Tues Mar 24 LC-ABD / LCUK, Bristol 1
Positron Target Prototype - Status
Leo Jenner
Tues Mar 24 LC-ABD / LCUK, Bristol 2
Overview
• The set-up
• Latest Simulation
• Project plan
• Progress
Tues Mar 24 LC-ABD / LCUK, Bristol 3
ILC
Tues Mar 24 LC-ABD / LCUK, Bristol 4
Tues Mar 24 LC-ABD / LCUK, Bristol 5
Tues Mar 24 LC-ABD / LCUK, Bristol 6
The plan is still the same…
• Sweep in parameter space of B-Field, Rotation Speed and Immersion (1 T, 2000 rpm, 50 mm)
• Observation of kicks as spokes traverse field
• Measurement of eddy currents by torque and direct heating ( Lei Zang: PhD student, Liv )
Additional support from Duncan Scott ( ASTeC )
• Study of rotor-dynamics (LLNL: accelerometers)
• Simulations from Jim Rochford (RAL) in parallel with LLNL
Tues Mar 24 LC-ABD / LCUK, Bristol 7
B-field
00.20.40.60.81.0
Imm
ersi
on
Speed
2000 rpm
1500 rpm
1000 rpm
500 rpm
Carmen spoke model
Retarding torque predicted by CARMEN for 100rpm for a full revolution
90o
18o
162o
234o306
oAlignment at t=0
18o 90o 162o
234o
306o
Model results; full revolution
•Here we see the torque peaks correspond to each point a spoke crosses the –ve X axis i.e. when a spoke passes through the coil centres
rotation
Tues Mar 24 LC-ABD / LCUK, Bristol 9
Tues Mar 24 LC-ABD / LCUK, Bristol 10
-3000
-2000
-1000
0
1000
2000
3000
4000
5000
6000
7000
8000
0 1 2 3 4 5 6
Nm
m
no field
field-on
carmen
carmen + friction
carmen + 'field friction'
no field max
field max
Conclusion
• I’m confident the experimental programme will be completed in the next 2 months
• PAC paper, NIM paper will follow
• Thank you and goodbye!