PROJECT TITLE:G+3 Labour Camp
PROJECT NO.:JD0188
Location: Dubai
Name Numbers Excavation Polythene
Sheet PCC Back fill Water Proofing
Structural
Concrete Cover Number
Area L B H Cum M2 M3Over
FoundationM2 Cum m
Size (mm) 6 8 10 12.00 14 16 18 20
Fixed Line 1.55Weight (kg
per m)
0.22 0.40 0.62 0.89 1.21 1.58 2.00 2.47
4 7.50 7.50 0.50 386.9 249.6 12.5 43.1 285.0 112.5 0.05 top 20 0.10 150.00 7.40 1,110 2.47 2,742 10,967
0.05 bottom 20 0.10 150.00 7.40 1,110 2.47 2,742 10,967
10 4.50 4.50 0.70 372.2 240.1 12.0 8.7 328.5 141.8 0.05 top 12 0.10 90.00 4.40 396 0.89 352 3,516
0.05 bottom 16 0.10 90.00 4.40 396 1.58 626 6,257
12 3.80 3.80 0.60 328.1 211.7 10.6 7.9 282.7 104.0 0.05 top 10 0.10 76.00 3.70 281 0.62 174 2,082
0.05 bottom 16 0.15 50.67 3.70 187 1.58 296 3,554
6 5.10 5.10 0.80 281.3 181.5 9.1 8.3 254.0 124.8 0.05 top 12 0.10 102.00 5.00 510 0.89 453 2,717
0.05 bottom 16 0.10 102.00 5.00 510 1.58 806 4,835
8 5.90 5.90 0.90 492.2 317.5 15.9 7.3 448.4 250.6 0.05 top 12 0.10 118.00 5.80 684 0.89 608 4,862
0.05 bottom 16 0.10 118.00 5.80 684 1.58 1,081 8,651
4 3.20 3.20 0.50 80.4 51.8 2.6 6.7 66.6 20.5 0.05 top 10 0.10 64.00 3.10 198 0.62 122 490
0.05 bottom 12 0.10 64.00 3.10 198 0.89 176 705
4 4.70 4.70 0.70 161.3 104.0 5.2 9.4 141.0 61.9 0.05 top 16 0.10 94.00 4.60 432 1.58 683 2,733
0.05 bottom 16 0.10 94.00 4.60 432 1.58 683 2,733
6 4.20 4.20 0.60 196.8 127.0 6.3 9.5 166.3 63.5 0.05 top 10 0.10 84.00 4.10 344 0.62 212 1,275
0.05 bottom 16 0.10 84.00 4.10 344 1.58 544 3,265
4 2.30 2.30 0.50 45.2 29.2 1.5 3.5 39.6 10.6 0.05 top 10 0.10 46.00 2.20 101 0.62 62 250
0.05 bottom 12 0.15 30.67 2.20 67 0.89 60 240
6 2.00 2.00 0.40 53.6 34.6 1.7 3.1 43.2 9.6 0.05 top 10 0.15 26.67 1.90 51 0.62 31 188
0.05 bottom 10 0.15 26.67 1.90 51 0.62 31 188
4 7.50 5.10 0.50 269.4 173.8 8.7 23.2 203.4 76.5 0.05 top 16 0.15 84.00 7.40 622 1.58 982 3,929
0.05 bottom 16 0.15 84.00 7.40 622 1.58 982 3,929
4 6.80 3.60 0.50 178.6 115.2 5.8 15.5 139.5 49.0 0.05 top 16 0.15 69.33 6.70 465 1.58 734 2,936
0.05 bottom 16 0.15 69.33 6.70 465 1.58 734 2,936
TOTAL 72 2,845.8 1,836.0 91.8 146.3 2,398.2 1,025.2 TOTAL #######
22 1.00 0.30 0.50 28.60 3.3 0.03 V 25 18 0.50 9.00 3.85 35 762
H 8 0.15 13 1.56 20.80 0.40 8 181
26 0.80 0.30 0.50 28.60 3.1 0.03 V 25 16 0.50 8.00 3.85 31 801
H 8 0.15 10 1.44 14.40 0.40 6 148
18 1.20 0.30 0.50 27.00 3.2 0.03 V 25 26 0.50 13.00 3.85 50 901
H 10 0.1 25 1.52 38.00 0.62 23 422
4 0.80 0.25 0.50 4.20 0.4 0.03 V 25 16 0.50 8.00 3.85 31 123
H 8 0.15 10 1.44 14.40 0.40 6 23
6 0.2 0.50 9.42 0.6 0.03 V 25 12 0.50 6.00 3.85 23 139
H 8 0.15 10 0.72 7.24 0.40 3 17
22 1.00 0.30 17.06 112.6 0.03 V 25 18 17.06 307.08 3.85 1182 26010
H 8 0.15 455 1.56 709.70 0.40 280 6167
3 1.00 0.30 3.60 3.2 0.03 V 25 18 3.60 64.80 3.85 249 748
H 8 0.15 96 1.56 149.76 0.40 59 177
26 0.80 0.30 17.06 106.5 0.03 V 25 16 17.06 272.96 3.85 1051 27323
H 8 0.15 341 1.44 491.33 0.40 194 5046
18 1.20 0.30 17.06 110.5 0.03 V 25 26 17.06 443.56 3.85 1708 30739
H 10 0.1 853 1.44 1,228.32 0.62 758 13642
4 0.80 0.25 9.06 7.2 0.03 V 25 16 9.06 144.96 3.85 558 2232
H 8 0.15 181 1.44 260.93 0.40 103 412
6 0.2 9.06 10.7 0.03 V 25 12 9.06 108.72 3.85 419 2511
H 8 0.15 181 0.72 131.12 0.40 52 311
3 0.60 0.20 3.60 1.3 0.03 V 16 10 3.60 36.00 1.58 57 171
H 8 0.15 72 1.08 77.76 0.40 31 92
Take Off - Calculation Sheet
DWG REF: G+3 Labour Camp
Part of Structure Description:Sub Structure & Super Structure
Location/
Description
Dimension of Structure
Bar Mark ¢Dia. Spacing Bar Cut
LengthNet bar Length Unit Wt. (kg/m)
Net Weight
Bars
Total
Weight
Quantity Estimation of G+3 Labor camp Prepared by Sala Shamimi Sept 22 , 2016
F7
F8
F9
C5
C2
C3
C4
C5
C6
C1
Columns -
Super
MAIN CAMP
C1
C2
C3
C4
F10
CF1
CF2
Columns -
Sub
Footings
F1
F2
F3
F4
F5
F6
TOTAL 362.7 TOTAL ######
8 4.70 0.25 20.55 193.2 0.03 V 16 0.15 31.3 20.55 1,287.80 1.58 2,034.72 16,277.79
H 10 0.15 137.0 4.70 1,287.80 0.62 794.57 6,356.58
8 3.60 0.25 20.55 148.0 0.03 V 16 0.15 24.0 20.55 986.40 1.58 1,558.51 12,468.10
H 10 0.15 137.0 3.60 986.40 0.62 608.61 4,868.87
TOTAL 341.1 TOTAL - ###### 68.0 1.27 1.25 0.20 21.6 0.05 12 0.15 571 1.17 668.30 0.89 593 2374
384.0 0.28 1.25 0.20 26.9 0.05 Stairs 10 0.15 417 1.15 479.65 0.62 296 1184
1.0 0.05 Floor- L 12 0.15 56 4.10 229.60 0.89 204 816
0.05 Floor- B 12 0.15 48 3.50 168.00 0.89 149 597
TOTAL 48.5 TOTAL ######
TB1 1 840.00 0.25 0.60 0.60 210.0 46.2 126.0 0.03
Typical
Calculation for
Floor/Sectional
20 m Beam Section with 1 Intermediate - Section20.00 0.70 0.25 3.50 190.20
FB1 1 235.00 0.25 0.70 0.70 41.1 0.03 top 25 0 2 20.00 20.00 4 77 154.00
SB1 2 280.00 0.25 0.70 0.70 98.0 0.03 bot 20 0 2 20.00 20.00 2.47 49 98.80
RB 1 280.00 0.25 0.70 0.70 49.0 0.03 mid_b 20 0 1 14.00 14.00 2.47 35 34.58
RB1 1 38.00 0.25 0.60 0.60 5.7 0.03 int_t 25 0 1 6.00 6.00 4 23 23.10
Face 12 0 4 20.00 20.00 2.47 49 197.60
Stirrups_n 8 0.2 90 1.90 1.90 0.40 1 67.55
Stirrups_s 8 0.1 120 1.90 1.90 0.40 1 90.06
TOTAL 319.8 TOTAL ######
Total1 2,352 0.15 352.7 0.03 Button 8 0.15 7 0.94 12.53 0.40 4.95 11,641.77
0.03 Top
1 2,352 0.30 705.5 0.03 Button 16 0.1 10 0.94 18.80 1.58 29.70 69,850.62
0.03 Top 12 0.1 10 0.94 18.80 0.89 16.69 39,257.82
2 1,937 0.30 1,161.9 0.03 Button 16 0.1 10 0.94 18.80 1.58 29.70 ##########
0.03 Top 12 0.1 10 0.94 18.80 0.89 16.69 64,659.15
1 1,937 0.30 581.0 0.03 Button 16 0.1 10 0.94 18.80 1.58 29.70 57,523.34
0.03 Top 12 0.1 10 0.94 18.80 0.89 16.69 32,329.57
3 18.66 4.55 4.10 0.20 11.2 0.03 Button 12 0.15 7 0.94 12.53 0.89 11.13 207.62
0.03 Top 12 0.15 7 0.94 12.53 0.89 11.13 207.62
4 19.71 4.47 4.41 0.20 15.8 0.03 Button 12 0.15 7 0.94 12.53 0.89 11.13 219.39
0.03 Top 12 0.15 7 0.94 12.53 0.89 11.13 219.39
Total 2,828.1 0.03TOTAL Main
Bars########
Total Extra Bar ########
Total ########
D1_1 22 3.00 3.00 0.15 29.7 0.03 16 0.1 30 3 176.4 1.58 3,880.80 6,132
D1_2 22 3.00 3.00 0.15 29.7 0.03 16 0.1 30 3 176.4 1.58 3,880.80 6,132
D1_3 22 3.00 3.00 0.15 29.7 0.03 16 0.1 30 3 176.4 1.58 3,880.80 6,132
D1_R 22 3.00 3.00 0.15 29.7 0.03 16 0.1 30 3 176.4 1.58 3,880.80 6,132
TOTAL 118.8 26,489
4 2.50 2.50 0.35 38.8 33.6 1.7 - 64.0 8.8 top
- 0.05 bottom 12 0.10 50 2.40 120 0.89 107 426
2 2.40 2.40 0.35 17.9 15.7 0.8 - 29.8 4.0 top
- 0.05 bottom 12 0.15 32 2.30 74 0.89 65 131
6 2.10 2.10 0.35 41.0 37.5 1.9 - 70.6 9.3 top
- 0.05 bottom 12 0.15 28 2.00 56 0.89 50 298
3 1.90 1.90 0.35 16.8 15.9 0.8 - 29.6 3.8 0.05 top
- 0.05 bottom 10 0.15 25 1.80 46 0.62 28 84
2 4.20 2.60 0.35 33.9 27.6 1.4 - 53.2 7.6 0.05 top 16 0.10 68 4.10 279 1.58 441 881
- 0.05 bottom 16 0.10 68 4.10 279 1.58 441 881
2 3.50 2.20 0.35 23.9 20.3 1.0 - 38.8 5.4 0.05 top 16 0.10 57 3.40 194 1.58 306 612
- 0.05 bottom 16 0.10 57 3.40 194 1.58 306 612
2 3.60 2.40 0.35 26.8 22.4 1.1 - 43.0 6.0 0.05 top 16 0.10 60 3.50 210 1.58 332 664
- 0.05 bottom 16 0.10 60 3.50 210 1.58 332 664
TOTAL 198.9 173.0 8.6 - 328.9 44.9 TOTAL 5,779.1
13 0.80 0.25 0.65 17.75 1.7 0.03 V 20 16 0.65 10.40 2.47 26 334
H 8 0.15 9 1.38 11.96 0.40 5 61
12 0.60 0.20 0.65 12.48 0.9 0.03 V 20 12 0.65 7.80 0.89 7 83
H 8 0.15 9 1.10 9.53 0.40 4 45
2 0.75 0.20 0.65 2.47 0.2 0.03 V 20 12 0.65 7.80 2.47 19 39
H 8 0.15 9 1.38 11.96 0.40 5 9
Lift Wall
Columns -
Super
LW -
Long
Columns -
Sub
SlabF2-F3
R
UP-R
Beams
Drop Slab
MASJID
LW -
Short
Staircase
4.20 3.60
Calculation for 1 m2
GF
F1
Footings
F1
F2
F3
F4
CF1
CF2
CF3
C1
C2
C3
0.15 2.3
13 0.80 0.25 6.25 16.3 0.03 V 20 16 6.25 100.00 2.47 247 3211
H 8 0.15 83 1.38 115.00 0.40 45 591
12 0.60 0.20 7.75 11.2 0.03 V 20 12 7.75 93.00 2.47 230 2757
H 8 0.15 103 1.10 113.67 0.40 45 539
2 0.75 0.20 7.75 2.3 0.03 V 20 12 7.75 93.00 2.47 230 459
H 8 0.15 103 1.38 142.60 0.40 56 113
TOTAL 32.6 TOTAL 8,899.8
4 13.00 0.20 0.60 2.6 0 6.2
3 12.50 0.20 0.60 2.5 0 4.5
2 17.90 0.25 0.60 5.4
4 7.58 0.25 0.60 4.5
2 17.90 0.25 0.80 7.2
2 7.58 0.25 0.80 3.0
2 9.38 0.20 0.70 2.6
2 3.80 0.20 0.70 1.1
2 15.00 0.20 0.70 4.2
2 8.00 0.20 0.70 2.2
1 15.00 0.20 0.70 2.1
TOTAL 5.1 - 43.1 TOTAL Avg factor for beam used as above #######GF 1 286.03 20.75 17.90 0.15 42.9 8 0.15 13 1.00 13.33 0.40 5.27 1,506.40
1 135.5 17.90 7.57 0.30 40.7 12 0.15 13 1.00 13.33 0.89 11.84 3,208.71
1 82.323 9.37 17.90 0.15 12.3 12 0.15 13 1.00 13.33 0.89 11.84 1,949.41
1 57 15.00 3.80 0.15 8.6 10 0.15 13 1.00 13.33 0.62 8.23 937.84
TOTAL - 104.5 TOTAL 8,210.5
lengih T8 lengih T10 lengih T12 lengih T16 lengih T20Total
WeightBase 2 15.7 8.2 0.4 60.4 257.5 - - 90.1 3433 5424
Wall_l 4 15.0 0.4 4.0 84.0 3200 7904
Wall_s 4 6.8 0.4 4.0 38.1 1451 3583
Top 2 7.5 15.0 0.3 67.5 3000 4740
TOTAL 279.7 TOTAL 6433 4651 23384
lengih T8 lengih T10 lengih T12 lengih T16 lengih T20
Foundation 6 2.00 2.00 0.35 37.2 26.5 4.0 - 64.8 8.4 288 288 435
C1_Sub 2 0.7 0.2 1.5 5.40 0.4 80 42 98
C2_Sub 4 0.5 0.2 1.5 8.40 0.6 96 60 133
C1_Sup 2 0.7 0.2 5.4 1.5 288 151 354
C2_Sup 4 0.5 0.2 5.4 2.2 346 216 480
3 6.8 0.6 0.2 1.4 0 2.4 167 41 122 296
2 12.9 0.6 0.2 3.1 211 52 155 375
2 6.8 0.8 0.2 2.2 135 27 82 280
2 14.8 0.8 0.2 4.7 294 59 178 609
Slab 150 1 12.9 6.8 0.2 13.2 877 351
250 1 14.8 6.8 0.3 25.2 1342 1194
TOTAL 37.2 27.8 4.0 - 63.9 TOTAL 2493 288 1521 746 259 4973
lengih T8 lengih T10 lengih T12 lengih T16 lengih T20
4 1.10 1.10 0.30 7.5 5.8 0.9 15.0 1.5 97 86
0
C7_Sub 4 0.4 0.2 1.5 4.80 0.5 56 48 98
C7_Sup 4 0.4 0.2 3.8 1.2 140 122 248
TB1 2 7.2 0.2 0.5 1.4 1.4 84 29 72 172
RB1 2 7.2 0.2 0.6 1.7 84 29 100 217
TB1 2 6.4 0.2 0.5 1.3 1.3 74 26 64 154
RB1 2 6.4 0.2 0.6 1.5 74 26 90 194
150 1 7.2 6.4 0.2 6.9 610 244
250 1 7.2 6.4 0.3 11.4 1220 1086
TOTAL 7.5 8.5 0.9 19.8 27.4 TOTAL 1122 1329 495 2606
Total 5,595.2 909,576
910
Total weight in ( kgs )
Total weight in ( Tons)
Columns -
Super
Beams
TB1
TB2
RB1
RB2
C2
C3
Roof
Slab
Columns
Beams
TB1
RB1
Foundation F11
Tanks
Columns
Beam
Slab
HOLDING TANKS
LV ROOM & SUB STATION
PUMP ROOM
C1
Name Numbers Total Volume Concrete Volume
Backfill Volume
Area L B H Cum Cum Cum
1.1
4 7.5 7.5 0.5 62.41 19.27 43.14
10 4.5 4.5 0.7 24.01 15.28 8.735
12 3.8 3.8 0.6 17.64 9.76 7.876
6 5.1 5.1 0.8 30.25 21.91 8.342
8 5.9 5.9 0.9 39.69 32.43 7.261
4 3.2 3.2 0.5 12.96 6.22 6.74
4 4.7 4.7 0.7 26.01 16.56 9.447
6 4.2 4.2 0.6 21.16 11.68 9.476
4 2.3 2.3 0.5 7.29 3.75 3.545
6 2 2 0.4 5.76 2.70 3.06
4 7.5 5.1 0.5 43.45 20.23 23.225
4 6.8 3.6 0.5 28.8 13.34 15.46
TOTAL
Stairs 4 4.70 4.10 1.00
C1 22 1.00 0.30 0.50
C2 26 0.80 0.30 0.50
C3 18 1.20 0.30 0.50
4 2.5 2.5 0.35 8.41 0.00
2 2.40 2.40 0.35
6 2.10 2.10 0.35
3 1.90 1.90 0.35
2 4.20 2.60 0.35
2 3.50 2.20 0.35
2 3.60 2.40 0.35
C1 13 0.80 0.25
C2 12 0.60 0.20
C3 2 0.75 0.20
C1 13 0.80 0.25
C2 12 0.60 0.20
C3 2 0.75 0.20
F4
F5
F6
CF3
F2
F3
F4
CF1
CF2
Location/ Description
Dimension of Structure
Backfill Over Foundation‐Main Camp
Backfill Over Foundation‐Masjid
F1
Footings
Columns - Sub
F7
F8
F9
F10
CF1
CF2
F1
F2
F3
6 8 10 12.00 14 16 18 20 25 32 40 50 0.22 0.40 0.62 0.89 1.21 1.58 2.00 2.47 3.85 6.31 9.86 15.41
Number
2 16 0.1 330 6 1980 1.58 3,128.40 6,256.80
8 16 0.1 30 3 90 1.58 142.20 1,137.60
8 12 0.1 40 4 160 0.89 142.08 1,136.64
12 16 0.1 60 3 180 1.58 284.40 3,412.80
16 16 0.15 13 2 26.67 1.58 42.13 674.13
8 16 0.1 30 3 90.00 1.58 142.20 1,137.60
4 16 0.1 330 6 1980 1.58 3,128.40 12,513.60
24 16 0.1 30 3 90 1.58 142.20 3,412.80
16 12 0.1 40 4 160 0.89 142.08 2,273.28
24 16 0.1 60 3 180 1.58 284.40 6,825.60
28 16 0.15 13 2 26.67 1.58 42.13 1,179.73
16 16 0.1 30 3 90.00 1.58 142.20 2,275.20
8 16 0.1 30 2.5 75 1.58 118.50 948.00
R 2 16 0.1 330 6 1980 1.58 3,128.40 6,256.80
12 16 0.1 30 3 90 1.58 142.20 1,706.40
8 12 0.1 40 4 160 0.89 142.08 1,136.64
12 16 0.1 60 3 180 1.58 284.40 3,412.80
14 16 0.15 13 2 26.67 1.58 42.13 589.87
8 16 0.1 30 3 90.00 1.58 142.20 1,137.60
4 16 0.1 30 2.5 75 1.58 118.50 474.00
Total 62,529.72
Net Weight Bars Total WeightLocation
F1
F2‐F3
Number of location ¢Dia. Spacing Bar Cut
LengthNet bar Length
Unit Wt. (kg/m)
Mass Cut & Fill
Grid Length Width of Section EGL FGL Bottom Level Type Grid EGL
Cut Fill L B Cut Fill
1 - Point 24 0 65 9.931 9.37 9.37 Cut 0.56 - 568 - 2 - Point 25 9.831
- - 45 22.545 65 9.871 9.01 9.01 Cut 0.86 - 872 - 8.161
- - 45 22.590 60 9.861 8.64 8.64 Cut 1.22 - 1,236 - 8.261
- - 45 22.5135 56 9.851 8.07 8.07 Cut 1.78 - 1,803 - 7.911
- - 45 22.5180 51 9.311 7.8 7.8 Cut 1.51 - 1,530 - 7.961
- - 45 22.5225 46 9.251 7.6 7.6 Cut 1.65 - 1,672 - 8.011
- - 45 22.51 - Point 18 270 41 7.601 7.57 7.57 Cut 0.03 - 2 - Point 31 7.711
7,681 -
Total Excavation m3 8,739 Total Filling m3 5,028
Height Section Volume
FGL Bottom Level Type Grid EGL FGL Bottom
Level Type
Cut Fill L B Cut Fill Cut Fill L B Cut Fill
9.2 9.2 Cut 0.63 - 639 - 3 - Point 40 8.411 9.2 9.2 Fill - 0.79 - 710 - - 45 22.5 - - 45 20
9.26 9.26 Fill - 1.10 - 1,113 7.991 9.34 9.34 Fill - 1.35 - 1,214 - - 45 22.5 - - 45 20
8.87 8.87 Fill - 0.61 - 617 8.011 8.94 8.94 Fill - 0.93 - 627 - - 45 22.5 - - 45 15
8.28 8.28 Fill - 0.37 - 374 7.991 8.34 8.34 Fill - 0.35 - 173 - - 45 22.5 - - 45 11
8.16 8.16 Fill - 0.20 - 201 7.911 7.86 7.86 Cut 0.05 - 14 - - - 45 22.5 - - 45 6
7.61 7.61 Cut 0.40 - 406 - - - - - - - 45 22.5 - - 45 1
7.72 7.72 Fill - 0.01 - -
1,045 2,304 14 2,724
Height Section Volume Height Section Volume
111 2 3 4 5 6 7 8 9 10 12
A
B
C
D
F
G
H
I
J
K
L
E
58100
3825 4475 6100 5750 2985 5915 5915 8185 6650 4475 3825
44400
3550
2600
4450
3750
5450
5175
5075
37
50
4450
260
03
55
0
F1 F1
F1
F1
F2
F3
F3
F3
F3
F3 F3
F3
F3
F3
F3
F3
F2
F2
F2
F2 F2
F2
CF1
1800
2850
F6
F10
F8F8
F6
F10
F10F10
CF2
F4
F5
F4F4
F9
F9F9
F9
F10
F10
F7 F7
F7F7
F4
F4
F5F5
F5F5
F4
F6 F6
F8F8F8
1200
1750 1750
1200
31501650
2600 2765 3035 3150
1900
2175 1500
1900
1850
2400
2275
1900
1850
2175 1500
26003150
1400
240
90
465
615
465
1665 2650 30352600
21751500
1900
1850
1200
1750
1650
350
3150
600
1750
1200
2600
21751500
1850
1900
1550 1425
CF2
1550 1425
1800
CF2
1265 1710
CF2
1265 1710
1800
1800
F5
90
2100
CF1
1800
2850
2100
CF1
1800
2850
2100
CF1
1800
2850
2100
2400
2300
2400
2600
2500
2200
2300
2200
2300
2500
2300
F2
F2
2200
F3
600
F8
F5
F2
2300
F5
1950
1950
1000 GA POLYTHENE SHEETS
2 layers of 250mm each thoroughly compacted
50mm THK. P.C.C.
MIN
. 1
00
0
WATER PROOFING
(2 layers of Bitumen Coat as per spec.)
TYPICAL FOUNDATION DETAIL
EXISTING GROUND LEVEL
±0.00 GL
-1.00
±0.00 GL
to not more than 95% of MDD for sand or 98% MDD for road base
(Backfill material shall be Engineered fill / Road Base)
FOUNDATION LAYOUT
1:100@A1
S00500
GENERAL NOTES
5.ANY DISCREPANCIES, EITHER BETWEEN WRITTEN
DIMENSIONS AND SITE DIMENSIONS OR BETWEEN
THIS DRAWING AND OTHER CONSULTANT'S OR
SUPPLIER'S DRAWINGS SHOULD BE BROUGHT TO
THE IMMEDIATE ATTENTION OF THE ARCHITECT
BEFORE EXECUTING THE WORKS.
6. THIS DRAWING IS TO BE READ IN CONJUNCTION
WITH THE RELEVANT STRUCTURAL, MECHANICAL&
ELECTRICAL DRAWINGS AND SPECIFICATIONS.
7. ALL WORKS ARE TO BE CARRIED OUT IN
ACCORDANCE WITH THE RELEVANT CODES OF
PRACTICE AND ALSO TO MEET THE LOCAL
AUTHORITY REQUIREMENTS.
1.THIS DRAWING IS THE COPYRIGHT OF GEO.
THIS DRAWING OR ANY PORTION OF IT MAY
NOT BE REPRODUCED IN ANY WAY WITHOUT THE
CONSENT OF GEO.
2.DIMENSIONS ARE NOT TO BE SCALED FROM THIS
DRAWING.
3.DIMENSIONS ARE IN METERS, UNLESS NOTED
OTHERWISE.
4.THE CONTRACTOR IS TO VERIFY ALL DIMENSION
ON SITE BEFORE EXECUTING THE SITE.
DATE:- DRAWN:- CHECKED:- SCALE:-
PROJECT NO
ZONE NO LEVEL NO DRAWING NO REV. NO
CONSULTANT:
Global Engineering Consultants
Office-909, Safa Tower
P.O.Box: 29175, Dubai, U.A.E.
Sheikh Zayed Road
TEL:04-3278 298, FAX:04-3278 398
www.geoco.ae . [email protected]
NAMEDATEREV. DESCRIPTION
CLIENT:
09-05-2016
PROJECT:
DRAWING TITLE:
LOCATION:
A = APPROVED B = APPROVED WITH COMMENTS C = RETURN
SURVEYOR/INSPECTOR PROJECT ENGINEER PROJECT MANAGERSURVEYOR/INSPECTOR
SB SHS
JD0188
CLEVELAND BRIDGE &
ENGINEERING MIDDLE EAST
Private LTD
PLOT NO. 599-1150 AT
JAFZA, DUBAI, U.A.E
57.26
8.66
MGC
Proposed
G+3 Labour Camp
TYPE SIZE
L X B X H
BOTTOM REINFORCEMENT
SHORT DIRECTION
TOP REINFORCEMENT
LONG DIRECTION SHORT DIRECTION LONG DIRECTION
FOUNDATIONS SCHEDULE:
4500 X 4500 X 700F2
3800 X 3800 X 600F3
REMARKS
F4
F1 -
LEVEL
(DMD)
-
-
-
7500 X 7500 X 500
5100 X 5100 X 800
EXTRA BARS AS
SHOWN IN PLAN
F5 -5900 X 5900 X 900
F6 -3200 X 3200 X 500
F7 -4700 X 4700 X 700
F8 -4200 X 4200 X 600
FOUNDATIONS NOTES:-In reference to soil investigation report Ref# GSI/0069/16/DXB-GEO by MATERIAL LAB. dated on 18/06/2016.1. The allowable net bearing pressure value is 175 kPa2. It is recommended that the foundation to be laid at a depth of not less than 1.50m below EGL or existing
ground level which is lower.3.The exposed foundation ground after excavation shall be inspected by a qualified engineer to confirm that the
required depth has been reached and that any undesirable materials are removed. Moreover, the exposedfoundation ground shall be proof rolled with heavy vibratory rollers to ensure that any loose materials havebeen densified to not less than 95% of the max. dry density as determined by ASTM D 1557 (Modified Proctor)or equivalent BS Procedure.
F9 -2300 X 2300 X 500
F10 -2000 X 2000 X 400
CF1 -7250 X 5100 X 500
CF2 -6800 X 3600 X 500
T20@ 100C/C T20 @ 100C/C
T16 @ 100C/C T16@ 100C/C T12 @ 100C/C T12 @ 100C/C
T16 @ 150C/C T16 @ 150C/C
T16 @ 100C/C T16 @ 100C/C
T10 @ 100C/C T10 @ 100C/C
T12 @ 100C/C T12 @ 100C/C
T16 @ 100C/C T16 @ 100C/C
T12 @ 100C/C T12 @ 100C/C
T16 @ 100C/C T16 @ 100C/C
T16 @ 100C/C T16 @ 100C/C
T12 @ 100C/C T16 @ 150C/C
T10 @ 100C/C T10 @ 100C/C
T12 @ 150C/C T12 @ 150C/C
T10 @ 150C/C T10 @ 150C/C
T10 @ 100C/C T10 @ 100C/C
T10 @ 150C/C T10 @ 150C/C
T16 @ 150C/C T16 @ 150C/C
T20 @ 100C/C T20 @ 100C/C
T12 @ 100C/C T12 @ 100C/C
T10 @ 100C/C T10 @ 100C/C
T16 @ 150C/C T16 @ 150C/C
T16 @ 150C/C T16 @ 150C/C T16 @ 150C/C T16 @ 150C/C
TB1 TB1 TB1 TB1 TB1 TB1 TB1TB1
TB
1
TB1 TB1
TB1TB1
TB
1
TB
1
TB1 TB1
TB
1
TB1
TB1TB1TB1TB1TB1TB1TB1TB1
TB
1
TB
1
TB1
TB
1T
B1
TB
1
TB1TB1TB1TB1
TB
1
TB
1T
B1
TB
1T
B1
TB
1T
B1
TB1TB1
TB
1
TB
1
TB
1
TB
1
TB
1
TB1TB1TB1TB1TB1TB1
TB
1
TB
1
TB
1
TB
1
TB
1
TB
1
TB
1
TB
1
TB
1
TB
1
TB
1
TB
1
TB
1
TB
1T
B1
TB
1T
B1
TB
1
TB
1T
B1
TB
1
T
B
1
TB
1
TB
1
TB
1
TB
1
TB
1
TB
1
TB
1T
B1
TB
1
TB
1
TB
1
TB
1
TB
1
TB
1T
B1
TB
1
TB
1
TB
1T
B1
TB
1
TB
1T
B1
TB
1
TB
1
TB
1
TB
1
TB1 TB1 TB1 TB1TB1 TB1 TB1
TB1 TB1
TB1
TB1
TB1 TB1
TB1
TB1TB1
TB1 TB1
TB1 TB1
TB1
TB1TB1
111 2 3 4 5 6 7 8 9 10 12
A
B
C
D
F
G
H
I
J
K
L
E
58100
3825 4475 6100 5750 2985 5915 5915 8185 6650 4475 3825
44
40
0
35
50
26
00
44
50
37
50
54
50
51
75
50
75
37
50
44
50
26
00
35
50
TB
1
TB1 TB1 TB1 TB1TB1 TB1 TB1TB1
WITH ONE MESH
T8@150 C/C
GENERAL NOTES
5.ANY DISCREPANCIES, EITHER BETWEEN WRITTEN
DIMENSIONS AND SITE DIMENSIONS OR BETWEEN
THIS DRAWING AND OTHER CONSULTANT'S OR
SUPPLIER'S DRAWINGS SHOULD BE BROUGHT TO
THE IMMEDIATE ATTENTION OF THE ARCHITECT
BEFORE EXECUTING THE WORKS.
6. THIS DRAWING IS TO BE READ IN CONJUNCTION
WITH THE RELEVANT STRUCTURAL, MECHANICAL&
ELECTRICAL DRAWINGS AND SPECIFICATIONS.
7. ALL WORKS ARE TO BE CARRIED OUT IN
ACCORDANCE WITH THE RELEVANT CODES OF
PRACTICE AND ALSO TO MEET THE LOCAL
AUTHORITY REQUIREMENTS.
1.THIS DRAWING IS THE COPYRIGHT OF GEO.
THIS DRAWING OR ANY PORTION OF IT MAY
NOT BE REPRODUCED IN ANY WAY WITHOUT THE
CONSENT OF GEO.
2.DIMENSIONS ARE NOT TO BE SCALED FROM THIS
DRAWING.
3.DIMENSIONS ARE IN METERS, UNLESS NOTED
OTHERWISE.
4.THE CONTRACTOR IS TO VERIFY ALL DIMENSION
ON SITE BEFORE EXECUTING THE SITE.
DATE:- DRAWN:- CHECKED:- SCALE:-
PROJECT NO
ZONE NO LEVEL NO DRAWING NO REV. NO
CONSULTANT:
Global Engineering Consultants
Office-909, Safa Tower
P.O.Box: 29175, Dubai, U.A.E.
Sheikh Zayed Road
TEL:04-3278 298, FAX:04-3278 398
www.geoco.ae . [email protected]
NAMEDATEREV. DESCRIPTION
CLIENT:
09-05-2016
PROJECT:
DRAWING TITLE:
LOCATION:
A = APPROVED B = APPROVED WITH COMMENTS C = RETURN
SURVEYOR/INSPECTOR PROJECT ENGINEER PROJECT MANAGERSURVEYOR/INSPECTOR
SB SHS
JD0188
CLEVELAND BRIDGE &
ENGINEERING MIDDLE EAST
Private LTD
PLOT NO. 599-1150 AT
JAFZA, DUBAI, U.A.E
57.26
8.66
MGC
Proposed
G+3 Labour Camp
GF SLAB LAYOUT
1:100@A1
S01200
TYPE
SIZE
D X W
MID
CONT. EXTRA BOT
INT. SUPPORT
CONT.
FACE BARS
STIRRUPS
NOMINAL NEAR SUPP. L/4
REMARKS
EXTRA TOP
TIE BEAM SCHEDULE
TB1 600 X 250 2T16 T8 @ 200 T8 @ 1502T161T16 2T16 2T12
CONCRETE WALL SCHEDULE
TYPE
250
REINFORCEMENT
VERTICAL HORIZONTAL
LIFT
THICKNESS
T16@150 T10@150
ELEVATION 1
- all Facades paint has a reflective index of 45%
- all spaces has open able windows.
- All paints & Coats limit of Volatile Organic Compounds (VOC) do not exceed the allowable
limit and are certified by Dubai Central Lab.
GREEN BUILDING COMMENTS
C D
A B F G H I J K LE
1.65
2.80
4.00
3.60
1.60
3.40
4.00
3.60
4.00
.603.4
04.0
04.0
01.2
0
4.00
.60
4.00
W04 W03 W05 W10
GD1
GD1
D01
FD1
FD1
D01
W05
W12 W11 W16 W15 W09 W14 W16 W13 W14
W13 W11 W15W16
W13 W16W14 W12
W12 W14
W22
W22
W13W11W09W15W14
TL +5.05
FFL +9.70
PL +9.38
PL +26.90
FFL +13.70
FFL +17.70
FFL +21.70
FFL +25.70
TL +14.30
TL +29.30
SSL +28.70
Ground Floor
First Floor
Second Floor
Third Floor
Roof Floor
Stairs Floor
FFL +9.70
PL +9.14
PL +26.90
FFL +13.70
FFL +17.70
FFL +21.70
FFL +25.70
TL +14.30
TL +29.30
SSL +28.70
Ground Floor
First Floor
Second Floor
Third Floor
Roof Floor
Stairs Floor
W14
3.5544.40
2.60 4.46 3.74 5.45 5.17 5.07 3.75 4.45 2.60 3.55
20mm Thick(min .)Smooth Cement/Sand Plaster + Epoxy Paint
(color as per )
FINISHES NOTE:
ELEVATION 2
- all Facades paint has a reflective index of 45%
- all spaces has open able windows.
- All paints & Coats limit of Volatile Organic Compounds
(VOC) do not exceed the allowable limit and are certified by
Dubai Central Lab.
GREEN BUILDING COMMENTS
11 1234567891012
58.10
3.824.476.105.752.985.925.928.186.654.473.83
1.06
4.00
.60
4.00
.60
1.60
3.60
.403.6
0.40
3.60
.402.4
0
1.60
3.60
3.60
.403.6
0.40
2.40
1.20
1.60
3.60
3.60
.403.6
0.40
2.40
1.20
11.00
1.60
11.00
1.60
FFL +9.70
PL +9.14
4.00
PL +26.90
19.60
FFL +13.70
4.00
.31
FFL +17.70
4.00
FFL +21.70
4.00
1.20
FFL +25.70
TL +14.30
1.80
.60
TL +29.30
SSL +28.70
Ground Floor
First Floor
Second Floor
Third Floor
Roof Floor
Stairs Floor
1.40
2.40
1.20
2.40
.403.6
0.40
3.60
.403.6
0
W05 W04 W03 W03W06 W07 W05 W05
W15 W14 W15 W16 W13 W17 W15 W14
W08W08
W16
W16
W09 W13
W14 W17
W17
W09 W16
W15
W13
W16 W13
W09
W14
W17
W13W16
W17
W14
W17
1.06
W14
W18W18
FFL +9.70
PL +8.64
4.00
PL +26.90
19.60
FFL +13.70
4.00
FFL +17.70
4.00
FFL +21.70
4.00
1.20
FFL +25.70
TL +14.30
1.80
.60
TL +29.30
SSL +28.70
Ground Floor
First Floor
Second Floor
Third Floor
Roof Floor
Stairs Floor
1.00
20mm Thick(min .)Smooth Cement/Sand Plaster + Epoxy Paint
(color as per )
FINISHES NOTE:
GENERAL NOTES
5.ANY DISCREPANCIES, EITHER BETWEEN WRITTEN
DIMENSIONS AND SITE DIMENSIONS OR BETWEEN
THIS DRAWING AND OTHER CONSULTANT'S OR
SUPPLIER'S DRAWINGS SHOULD BE BROUGHT TO
THE IMMEDIATE ATTENTION OF THE ARCHITECT
BEFORE EXECUTING THE WORKS.
6. THIS DRAWING IS TO BE READ IN CONJUNCTION
WITH THE RELEVANT STRUCTURAL, MECHANICAL&
ELECTRICAL DRAWINGS AND SPECIFICATIONS.
7. ALL WORKS ARE TO BE CARRIED OUT IN
ACCORDANCE WITH THE RELEVANT CODES OF
PRACTICE AND ALSO TO MEET THE LOCAL
AUTHORITY REQUIREMENTS.
1.THIS DRAWING IS THE COPYRIGHT OF GEO.
THIS DRAWING OR ANY PORTION OF IT MAY
NOT BE REPRODUCED IN ANY WAY WITHOUT THE
CONSENT OF GEO.
2.DIMENSIONS ARE NOT TO BE SCALED FROM THIS
DRAWING.
3.DIMENSIONS ARE IN METERS, UNLESS NOTED
OTHERWISE.
4.THE CONTRACTOR IS TO VERIFY ALL DIMENSION
ON SITE BEFORE EXECUTING THE SITE.
DATE:- DRAWN:- CHECKED:- SCALE:-
PROJECT NO
ZONE NO LEVEL NO DRAWING NO REV. NO
CONSULTANT:
Proposed
G+3 Labour Camp
NAMEDATEREV. DESCRIPTION
CLIENT:
26-04-2016
PROJECT:
DRAWING TITLE:
LOCATION:
A = APPROVED B = APPROVED WITH COMMENTS C = RETURN
SURVEYOR/INSPECTOR PROJECT ENGINEER PROJECT MANAGERSURVEYOR/INSPECTOR
- ASF
KEY PLAN
JD0188
CLEVELAND BRIDGE &
ENGINEERING MIDDLE EAST
Private LTD
PLOT NO. 599-1150 AT
JEBEL ALI IND., DUBAI, U.A.E
Existing Sockyard
Existing Sockyard
Existing Building
BUS PARKING
CAPACITY = 80 PERSONS EACH
BUS PARKING
CAPACITY = 80 PERSONS EACH
BUS PARKING
CAPACITY = 80 PERSONS EACH
BUS PARKING
CAPACITY = 80 PERSONS EACH
BUS PARKING
CAPACITY = 80 PERSONS EACH
BUS PARKING
CAPACITY = 80 PERSONS EACH
BUS PARKING
CAPACITY = 80 PERSONS EACH
14.80
5.00
118.6
6
57.26
24.02
8.66
Mosque
MGC
Global Engineering Consultants
Office-603, Bldg No. 01, Bay Square
P.O.Box: 29175, Dubai, U.A.E.
Business Bay
TEL:04-55 793 88, FAX:04-27 69 669
www.geoco.ae . [email protected]
ISSUED FOR TENDER
ELEVATIONS
A - 200
1:150@A1
00 28-04-16 MAMISSUED FOR APPROVAL
00
ELEVATION -01
ELEVATION -02
AS ADDITION