44
TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt June 18, 2015

TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements –

Pervious Asphalt

June 18, 2015

Page 2: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

Frequent flooding occurs along the portion of the Route 9 Southbound shoulder lying approximately 500-feet south of its intersection with Oxycocus Road in Stafford Township, Ocean County, NJ. Local businesses are adversely impacted.

PROBLEM STATEMENT

Page 3: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

LOCATION MAP

PROJECT AREA

Page 4: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

• June 2014 – Began design effort with field survey

• July 2014 – Subsurface Utility Test Pits

• August 2014 – Draft PS&E

• September 2014 – Final PS&E

• October 2014 – IEW begins/completes construction

PROJECT TIMELINE

Page 5: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

• Urban Principal Arterial

• 35 MPH Speed Limit

• ADT = 19,020 (2012)

• 1 Travel Lane Per Direction

• No Median

• 7-Foot Wide Shoulders (Surveyed)

• Curb on Southbound Side Only (Curb/Grass/Sidewalk)

ROUTE 9 – ROADWAY CHARACTERISTICS

Page 6: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

TRADITIONAL SOLUTION NOT FEASIBLE!!

8” STEEL GAS COVER = 2.8’ 2” TELEPHONE

COVER = 2.6’

12 - 4” PVC TELEPHONE COVER = 2.8’

Page 7: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

INFLITRATION TESTS (Downer Loamy Sand, DocB – HSG B)

2.0 in/hr

3.5 in/hr

8.1 in/hr

56.8 in/hr

NJDEP MINIMUM RATE = 0.5 in/hr

Page 8: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

DESIGN SOLUTION – Pervious Asphalt Shoulder

(2” STONE - #2)

(1” STONE - #57)

(OPEN-GRADED 9.5 MM FRICTION COURSE)

Page 9: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

DESIGN SOLUTION – Stone Infiltration Area

(WASHED RIVER JACK STONE CONSISTING OF 3” WHITE COBBLES )

(2” STONE - #2)

PLAN

Page 10: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

CONSTRUCTION COST ESTIMATE

25% OF TOTAL COST IMPERVIOUS COST = $125/ton

Page 11: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

CONSTRUCTION PHOTOS – October 13, 2014

Page 12: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

CONSTRUCTION PHOTOS – October 13, 2014

Page 13: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

CONSTRUCTION PHOTOS – October 13, 2014

Page 14: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

CONSTRUCTION PHOTOS – October 13, 2014

Page 15: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

CONSTRUCTION PHOTOS – October 13, 2014

Page 16: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

CONSTRUCTION PHOTOS – October 13, 2014

Page 17: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

CONSTRUCTION PHOTOS – Infiltration Area

October 13, 2014 October 16, 2014

Page 18: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

POST-CONSTRUCTION PHOTOS – October 16, 2014

Page 19: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

POST-CONSTRUCTION PHOTOS – October 16, 2014

Page 20: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

POST-CONSTRUCTION PHOTOS – October 16, 2014

Page 21: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

POST-CONSTRUCTION PHOTOS – October 16, 2014

Page 22: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

POST-CONSTRUCTION PHOTOS – October 16, 2014

Page 23: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

POST-CONSTRUCTION PHOTOS – October 16, 2014

Page 24: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

POST-CONSTRUCTION PHOTOS – October 16, 2014

Page 25: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

POST-CONSTRUCTION PHOTOS – October 16, 2014

Page 26: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

POST-CONSTRUCTION PHOTOS – October 16, 2014

Page 27: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

NJDEP BMP Manual Recommends:

• Vacuum sweep at least 4 times per year

• Follow sweep with high pressure hosing

• Remove and dispose of dislodged sediment

MAINTENANCE REQUIREMENTS

Page 28: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

WINTER 2014/2015 SUMMARY

From njweather.com

• 21ST coldest in 120 years of record (Ave Temp = 29.5⁰F)

• Coldest winter since 1993/1994 (29.0 ⁰F)

• 11.97” of rain

From Office of the New Jersey State Climatologist

• 8 significant snowfall events

• Total snowfall in Stafford Township = 25.6 inches

• Highest snowfall total for single event = 5.8 inches

Page 29: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

FIRST POST WINTER PHOTOS – April 2014

Page 30: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

FIRST POST WINTER PHOTOS – April 2014

Page 31: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

FIRST POST WINTER PHOTOS – April 2014

Page 32: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

POST WINTER PHOTOS

Page 33: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

POST WINTER PHOTOS

Page 34: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

POST WINTER PHOTOS

Page 35: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

FIRST POST WINTER PHOTOS – April 2014

Page 36: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

SECOND POST-WINTER – No Photos Taken

• However, during 3rd winter, reports of flooding resumed.

• Discovered maintenance had not occurred since end of

construction.

Page 37: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

THIRD POST WINTER PHOTOS – July 14, 2016

Page 38: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

THIRD POST WINTER PHOTOS – July 14, 2016

Page 39: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

THIRD POST WINTER PHOTOS – July 14, 2016

Page 40: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

THIRD POST WINTER PHOTOS – July 14, 2016

Page 41: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

THIRD POST WINTER PHOTOS – July 14, 2016

Page 42: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

THIRD POST WINTER PHOTOS – July 14, 2016

Page 43: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

THIRD POST WINTER PHOTOS – July 14, 2016

Page 44: TRB ADC60 Summer Conference NJDOT Route 9 Drainage Improvements Pervious Asphalt · 2018. 6. 6. · NJDOT Route 9 Drainage Improvements ... •June 2014 – Began design effort with

Thank You!!

Michael P. Sears, P.E. HNTB Corporation Empire State Building 350 Fifth Avenue 57th Floor New York, NY 10018 (212) 915-9537 [email protected]

QUESTIONS

Before

After