    UMTS Training Program

    Paul C. ChenRegional Readiness Team

    11/30/06

    V.2

  • 5/21/2018 UMTS Training Program v2

    2/18

    2006 Lucent Technologies. All Rights Reserved.

    Lucent TechnologiesProprietary

    Use pursuant to company instruction 2

    Issue Change Description Date Author

    1 Sent out for comments 11/2/06 P. Chen

    2 Updated and incoporated feedbacks 11/30/06 P. Chen

  • 5/21/2018 UMTS Training Program v2

    3/18 2006 Lucent Technologies. All Rights Reserved.

    Lucent TechnologiesProprietary

    Use pursuant to company instruction 3

    Summary

    Find your name for the potential assignments in Slides 4 - 6.

    Identify the specific training roadmap for you in Slide 7 - 8.

    Slide 9 contents the info for Columbus UTRAN training.

    Slides 10 and 11 are about the UMTS bootcamp.

    The rest of the slides are for your reference.

    Please note that you must complete

    at least one SMS certification program

    by either Dec 06 or Mar 06.

    (Refer to Slides 7 or 8 for details.)

  • 5/21/2018 UMTS Training Program v2

    4/18 2006 Lucent Technologies. All Rights Reserved.

    Lucent TechnologiesProprietary

    Use pursuant to company instruction 4

    Resource PlanAMX Trial (with NPI)

    Resource Plan

    Assumption(s)

    See Note 1 6 mo. 3 mo. 3 mo. 3 mo. 3 mo. See Note 2 See Notes 2 & 3 1 mo. 6 mo. 6 mo.

    Resources

    Required1 1 2 1 1 1 3 7 2 1 1

    Resources

    Identified

    A.Junco R. Jaurez N. Kucinskas

    M. Shim'ro

    R. Mir

    R. Jaurez J. DeLeon A.Benitez A.Jaurez

    G.Gamino

    H. Zepeda

    M. Hernan'z

    A. Ortiz

    J.OrnelasA.Goulart

    J.Covolan

    A. Prado

    S. Balla

    H.Zepeda P. Chen /

    S. Jerger

    NPI Support M.Wabner J. Fenk L. Venario

    R.Grbdf

    C.Carb'er

    J. Fenk

    R.R'ners

    J. Fenk -- -- J. Fenk R.Reiners

    Y.Trang.

    -- -- --

    As of 11/20/2006

    Note 2) Assume 14 NodeBs and one RNC for a trial. Additional NodeBs need more manpower or installation/integration can be done sequentially. The installation

    assignment will be one month and the integration assignment will be two months for a trial.

    Note 3) For UTRAN integration, additional support (one engineer in each of the following areas) is needed regardless using Lucent's core network or other core

    network: LSS, LMRS, MGM, SGSN/GGSN/firewall, PSAX, HLR, etc.

    Tech. Deputy

    RRM/TPM

    Note 1) Need a program manager, a project controls manager, a logistic manager, a quality manager, a implementation manager, and a technical director for 6

    months. For trials, these positions could be part time jobs.

    Network Integration,

    Customer AcceptanceTesting,

    & Tech Support

    Tier1/2

    Network

    Optimization

    Site Material

    Engrg

    Order Mgmt/

    Logistics

    Site Loc'n &

    Const'n

    Installation

    American

    Movil Trial

    Program

    Manager

    engrg Network Plan

    and Design

  • 5/21/2018 UMTS Training Program v2

    5/18 2006 Lucent Technologies. All Rights Reserved.

    Lucent TechnologiesProprietary

    Use pursuant to company instruction 5

    Resource PlanAruba SETAR

    Resource Plan

    Assumption(s)8 mo. 6 mo. 3 mo. 3 mo. 3 mo. 3 mo. 5 mo. 6 mo. 6 mo. 1 mo. 6 mo. 8 mo.

    Resources

    Required1 2 2 1 1 1 3 7 7 1 1 2

    Resources

    Identified

    A. Venegas

    (Prog Mgr)

    A. Garcia

    (Proj Mgr)

    V. Ferran

    (CORE/

    SDHLR)

    R. Perry

    (UTRAN)

    J. Marelli

    (CSS Lead)

    N. Kucinskas

    (CNDD)

    V. Ferran

    (CORE/

    SDHLR)

    R. Perry

    (UTRAN)

    V. Ferran

    (CORE/

    SDHLR)

    R. Perry

    (UTRAN)

    A. Garcia

    (Proj Mgr)

    Omar Arias

    (Installation Mgr)

    Andy Ortiz

    (Core + SDHLR +

    RNC)

    Jose Rivera

    (Node B)

    Raul Namur (Core -

    LCP/MGM/eMRS/IWF)

    Ramesh Babu

    (SDHLR/Core)

    Jose Zuple

    (Packet Core)

    Pablo Grassi (SDHLR)

    Jose Zuple (UTRAN)

    Jose Ayala (UTRAN)

    Alberto Ortiz (UTRAN)

    Manuel Torres (Overall)

    (Notes 1 & 2)

    Raul Namur (Core -

    LCP/MGM/eMRS/IWF)

    Jose Zuple

    (Packet Core)

    Pablo Grassi (SDHLR)

    Jose Zuple (UTRAN)

    Jose Ayala (UTRAN)

    (Note 1)

    Carlos

    Moreta

    Gustavo Otto P. Chen /

    M. Roby

    NPI Support TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD

    As of 11/20/2006

    Note 1) The engineers for CS core integration, CAT and Tech Support and GSM Migration are TBD.

    Note 2) The Readiness Team also has the following engineers committed to this project. However, their supervisors indicated that their final commitment is contengent upon

    the project schedule: Juliano Miyake and Marcio Matoso Marques (3GMSC, including LCP1800, uMGW, and p-aMGW), Alcedir Goulart and Paulo Martini (RNC), Douglas

    Felipe (NodeB).

    Order

    Mgmt/

    Logistics

    Site Loc'n

    & Const'n

    Installation

    SetarDeployment

    Program

    Manager

    engrg Network Plan

    and Design

    Tech. Deputy

    RRM/TPM

    Network Integration &

    Customer Acceptance

    Testing

    Network

    Optimization

    Site

    Material

    Engrg

    Tech Support Tier1/2

  • 5/21/2018 UMTS Training Program v2

    6/18 2006 Lucent Technologies. All Rights Reserved.

    Lucent TechnologiesProprietary

    Use pursuant to company instruction 6

    Resource PlanAMX Deployment (1/2)

    Resource Resource

    Rqmt TSS MX BZ VE SCCA Gap2 Luis Alvarez Alice Silva Venegas, Andres 0

    2 Raul Jaurez Klaus Christiansen Roger Perry Rojas, Ernesto Luis

    Hernandez, Irving

    0

    3 Nancy Kucinskas

    Juan Marelli

    Marcelo Shimabukuro 0

    8 Raul Jaurez Paulo Marin Roger Perry Rojas, Ernesto Luis

    Hernandez, Irving

    3

    1 Paola Blanco

    Jorge De Leon

    Ivonne Vigueras

    Dora Cachin 0

    4 German Leonhart Hugo Sancho Rojas, Ernesto Luis 1

    UTRAN

    Install'n *

    6 Adrian Jaurez

    Gustavo Gamino

    Paulo Martini

    Douglas Felipe

    Oliver Sayago

    Erick Mateo

    Jose Sojo

    Juan Francisco Lara

    Elio Chourio

    Edward Pico

    Luimer Delgado

    Rivera, Jose

    Iraola, Cesar Arturo

    Cordova, Rolando

    0

    CS Install'n 0 Mauro Frana 0

    PS Install'n 0 Jose Lorenzo 0

    Commitment for Potential Candidates

    Program Manager

    Engrg

    Network Plan and Design

    AMX Deployment

    Site Material Engrg

    Order Mgmt/

    Logistics

    Site Loca'n & Const'n

    Install (infra &

    equip)

  • 5/21/2018 UMTS Training Program v2

    7/18 2006 Lucent Technologies. All Rights Reserved.

    Lucent TechnologiesProprietary

    Use pursuant to company instruction 7

    Resource PlanAMX Deployment (2/2)Resource Resource

    Rqmt TSS MX BZ VE SCCA Gap

    Commitment for Potential CandidatesAMX Deployment

    RNC Integ'n 6 Juan Ornelas

    Hector Zepeda

    Benito Araujo

    Milton Brito

    Paulo Martini

    A. Goulart

    0

    NodeB

    Integ'n

    12 Juan Ornelas

    Felcris Cova

    Jose Luis Zupel

    Jose Ayala

    Jorge Barriga

    Luis Barrera

    Felipe Ibarguen

    Douglas Felipe

    Marcio Marques

    Juliano Miyaki

    Sandro Maza

    Alcedir Goulart

    0

    CS Integ'n 1 Marcos Hernandez

    Raul NamurLuizGuilherme **

    Antonio Braz **

    0

    PS Integ'n 1 Gustavo Hernandez

    Javier Caparo

    Nicolas Cosarinsky

    Elmar Rodovalho **

    0

    Network Optim'n (RF Optim'n) 3 J.Covolan

    A.Prado

    S. Balla

    0

    8 Hector Zepeda

    Juan Ornelas

    Marcos HernandezGustavo Hernandez

    Grettel Ojeda

    Jose Serrano

    Benito Araujo

    0

    5 Hector Zepeda

    Marcos Hernandez

    R. Namur

    J. Zuple

    J. Ayala

    P. Grassi

    0

    ** TSS BZ

    Customer Accept.

    Tech. Support

    Tier 1 - 2

    Network Integ'n

  • 5/21/2018 UMTS Training Program v2

    8/18 2006 Lucent Technologies. All Rights Reserved.

    Lucent TechnologiesProprietary

    Use pursuant to company instruction 8

    Jun 07

    Training Program Roadmap (1)

    TookSomeWeb-BasedUM

    TSClassesor

    HaveSomeUMTSDeploym

    entExperience

    UTRAN

    Hands-On

    Training

    In Columbus

    CompleteAtLeast

    OneFullUMTSDeploym

    entCycle

    UTRAN

    Integration

    Engineer

    CS Core

    Integn Engr

    Network

    Dsgn Engr

    RF Design

    Engineer

    Skill Level

    SMEReadyIn Pipeline

    On The Job

    Training (OJT)

    RF Optimization

    Engineer

    CL8302C, LTW830Y,

    LTW831Y, LTW833Y, LTW842Y

    LTW893Y, LTW010Y

    Time Line

    Oct 06 Mar 07Dec 06

    Alt.

    (Integration engineers also conduct the customer

    acceptance testing and tier1/tier2 technical support.)

    OJT or

    Shadow

    Assignt

    UMTS

    Boot

    Camp

    LTW650Y, LTW841Y,

    LTW584Y, LWT063Y,

    LWT078Y, LWT097Y

    R

    espectiveSMSSkillsCertification

    (If you are looking for OJT or

    Shadow assignment opportunity,

    Please contact the Regional Readiness Team.)

    UMTS

    Boot

    CampPS Core

    Integn Engr

    LTW716Y, LTW764Y,

    UM5550, UM5950

    UM3520, UM3530,

    UM3540, UM7541

    V.2

    TS100

    1WO

    ne-Lucent

    AR

    MProcedure

  • 5/21/2018 UMTS Training Program v2

    9/18 2006 Lucent Technologies. All Rights Reserved.

    Lucent TechnologiesProprietary

    Use pursuant to company instruction 9

    Training Program Roadmap (2)

    TookSom

    eWeb-BasedUMTSClassesor

    HaveSom

    eUMTSDeploymentExperience

    RespectiveSMSSkillsCe

    rtification

    CompleteAtLeas

    t

    OneFullUMTSDeploymentCycle

    Engineering,

    Site Matl

    Engineering,Order Mgmt

    & Logistics,

    Install. Supv.

    Skill Level

    SMEReadyIn Pipeline

    UM1001,

    UM1911. LTW829Y

    Site Survey,

    Site Location

    & Construction

    Engineer

    Time Line

    Oct 06 Dec 06 Mar 07

    UM1001, UM1911,UM3901, LTW829Y

    Program (Project)

    Manager

    LBP620L,

    LBP720WLBP726W,

    LBP730WLBP738W

  • 5/21/2018 UMTS Training Program v2

    10/18 2006 Lucent Technologies. All Rights Reserved.

    Lucent TechnologiesProprietary

    Use pursuant to company instruction 10

    AR BR CL DO GT MX PE VE Total

    1/31/05 8 8 0 0 0 0 0 2 18

    2/28/05 0 10 0 0 0 0 0 0 10

    3/31/05 0 8 0 0 0 0 0 0 8

    4/30/05 0 0 0 0 0 0 0 0 0

    5/31/05 0 0 0 0 0 0 0 0 0

    6/30/05 0 3 0 0 0 0 0 0 3

    7/31/05 0 0 0 0 0 0 0 6 6

    8/31/05 0 0 0 0 0 30 2 252 284

    9/30/05 0 10 0 0 0 0 3 12 25

    10/31/05 0 0 0 0 0 0 0 2 2

    11/30/05 0 11 0 0 0 0 0 6 17

    12/31/05 0 10 0 0 0 0 0 0 10

    1/31/06 0 16 0 0 0 0 0 5 21

    2/28/06 0 16 0 0 0 0 0 12 28

    3/31/06 0 20 0 0 0 0 0 4 24

    4/30/06 8 48 0 0 0 0 0 34 905/31/06 176 9 0 0 0 262 8 0 455

    6/30/06 24 394 20 84 0 0 200 2 724

    7/31/06 40 728 0 0 0 50 0 98 916

    8/31/06 0 16 0 0 2 14 8 92 132

    9/30/06 8 14 0 0 0 2 24 142 190

    10/31/06 8 2 0 1 2 20 12 132 177

    Monthly Training Hours by Countries

  • 5/21/2018 UMTS Training Program v2

    11/18 2006 Lucent Technologies. All Rights Reserved.

    Lucent TechnologiesProprietary

    Use pursuant to company instruction 11

    Engineers Taken Most UMTS Trainings

    Deployment

    OJT

    BootCamp

    (LWT063)

    CB202B

    CB201C

    CB201B

    CB201A

    IN0330

    IN0333

    IN0510

    IN1920

    IN2215

    LTW190V

    UM1001W

    UM1911W

    UM4305

    UM4801

    Balla

    Barrera

    Bosso

    Carmo

    Cheda

    Chourio

    Cordova

    Couto

    Covolan

    Gamino

    Gonzalez

    Goulart

    Jaurez

    Kucinskas

    Lara

    Lasterra

    Mangia

    Marques

    Mello

    Moreira

    Namur

    Ornelas

    Perry

    Pico

    Sayago

    Sojo

    Tolaba

    Zepeda

    Zupel

    AR PE BR BR VE VE PE BR BR MX VE BR MX AR DO VE BR BR BR BR AR MX VE VE VE VE AR MX AR

    Legend: PS TSS VE MX BR SCCA Source: IP&T Team 11/14/06

  • 5/21/2018 UMTS Training Program v2

    12/18 2006 Lucent Technologies. All Rights Reserved.

    Lucent TechnologiesProprietary

    Use pursuant to company instruction 12

    UTRAN Hands-On Training

    CB201A December 5-6, 2006CB201B December 7-8, 2006CB201C December 11-12, 2006CB202B December 13-15, 2006

    CB201A - UMTS Node-B Configuration and Integration Testing 1.0CB201B - UMTS Node-B Deployment and Integration Testing 1.0CB201C - PSAX Provisioning for the UMTS UTRAN

    CB202B - Overview of the UMTS Radio Network Controller and its integration with thenodeBs

    Prerequisites for the course are:1.) Attendee must have a valid US B1/B2 visa2.) SABA courses UM1001 and UM1911 are recommended before attendance.3.) Priority will be given to those in roles of RNC integration, given current needs in

    the region

    Additional information concerning building access, lodging and travel can be found athttp://tssmobility-cb.web.lucent.com/Training/Training_Location/Training_location.htm

  • 5/21/2018 UMTS Training Program v2

    13/18 2006 Lucent Technologies. All Rights Reserved.

    Lucent TechnologiesProprietary

    Use pursuant to company instruction 13

    The first Bootcamp was Feb 20-24: 2006 Network Design, Integration & Operations UMTS Bootcamp

    for Cingular Deployment. The target audience is Network Design Engineers, Integration Engineers andOperations Engineers. To access the recorded course via https://training.lucent.com, search on LWT063Y. To

    access the materials quickly to determine if applicable to your group:

    http://garet.training.lucent.com/wu/LWT063Y.html

    -----------------------------------------------------------------

    The next Bootcamp was March 6-10: UMTS Circuit Core Training for Cingular Deployment. The target

    Audience: Network Design Engineers, Integration Engineers and Operations Engineers. To access the recorded

    courses via https://training.lucent.com, search on LWT065Y. To access the materials quickly to determine if

    applicable to your group: http://garet.training.lucent.com/wu/LWT065Y.html

    ------------------------------------------------------------------

    The third set of Bootcamps occurred May 8-12 and June 26-30 and July19-21: UMTS RF Design & Optimization

    Readiness Training for Cingular Deployment. The target Audience: RF Design & Optimization Engineers

    supporting UMTS RF Design and Optimization. To access the recorded courses via https://training.lucent.com,

    search on LWT010Y. To access the materials quickly to determine if applicable to your group:

    http://garet.training.lucent.com/wu/LWT010Y.html

    You can also access these materials/recordings via:May 8-12:

    http://quickplace.web.lucent.com/QuickPlace/wirelessu/Main.nsf/h_Toc/6EF1C1870CE37A46852571650064FE5

    5/?OpenDocument

    June 26-30,July19-21:

    http://quickplace.web.lucent.com/QuickPlace/wirelessu/Main.nsf/h_Toc/C567EEF97A9CD384852571950061D88

    B/?OpenDocument

    Existing UMTS Bootcamp Recordings

  • 5/21/2018 UMTS Training Program v2

    14/18 2006 Lucent Technologies. All Rights Reserved.

    Lucent TechnologiesProprietary

    Use pursuant to company instruction 14

    UMTS Boot Camp TrainingAt present, only web based training available.

    1. Go to https://training.lucent.comand login

    2. Type in LWT063 (e.g.) in the search box

    3. Click on "Search Full Catalog

    4. The results are shown below.

    5. Select the Course No and click on Launch to register for bootcamp.

    6. Just FYI, for other UMTS related courses, enter UMTS in the Course Title field for a Search Available Offers.

    https://training.lucent.com/https://training.lucent.com/
  • 5/21/2018 UMTS Training Program v2

    15/18 2006 Lucent Technologies. All Rights Reserved.

    Lucent TechnologiesProprietary

    Use pursuant to company instruction 15

    UMTS Training Course Catalog (1)

    V.2

    ID Title HRS

    TS1001W TS1001W One-Lucent Assistance Request Management ARM Procedure 2

    -- CI Training from: http://cares.web.lucent.com/training/ci_tutorial.ppt 2

    CB201A UMTS Node-B Configuration and Integration Testing 24

    CB201B UMTS Node-B Deployment and Integration Testing 1.0 18

    CB201C PSAX Provisioning for the UMTS UTRAN 12

    CB202A UMTS Radio Network Controller Commissioning and Integration 30

    CB202B Overview of the UMTS Radio Network Contro ller and its in tegration with the nodeBs 30

    CL8302C CDMA IS-95 and 3G-1X RF Design & Growth Engineering for PCS (1900 MHz) Systems 24

    IN0330 Enhanced Service Manager Introduction 4

    IN0331 Enhanced Service Manager Provisioning Concepts 8

    IN0332 Enhanced Service Manager for Application Service Administrators 4IN0333 Enhanced Service Manager for System Administrators 16

    IN0510 MAS Operations, Administration and Maintenance (R26 SU2) 40

    IN0511 MAS Advanced Features (R26 SU2) 24

    IN1920 USDS (Unified Subscriber Data Server) Overview R6.0 SU1 8

    IN1920-R SDHLR Overview 8

    IN2215 Enhanced Media Resource Server Operations and Maintenance 32

    LTW190V UMTS Overview (Includes Big Picture Overview) - TEF Video 2

    LTW584Y UMTS PARCAT and NDP Project database 2.5

    LTW650Y Network Data Provisioning Workshop 2.5

    LTW829Y NodeB Overview 1.5

    LTW830Y UMTS RF Design and Audit Processes for Cingular 1

    LTW831Y RF Design and Performance Requirements 2

    LTW833Y Antenna Selection for UMTS RF Design 1

    LTW841Y UMTS Network Provisioning Boot Camp 40

    LTW842Y UMTS RF Design Cingular Readiness Training for Cingular Deployment 15

    LTW893Y UMTS RF Optimization Methods and Procedures 1

  • 5/21/2018 UMTS Training Program v2

    16/18 2006 Lucent Technologies. All Rights Reserved.

    Lucent TechnologiesProprietary

    Use pursuant to company instruction 16

    UMTS Training Course Catalog (2)

    V.2

    ID Title HRS

    LWT010Y UMTS RF Optimization Readiness Training for Cingular Deployment 1

    LWT063Y LWT063Y 2006 Network Design, Integration & operation UMTS Bootcamp 40

    LWT078Y NDP and ParCat Introduction 3

    LW T097Y Managed UTRAN Objects and Attributes using ParCat, NDP and the OMP-UPS 1.75

    UM1001 UM1001 UMTS System Introduction 24

    UM1001C UM1001 UMTS System Introduction 6

    UM1001W UM1001 UMTS System Introduction 8

    UM1911 UM1911 UMTS Hardware Overview 24

    UM1911C UM1911 UMTS Hardware Overview 1

    UM1911R UM1911 UMTS Hardware Overview 24

    UM1911W UM1911 UMTS Hardware Overview 12

    UM3302 UMTS Packet Core Network Signaling and Parameters 24

    UM3302W UMTS Packet Core Network Signaling and Parameters 4

    UM3901 UM3901 UMTS Flexent Packet Core Network Overview 8

    UM3901W UM3901 UMTS Flexent Packet Core Network Overview 3

    UM4305 UTRAN Processes and Parameter Settings 24

    UM4801 MTS UTRAN Opt imization 40

    LTW716Y UMTS - CS Core Overview and UTRAN Call Processing 2

    LTW764Y UMTS Release 99 3G MSC and Migration to R5 1.75

    UM4304W UTRAN Signalling Fundamentals 8

    UM4502 UTRAN Node B Network Element Fault Management 16UM4503 UTRAN RNC Network Element Fault Management 16

    UM5050 3G-MSC Translations 24

    UM5350 UMTS 3G-MSC and GMSC System Capacity Monitoring and Engineering 16

    UM5550 3G-MSC Operation, Administration, Maintenance & Provisioning 32

    UM5950 3G-MSC Overview 16UM3520 UMTS Flexent PCN SGSN Operations, Administration, Maintenance, and Provisioning 32

    UM3530 GGSN OA&M 24

    UM3540 UMTS Flexent PCN CGF OA&M: System Overview 8

    UM7541 OMC-UPS Training for Network Operation Center (NOC) Personnel 40

  • 5/21/2018 UMTS Training Program v2

    17/18 2006 Lucent Technologies. All Rights Reserved.

    Lucent TechnologiesProprietary

    Use pursuant to company instruction 17

    SMS Skill Programs Practice Mapping (1)

    Program Manager

    UMTS Customer Project AdvocateAdvanced UMTS Customer Project Advocate

    EngineeringUMTS UTRAN Network Deployment Services (NDS) Site and Office Engineering (SOE) Skills ProgramUMTS PS & CS Network Deployment Services (NDS) Site and Office Engineering (SOE) Skills ProgramUMTS PS CORE Intermediate Skills for the Site and Office Engineering Job Function

    Site Material EngineeringUMTS UTRAN Network Deployment Services (NDS) Site and Office Engineering (SOE) Skills Program

    UMTS UTRAN Intermediate Skills for the Site & Office Engineering Job FunctionUMTS UTRAN Advanced Site & Office Engineering (Version 3)UMTS PS & CS Network Deployment Services (NDS) Site and Office Engineering (SOE) Skills ProgramUMTS PS CORE Intermediate Skills for the Site and Office Engineering Job Function

    UMTS UTRAN Network Deployment Services (NDS) Site Survey (SS) Skills ProgramUMTS PS & CS Network Deployment Services (NDS) Site Survey (SS) Skills Program

    Order Management & LogisticsUMTS UTRAN Network Deployment Services (NDS) Site and Office Engineering (SOE) Skills Program

    UMTS PS & CS Network Deployment Services (NDS) Site and Office Engineering (SOE) Skills Program

    Site Location & ConstructionUMTS UTRAN Network Deployment Services (NDS) Site and Office Engineering (SOE) Skills ProgramUMTS PS & CS Network Deployment Services (NDS) Site and Office Engineering (SOE) Skills Program

  • 5/21/2018 UMTS Training Program v2

    18/18 2006 Lucent Technologies All Rights Reserved

    Lucent TechnologiesProprietary

    Use pursuant to company instruction 18

    SMS Skill Programs Practice Mapping (2)

    Network Plan & Design

    UMTS RF DesignAdvanced UMTS RF DesignMobility Solutions RF Engineering Center RF Design Engineering for UMTSUMTS Network Planning Engineering (Version 3)

    Advanced UMTS Network Planning Engineering (Version 2)

    InstallationUMTS PS & CS Network Deployment Services (NDS) Installation Supervision (InstallSupv) Skills ProgramUMTS UTRAN Network Deployment Services (NDS) Installation Supervision (InstallSupv) Skills Program

    Network IntegrationUMTS UTRAN Integration Field Support V3 Skills ProgramUMTS UTRAN Integration Field Support V3 Advanced Skills ProgramUMTS UTRAN Node B Integration Field Support (IFS) Skills ProgramUMTS Circuit Switch Integration Field Support

    Network OptimizationUMTS RF Optimization

    Advanced UMTS RF OptimizationMobility Solutions RF Engineering Center UMTS RF Optimization Engineering

    Technical SupportUMTS Remote Technical Support CORE Circuit Switched (CS) Skills Program - Customer OperationsUMTS Remote Technical Support CORE Packet Switched (PS) Skills Program - Customer OperationsUMTS Remote Technical Support Skills Program - Customer OperationsUMTS Remote Technical Support UTRAN