcamp
for Cingular Deployment. The target audience is Network Design Engineers, Integration Engineers andOperations Engineers. To access the recorded course via https://training.lucent.com, search on LWT063Y. To
access the materials quickly to determine if applicable to your group:
http://garet.training.lucent.com/wu/LWT063Y.html
-----------------------------------------------------------------
The next Bootcamp was March 6-10: UMTS Circuit Core Training for Cingular Deployment. The target
Audience: Network Design Engineers, Integration Engineers and Operations Engineers. To access the recorded
courses via https://training.lucent.com, search on LWT065Y. To access the materials quickly to determine if
applicable to your group: http://garet.training.lucent.com/wu/LWT065Y.html
------------------------------------------------------------------
The third set of Bootcamps occurred May 8-12 and June 26-30 and July19-21: UMTS RF Design & Optimization
Readiness Training for Cingular Deployment. The target Audience: RF Design & Optimization Engineers
supporting UMTS RF Design and Optimization. To access the recorded courses via https://training.lucent.com,
search on LWT010Y. To access the materials quickly to determine if applicable to your group:
http://garet.training.lucent.com/wu/LWT010Y.html
You can also access these materials/recordings via:May 8-12:
http://quickplace.web.lucent.com/QuickPlace/wirelessu/Main.nsf/h_Toc/6EF1C1870CE37A46852571650064FE5
5/?OpenDocument
June 26-30,July19-21:
http://quickplace.web.lucent.com/QuickPlace/wirelessu/Main.nsf/h_Toc/C567EEF97A9CD384852571950061D88
B/?OpenDocument
Existing UMTS Bootcamp Recordings
5/21/2018 UMTS Training Program v2
14/18 2006 Lucent Technologies. All Rights Reserved.
Lucent TechnologiesProprietary
Use pursuant to company instruction 14
UMTS Boot Camp TrainingAt present, only web based training available.
1. Go to https://training.lucent.comand login
2. Type in LWT063 (e.g.) in the search box
3. Click on "Search Full Catalog
4. The results are shown below.
5. Select the Course No and click on Launch to register for bootcamp.
6. Just FYI, for other UMTS related courses, enter UMTS in the Course Title field for a Search Available Offers.
https://training.lucent.com/https://training.lucent.com/5/21/2018 UMTS Training Program v2
15/18 2006 Lucent Technologies. All Rights Reserved.
Lucent TechnologiesProprietary
Use pursuant to company instruction 15
UMTS Training Course Catalog (1)
V.2
ID Title HRS
TS1001W TS1001W One-Lucent Assistance Request Management ARM Procedure 2
-- CI Training from: http://cares.web.lucent.com/training/ci_tutorial.ppt 2
CB201A UMTS Node-B Configuration and Integration Testing 24
CB201B UMTS Node-B Deployment and Integration Testing 1.0 18
CB201C PSAX Provisioning for the UMTS UTRAN 12
CB202A UMTS Radio Network Controller Commissioning and Integration 30
CB202B Overview of the UMTS Radio Network Contro ller and its in tegration with the nodeBs 30
CL8302C CDMA IS-95 and 3G-1X RF Design & Growth Engineering for PCS (1900 MHz) Systems 24
IN0330 Enhanced Service Manager Introduction 4
IN0331 Enhanced Service Manager Provisioning Concepts 8
IN0332 Enhanced Service Manager for Application Service Administrators 4IN0333 Enhanced Service Manager for System Administrators 16
IN0510 MAS Operations, Administration and Maintenance (R26 SU2) 40
IN0511 MAS Advanced Features (R26 SU2) 24
IN1920 USDS (Unified Subscriber Data Server) Overview R6.0 SU1 8
IN1920-R SDHLR Overview 8
IN2215 Enhanced Media Resource Server Operations and Maintenance 32
LTW190V UMTS Overview (Includes Big Picture Overview) - TEF Video 2
LTW584Y UMTS PARCAT and NDP Project database 2.5
LTW650Y Network Data Provisioning Workshop 2.5
LTW829Y NodeB Overview 1.5
LTW830Y UMTS RF Design and Audit Processes for Cingular 1
LTW831Y RF Design and Performance Requirements 2
LTW833Y Antenna Selection for UMTS RF Design 1
LTW841Y UMTS Network Provisioning Boot Camp 40
LTW842Y UMTS RF Design Cingular Readiness Training for Cingular Deployment 15
LTW893Y UMTS RF Optimization Methods and Procedures 1
5/21/2018 UMTS Training Program v2
16/18 2006 Lucent Technologies. All Rights Reserved.
Lucent TechnologiesProprietary
Use pursuant to company instruction 16
UMTS Training Course Catalog (2)
V.2
ID Title HRS
LWT010Y UMTS RF Optimization Readiness Training for Cingular Deployment 1
LWT063Y LWT063Y 2006 Network Design, Integration & operation UMTS Bootcamp 40
LWT078Y NDP and ParCat Introduction 3
LW T097Y Managed UTRAN Objects and Attributes using ParCat, NDP and the OMP-UPS 1.75
UM1001 UM1001 UMTS System Introduction 24
UM1001C UM1001 UMTS System Introduction 6
UM1001W UM1001 UMTS System Introduction 8
UM1911 UM1911 UMTS Hardware Overview 24
UM1911C UM1911 UMTS Hardware Overview 1
UM1911R UM1911 UMTS Hardware Overview 24
UM1911W UM1911 UMTS Hardware Overview 12
UM3302 UMTS Packet Core Network Signaling and Parameters 24
UM3302W UMTS Packet Core Network Signaling and Parameters 4
UM3901 UM3901 UMTS Flexent Packet Core Network Overview 8
UM3901W UM3901 UMTS Flexent Packet Core Network Overview 3
UM4305 UTRAN Processes and Parameter Settings 24
UM4801 MTS UTRAN Opt imization 40
LTW716Y UMTS - CS Core Overview and UTRAN Call Processing 2
LTW764Y UMTS Release 99 3G MSC and Migration to R5 1.75
UM4304W UTRAN Signalling Fundamentals 8
UM4502 UTRAN Node B Network Element Fault Management 16UM4503 UTRAN RNC Network Element Fault Management 16
UM5050 3G-MSC Translations 24
UM5350 UMTS 3G-MSC and GMSC System Capacity Monitoring and Engineering 16
UM5550 3G-MSC Operation, Administration, Maintenance & Provisioning 32
UM5950 3G-MSC Overview 16UM3520 UMTS Flexent PCN SGSN Operations, Administration, Maintenance, and Provisioning 32
UM3530 GGSN OA&M 24
UM3540 UMTS Flexent PCN CGF OA&M: System Overview 8
UM7541 OMC-UPS Training for Network Operation Center (NOC) Personnel 40
5/21/2018 UMTS Training Program v2
17/18 2006 Lucent Technologies. All Rights Reserved.
Lucent TechnologiesProprietary
Use pursuant to company instruction 17
SMS Skill Programs Practice Mapping (1)
Program Manager
UMTS Customer Project AdvocateAdvanced UMTS Customer Project Advocate
EngineeringUMTS UTRAN Network Deployment Services (NDS) Site and Office Engineering (SOE) Skills ProgramUMTS PS & CS Network Deployment Services (NDS) Site and Office Engineering (SOE) Skills ProgramUMTS PS CORE Intermediate Skills for the Site and Office Engineering Job Function
Site Material EngineeringUMTS UTRAN Network Deployment Services (NDS) Site and Office Engineering (SOE) Skills Program
UMTS UTRAN Intermediate Skills for the Site & Office Engineering Job FunctionUMTS UTRAN Advanced Site & Office Engineering (Version 3)UMTS PS & CS Network Deployment Services (NDS) Site and Office Engineering (SOE) Skills ProgramUMTS PS CORE Intermediate Skills for the Site and Office Engineering Job Function
UMTS UTRAN Network Deployment Services (NDS) Site Survey (SS) Skills ProgramUMTS PS & CS Network Deployment Services (NDS) Site Survey (SS) Skills Program
Order Management & LogisticsUMTS UTRAN Network Deployment Services (NDS) Site and Office Engineering (SOE) Skills Program
UMTS PS & CS Network Deployment Services (NDS) Site and Office Engineering (SOE) Skills Program
Site Location & ConstructionUMTS UTRAN Network Deployment Services (NDS) Site and Office Engineering (SOE) Skills ProgramUMTS PS & CS Network Deployment Services (NDS) Site and Office Engineering (SOE) Skills Program
5/21/2018 UMTS Training Program v2
18/18 2006 Lucent Technologies All Rights Reserved
Lucent TechnologiesProprietary
Use pursuant to company instruction 18
SMS Skill Programs Practice Mapping (2)
Network Plan & Design
UMTS RF DesignAdvanced UMTS RF DesignMobility Solutions RF Engineering Center RF Design Engineering for UMTSUMTS Network Planning Engineering (Version 3)
Advanced UMTS Network Planning Engineering (Version 2)
InstallationUMTS PS & CS Network Deployment Services (NDS) Installation Supervision (InstallSupv) Skills ProgramUMTS UTRAN Network Deployment Services (NDS) Installation Supervision (InstallSupv) Skills Program
Network IntegrationUMTS UTRAN Integration Field Support V3 Skills ProgramUMTS UTRAN Integration Field Support V3 Advanced Skills ProgramUMTS UTRAN Node B Integration Field Support (IFS) Skills ProgramUMTS Circuit Switch Integration Field Support
Network OptimizationUMTS RF Optimization
Advanced UMTS RF OptimizationMobility Solutions RF Engineering Center UMTS RF Optimization Engineering
Technical SupportUMTS Remote Technical Support CORE Circuit Switched (CS) Skills Program - Customer OperationsUMTS Remote Technical Support CORE Packet Switched (PS) Skills Program - Customer OperationsUMTS Remote Technical Support Skills Program - Customer OperationsUMTS Remote Technical Support UTRAN