** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
PRELDES 2.000 2.000 2013NFA
ROWINCD 0.040 0.040 2013NFA
DETLDES 1.000 1.000 2014NFA
ROWACQU 0.500 0.500 2014NFA
NYSDOT
800400
BEAR MOUNTAIN PARKWAY RECONSTRUCTION: RTES 6/9/202 - RTES 35/202;
TOWN OF CORTLANDT & CITY OF PEEKSKILL.
3.540 0.000 0.000 2.040 1.500 AQC:A10P TOTAL 4YR COST :WESTCHESTER TPC : $32-$50 M
DETLDES 0.800 0.800 2011NFA
ROWACQU 0.500 0.500 2011NFA
NYSDOT
800402
INTERCHANGE RECONSTRUCTION: THIS PROJECT INVOLVES THE
RECONSTRUCTION OF THE BEAR MOUNTAIN STATE PARKWAY
INTERCHANGE WITH US ROUTE 6 IN THE TOWN OF CORTLANDT IN
WESTCHESTER COUNTY. BIN 1003420.
1.300 1.300 0.000 0.000 0.000 AQC:D3P TOTAL 4YR COST :WESTCHESTER TPC : $26-$40 M
0.019 0.019 CONINSPSTP FLEX 2014
CONINSP 0.008 0.008 2014NFA
0.086 0.086 CONSTSTP FLEX 2014
CONST 0.023 0.023 2014NFA
LOCAL
801051
ROUTE 9 DRAINAGE IMPROVEMENTS, PHILIPSBURG MANOR: FROM NEW
BROADWAY - POCANTICO STREET. DRAINAGE IMPROVEMENTS TO
PREVENT SILTATION OF MILL PONDS @ HISTORIC SITE; REQUIREMENT FOR
FHWA PARTICIPATION IN TEP PROJECT AT MANOR. MP. 9-87032 8.00-8.16
0.136 0.000 0.000 0.000 0.136 AQC:A2P TOTAL 4YR COST :WESTCHESTER TPC : < $0.75 M
0.394 HPP 0.394 CONINSP2011
CONINSP 0.098 0.098 2011NFA
3.542 HPP 3.542 CONST2011
CONST 0.886 0.886 2011NFA
PRELDES 0.050 0.050 2011NFA
NYSDOT
801070
RENOVATE STATE ROUTE 9 IN PHILLIPSTOWN-ROUTE 9 PAVEMENT
RESURFACING: WESTCHESTER COUNTY TO ROUTE 301. TOWN OF
PHILLIPSTOWN. NY 106
4.970 4.970 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :PUTNAM TPC : $4.6-$7.5 M
0.025 0.025 SCOPINGHSIP 2014
SCOPING 0.003 0.003 2014NFA
NYSDOT
801905
RTE 118/UNDERHILL RD: UPGRADE SIGNAL & CONSTRUCT LEFT TURN
LANES ON ROUTE 188 AND UNDERHILL RD APPROACH & A RIGHT TURN
LANE ON THE SB RTE 118 APPROACH. ROUTE 118/DOWNING DRIVE:
CONSTRUCT A LEFT TURN LANE ON SB. BINS 1071600 107610. TOWN OF
YORKTOWN.
0.028 0.000 0.000 0.000 0.028 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $2-$4 M
ROWINCD 0.108 0.108 2011NFA
DETLDES 0.350 0.350 2012NFA
ROWACQU 0.360 0.360 2012NFA
CONINSP 0.300 0.300 2013NFA
CONST 3.000 3.000 2013NFA
NYSDOT
802016
ROUTE 119 INTERSECTION AT ROUTE 100A RECONSTRUCTION. SPLIT FROM
PIN 8020.11. TOWN OF GREENBURGH, WESTCHESTER COUNTY BIN 1071600 &
1071610
4.118 0.108 0.710 3.300 0.000 AQC:A10P TOTAL 4YR COST :WESTCHESTER TPC : $3.3-$5.6 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 2 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
ROWINCD 0.027 0.027 2011NFA
ROWACQU 0.090 0.090 2012NFA
CONINSP 0.300 0.300 2013NFA
CONST 3.000 3.000 2013NFA
NYSDOT
802017
ROUTE 119 @ ROUTE 100B INTERSECTION RECONSTRUCTION STAGE 2, SPLIT
FROM PIN 8020.11. TOWN OF GREENBURGH.
3.417 0.027 0.090 3.300 0.000 AQC:A6P TOTAL 4YR COST :WESTCHESTER TPC : $3.3-$5.6 M
0.280 0.280 PRELDESHBRR 2012
PRELDES 0.070 0.070 2012NFA
0.020 0.020 ROWINCDHBRR 2012
ROWINCD 0.005 0.005 2012NFA
0.365 0.365 DETLDESHBRR 2014
DETLDES 0.091 0.091 2014NFA
NYSDOT
802500
BRIDGE REPLACEMENT: ROUTE 100/ROUTE 9A BRIDGE. TOWN OF
GREENBURGH, WESTCHESTER COUNTY BIN 1006110
0.831 0.000 0.375 0.000 0.456 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $9.5-15.5 M
0.167 0.167 DETLDESCMAQ 2013
DETLDES 0.042 0.042 2013NFA
0.059 0.059 ROWACQUCMAQ 2013
ROWACQU 0.015 0.015 2013NFA
NYSDOT
803042
ROUTE 59 @ AIRMONT INTERSECTION IMPROVEMENTS. ADD A STACKING
LANE IN EACH DIRECTION AS ROUTE 59 APPROACHES AIRMONT ROAD.
PROJECT LENGTH IS 3/10 MILE. VILLAGE OF AIRMONT, TOWN OF RAMAPO.
0.283 0.000 0.000 0.283 0.000 AQC:D1P TOTAL 4YR COST :ROCKLAND TPC : $7.5-$12 M
CONINSP 0.216 0.216 2012NFA
CONST 1.800 1.800 2012NFA
NYSDOT
805528
ROUTE 306 SIDEWALKS: NEW/IMPROVED PEDESTRIAN FACILITY
GRANDVIEW AVENUE TO POMONA ROAD. TOWN OF RAMAPO AND VILLAGE
OF WESLEY HILLS.
2.016 0.000 2.016 0.000 0.000 AQC:C2P TOTAL 4YR COST :ROCKLAND TPC : $2-$4 M
ROWACQU 0.100 0.100 2011NFA
CONINSP 0.117 0.117 2012NFA
CONST 0.975 0.975 2012NFA
LOCAL
805903
SIDEWALK PROJECT ROUTE 340 : ROUTE 303 TO KINGS HIGHWAY, PHASE II.
TOWN OF ORANGETOWN, ROCKLAND COUNTY
1.192 0.100 1.092 0.000 0.000 AQC:C2P TOTAL 4YR COST :ROCKLAND TPC : $1.2-$2.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 3 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.400 0.400 CONINSPHBRR 2013
CONINSP 0.100 0.100 2013NFA
4.000 4.000 CONSTHBRR 2013
CONST 1.000 1.000 2013NFA
0.360 0.360 CONINSPIM 2013
CONINSP 0.040 0.040 2013NFA
3.600 3.600 CONSTIM 2013
CONST 0.400 0.400 2013NFA
NYSDOT
806210
INTERSTATE 84 BRIDGE REPLACEMENT OVER DINGLE RIDGE ROAD. BINS
1032621 & 1032622. TOWN OF SOUTHEAST
9.900 0.000 0.000 9.900 0.000 AQC:A19P TOTAL 4YR COST :PUTNAM TPC : $7.5-$12 M
CONINSP 0.500 0.500 2012NFA
CONST 5.000 5.000 2012NFA
NYSDOT
807416
ROUTE 45: NEW JERSEY STATE LINE - ROUTE 59 NEW CONSTRUCTION &
RECONSTRUCTION WITH REPAVING , ADDING SIDEWALKS, DRAINAGE
IMPROVEMENTS, AND NO ADDITION OF LANES. VILLAGE OF CHESTNUT
RIDGE, TOWN OF RAMAPO AND VILLAGE OF SPRING VALLEY.
5.500 0.000 5.500 0.000 0.000 AQC:A10P TOTAL 4YR COST :ROCKLAND TPC : $6-$9.4 M
0.767 CMAQ 0.767 OPER2011NYSDOT
808804
INTEGRATED 511 NY/REGIONAL BRANDING, MARKETING, DEPLOYMENT,
AND OPERATIONS.
0.767 0.767 0.000 0.000 0.000 AQC:NON TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
PRELDES 2.144 2.144 2014NFA
ROWINCD 0.161 0.161 2014NFA
NYSDOT
809343
PIP: NORTH MIDDLETOWN ROAD - RTE 202. REHABILITATE BRIDGES, &
PROVIDE MINOR OPERATIONAL & SAFETY IMPROVEMENTS.
T/CLARKSTOWN, RAMAPO, & HAVERSTRAW
2.305 0.000 0.000 0.000 2.305 AQC:A10P TOTAL 4YR COST :ROCKLAND TPC : $26-$40 M
PRELDES 1.200 1.200 2014NFA
ROWINCD 0.090 0.090 2014NFA
SCOPING 0.200 0.200 2014NFA
NYSDOT
809937
CROSS COUNTY PARKWAY/SAW MILL RIVER PARKWAY INTERCHANGE
SAFETY IMPROVEMENTS. CITY OF YONKERS BIN 5500529 & 5500530
1.490 0.000 0.000 0.000 1.490 AQC:D3P TOTAL 4YR COST :WESTCHESTER TPC : $32-$50 M
SCOPING 0.105 0.105 2012NFA
PRELDES 0.471 0.471 2013NFA
0.042 0.042 ROWINCDSTP FLEX 2013
ROWINCD 0.010 0.010 2013NFA
DETLDES 0.482 0.482 2014NFA
ROWACQU 0.536 0.536 2014NFA
NYSDOT
810142
HUTCHINSON RIVER PARKWAY (HRP) / CROSS COUNTY PARKWAY (CCP)
INTERCHANGE RECON: RELOCATE EXISTING NORTHBOUND EXIT 13 TO
VICINITY OF HRP EXIT 15 TO IMPROVE GEOMETRY & OPERATION OF THE
INTERCHANGE FOR WESTBOUND CCP TRAFFIC. WESTCHESTER COUNTY
1.646 0.000 0.105 0.523 1.018 AQC:D3P TOTAL 4YR COST :WESTCHESTER TPC : $15-$25 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 4 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
ROWINCD 0.050 0.050 2013NFA
1.080 1.080 DETLDESIM 2014
DETLDES 0.120 0.120 2014NFA
ROWACQU 0.500 0.500 2014NFA
NYSDOT
810322
ROUTE 9A: ROUTE 119 EXECUTIVE BOULEVARD. NEW
CONSTRUCTION/RECONSTRUCTION OF ROUTE 9A, WHICH IS 4 LANES
UNDIVIDED INTO 4 LANES DIVIDED W/LEFT TURN LANES. IMPROVING
EXISTING/ADDING SIDEWALKS. TOWNS OF GREENBURGH & MT PLEASANT
& VILLAGE OF ELMSFORD;
1.750 0.000 0.000 0.050 1.700 AQC:NON TOTAL 4YR COST :WESTCHESTER TPC : $21-$31 M
0.007 0.007 ROWACQUHPP 2013
ROWACQU 0.003 0.003 2013NFA
LOCAL
810350
REPLACE SIDEWALK ALONG ROUTE 9A IN HAMLET OF MONTROSE: KINGS
FERRY RD- VA HOSPITAL, CONSTRUCT 5 FOOT WIDE CONCRETE SIDEWALK
AND IMPROVE CURB AND DRAINAGE ON THE WEST SIDE OF RTE 9A
(ALBANY POST RD). HAMLET OF MONTROSE, TOWN OF CORTLANDT. NY405
HPP 1500
0.010 0.000 0.000 0.010 0.000 AQC:C2P TOTAL 4YR COST :WESTCHESTER TPC : < $0.75 M
3.248 HBRR 3.248 CONINSP2011
CONINSP 0.812 0.812 2011NFA
34.400 HBRR 34.400 CONST2011
CONST 8.600 8.600 2011NFA
WESTCHESTER
811013
BRONX RIVER PARKWAY/BRONX RIVER & MNR @ CRANE ROAD BRIDGE
REHABILITATION (BIN 3348779). TOWN OF GREENBURGH, TOWN OF
SCARSDALE AND VILLAGE OF SCARSDALE.
47.060 47.060 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $70-$130 M
1.361 1.361 DETLDESIM 2014
DETLDES 0.151 0.151 2014NFA
NYSDOT
811349
I-684 BRIDGES - TAMARACK SWAMP-ROUTE 22 REHABILITATION: MULTI
COURSE OVERLAY. BINS 1052981, 1052982, 1052991, 1052992, 1053001, 1053002,
1053041, 1053042. TOWN OF NORTH CASTLE.
1.512 0.000 0.000 0.000 1.512 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $32-$50 M
0.024 0.024 SCOPINGIM 2013
SCOPING 0.003 0.003 2013NFA
0.079 0.079 PRELDESIM 2014
PRELDES 0.009 0.009 2014NFA
NYSDOT
811351
TURK HILL ROAD OVER I-684 BRIDGE DECK REPLACEMENT. TOWN OF
SOUTHEAST. BIN 1054250.
0.115 0.000 0.000 0.027 0.088 AQC:A19P TOTAL 4YR COST :PUTNAM TPC : $2-$4 M
1.827 1.827 DETLDESIM 2012
DETLDES 0.203 0.203 2012NFA
NYSDOT
811354
I-684 RESURFACING: HARDSCRABBLE ROAD TO I-84. PROJECT WILL
IMPROVE PAVEMENT CONDITION AND RESTORE RIDING
CHARACTERISITICS. TOWNS OF NORTH SALEM & SOUTHEAST.
2.030 0.000 2.030 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $32-$50 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 5 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
1.248 IM 1.248 CONINSP2011
CONINSP 0.416 0.416 2011NFA
12.482 IM 12.482 CONST2011
CONST 4.156 4.156 2011NFA
NYSDOT
811355
I-684 RESURFACING: ROUTE 120 - TAMARACK SWAMP REHABILITATION
MULTI COURSE OVERLAY (D CONTRACT). TOWNS OF HARRISON & NORTH
CASTLE & VILLAGE OF HARRISON, WESTCHESTER COUNTY
18.302 18.302 0.000 0.000 0.000 AQC:A10P TOTAL 4YR COST :WESTCHESTER TPC : $15-$25 M
SCOPING 0.031 0.031 2012NFA
PRELDES 0.086 0.086 2013NFA
ROWINCD 0.011 0.011 2013NFA
DETLDES 0.086 0.086 2014NFA
ROWACQU 0.032 0.032 2014NFA
NYSDOT
812658
TACONIC STATE PARKWAY REHABILITATION FROM BRYANT POND ROAD
TO BULLET HOLE ROAD: SHOULDERS AND PAVEMENT. TOWN OF PUTNAM
VALLEY
0.246 0.000 0.031 0.097 0.118 AQC:A10P TOTAL 4YR COST :PUTNAM TPC : $32-$50 M
PRELDES 0.903 0.903 2012NFA
ROWINCD 0.021 0.021 2012NFA
DETLDES 0.463 0.463 2013NFA
ROWACQU 0.043 0.043 2013NFA
NYSDOT
812659
TACONIC STATE PARKWAY REHABILITATION FROM STILLWATER POND TO
ROUTE 301 TO INCLUDE RESURFACING AND SHOULDERS. TOWN OF
PUTNAM VALLEY
1.430 0.000 0.924 0.506 0.000 AQC:A10P TOTAL 4YR COST :PUTNAM TPC : $12.5-$19 M
ROWACQU 0.155 0.155 2011NFANYSDOT
812726
CONSTRUCT GRADE SEPARATION-INTERCHANGE BETWEEN TACONIC
PARKWAY AND PUDDING ST. REPLACE AN EXISTING AT-GRADE
INTERSECTION OF THE TSP AND PUDDING STREET WITH A GRADE
SEPARATED INTERCHANGE. TOWN OF PUTNAM VALLEY NY264 HPP#85
0.155 0.155 0.000 0.000 0.000 AQC:D3P TOTAL 4YR COST :PUTNAM TPC : $21-$31 M
0.008 HBRR 0.008 CONINSP2011
CONINSP 0.002 0.002 2011NFA
0.080 HBRR 0.080 CONST2011
CONST 0.020 0.020 2011NFA
CONST 26.250 26.250 2011NFA
NYSDOT
812736
BRIDGE REHAB: TACONIC STATE PARKWAY NORTHBOUND/CROTON
RESERVOIR. TOWN OF YORKTOWN , WESTCHESTER COUNTY. BIN 5502190
26.360 26.360 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $40-$60 M
ROWACQU 0.300 0.300 2011NFA
CONINSP 0.300 0.300 2012NFA
CONST 2.500 2.500 2012NFA
NYSDOT
813117
ROUTE 22 INTERIM IMPROVEMENT @ MILLTOWN ROAD. PAVEMENT
RECONSTRUCTION. TOWN OF SOUTHEAST, PUTNAM COUNTY
3.100 0.300 2.800 0.000 0.000 AQC:A10P TOTAL 4YR COST :PUTNAM TPC : $2-$4 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 6 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.127 0.127 DETLDESHBRR 2014
DETLDES 0.032 0.032 2014NFA
NYSDOT
821659
SAW MILL RIVER PARKWAY/KISCO AVENUE BRIDGE REHABILITATION TO
CORRECT MINOR STRUCTURAL DEFICIENCIES. BIN 5500969, VILLAGE OF
MOUNT KISCO.
0.159 0.000 0.000 0.000 0.159 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $4.6-$7.5 M
SCOPING 0.066 0.066 2014NFANYSDOT
821663
SAW MILL RIVER PARKWAY REHABILITATION FROM ROUTE 120 TO ROUTE
117 TO INCLUDE PAVEMENT REHABILITATION, NEW GUIDERAILS, DRAINAGE
UPGRADES, SHOULDERS AND NEW SIGNS. TOWNS OF BEDFORD AND NEW
CASTLE
0.066 0.000 0.000 0.000 0.066 AQC:A10P TOTAL 4YR COST :WESTCHESTER TPC : $7.5-$12 M
0.127 0.127 PRELDESHBRR 2014
PRELDES 0.032 0.032 2014NFA
0.013 0.013 ROWINCDHBRR 2014
ROWINCD 0.003 0.003 2014NFA
0.085 0.085 SCOPINGHBRR 2014
SCOPING 0.021 0.021 2014NFA
NYSDOT
821681
SAW MILL RIVER PARKWAY/SAW MILL RIVER. REPLACE EXISTING
DEFICIENT BRIDGE WITH NO ADDITION OF LANES. BIN 5500739. TOWN OF
GREENBURGH.
0.281 0.000 0.000 0.000 0.281 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $6-$9.4 M
CONINSP 0.300 0.300 2011NFA
CONST 2.797 2.797 2011NFA
NYSDOT
823913
BRIDGE REHABILITATION: ROUTE 9W BRIDGE OVER CEDAR POND BROOK .
BIN 1007140. TOWN OF STONY POINT, ROCKLAND COUNTY
3.097 3.097 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :ROCKLAND TPC : $2-$4 M
CONINSP 0.015 0.015 2011NFA
CONST 0.131 0.131 2011NFA
NYSDOT
832737
DRAINAGE IMPROVEMENT & PERMANENT EASEMENT: ROUTE 9D AT ZUTT
PROPERTY , TOWN OF PHILIPSTOWN; STABILIZE INTERMITTENT STREAM
CHANNEL
0.146 0.146 0.000 0.000 0.000 AQC:A2P TOTAL 4YR COST :PUTNAM TPC : < $0.75 M
CONINSP 0.023 0.023 2012NFA
CONST 0.188 0.188 2012NFA
LOCAL
839098
ROUTE 6; WOODCREST GARDEN APARTMENTS DRIVEWAY RELOCATION.
THIS PROJECT WILL RELOCATE EXISTING APARTMENT COMPLEX
DRIVEWAY FROM ROUTE 6 TO ACCESS ON MT HOPE ROAD. TOWN OF
CARMEL.
0.211 0.000 0.211 0.000 0.000 AQC:D1P TOTAL 4YR COST :PUTNAM TPC : < $0.75 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 7 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.014 0.014 ROWACQUHPP 2013
ROWACQU 0.003 0.003 2013NFA
LOCAL
839200
VILLAGE OF BREWSTER MAIN ST & RTE 6 RELATED CONSTRUCTION &
IMPROVEMENTS. INTERSECTION OF RT 6 & PEACEABLE HILL RD
-INTERSECTION OF RTE 6 & HILLSIDE PARK (1.36 MILES). PROVIDE
SIDEWAKS & HANDICAP RAMPS. NY262 HPP#79. VILLAGE BREWSTER &
TOWN SOUTHEAST.
0.017 0.000 0.000 0.017 0.000 AQC:C2P TOTAL 4YR COST :PUTNAM TPC : $0.6-$1.5 M
0.010 0.010 ROWACQUHPP 2014
ROWACQU 0.003 0.003 2014NFA
LOCAL
848039
ROUTE 202 @ MOHANSIC AVENUE: WILL INCLUDE THE INSTALLATION OF A
TURNING LANE FROM MOHANSIC AVE ONTO EAST BOUND LANE OF ROUTE
22 AND ADDING A CROSSWALK AND PEDESTRIAN SIGNAL PHASE. TOWN OF
YORKTOWN. WESTCHESTER COUNTY. SECTION 1702 HPP#194
0.013 0.000 0.000 0.000 0.013 AQC:A6P TOTAL 4YR COST :WESTCHESTER TPC : < $0.75 M
PRELDES 0.105 0.105 2012NFA
ROWINCD 0.052 0.052 2012NFA
DETLDES 0.214 0.214 2013NFA
ROWACQU 0.214 0.214 2013NFA
NYSDOT
850207
ROUTE 303 @ ORANGEBURG RD & RT 340 INTERSECTION IMPROVEMENTS:
PROJECT IMPROVES OPERATIONS & SAFETY AT THE INTERSECTIONS OF RTE
303, ORANGEBURG RD & RT 340 BY ADDING LEFT TURN LANES & AUXILIARY
THROUGH LANES AND SIGNALS. TOWN OF ORANGETOWN
0.585 0.000 0.157 0.428 0.000 AQC:D1P TOTAL 4YR COST :ROCKLAND TPC : $4.6-$7.5 M
0.084 0.084 PRELDESCMAQ 2013
PRELDES 1.321 1.321 2013NFA
0.013 0.013 ROWINCDCMAQ 2013
ROWINCD 0.118 0.118 2013NFA
0.086 0.086 DETLDESCMAQ 2014
DETLDES 1.221 1.221 2014NFA
NYSDOT
850210
ROUTE 59 FROM ROUTE 303-BROOME BOULEVARD. INSTALL LEFT TURN
LANES AT THE HUB SHOPPING CENTER AND AT BROOME BOULEVARD. AND
INTERSECTION IMPROVEMENTS. TOWN OF CLARKSTOWN.
2.843 0.000 0.000 1.536 1.307 AQC:D2P TOTAL 4YR COST :ROCKLAND TPC : $26-$40 M
0.280 STP LG URBAN 0.280 ROWACQU2011
ROWACQU 0.070 0.070 2011NFA
0.720 0.720 CONSTHPP 2012
CONST 0.180 0.180 2012NFA
0.414 0.414 CONINSPHSIP 2012
CONINSP 0.046 0.046 2012NFA
3.330 3.330 CONSTHSIP 2012
CONST 0.370 0.370 2012NFA
NYSDOT
850219
ROUTE 303 INTERSECTION IMPROVEMENT @ ERIE STREET INTERSECTION.
PROVIDE LEFT TURN LANES AND A SB RIGHT TURN LANE ON ROUTE 303.
COORDINATE TRAFFIC SIGNAL WITH ERIE ST RR CROSSING PROTECTION.
PROVIDE TURN LANES ON ERIE ST. T/ORANGETOWN. NY574 HPP#3192
5.410 0.350 5.060 0.000 0.000 AQC:D1P TOTAL 4YR COST :ROCKLAND TPC : $4.6-$7.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 8 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.928 0.928 PRELDESNHS 2013
PRELDES 0.232 0.232 2013NFA
NYSDOT
856116
ROUTE 35/202 RECONSTRUCTION FROM PEEKSKILL TO THE TACONIC STATE
PARKWAY TO INCLUDE A CENTER TURN LANE, UPGRADED SIGNALS, AND
DRAINAGE IMPROVEMENTS (4.2). TOWNS OF CORTLANDT AND YORKTOWN
1.160 0.000 0.000 1.160 0.000 AQC:NON TOTAL 4YR COST :WESTCHESTER TPC : $12.5-$19 M
CONINSP 0.213 0.213 2011NFA
CONST 2.925 2.925 2011NFA
LOCAL
856125
ROUTE 35/202 @ LAFAYETTE AVENUE AND HUDSON VALLEY HOSPITAL
INTERSECTION IMPROVEMENT PROJECT. THIS PROJECT INVOLVES TWO
TURN LANES ON ROUTE 35. TOWN OF CORTLANDT
3.138 3.138 0.000 0.000 0.000 AQC:D1P TOTAL 4YR COST :WESTCHESTER TPC : $2-$4 M
0.240 HPP 0.240 DETLDES2011
DETLDES 0.060 0.060 2011NFA
0.119 HPP 0.119 ROWACQU2011
ROWACQU 0.030 0.030 2011NFA
0.393 STP LG URBAN 0.393 ROWACQU2011
ROWACQU 0.098 0.098 2011NFA
0.540 0.540 CONINSPHSIP 2012
CONINSP 0.060 0.060 2012NFA
4.950 4.950 CONSTHSIP 2012
CONST 0.550 0.550 2012NFA
NYSDOT
856134
RTE 35/202 @ BEAR MTN PKWY EX, PINE GROVE CT & STONY ST. EXTEND
2ND THROUGH LANE FROM STONY ST - BEAR MTN PKWY EX; CONSTRUCT
LEFT TURN LANES @ EACH INTERSECTION; CONSTRUCT RIGHT TURN LANE
@ STONY ST; INSTALL TRAFFIC SIGNAL @ PINE GROVE CT. YORKTOWN
NY157
7.040 0.940 6.100 0.000 0.000 AQC:D1P TOTAL 4YR COST :WESTCHESTER TPC : $6-$9.4 M
PRELDES 0.220 0.220 2012NFA
DETLDES 0.220 0.220 2013NFA
NYSDOT
872965
I-287 CROSS WESTCHESTER EXPRESSWAY (CWE) RESURFACING:
BLOOMINGDALE RD-RT 120. PREVENTATIVE MAINTENANCE SINGLE COURSE
OVERLAY (D CONTRACT). TOWN OF HARRISON, VILLAGE OF HARRISON,
CITY OF WHITE PLAINS.
0.440 0.000 0.220 0.220 0.000 AQC:A10P TOTAL 4YR COST :WESTCHESTER TPC : $9.5-15.5 M
ROWACQU 0.027 0.027 2012NFANYSDOT
875476
RAVENSDALE AVE/SAW MILL RIVER PARKWAY & RR BRIDGE
REHABILITATION TO CORRECT MINOR STRUCTURAL DEFICIENCIES. (0.10M)
BIN 8820100 VILLAGE OF HASTINGS-ON-HUDSON
0.027 0.000 0.027 0.000 0.000 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $12.5-$19 M
0.004 0.004 ROWACQUCMAQ 2014
ROWACQU 0.001 0.001 2014NFA
LOCAL
875480
KIMBALL & MCLEAN SIGNALS: MODERNIZE OR UPGRADE 9 SIGNALIZED
INTERSECTIONS ON MCLEAN AVENUE AND 7 SIGNALIZED INTERSECTIONS
ON KIMBALL AVENUE TO CURRENT DESIGN STANDARDS. CITY OF
YONKERS
0.005 0.000 0.000 0.000 0.005 AQC:NON TOTAL 4YR COST :WESTCHESTER TPC : $1.2-$2.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 9 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
3.236 STP LG URBAN 3.236 CONST2011
CONST 0.809 0.809 2011NFA
ROCKLAND
875523
NEW HEMPSTEAD RD (CR 80): PALISADES PKWY-RTE 304: RECONSTRUCT 2.0
MILES OF NEW HEMPSTEAD RD, CONSTRUCT BRIDGE, ADD TURNING LANES
TO IMPROVE TRAFFIC SAFETY & OPERATIONS, RECONSTRUCT DRAINAGE &
INSTALL CURB & SIDEWALK. TOWNS OF CLARKSTOWN & RAMAPO.
4.045 4.045 0.000 0.000 0.000 AQC:D1P TOTAL 4YR COST :ROCKLAND TPC : $21-$31 M
0.544 0.544 CONINSPHBRR 2014
CONINSP 0.140 0.140 2014NFA
6.636 6.636 CONSTHBRR 2014
CONST 1.694 1.694 2014NFA
ROCKLAND
875525
ORANGEBURG ROAD (CR 20) BRIDGE REHABILITATION OVER CSX
RAILROAD AND ACCESS ROAD-TOWN OF ORANGETOWN. BIN 3346040.
9.014 0.000 0.000 0.000 9.014 AQC:A19P TOTAL 4YR COST :ROCKLAND TPC : $7.5-$12 M
0.160 0.160 CONINSPSTP LG URBAN 2013
CONINSP 0.040 0.040 2013NFA
1.520 1.520 CONSTSTP LG URBAN 2013
CONST 0.380 0.380 2013NFA
ROCKLAND
875526
OAK TREE ROAD BRIDGE REPLACEMENT IN KIND OVER SPARKILL CREEK
AND RECONSTRUCT APPROACHES. TOWN OF ORANGETOWN. BIN 3346090.
2.100 0.000 0.000 2.100 0.000 AQC:A19P TOTAL 4YR COST :ROCKLAND TPC : $2-$4 M
0.022 0.022 ROWACQUHBRR 2014
ROWACQU 0.005 0.005 2014NFA
PUTNAM
875604
SODOM ROAD BRIDGE REPLACEMENT OVER EAST BRANCH OF CROTON
RIVER TO INCLUDE APPROACH WORK, PAVEMENT MARKINGS, BRIDGE
RAILINGS, AND GUIDERAILS - BIN 2224030. TOWN OF SOUTHEAST
0.027 0.000 0.000 0.000 0.027 AQC:A19P TOTAL 4YR COST :PUTNAM TPC : $1.2-$2.5 M
CONINSP 0.297 0.297 2012NFA
CONST 2.703 2.703 2012NFA
PUTNAM
875626
MAYBROOK BIKEWAY I: CONSTRUCTION OF A 3.2 MILE SEGMENT OF
BIKEWAY ALONG A SECTION OF THE FORMER MAYBROOK FREIGHT LINE
RAILROAD BED WHICH INCLUDES RE-DECKING THREE BRIDGES FROM THE
DUTCHESS COUNTY LINE TO ROUTE 164 IN THE TOWN OF PATTERSON.
3.000 0.000 3.000 0.000 0.000 AQC:C2P TOTAL 4YR COST :PUTNAM TPC : $3.3-$5.6 M
0.343 0.343 CONINSPSTP LG URBAN 2014
CONINSP 0.085 0.085 2014NFA
5.145 5.145 CONSTSTP LG URBAN 2014
CONST 1.287 1.287 2014NFA
ROCKLAND
875688
FORSHAY ROAD (CR 81-VIOLA ROAD TO WILLOW TREE ROAD) -
RECONSTRUCT 1.3 MILES OF FORSHAY ROAD. RECONSTRUCT DRAINAGE
SYSTEMS AND INSTALL CURB AND SIDEWALK. TOWN OF RAMAPO
6.860 0.000 0.000 0.000 6.860 AQC:A10P TOTAL 4YR COST :ROCKLAND TPC : $6-$9.4 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 10 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.086 0.086 ROWACQUSTP LG URBAN 2013
ROWACQU 0.021 0.021 2013NFA
PUTNAM
875689
STONELEIGH AVENUE @ DREWVILLE ROAD INTERSECTION IMPROVEMENTS
INCLUDING NEW SIGNALIZATION AND THE ADDITION OF TURNING LANES
ON THREE OF THE FOUR LEGS OF THE INTERSECTION. TOWN OF CARMEL.
0.107 0.000 0.000 0.107 0.000 AQC:D3P TOTAL 4YR COST :PUTNAM TPC : $1.2-$2.5 M
0.565 0.565 CONINSPHPP 2014
CONINSP 0.141 0.141 2014NFA
5.600 5.600 CONSTHPP 2014
CONST 1.400 1.400 2014NFA
PUTNAM
875748
CONSTRUCT (CR 21) PEEKSKILL HOLLOW ROAD RENOVATION PROJECT
FROM OSCAWANA LAKE ROAD (CR20) TO CHURCH ROAD / MILL STREET:
IMPROVE GEOMETRICS, ADD SHOULDERS, AND IMPROVE DRAINAGE. TOWN
OF PUTNAM VALLEY. NY121
7.706 0.000 0.000 0.000 7.706 AQC:A3P TOTAL 4YR COST :PUTNAM TPC : $7.5-$12 M
0.080 0.080 ROWACQUHPP 2013
ROWACQU 0.020 0.020 2013NFA
PUTNAM
875749
STONELEIGH AVENUE (CR 35) RECONSTRUCTION FROM PUTNAM HOSPITAL
CENTER TO ROUTE 6 TO IMPROVE GEOMETRICS, ADD SHOULDERS, AND
IMPROVE DRAINAGE. TOWN OF CARMEL NY153
0.100 0.000 0.000 0.100 0.000 AQC:A4P TOTAL 4YR COST :PUTNAM TPC : $2-$4 M
0.107 0.107 DETLDESHBRR 2014
DETLDES 0.026 0.026 2014NFA
0.107 0.107 PRELDESHBRR 2014
PRELDES 0.026 0.026 2014NFA
0.009 0.009 ROWINCDHBRR 2014
ROWINCD 0.003 0.003 2014NFA
ROCKLAND
875768
WILLIAM STREET BRIDGE OVER SPARKILL CREEK REPLACEMENT AND
RECONSTRUCT APPROACHES. TOWN OF ORANGETOWN
0.278 0.000 0.000 0.000 0.278 AQC:A19P TOTAL 4YR COST :ROCKLAND TPC : $1.2-$2.5 M
0.129 0.129 DETLDESHBRR 2014
DETLDES 0.034 0.034 2014NFA
0.129 0.129 PRELDESHBRR 2014
PRELDES 0.034 0.034 2014NFA
0.009 0.009 ROWINCDHBRR 2014
ROWINCD 0.003 0.003 2014NFA
ROCKLAND
875769
SAMSONDALE AVENUE OVER CSX RAILROAD BRIDGE REHABILITATION .
TOWN OF HAVERSTRAW
0.338 0.000 0.000 0.000 0.338 AQC:A19P TOTAL 4YR COST :ROCKLAND TPC : $1.2-$2.5 M
0.632 0.632 CONINSPHBRR 2013
CONINSP 0.158 0.158 2013NFA
6.907 6.907 CONSTHBRR 2013
CONST 1.944 1.944 2013NFA
METRO-NORTH
875774
NORTH BARRY AVENUE OVER METRO NORTH RAILROAD BRIDGE
REPLACEMENT IN KIND - BIN 1165170. TOWN OF MAMARONECK
9.641 0.000 0.000 9.641 0.000 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $7.5-$12 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 11 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.420 0.420 CONSTSTP ENHANCE 2013
CONST 0.106 0.106 2013NFA
LOCAL
875862
RAMAPO RIVER TRAILWAY; TRANSPORTATION ENHANCEMENT PROJECT.
PROJECT TO CONSTRUCT 10 FT WIDE PAVE TRAIL WITH SHOULDERS
PARALLEL TO THE RAMAPO RIVER FROM SUFFERN TRAIN STATION TO THE
HILLBURN TRAIN STATION AT ROUTE 59. TOWN OF RAMAPO, ROCKLAND
COUNTY
0.526 0.000 0.000 0.526 0.000 AQC:C2P TOTAL 4YR COST :ROCKLAND TPC : < $0.75 M
0.158 TCSP 0.158 PRELDES2011
PRELDES 0.039 0.039 2011NFA
2.499 2.499 CONSTSTP ENHANCE 2014
CONST 0.833 0.833 2014NFA
0.140 0.140 CONINSPSTP FLEX 2014
CONINSP 0.035 0.035 2014NFA
0.422 0.422 CONSTSTP FLEX 2014
CONST 1.019 1.019 2014NFA
LOCAL
875886
MAIN STREET STREETSCAPE: VILLAGE OF HAVERSTRAW. WORK INCLUDES:
REPLACE SIDEWALKS, REPLACE CURBS, RESERFACE STREET AND LIGHT
POLES. VILLAGE OF HAVERSTRAW, ROCKLAND COUNTY. TEP PROJECT ID
85053.
5.145 0.197 0.000 0.000 4.948 AQC:C14P TOTAL 4YR COST :ROCKLAND TPC : $4.6-$7.5 M
0.127 CMAQ 0.127 DETLDES2011
DETLDES 0.032 0.032 2011NFA
0.009 0.009 ROWACQUCMAQ 2012
ROWACQU 0.003 0.003 2012NFA
0.098 0.098 CONINSPCMAQ 2013
CONINSP 0.026 0.026 2013NFA
1.249 1.249 CONSTCMAQ 2013
CONST 0.312 0.312 2013NFA
LOCAL
875899
PELHAM ROAD TRAFFIC SIGNALS: REPLACEMENT OF 10 TRAFFIC SIGNALS
ALONG PELHAM ROAD FROM PELHAM MANOR TO MAIN STREET; CONNECT
EXISTING SIGNALS WITH THE TRAFFIC SIGNAL COORDINATION SYSTEM.
CITY OF NEW ROCHELLE.
1.856 0.159 0.012 1.685 0.000 AQC:NON TOTAL 4YR COST :WESTCHESTER TPC : $1.2-$2.5 M
0.424 0.424 DETLDESCMAQ 2012
DETLDES 0.106 0.106 2012NFA
0.008 0.008 ROWACQUCMAQ 2013
ROWACQU 0.003 0.003 2013NFA
0.283 0.283 CONINSPCMAQ 2014
CONINSP 0.072 0.072 2014NFA
4.328 4.328 CONSTCMAQ 2014
CONST 1.109 1.109 2014NFA
LOCAL
875900
MAIN STREET & HUGUENOT STREET TRAFFIC SIGNALS: REPLACEMENT OF
36 SIGNALS FROM CLEVELAND AVENUE TO COOPER DRIVE; CONNECT TO
THE EXISTING TRAFFIC SIGNAL COORDINATION SYSTEM. CITY OF NEW
ROCHELLE.
6.333 0.000 0.530 0.011 5.792 AQC:NON TOTAL 4YR COST :WESTCHESTER TPC : $6-$9.4 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 12 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.136 0.136 DETLDESCMAQ 2014
DETLDES 0.034 0.034 2014NFA
0.136 0.136 PRELDESCMAQ 2014
PRELDES 0.034 0.034 2014NFA
0.004 0.004 ROWINCDCMAQ 2014
ROWINCD 0.001 0.001 2014NFA
LOCAL
875902
WEBSTER AVENUE TRAFFIC SIGNALS: REPLACEMENT OF 11 TRAFFIC
SIGNALS FROM MAIN STREET TO EASTCHESTER ROAD; CONNECT TO THE
EXISTING TRAFFIC SIGNAL COORDINATION SYSTEM. CITY OF NEW
ROCHELLE.
0.345 0.000 0.000 0.000 0.345 AQC:NON TOTAL 4YR COST :WESTCHESTER TPC : $3.3-$5.6 M
0.080 FTA 5307 0.080 CONINSP2011
CONINSP 0.020 0.020 2011NFA
0.715 FTA 5307 0.715 CONST2011
CONST 0.180 0.180 2011NFA
PUTNAM
875905
PUTNAM BIKEWAY II, STAGE 4: CONTINUATION OF PUTNAM BIKEWAY FROM
THE TERMINUS OF STAGE 3 TO NORTH MAIN ST IN BREWSTER VILLAGE AND
MAYBROOK BIKEWAY II. THE NEW PROJECT FUNDING SHOWN IS FOR THE
FINAL 0.9 MILE LONG STAGE. TOWN OF SOUTHEAST, PUTNAM COUNTY
0.995 0.995 0.000 0.000 0.000 AQC:C2P TOTAL 4YR COST :PUTNAM TPC : $1.2-$2.5 M
0.002 0.002 ROWINCDHPP 2014LOCAL
875951
REALIGN UNION VALLEY ROAD IN TOWN OF CARMEL: RE-ALIGN UNION
VALLEY RD IN VICINITY OF GLENACOM RD TO IMPROVE SIGHT DISTANCE.
INCLUDES ROW ACQUISITION , DRAINAGE WORK, & OTHER WORK
INCIDENTAL TO THE PROJECT OBJECTIVE. TOWN OF CARMEL. NY285
HPP#263
0.002 0.000 0.000 0.000 0.002 AQC:A5P TOTAL 4YR COST :PUTNAM TPC : < $0.75 M
0.020 HPP 0.020 DETLDES2011
DETLDES 0.005 0.005 2011NFA
0.015 HPP 0.015 PRELDES2011
PRELDES 0.004 0.004 2011NFA
0.001 HPP 0.001 ROWINCD2011
0.001 0.001 ROWACQUHPP 2013
0.009 0.009 ROWINCDHPP 2013
ROWINCD 0.002 0.002 2013NFA
LOCAL
875953
VILLAGE OF COLD SPRING MAIN ST SIDEWALKS & LIGHTING
IMPROVEMENTS: WEST ST-CEDAR ST. REPAIR / REPLACE EXISTING
SIDEWALKS, ADDRESS HANDICAP ACCESSIBILITY WHERE NEEDED AND
REMOVE AND REPLACE LIGHTING IN THE AREA. VILLAGE OF COLD SPRING.
NY384 HPP #1301
0.057 0.045 0.000 0.012 0.000 AQC:C2P TOTAL 4YR COST :PUTNAM TPC : < $0.75 M
0.324 0.324 CONSTHPP 2012
CONST 0.081 0.081 2012NFA
CONINSP 0.020 0.020 2012NFA
LOCAL
875962
CONSTRUCT SIDEWALKS & CURBS ON VALLEY RD IN TOWN OF BEDFORD:
CHERRY ST-HUNTSVILLE RD, CONSTRUCTION OF SIDEWALKS ALONG
VALLEY ROAD TO CONNECT TO NEW AND EXISTING SIDEWALKS SERVING
THE PARK AND DOWNTOWN COMMUNITY. TOWN OF BEDFORD. NY409
HPP#1512.
0.425 0.000 0.425 0.000 0.000 AQC:C2P TOTAL 4YR COST :WESTCHESTER TPC : < $0.75 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 13 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.040 HPP 0.040 DETLDES2011
DETLDES 0.011 0.011 2011NFA
0.008 HPP 0.008 PRELDES2011
PRELDES 0.002 0.002 2011NFA
0.004 HPP 0.004 ROWINCD2011
ROWINCD 0.001 0.001 2011NFA
0.533 0.533 CONSTHPP 2013
CONST 0.133 0.133 2013NFA
0.004 0.004 ROWACQUHPP 2013
ROWACQU 0.001 0.001 2013NFA
CONINSP 0.016 0.016 2013NFA
LOCAL
875963
CONSTRUCT SIDEWALK & IMPROVEMENTS ON BROADWAY TOWN OF
CORTLANDT : 8TH ST TO 16TH ST. PROVIDE CONCRETE SIDEWALK, CURB &
DRAINAGE IMPROVEMENTS ON THE WEST SIDE OF BROADWAY &
ON-STREET PARKING ON BOTH SIDES WHERE NEEDED. TOWN OF
CORTLANDT. NY297 HPP#424
0.753 0.066 0.000 0.687 0.000 AQC:C2P TOTAL 4YR COST :WESTCHESTER TPC : $0.6-$1.5 M
0.135 0.135 CONINSPHPP 2012
CONINSP 0.079 0.079 2012NFA
2.463 2.463 CONSTHPP 2012
CONST 1.116 1.116 2012NFA
0.114 0.114 ROWACQUHPP 2012
ROWACQU 0.029 0.029 2012NFA
ROCKLAND
875964
WEST SHORE RIVER LN RR CROSSING STUDY & IMPROVEMENTS (BEAR MTN
MAINTENANCE RD - ANDRE AVE): SAFETY MEASURES TO IMPROVE SAFETY
& DESIGNATION OF QUIET ZONES FOR THE 13 PUBLIC AND 7 PRIVATE
RR/ROADWAY INTERSECTIONS (NY 299 HPP#443, NY421 #1611, NY578 #3256)
3.936 0.000 3.936 0.000 0.000 AQC:A1P TOTAL 4YR COST :ROCKLAND TPC : $3.3-$5.6 M
0.066 0.066 DETLDESCMAQ 2014
DETLDES 0.016 0.016 2014NFA
0.066 0.066 PRELDESCMAQ 2014
PRELDES 0.016 0.016 2014NFA
0.004 0.004 ROWINCDCMAQ 2014
ROWINCD 0.001 0.001 2014NFA
LOCAL
875966
GERMONDS RD: PALISADES INTERSTATE PKWY (PIP) RAMPS INTERSECTION
RECONSTRUCTION: MIDDLETOWN ROAD/LITTLE TOR ROAD. INCLUDES
CHANNELIZED LANES & TURN LANE FROM NB PIP RAMP. PROJECT PART OF
ROCKLAND COUNTY SIGNAL RETIMING STUDY. TOWN OF CLARKSTOWN.
0.169 0.000 0.000 0.000 0.169 AQC:D1P TOTAL 4YR COST :ROCKLAND TPC : $0.6-$1.5 M
0.004 0.004 DETLDESCMAQ 2014
DETLDES 0.001 0.001 2014NFA
0.004 0.004 PRELDESCMAQ 2014
PRELDES 0.001 0.001 2014NFA
LOCAL
875967
TOWN OF ORANGETOWN TRAFFIC SIGNALS IMPROVEMENTS: RETIME AND
REPLACE SUBSTANDARD TRAFFIC SIGNALS WITH MODERN EQUIPMENT AT
28 INTERSECTIONS IDENTIFIED IN ROCKLAND COUNTY'S SIGNAL RE-TIMING
PROJECT. TOWN OF ORANGETOWN, ROCKLAND COUNTY
0.010 0.000 0.000 0.000 0.010 AQC:D2P TOTAL 4YR COST :ROCKLAND TPC : < $0.75 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 14 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.012 0.012 DETLDESSTP LG URBAN 2012
DETLDES 0.003 0.003 2012NFA
0.012 0.012 PRELDESSTP LG URBAN 2012
PRELDES 0.003 0.003 2012NFA
0.012 0.012 CONINSPSTP LG URBAN 2014
CONINSP 0.003 0.003 2014NFA
0.232 0.232 CONSTSTP LG URBAN 2014
CONST 0.058 0.058 2014NFA
LOCAL
875974
MILL ROAD SIGNALS: MAYFAIR RD TO CALIFORNIA RD. UPGRADE
CONTROLLER/CABINET & VEHICLE DETECTION AT MILL AND LINCOLN
PLACE. REPLACE EXISTING TRAFFIC SIGNALS AT MILL/MAYFAIR RD &
MILL/OAKRIDGE PLACE. UPGRADE PEDESTRIAN SIGNALS. TOWN OF
EASTCHESTER.
0.335 0.000 0.030 0.000 0.305 AQC:D2P TOTAL 4YR COST :WESTCHESTER TPC : < $0.75 M
0.009 0.009 CONINSPCMAQ 2013
CONINSP 0.003 0.003 2013NFA
0.105 0.105 CONSTCMAQ 2013
CONST 0.026 0.026 2013NFA
0.012 0.012 DETLDESCMAQ 2013
DETLDES 0.004 0.004 2013NFA
0.009 0.009 PRELDESCMAQ 2013
PRELDES 0.003 0.003 2013NFA
LOCAL
875975
PELHAM SIGNALS: LINCOLN AVENUE & WOLFS LANE/FIFTH AVENUE.
INSTALL VEHICLE DETECTION LOOPS AT INDIVIDUAL INTERSECTIONS
WITHOUT OPERATING LOOPS. SIGNALS WILL BE COORDINATED BY PRESET
TIMING, NOT INTERCONNECTED. VILLAGE OF PELHAM.
0.171 0.000 0.000 0.171 0.000 AQC:D2P TOTAL 4YR COST :WESTCHESTER TPC : < $0.75 M
0.004 0.004 ROWACQUCMAQ 2013
ROWACQU 0.001 0.001 2013NFA
0.017 0.017 CONINSPCMAQ 2014
CONINSP 0.004 0.004 2014NFA
0.289 0.289 CONSTCMAQ 2014
CONST 0.075 0.075 2014NFA
LOCAL
875976
RTE 9 TRAFFIC SIGNALS: OPERATIONAL IMPROVEMENTS TO 5
INTERSECTIONS ALONG RTE 9. MAY INCLUDE RE-STRIPING & MINOR
PAVEMENT WIDENING TO ADD CRITICAL LANE MOVEMENTS IN AREA OF
THE INTERSECTIONS. VILLAGE OF TARRYTOWN.
0.390 0.000 0.000 0.005 0.385 AQC:D1P TOTAL 4YR COST :WESTCHESTER TPC : < $0.75 M
0.049 0.049 DETLDESHPP 2012
DETLDES 0.012 0.012 2012NFA
0.049 0.049 PRELDESHPP 2012
PRELDES 0.012 0.012 2012NFA
0.001 0.001 ROWACQUHPP 2012
LOCAL
876004
VILLAGE OF COLD SPRING MAIN STREET AND ANCILLARY ROAD SIDEWALK
IMPROVEMENTS. MAIN ST: RT 9D-RAILROAD TRACK, NEW ST:
MARKET-WEST ST., WEST ST: NORTH ST-MAIN ST, & MOUNTAIN AVE:
CEDAR ST-FISHKILL AVE. NY266 HPP #101
0.123 0.000 0.123 0.000 0.000 AQC:C2P TOTAL 4YR COST :PUTNAM TPC : $0.6-$1.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 15 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.028 0.028 CONINSPHPP 2012
CONINSP 0.007 0.007 2012NFA
0.116 0.116 CONSTHPP 2012
CONST 0.029 0.029 2012NFA
LOCAL
876005
VILLAGE OF NELSONVILLE SIDEWALK IMPROVEMENTS. PAVING &
SIDEWALK INSTALLATION TO NORTH PEARL, CROWN ST, PINE ST, WOOD
AVE. NY306 HPP#478. VILLAGE OF NELSONVILLE, PUTNAM COUNTY
0.180 0.000 0.180 0.000 0.000 AQC:C2P TOTAL 4YR COST :PUTNAM TPC : < $0.75 M
0.072 0.072 DETLDESHPP 2014
DETLDES 0.018 0.018 2014NFA
0.016 0.016 PRELDESHPP 2014
PRELDES 0.004 0.004 2014NFA
0.008 0.008 ROWINCDHPP 2014
ROWINCD 0.002 0.002 2014NFA
LOCAL
876010
RECONFIGURE ROAD THROUGH FDR VA HOSPITAL TO PROVIDE ACCESS TO
BATERY PLACE TOWN OF CORTLANDT. RECONFIGURE THE EXISTING FDR
VA HOSPITAL ACCESS RD TO PROVIDE A SAFE ACCESS TO BATTERY PLACE
& VISITORS TO THE HOSPITAL. NY358 HPP#1050. TOWN OF CORTLANDT.
0.120 0.000 0.000 0.000 0.120 AQC:A10P TOTAL 4YR COST :WESTCHESTER TPC : $0.6-$1.5 M
0.400 HPP 0.400 DETLDES2011
DETLDES 0.100 0.100 2011NFA
0.400 HPP 0.400 PRELDES2011
PRELDES 0.100 0.100 2011NFA
LOCAL
876011
CROTON-ON-HUDSON, NY RESTORATION OF VAN CORTLANDT MANOR
ENTRANCE ROAD NY503 HPP#2372, AND RESTORATION OF THE VAN
CORTLANDT MANOR ENTRANCE NEAR CROTON. NY674 HPP#4613, NY503
HPP#2372. VILLAGE OF CROTON-ON-HUDSON, WESTCHESTER COUNTY
1.000 1.000 0.000 0.000 0.000 AQC:A10P TOTAL 4YR COST :WESTCHESTER TPC : $3.3-$5.6 M
ROWACQU 0.010 0.010 2011NFALOCAL
876020
REPAIR SILVER MINE BRIDGE IN THE TOWN OF LEWISBORO. PROJECT WILL
REPLACE SILVER SPRING ROAD CULVERT & GUIDE RAIL TO ELIMINATE
SAFETY CONCERNS. FROM 100' TO THE NORTH & 100' TO THE SOUTH OF THE
CENTER LINE OF THE CULVERT. NY419 HPP#1595. TOWN LEWISBORO
0.010 0.010 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : < $0.75 M
ROWACQU 0.005 0.005 2011NFA
0.103 0.103 CONSTHPP 2012
CONST 0.026 0.026 2012NFA
CONINSP 0.010 0.010 2012NFA
LOCAL
876021
TOWN OF NORTH SALEM RECONSTRUCTION AND REPAVING OF KEELER
LANE FROM HUNT LANE TO ROUTE 121. PROJECT WILL REPLACE EXISTING
DRAINAGE FACILITIES, ROADWAY RECLAMATION AND REPAVING. NY540
HPP#2766. TOWN OF NORTH SALEM, WESTCHESTER COUNTY
0.144 0.005 0.139 0.000 0.000 AQC:A10P TOTAL 4YR COST :WESTCHESTER TPC : < $0.75 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 16 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.500 HPP 0.500 PRELDES2011
PRELDES 0.125 0.125 2011NFA
1.040 1.040 ROWACQUHPP 2013
ROWACQU 17.728 17.728 2013NFA
0.920 0.920 DETLDESHPP 2014
DETLDES 0.231 0.231 2014NFA
0.634 0.634 DETLDESTCSP 2014
DETLDES 0.158 0.158 2014NFA
LOCAL
876032
RECONSTRUCT ASHBURTON AVE (WARBURTON AVE-YONKERS AVE)
IMPROVE THE LEVEL OF SERVICE & REDUCE TRAFFIC THROUGH THE
REDESIGN OF THE CURRENT TYPICAL HIGHWAY SECTION UTILIZING
STSCAPING & TRAFFIC CALMING TECHNIQUES. NY 286 #271, NY334 #779, NY
642 #4581, NY695
21.336 0.625 0.000 18.768 1.943 AQC:C7P TOTAL 4YR COST :WESTCHESTER TPC : $32-$50 M
0.004 0.004 ROWINCDSTP LG URBAN 2012
ROWINCD 0.001 0.001 2012NFA
0.042 0.042 ROWACQUSTP LG URBAN 2013
ROWACQU 0.010 0.010 2013NFA
CONINSP 0.059 0.059 2014NFA
0.792 0.792 CONSTSTP LG URBAN 2014
CONST 0.198 0.198 2014NFA
LOCAL
876033
JAY STREET SIDEWALK IMPROVEMENTS. NEW/IMPROVED PEDESTRIAN
FACILITY. TOWN OF BEDFORD, WESTCHETER COUNTY
1.106 0.000 0.005 0.052 1.049 AQC:C2P TOTAL 4YR COST :WESTCHESTER TPC : $0.6-$1.5 M
0.250 0.250 CONSTHPP 2014LOCAL
876050
DOWNTOWN REVITALIZATION TOWN OF CLARKSTOWN, DOWNTOWN NEW
CITY MAIN STREET FROM CONGERS RD TO THIRD STREET. WORK
INCLUDES: INSTALL SIDEWALKS, DRAINAGE IMPROVEMENTS, NEW
ROADBED, SIGNALIZED PEDESTRIAN CROSSWALK. NY 223. TOWN OF
CLARKSTOWN, ROCKLAND CO.
0.250 0.000 0.000 0.000 0.250 AQC:A10P TOTAL 4YR COST :ROCKLAND TPC : < $0.75 M
0.032 TCSP 0.032 DETLDES2011
DETLDES 0.008 0.008 2011NFA
0.032 TCSP 0.032 PRELDES2011
PRELDES 0.008 0.008 2011NFA
0.001 TCSP 0.001 ROWINCD2011
0.011 0.011 CONINSPTCSP 2012
CONINSP 0.058 0.058 2012NFA
0.545 0.545 CONSTTCSP 2012
CONST 0.136 0.136 2012NFA
0.001 0.001 ROWACQUTCSP 2012
LOCAL
876091
ROUTE 6 (MAIN STREET) IMPROVEMENTS; UPGRADE SIDEWALKS, CURBS,
LANDSCAPE, AND LIGHTING, AND ADA IMPROVEMENTS. CITY OF
PEEKSKILL, WESTCHESTER COUNTY. TCSP GRANT PROJECT # 09NY012
0.832 0.081 0.751 0.000 0.000 AQC:C2P TOTAL 4YR COST :WESTCHESTER TPC : $0.6-$1.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 17 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
DETLDES 0.350 0.350 2011NFA
ROWACQU 0.050 0.050 2011NFA
2.000 2.000 CONSTHBRR 2014
CONST 0.500 0.500 2014NFA
2.080 2.080 CONSTHPP 2014
CONST 0.520 0.520 2014NFA
CONINSP 0.650 0.650 2014NFA
1.522 1.522 CONSTSTP LG URBAN 2014
CONST 8.920 8.920 2014NFA
WESTCHESTER
876092
REHABILITATION OF THE ASHFORD AVE. BRIDGE OVER I-87 IN THE
VILLAGES OF DOBBS FERRY AND ARDSLEY., BINS 5348380 & 534838A.
WESTCHESTER COUNTY. NY436 HPP#1752
16.592 0.400 0.000 0.000 16.192 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $15-$25 M
DETLDES 0.115 0.115 2011NFA
PRELDES 0.115 0.115 2011NFA
ROWACQU 0.005 0.005 2011NFA
ROWINCD 0.005 0.005 2011NFA
0.160 0.160 CONINSPHPP 2013
CONINSP 0.040 0.040 2013NFA
1.800 1.800 CONSTHPP 2013
CONST 0.450 0.450 2013NFA
LOCAL
876094
RECONSTRUCTION ROUTE 6. CONKLIN AVE ON WEST TO LEXINGTON AVE
ON EAST. COMPLETE THE SIDEWALK NETWORK & PROVIDE ENHANCED BUS
SHELTERS, PROVIDE RAISED, LANDSCAPED CENTER ISLANDS AT CERTAIN
INTERSECTIONS. TOWN OF CORTLANDT. 2008 SECTION 129
2.690 0.240 0.000 2.450 0.000 AQC:C2P TOTAL 4YR COST :WESTCHESTER TPC : $2-$4 M
0.064 0.064 DETLDESHPP 2012
DETLDES 0.016 0.016 2012NFA
0.040 0.040 PRELDESHPP 2012
PRELDES 0.010 0.010 2012NFA
0.008 0.008 ROWACQUHPP 2012
ROWACQU 0.002 0.002 2012NFA
0.008 0.008 ROWINCDHPP 2012
ROWINCD 0.002 0.002 2012NFA
0.080 0.080 CONINSPHPP 2013
CONINSP 0.020 0.020 2013NFA
0.800 0.800 CONSTHPP 2013
CONST 0.200 0.200 2013NFA
LOCAL
876101
SOUND SHORE MEDICAL CENTER IMPROVEMENTS: REPLACE THE
SIDEWALKS ON: BURLING LANE, MEMORIAL HIGHWAY, LOCKWOOD AVE,
DIVISION ST, WASHINGTON AVE & GLOVER JOHNSON PLACE. ALSO
IMPROVE LIGHTING & SIGNING WITHIN THE PROJECT LIMITS. CITY OF NEW
ROCHELL HPP#461
1.250 0.000 0.150 1.100 0.000 AQC:C2P TOTAL 4YR COST :WESTCHESTER TPC : $0.6-$1.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 18 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
DETLDES 0.015 0.015 2012NFA
PRELDES 0.017 0.017 2012NFA
0.026 0.026 CONINSPTCSP 2013
CONINSP 0.006 0.006 2013NFA
0.163 0.163 CONSTTCSP 2013
CONST 0.041 0.041 2013NFA
LOCAL
876102
PEARL RIVER DOWNTOWN REVITALIZATION: IMPLEMENTATION OF
SIDEWALK RESTORATION ON THREE BLOCKS. MAIN STREET: FRANKLIN TO
CENTRAL AVE & CENTRAL AVE: MAIN STEET TO WILLIAM STREET &
WILLIAM STREET TO FIREHOUSE. ORANGETOWN, ROCKLAND COUNTY. 2010
TCSP NY005
0.268 0.000 0.032 0.236 0.000 AQC:C2P TOTAL 4YR COST :ROCKLAND TPC : < $0.75 M
0.745 STP ENHANCE 0.745 CONST2011
CONST 0.186 0.186 2011NFA
LOCAL
878011
TEP; OLD CROTON AQUEDUCT OVERSEERS HOUSE RESTORATION:
RESTORATION OF OVERSEERS HOUSE TO INCLUDE INTERIOR UPDATING TO
ADAPT TO CONTEMPORARY USES, INCLUDING EXHIBIT AND OFFICE SPACES,
CLASSROOMS, MEETING ROOMS, ETC. TEP # 8062. TOWN OF GREENBURGH.
0.931 0.931 0.000 0.000 0.000 AQC:C14P TOTAL 4YR COST :WESTCHESTER TPC : $0.6-$1.5 M
0.552 0.552 CONSTSTP ENHANCE 2014
CONST 0.138 0.138 2014NFA
LOCAL
878012
LINKING LANDMARKS ALONG THE HUDSON: CONSTRUCT/RECONSTRUCT
APPROX 1 MILE OF TRAIL THRU NEW COUNTY PARK TO LINK LYNDHURST &
SUNNYSIDE HISTORIC SITES; DEVELOP LANDSCAPING PLAN FOR PARK;
IMPLEMENT VARIOUS LANDSCAPING IMPROVEMENTS. TEP # 8063. TOWN
GREENBURGH
0.690 0.000 0.000 0.000 0.690 AQC:C2P TOTAL 4YR COST :WESTCHESTER TPC : $0.6-$1.5 M
0.613 STP ENHANCE 0.613 CONST2011
CONST 0.153 0.153 2011NFA
LOCAL
878029
LARCHMONT RR STATION - PALMER AVE. BUSINESS DISTRICT
STREETSCAPE; IMPROVEMENTS OF STREET & SIDEWALK LIGHTING,
PROVIDE A NEW BICYCLE PARKING FACILITY, AND IMPROVE SIDEWALKS &
BUS WAITING FACILITIES. VILLAGE OF LARCHMONT, WESTCHESTER
COUNTY
0.766 0.766 0.000 0.000 0.000 AQC:B8P TOTAL 4YR COST :WESTCHESTER TPC : $0.6-$1.5 M
0.560 CMAQ 0.560 OPER2011
OPER 0.140 0.140 2011NFA
0.560 0.560 OPERCMAQ 2012
OPER 0.140 0.140 2012NFA
0.560 0.560 OPERCMAQ 2013
OPER 0.140 0.140 2013NFA
0.560 0.560 OPERCMAQ 2014
OPER 0.140 0.140 2014NFA
NYSDOT
880688
WESTCHESTER COUNTY COMMUTE ALTERNATIVES: FOCUSES ON
STRATEGIES INTENDED TO CHANGE THE TRAVEL BEHAVIOR OF
COMMUTERS INCLUDING MODE CHOICE & THE DIRECTION/TIME OF
TRAVEL, AND THEREBY REDUCE CONGESTION, IMPROVE MOBILITY &
IMPROVE AIR QUALITY.
2.800 0.700 0.700 0.700 0.700 AQC:C3P TOTAL 4YR COST :WESTCHESTER TPC : $4.6-$7.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 19 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.520 CMAQ 0.520 OPER2011
OPER 0.130 0.130 2011NFA
0.520 0.520 OPERCMAQ 2012
OPER 0.130 0.130 2012NFA
0.520 0.520 OPERCMAQ 2013
OPER 0.130 0.130 2013NFA
0.520 0.520 OPERCMAQ 2014
OPER 0.130 0.130 2014NFA
ROCKLAND
880689
ROCKLAND COUNTY COMMUTE ALTERNATIVES: FOCUSES ON STRATEGIES
INTENDED TO CHANGE THE TRAVEL BEHAVIOR OF COMMUTERS
INCLUDING MODE CHOICE & THE DIRECTION/TIME OF TRAVEL, AND
THEREBY REDUCE CONGESTION, IMPROVE MOBILITY & IMPROVE AIR
QUALITY.
2.600 0.650 0.650 0.650 0.650 AQC:C3P TOTAL 4YR COST :ROCKLAND TPC : $3.3-$5.6 M
0.240 CMAQ 0.240 OPER2011
OPER 0.060 0.060 2011NFA
0.240 0.240 OPERCMAQ 2012
OPER 0.060 0.060 2012NFA
0.240 0.240 OPERCMAQ 2013
OPER 0.060 0.060 2013NFA
0.240 0.240 OPERCMAQ 2014
OPER 0.060 0.060 2014NFA
NYSDOT
880690
METRO-NORTH RAILROAD MARKETING CONNECTING SERVICES PROGRAM:
PROMOTES THE USE OF BUSES, CAR/VANPOOLING, FERRIES, ETC., TO
ACCESS MAJOR METRO-NORTH RAIL CORRIDORS. PROGRAM ALSO
INCLUDES FUNDING FOR UNI-TICKET USE.
1.200 0.300 0.300 0.300 0.300 AQC:C1P TOTAL 4YR COST :MULTI TPC : $2-$4 M
OPER 4.200 4.200 2011NFA
OPER 4.200 4.200 2012NFA
OPER 4.200 4.200 2013NFA
OPER 4.200 4.200 2014NFA
NYSDOT
880691
TRANSPORTATION MGMT CENTER (TMC) OPERATIONS: ONGOING COST TO
OPERATE THE TMC INCLUDING STAFF SALARIES, OFFICE EXPENSES,
SUPPLIES, MATERIALS, EQUIPMENT, ETC.
16.800 4.200 4.200 4.200 4.200 AQC:B1P TOTAL 4YR COST :MULTI TPC : $26-$40 M
OPER 0.200 0.200 2011NFA
OPER 0.200 0.200 2013NFA
NYSDOT
880764
HIGHWAY EMERGENCY LOCAL PATROL (HELP) DISPATCH SERVICES.
0.400 0.200 0.000 0.200 0.000 AQC:A6P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
CONINSP 0.180 0.180 2013NFA
CONST 1.500 1.500 2013NFA
NYSDOT
880872
STATE FISCAL YEAR 12/13/14 STATE POLLUTANT DISCHARGE ELIMINATION
SSYSTEM FACILITIES MAINTENANCE
1.680 0.000 0.000 1.680 0.000 AQC:A2P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 20 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
CONINSP 0.180 0.180 2012NFA
CONST 1.500 1.500 2012NFA
NYSDOT
880889
CULVERTS REHABILITATION/REPLACEMENT OF CULVERTS ON STATE
HIGHWAYS.
1.680 0.000 1.680 0.000 0.000 AQC:A2P TOTAL 4YR COST :MULTI TPC : $2-$4 M
0.244 0.244 CONINSPNHS 2012
CONINSP 0.061 0.061 2012NFA
2.030 2.030 CONSTNHS 2012
CONST 0.507 0.507 2012NFA
NYSDOT
880911
STATE FISCAL YEAR 11/12/13 BIENNIAL SIGN CONTRACT: PROJECT WILL
BRING THE TACONIC STATE PARKWAY SIGNS INTO COMPLIANCE, TO THE
EXTENT PRACTICAL, WITH THE NATIONAL STANDARDS FOR TRAFFIC SIGNS.
VARIOUS COUNTIES IN REGION 8
2.842 0.000 2.842 0.000 0.000 AQC:C13P TOTAL 4YR COST :MULTI TPC : $2-$4 M
DETLDES 0.100 0.100 2012NFA
CONINSP 0.300 0.300 2013NFA
CONST 2.500 2.500 2013NFA
NYSDOT
880913
STATE FISCAL YEARS 11/12 AND 12/13 BIENNIAL SIGN CONTRACT, REPLACE
DEFICIENT SIGNS ON STATE HIGHWAYS, VARIOUS COUNTIES
2.900 0.000 0.100 2.800 0.000 AQC:C13P TOTAL 4YR COST :MULTI TPC : $2-$4 M
DETLDES 0.100 0.100 2014NFANYSDOT
880914
STATE FISCAL YEARS 15/16/17 BIENNIAL SIGN CONTRACT, REPLACE
DEFICIENT SIGNS ON STATE HIGHWAYS, VARIOUS COUNTIES
0.100 0.000 0.000 0.000 0.100 AQC:C13P TOTAL 4YR COST :MULTI TPC : $2-$4 M
CONINSP 0.096 0.096 2011NFA
CONST 0.800 0.800 2011NFA
NYSDOT
880919
STATE FISCAL YEAR 10/11 SIGNAL REQUIREMENTS: PROJECT WILL CONSIST
OF UPGRADING OR INSTALLING NEW TRAFFIC SIGNALS AS NEEDED IN THE
COUNTIES OF COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE,
PUTNAM, & WESTCHESTER.
0.896 0.896 0.000 0.000 0.000 AQC:D2P TOTAL 4YR COST :MULTI TPC : $2-$4 M
DETLDES 0.050 0.050 2011NFA
CONINSP 0.072 0.072 2012NFA
CONST 0.600 0.600 2012NFA
NYSDOT
880920
STATE FISCAL YEAR 11/12 SIGNAL REQUIREMENTS: PROJECT WILL CONSIST
OF UPGRADING OR INSTALLING NEW TRAFFIC SIGNALS AS NEEDED IN THE
COUNTIES OF COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE,
PUTNAM, & WESTCHESTER.
0.722 0.050 0.672 0.000 0.000 AQC:D2P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 21 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
ROWINCD 0.100 0.100 2011NFA
DETLDES 0.050 0.050 2012NFA
ROWACQU 0.200 0.200 2012NFA
CONINSP 0.120 0.120 2013NFA
CONST 1.000 1.000 2013NFA
NYSDOT
880921
STATE FISCAL YEAR 12/13 SIGNAL REQUIREMENTS, INSTALL NEW OR
UPGRADE EXISTING TRAFFIC SIGNALS ON STATE HIGHWAYS, VARIOUS
COUNTIES
1.470 0.100 0.250 1.120 0.000 AQC:D2P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
CONINSP 0.216 0.216 2012NFA
CONST 1.800 1.800 2012NFA
NYSDOT
880924
SFY 11/12 TRAFFIC SIGNAL REPLACEMENT: PROJECT WILL CONSIST OF
REPLACING TRAFFIC SIGNALS THAT ARE EITHER OUTDATED OR DEFECTIVE.
THE WORK WILL ENSURE THAT ALL TRAFFIC SIGNALS FUNCTION AS
INTENDED. VARIOUS COUNTIES IN REGION 8.
2.016 0.000 2.016 0.000 0.000 AQC:D2P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
DETLDES 0.310 0.310 2011NFA
ROWACQU 0.200 0.200 2011NFA
CONINSP 0.216 0.216 2013NFA
CONST 1.800 1.800 2013NFA
NYSDOT
880926
SFY 12/13 TRAFFIC SIGNAL REPLACEMENT: PROJECT WILL CONSIST OF
REPLACING TRAFFIC SIGNALS THAT ARE EITHER OUTDATED OR DEFECTIVE.
THE WORK WILL ENSURE THAT ALL TRAFFIC SIGNALS FUNCTION AS
INTENDED. VARIOUS COUNTIES IN REGION 8.
2.526 0.510 0.000 2.016 0.000 AQC:D2P TOTAL 4YR COST :MULTI TPC : $2-$4 M
CONINSP 0.216 0.216 2011NFA
CONST 1.800 1.800 2011NFA
NYSDOT
880928
STATE FISCAL YEAR 10/11 SIGNAL REPLACEMENTS:INSTALL TRAFFIC
SIGNALS &/OR UPGRADE/MODIFY EXISTING SIGNALS WHERE WARRANTED
BY PRIORITY ORDER IN COLUMBIA, DUTCHESS, PUTNAM, & WESTCHESTER
COUNTIES.
2.016 2.016 0.000 0.000 0.000 AQC:D2P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
DETLDES 0.050 0.050 2012NFANYSDOT
880935
STATE FISCAL YEAR 12/13 GUIDERAIL REPLACEMENT: PROJECT WILL
CONSIST OF REPLACING DAMAGED OR NON-FUNCTIONAL GUIDERAIL AND
MEDIAN BARRIERS ON STATE HIGHWAYS, THUS IMPROVING ROADWAY
SAFETY. VARIOUS COUNTIES
0.050 0.000 0.050 0.000 0.000 AQC:A9P TOTAL 4YR COST :MULTI TPC : $2-$4 M
CONINSP 0.240 0.240 2011NFA
CONST 2.000 2.000 2011NFA
DETLDES 0.020 0.020 2011NFA
NYSDOT
880941
STATE FISCAL YEAR 11/12 GUIDERAIL MAINTENANCE: PROJECT WILL
CONSIST OF REPAIRING OR REPLACING DAMAGED OR NON-FUNCTIONAL
GUIDERAIL AND MEDIAN BARRIERS ON STATE HIGHWAYS, THUS
IMPROVING ROADWAY SAFETY. VARIOUS COUNTIES
2.260 2.260 0.000 0.000 0.000 AQC:A9P TOTAL 4YR COST :MULTI TPC : $2-$4 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 22 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
DETLDES 0.020 0.020 2011NFA
CONINSP 0.300 0.300 2012NFA
CONST 3.000 3.000 2012NFA
NYSDOT
880942
STATE FISCAL YEAR 12/13 GUIDERAIL MAINTENANCE, REPAIR DAMAGED
GUIDERAIL ON STATE HIGHWAYS, VARIOUS COUNTIES
3.320 0.020 3.300 0.000 0.000 AQC:A9P TOTAL 4YR COST :MULTI TPC : $2-$4 M
DETLDES 0.010 0.010 2012NFA
CONINSP 0.240 0.240 2013NFA
CONST 2.000 2.000 2013NFA
NYSDOT
880945
SFY 13/14/15 BIENNIAL MOWING/LITTER PICKUP : PICKUP LITTER, TRASH, &
OTHER DEBRIS; MOWING OF ROADSIDE (SHOULDER AND MEDIAN) TURF
AREAS ALONG SELECTED SECTIONS OF STATE HIGHWAYS IN COLUMBIA,
DUTCHESS, ORANGE, ULSTER COUNTIES
2.250 0.000 0.010 2.240 0.000 AQC:A11P TOTAL 4YR COST :MULTI TPC : $2-$4 M
DETLDES 0.030 0.030 2011NFA
CONINSP 0.484 0.484 2012NFA
CONST 4.840 4.840 2012NFA
NYSDOT
880955
SFY 11/12/13 BIENNIAL LONG LINES PAVEMENT REAPPLY LONG LINE
PAVEMENT MARKINGS TO MAINTAIN REFLECTIVITY AND DELINEATION.
VARIOUS COUNTIES THROUGH OUT REGION 8.
5.354 0.030 5.324 0.000 0.000 AQC:A11P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
DETLDES 0.030 0.030 2011NFA
CONINSP 0.290 0.290 2012NFA
CONST 2.420 2.420 2012NFA
NYSDOT
880962
SFY 11/12/13 BIENNIAL SPECIAL SAFETY PAVEMENT MARKINGS AS NEEDED
IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER, &
WESTCHESTER COUNTIES.
2.740 0.030 2.710 0.000 0.000 AQC:A11P TOTAL 4YR COST :MULTI TPC : $2-$4 M
CONINSP 0.054 0.054 2012NFA
CONST 0.450 0.450 2012NFA
NYSDOT
880969
STATE FISCAL YEAR 11/12/13 BIENNIAL ROADSIDE VEGETATION CONTROL:
PROJECT WILL CONSIST OF REMOVING OVERGROWN & UNDESIRABLE
VEGETATION ALONG STATE HIGHWAYS, INCLUDING EXIT/ENTRANCE
RAMPS AND REST AREAS. VARIOUS COUNTIES THROUGHOUT REGION 8
0.504 0.000 0.504 0.000 0.000 AQC:C11P TOTAL 4YR COST :MULTI TPC : < $0.75 M
DETLDES 0.010 0.010 2012NFA
CONINSP 0.054 0.054 2014NFA
CONST 0.450 0.450 2014NFA
NYSDOT
880970
STATE FISCAL YEARS 13/14 AND 14/15 BIENNIAL ROADSIDE VEGETATION
CONTROL, ON STATE HIGHWAYS, VARIOUS COUNTIES
0.514 0.000 0.010 0.000 0.504 AQC:C11P TOTAL 4YR COST :MULTI TPC : < $0.75 M
CONINSP 0.400 0.400 2011NFA
CONST 4.000 4.000 2011NFA
NYSDOT
880976
SFY 11/12 BRIDGE WHERE & WHEN TO PERFORM UNSCHEDULED PRIORITY
BRIDGE WORK AS NEEDED IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM,
ROCKLAND, ULSTER & WESTCHESTER COUNTIES.
4.400 4.400 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 23 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
DETLDES 0.015 0.015 2011NFA
CONINSP 0.400 0.400 2012NFA
CONST 4.000 4.000 2012NFA
NYSDOT
880977
STATE FISCAL YEAR 12/13 BRIDGE WHERE & WHEN TO PERFORM
UNSCHEDULED PRIORITY BRIDGE WORK.
4.415 0.015 4.400 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
CONINSP 0.400 0.400 2011NFA
CONST 1.500 1.500 2011NFA
DETLDES 0.015 0.015 2011NFA
NYSDOT
880983
STATE FISCAL YEAR 11/12 HIGHWAY WHERE & WHEN: PROJECT WILL
CONSIST OF TAKING IMMEDIATE ACTION TO REPAIR AND PREVENT
FURTHER DEGRADATION OF PORTIONS OF STATE HIGHWAYS IN THE EVENT
OF AN EMERGENCY. AS NEEDED IN REGION 8
1.915 1.915 0.000 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
DETLDES 0.015 0.015 2012NFA
CONINSP 0.400 0.400 2013NFA
CONST 4.000 4.000 2013NFA
NYSDOT
880984
STATE FISCAL YEAR 12/13 HIGHWAY WHERE & WHEN TO PERFORM
UNSCHEDULED PRIORITY WORK.
4.415 0.000 0.015 4.400 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
CONINSP 0.400 0.400 2011NFA
CONST 4.000 4.000 2011NFA
DETLDES 0.150 0.150 2011NFA
NYSDOT
880990
SFY 11/12 CYCLICAL BRIDGE PAINTING AS NEEDED IN COLUMBIA,
DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER
COUNTIES.
4.550 4.550 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
DETLDES 0.100 0.100 2011NFA
PRELDES 0.085 0.085 2011NFA
SCOPING 0.065 0.065 2011NFA
CONINSP 0.600 0.600 2012NFA
CONST 6.000 6.000 2012NFA
NYSDOT
880991
SFY 12/13 STATE BRIDGE PAINTING: PROJECT WILL CONSIST OF PAINTING
BRIDGE STEEL SURFACES THAT ARE CORRODED OR DETERIORATED, OR
THAT HAVE UNSATISFACTORY PAINT PROPERTIES AS NEEDED IN
COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER &
WESTCHESTER COUNTIES.
6.850 0.250 6.600 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $6-$9.4 M
PRELDES 0.010 0.010 2011NFA
ROWINCD 0.030 0.030 2011NFA
SCOPING 0.010 0.010 2011NFA
DETLDES 0.050 0.050 2012NFA
ROWACQU 0.100 0.100 2012NFA
CONINSP 0.216 0.216 2013NFA
CONST 1.800 1.800 2013NFA
NYSDOT
880994
STATE FISCAL YEAR 12/13 CULVERT REHABILITATION/REPLACEMENT, ON
STATE HIGHWAYS, VARIOUS COUNTIES
2.216 0.050 0.150 2.016 0.000 AQC:A2P TOTAL 4YR COST :MULTI TPC : $2-$4 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 24 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
OPER 5.353 5.353 2011NFA
OPER 5.751 5.751 2013NFA
NYSDOT
881033
HIGHWAY EMERGENCY LOCAL PATROL (HELP) FREEWAY INCIDENT
MANAGEMENT
11.104 5.353 0.000 5.751 0.000 AQC:A6P TOTAL 4YR COST :MULTI TPC : $15-$25 M
OPER 1.979 1.979 2012NFA
OPER 2.175 2.175 2014NFA
NYSDOT
881034
HIGHWAY EMERGENCY LOCAL PATROLS (HELP) MONITORING
(PRIOR PIN 8T0140, PREVIOUS DESCRIPTION 04/05 H.E.L.P. MONITORING).
4.154 0.000 1.979 0.000 2.175 AQC:A6P TOTAL 4YR COST :WESTCHESTER TPC : $3.3-$5.6 M
OPER 1.500 1.500 2011NFA
OPER 1.600 1.600 2012NFA
OPER 1.700 1.700 2013NFA
OPER 1.800 1.800 2014NFA
NYSDOT
881036
HIGHWAY EMERGENCY LOCAL PATROLS (HELP) COMMUNICATIONS-VOICE
DATA (PRIOR PIN 8T0146, PREVIOUS DESCRIPTION 2005 HELP
COMMUNICATION-VOICE DATA).
6.600 1.500 1.600 1.700 1.800 AQC:C13P TOTAL 4YR COST :WESTCHESTER TPC : $7.5-$12 M
MISC 0.256 0.256 2011NFA
MISC 0.261 0.261 2012NFA
MISC 0.268 0.268 2013NFA
MISC 0.276 0.276 2014NFA
NYSDOT
881042
STATE FISCAL YEAR 09/10 THRU STATE FISCAL YEAR 18/19 WEST NILE VIRUS
LARVACIDE PROGRAM, STATE HIGHWAYS, VARIOUS COUNTIES
1.061 0.256 0.261 0.268 0.276 AQC:C11P TOTAL 4YR COST :MULTI TPC : $2-$4 M
0.410 0.410 CONINSPHSIP 2012
CONINSP 0.046 0.046 2012NFA
4.104 4.104 CONSTHSIP 2012
CONST 0.456 0.456 2012NFA
0.724 0.724 CONINSPNHS 2012
CONINSP 0.181 0.181 2012NFA
6.242 6.242 CONSTNHS 2012
CONST 2.810 2.810 2012NFA
NYSDOT
881095
RUSTIC GUIDERAIL REPLACEMENT: STAGE 2 PROJECT TO ENHANCE
HIGHWAY SAFETY BY REPLACING GUIDERAIL SEGMENTS IN THE VINCINITY
OF RUN-OFF-THE-ROAD PRIORITY INVESTIGATIONS LOCATIONS, ALSO
REPLACE GUIDERAIL AT VARIOUS OTHER TYPE OF HIGH ACCIDCENT
LOCATIONS.
14.973 0.000 14.973 0.000 0.000 AQC:A9P TOTAL 4YR COST :MULTI TPC : $12.5-$19 M
CONINSP 0.120 0.120 2011NFA
CONST 1.000 1.000 2011NFA
NYSDOT
881098
STATE FISCAL YEAR 10/11 HIGHWAY JOB ORDER CONTRACT, CORRECTIVE
HIGHWAY MAINTENANCE, ON STATE HIGHWAYS, VARIOUS COUNTIES
1.120 1.120 0.000 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 25 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
DETLDES 0.010 0.010 2011NFA
CONINSP 0.100 0.100 2012NFA
CONST 1.000 1.000 2012NFA
NYSDOT
881114
STATE FISCAL YEAR 11/12 PAVEMENT REPAIR, PAVEMENT
REHABILITATION/RECONSTRUCTION, ON STATE HIGHWAYS, VARIOUS
COUNTIES
1.110 0.010 1.100 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
DETLDES 0.010 0.010 2012NFA
CONINSP 0.100 0.100 2013NFA
CONST 1.000 1.000 2013NFA
NYSDOT
881115
STATE FISCAL YEAR 12/13 PAVEMENT REPAIR, PAVEMENT
REHABILITATION/RECONSTRUCTION, ON STATE HIGHWAYS, VARIOUS
COUNTIES
1.110 0.000 0.010 1.100 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
DETLDES 0.010 0.010 2013NFA
CONINSP 0.107 0.107 2014NFA
CONST 1.072 1.072 2014NFA
NYSDOT
881116
STATE FISCAL YEAR 13/14 PAVEMENT REPAIR, PAVEMENT
REHABILITATION/RECONSTRUCTION, ON STATE HIGHWAYS, VARIOUS
COUNTIES
1.189 0.000 0.000 0.010 1.179 AQC:A10P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
DETLDES 0.020 0.020 2011NFA
CONINSP 0.049 0.049 2012NFA
CONST 0.400 0.400 2012NFA
NYSDOT
881119
STATE FISCAL YEAR 11/12 MANUAL OF UNIFORM TRAFFIC CONTROL
DEVICES SIGNS. REPLACE NON-COMPLIANT SIGNS, ON STATE HIGHWAYS,
VARIOUS COUNTIES.
0.469 0.020 0.449 0.000 0.000 AQC:A7P TOTAL 4YR COST :MULTI TPC : < $0.75 M
CONINSP 0.050 0.050 2011NFA
CONST 0.400 0.400 2012NFA
DETLDES 0.021 0.021 2012NFA
NYSDOT
881120
STATE FISCAL YEAR 12/13 MANUAL OF UNIFORM TRAFFIC CONTROL
DEVICES SIGNS. STATE FISCAL YEAR 12/13 MUTCD SIGNS, REPLACE
NON-COMPLIANT SIGNS, ON STATE HIGHWAYS, VARIOUS COUNTIES
0.471 0.050 0.421 0.000 0.000 AQC:C13P TOTAL 4YR COST :MULTI TPC : < $0.75 M
DETLDES 0.010 0.010 2014NFANYSDOT
881121
STATE FISCAL YEAR YEAR 14/15 PAVEMENT REPAIR, PAVEMENT
REHABILITATION/RECONSTRUCTION, ON STATE HIGHWAYS, VARIOUS
COUNTIES
0.010 0.000 0.000 0.000 0.010 AQC:A10P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
CONINSP 0.200 0.200 2011NFA
CONST 2.000 2.000 2011NFA
NYSDOT
881124
STATE FISCAL YEAR 09/10 CULVERT LINING AT SELECTED LOCATIONS ON
VARIOUS STATE HIGHWAYS THROUGHTOUT REGION.
2.200 2.200 0.000 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $2-$4 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 26 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
CONINSP 0.060 0.060 2011NFA
CONST 0.500 0.500 2011NFA
NYSDOT
881138
STATE FISCAL YEAR 10/11 BRIDGE JOB ORDER CONTRACT, CORRECTIVE
BRIDGE MAINTENANCE, ON STATE HIGHWAYS, VARIOUS COUNTIES
0.560 0.560 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : < $0.75 M
MISC 1.500 1.500 2011NFA
MISC 1.500 1.500 2012NFA
MISC 3.500 3.500 2013NFA
MISC 3.500 3.500 2014NFA
NYSDOT
881139
STATE FISCAL YEAR 09/10 THRU STATE FISCAL YEAR 19/20 TREES AND
BRUSH, REMOVAL OF HAZARDOUS TREES, ON STATE HIGHWAYS, VARIOUS
COUNTIES
10.000 1.500 1.500 3.500 3.500 AQC:A10P TOTAL 4YR COST :MULTI TPC : $12.5-$19 M
CONINSP 0.267 0.267 2011NFA
CONST 2.225 2.225 2011NFA
NYSDOT
881142
STATE FISCAL YEAR 10/11 SPECIAL SURFACE TREATMENT (WAS LADA)
2.492 2.492 0.000 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $2-$4 M
CONINSP 2.113 2.113 2011NFA
CONST 21.117 21.117 2011NFA
NYSDOT
881145
STATE FISCAL YEAR 11/12 PREVENTIVE MAINTENANCE INITIATIVE PAVING,
PAVEMENT RESURFACING, ON STATE HIGHWAYS, ROCKLAND &
WESTCHESTER COUNTIES
23.230 23.230 0.000 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $21-$31 M
CONINSP 0.270 0.270 2011NFA
CONST 2.250 2.250 2011NFA
NYSDOT
881146
STATE FISCAL YEAR 11/12 BRIDGE WASHING/DECK SEALING, BRIDGE
PREVENTIVE MAINTENANCE, ON STATE HIGHWAYS, VARIOIUS COUNTIES
2.520 2.520 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $2-$4 M
CONINSP 0.276 0.276 2012NFA
CONST 2.300 2.300 2012NFA
NYSDOT
881147
AMERICANS WITH DISABILITIES ACT SIDEWALK & RAMPS: LOWER
WESTCHESTER COUNTY
2.576 0.000 2.576 0.000 0.000 AQC:C2P TOTAL 4YR COST :WESTCHESTER TPC : $2-$4 M
DETLDES 0.045 0.045 2011NFA
CONINSP 0.054 0.054 2012NFA
CONST 0.450 0.450 2012NFA
NYSDOT
881150
STATE FISCAL YEARS 11/12 AND 12/13 BIENNIAL STORM WATER RETROFIT
(MS4) IN EAST OF THE HUDSON WATERSHED, STORM WATER QUALITY
IMPROVEMENTS, ON STATE HIGHWAYS, VARIOUS COUNTIES
0.549 0.045 0.504 0.000 0.000 AQC:A2P TOTAL 4YR COST :MULTI TPC : < $0.75 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 27 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
MISC 2.500 2.500 2011NFANYSDOT
881151
STATE FISCAL YEAR 09/10/11 MOWING/LITTER PICKUP, WESTCHESTER.
PICKUP LITTER, TRASH, & OTHER DEBRIS; MOWING OF ROADSIDE
(SHOULDER AND MEDIAN) TURF AREAS ALONG SELECTED SECTIONS OF
STATE HIGHWAYS.
2.500 2.500 0.000 0.000 0.000 AQC:A10P TOTAL 4YR COST :WESTCHESTER TPC : $2-$4 M
0.556 HBRR 0.556 CONINSP2011
CONINSP 0.754 0.754 2011NFA
5.481 HBRR 5.481 CONST2011
CONST 7.620 7.620 2011NFA
NYSDOT
881152
STATE FISCAL YEAR 10/11 BRIDGE MAINT BY CONTRACT (MBC) - MINOR
REHAB AND REPAIRS TO SELECTED STATE BRIDGES AS NEEDED.
14.411 14.411 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $12.5-$19 M
CONINSP 0.300 0.300 2011NFA
CONST 2.500 2.500 2011NFA
NYSDOT
881157
STATE FISCAL YEAR 10/11 HIGHWAY WHERE AND WHEN, STAGE 2, 24 HR
CONTRACTOR STANDBY READINESS: IMMEDIATELY REPAIR PORTIONS OF &
PREVENT FURTHER DEGRADATION TO STATE HIGHWAYS IN THE EVENT OF
AN EMAERGENCY, VARIOUS COUNTIES
2.800 2.800 0.000 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $2-$4 M
0.259 STP FLEX 0.259 CONINSP2011
CONINSP 0.065 0.065 2011NFA
2.592 STP FLEX 2.592 CONST2011
CONST 0.648 0.648 2011NFA
NYSD0T
881158
STATE FISCAL YEAR 10/11 CRACK SEALING. PREVENTIVE MAINTENANCE
CLEAN AND SEAL CRACKS AS NEEDED IN COLUMBIA, DUTCHESS, ORANGE,
PUTNAM, ROCKLAND, ULSTER & WESTCHESTER COUNTIES.
3.564 3.564 0.000 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
CONINSP 0.120 0.120 2011NFA
CONST 1.000 1.000 2011NFA
DETLDES 0.010 0.010 2011NFA
NYSDOT
881160
SFY 10/11 WESTCHESTER/ROCKLAND HIGHWAY JOB ORDER CONTRACT.
PREVENTIVE & ROUTINE MAINTENANCE AS NEEDED IN WESTCHESTER AND
ROCKLAND COUNTIES
1.130 1.130 0.000 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
MISC 1.000 1.000 2011NFANYSDOT
881161
DRAINAGE MULTIPLE AWARD CONTRACT. PREVENTIVE/CORRECTIVE
MAINTENANCE, ON STATE HIGHWAYS, VARIOUS COUNTIES
1.000 1.000 0.000 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $2-$4 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 28 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
DETLDES 0.010 0.010 2011NFA
CONINSP 0.120 0.120 2012NFA
CONST 1.000 1.000 2012NFA
NYSDOT
881165
STATE FISCAL YEAR 11/12 COLUMBIA, DUTCHESS, ORANGE, PUTNAM,
ULSTER HIGHWAY JOB ORDER CONTRACT: PROJECT WILL CONSIST OF
MAKING REPAIRS AND PERFORMING OTHER MAINTENANCE-RELATED
ACTIVITIES, AS NEEDED, TO PRESERVE THE SAFETY AND INTEGRITY OF
STATE HIGHWAYS.
1.130 0.010 1.120 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
DETLDES 0.010 0.010 2011NFA
CONINSP 0.120 0.120 2012NFA
CONST 1.000 1.000 2012NFA
NYSDOT
881166
STATE FISCAL YEAR 11/12 ROCKLAND & WESTCHESTER HIGHWAY JOB
ORDER CONTRACT: PROJECT WILL CONSIST OF MAKING REPAIRS AND
PERFORMING OTHER MAINTENANCE-RELATED ACTIVITIES, AS NEEDED, TO
PRESERVE THE SAFETY AND INTEGRITY OF STATE HIGHWAYS.
1.130 0.010 1.120 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
CONINSP 0.120 0.120 2011NFA
CONST 1.000 1.000 2011NFA
DETLDES 0.005 0.005 2011NFA
NYSDOT
881167
STATE FISCAL YEAR 11/12 DUTCHESS, ORANGE & PUTNAM COUNTIES
BRIDGE JOB ORDER CONTRACT. THIS PROJECT WILL CONSIST OF MAKING
REPAIRS AND PERFORMING OTHER MAINTENANCE-RELATED ACTIVITIES,
AS NEEDED.
1.125 1.125 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
CONINSP 0.120 0.120 2011NFA
CONST 1.000 1.000 2011NFA
DETLDES 0.005 0.005 2011NFA
NYSDOT
881168
STATE FISCAL YEAR 11/12 WESTCHESTER & ROCKLAND BRIDGE JOB ORDER
CONTRACT. THIS PROJECT WILL CONSIST OF MAKING REPAIRS AND
PERFORMING OTHER MAINTENANCE-RELATED ACTIVITIES, AS NEEDED.
1.125 1.125 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
CONINSP 0.120 0.120 2011NFA
CONST 1.000 1.000 2011NFA
DETLDES 0.005 0.005 2011NFA
NYSDOT
881169
STATE FISCAL YEAR 11/12 REGIONAL CULVERT JOB ORDER CONTRACT. THIS
PROJECT CONSISTS OF TAKING CORRECTIVE ACTIONS TO ADDRESS
DEFICIENCIES FOUND ON CULVERTS LOCATED ON STATE HIGHWAYS.
1.125 1.125 0.000 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
DETLDES 0.050 0.050 2011NFA
PRELDES 0.100 0.100 2011NFA
CONINSP 1.500 1.500 2012NFA
4.440 4.440 CONSTSTP FLEX 2012
CONST 10.560 10.560 2012NFA
NYSDOT
881173
STATE FISCAL YEAR 12/13 PREVENTIVE MAINTENANCE INITIATIVE (PMI)
PAVING: SINGLE COURSE OVERLAY (D CONTRACT) AS NEEDED.
16.650 0.150 16.500 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $15-$25 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 29 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.120 0.120 PRELDESSTP FLEX 2012
PRELDES 0.030 0.030 2012NFA
0.024 0.024 ROWINCDSTP FLEX 2012
ROWINCD 0.006 0.006 2012NFA
0.008 0.008 SCOPINGSTP FLEX 2012
SCOPING 0.002 0.002 2012NFA
0.080 0.080 DETLDESSTP FLEX 2013
DETLDES 0.020 0.020 2013NFA
0.080 0.080 ROWACQUSTP FLEX 2013
ROWACQU 0.020 0.020 2013NFA
0.080 0.080 CONINSPSTP FLEX 2014
CONINSP 0.020 0.020 2014NFA
0.800 0.800 CONSTSTP FLEX 2014
CONST 0.200 0.200 2014NFA
NYSDOT
881175
STATE FISCAL YEAR 14/15 BIENNIAL STORM WATER RETROFIT (MS4).
MUNICIPAL SEPARATE STORM SEWER SYSTEMS, EAST OF HUDSON.
1.490 0.000 0.190 0.200 1.100 AQC:A2P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
1.350 1.350 MISCHSIP 2012
MISC 0.150 0.150 2012NFA
NYSDOT
881179
BIENNIAL ACCIDENT INVESTIGATION STUDIES AS NEEDED IN COLUMBIA,
DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER AND WESTCHESTER
COUNTIES. PIN CHANGE FROM 8T0135.
1.500 0.000 1.500 0.000 0.000 AQC:A6P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
1.324 CMAQ 1.324 OPER2011
OPER 0.331 0.331 2011NFA
0.120 STP LG URBAN 0.120 OPER2011
OPER 0.030 0.030 2011NFA
1.040 1.040 OPERCMAQ 2012
OPER 0.260 0.260 2012NFA
0.120 0.120 OPERSTP LG URBAN 2012
OPER 0.030 0.030 2012NFA
1.040 1.040 OPERCMAQ 2013
OPER 0.260 0.260 2013NFA
0.120 0.120 OPERSTP LG URBAN 2013
OPER 0.030 0.030 2013NFA
1.040 1.040 OPERCMAQ 2014
OPER 0.260 0.260 2014NFA
0.120 0.120 OPERSTP LG URBAN 2014
OPER 0.030 0.030 2014NFA
NYSDOT
882038
TRAVEL DEMAND MANAGEMENT/511 PROGRAM : ACTIVITIES TO PROMOTE
NON-SINGLE OCCUPANT MODE CHOICES, RIDESHARING, DIRECTION / TIME
OF TRAVEL THAT LEADS TO REDUCED CONGESTION & IMPROVED AIR
QUALITY. DUTCHESS, ORANGE, PUTNAM, ROCKLAND, WESTCHESTER
COUNTIES
6.155 1.805 1.450 1.450 1.450 AQC:NON TOTAL 4YR COST :MULTI TPC : $9.5-15.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 30 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.800 0.800 MISCFTA 5307 2012
MISC 0.200 0.200 2012NFA
0.800 0.800 MISCFTA 5307 2013
MISC 0.200 0.200 2013NFA
0.800 0.800 MISCFTA 5307 2014
MISC 0.200 0.200 2014NFA
WESTCHESTER
882145
WESTCHESTER COUNTY BUS STOP ENHANCEMENTS.
3.000 0.000 1.000 1.000 1.000 AQC:B7P TOTAL 4YR COST :WESTCHESTER TPC : $4.6-$7.5 M
0.872 STP FLEX 0.872 OPER2011
OPER 0.218 0.218 2011NFA
0.960 0.960 OPERSTP FLEX 2012
OPER 0.240 0.240 2012NFA
0.960 0.960 OPERSTP FLEX 2013
OPER 0.240 0.240 2013NFA
0.960 0.960 OPERSTP FLEX 2014
OPER 0.240 0.240 2014NFA
NYSDOT
882157
POUGHKEEPSIE-WHITE PLAINS COMMUTER BUS: WEEKDAY PEAK-HOUR
SERVICE ALONG THE ROUTE 9 CORRIDOR SERVING RESIDENTS OF
DUTCHESS AND PUTNAM COUNTIES.
4.690 1.090 1.200 1.200 1.200 AQC:B1P TOTAL 4YR COST :MULTI TPC : $7.5-$12 M
0.640 STP FLEX 0.640 OPER2011
OPER 0.160 0.160 2011NFA
0.640 0.640 OPERSTP FLEX 2012
OPER 0.160 0.160 2012NFA
0.704 0.704 OPERSTP FLEX 2013
OPER 0.176 0.176 2013NFA
0.704 0.704 OPERSTP FLEX 2014
OPER 0.176 0.176 2014NFA
NYSDOT
882161
ORANGE-WESTCHESTER LINK (OWL): PEAK-HOUR COMMUTER BUS
PRIMARILY SERVING ORANGE COUNTY RESIDENTS OF THE ROUTE 17 (I-86)
CORRIDOR TO WESTCHESTER COUNTY WITH CONNECTIONS TO OTHER
SERVICES (TAPPAN ZEE EXPRESS, I-BUS & LOCAL SERVICE).
3.360 0.800 0.800 0.880 0.880 AQC:B1P TOTAL 4YR COST :MULTI TPC : $7.5-$12 M
0.796 0.796 MISCFTA 5307 2014
MISC 0.199 0.199 2014NFA
PUTNAM
882171
MAYBROOK III SECURITY FENCE, TRACK SWING AND BRIDGE WORK; ARE
ALL ELEMENTS OF THE PROPOSED MAYBROOK BIKEWAY III PROJECT.
(REFERENCE 8756.96)
0.995 0.000 0.000 0.000 0.995 AQC:C2P TOTAL 4YR COST :PUTNAM TPC : $1.2-$2.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 31 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.220 STP FLEX 0.220 OPER2011
OPER 0.055 0.055 2011NFA
0.220 0.220 OPERSTP FLEX 2012
OPER 0.055 0.055 2012NFA
0.224 0.224 OPERSTP FLEX 2013
OPER 0.056 0.056 2013NFA
0.224 0.224 OPERSTP FLEX 2014
OPER 0.056 0.056 2014NFA
NYSDOT
882185
STAMFORD-WHITE PLAINS EXPRESS BUS (I-BUS): COMMUTER BUS SERVICE
BETWEEN STAMFORD, CT AND WHITE PLAINS, NY WHICH IS PART OF
NYSDOT REGION 8 BUS NETWORK KNOWN AS THE
1.110 0.275 0.275 0.280 0.280 AQC:B1P TOTAL 4YR COST :WESTCHESTER TPC : $2-$4 M
11.885 FTA 5307 11.885 MISC2011
MISC 2.971 2.971 2011NFA
8.175 8.175 MISCFTA 5307 2012
MISC 2.044 2.044 2012NFA
4.000 4.000 MISCFTA 5307 2013
MISC 1.000 1.000 2013NFA
4.000 4.000 MISCFTA 5307 2014
MISC 1.000 1.000 2014NFA
WESTCHESTER
882206
WESTCHESTER COUNTY PREVENTIVE MAINTENANCE FUNDING FOR THE
WESTCHESTER COUNTY BEE-LINE BUS SYSTEM.
35.075 14.856 10.219 5.000 5.000 AQC:B3P TOTAL 4YR COST :WESTCHESTER TPC : $70-$130 M
0.530 FBD 0.530 OPER2011
0.800 0.800 OPERSTP FLEX 2012
OPER 0.200 0.200 2012NFA
0.800 0.800 OPERSTP FLEX 2013
OPER 0.200 0.200 2013NFA
0.800 0.800 OPERSTP FLEX 2014
OPER 0.200 0.200 2014NFA
NYSDOT
882218
HAVERSTRAW-OSSINING FERRY: CONTINUE THE LEASE OF EXISTING
PARKING AND/OR IMPROVEMENTS TO EXISTING DOCK FACILITIES.
3.530 0.530 1.000 1.000 1.000 AQC:B1P TOTAL 4YR COST :MULTI TPC : $6-$9.4 M
0.200 STP LG URBAN 0.200 OPER2011
OPER 0.050 0.050 2011NFA
0.200 0.200 OPERSTP LG URBAN 2012
OPER 0.050 0.050 2012NFA
0.200 0.200 OPERSTP LG URBAN 2013
OPER 0.050 0.050 2013NFA
0.200 0.200 OPERSTP LG URBAN 2014
OPER 0.050 0.050 2014NFA
NYSDOT
882219
ROUTE 9W BUS SERVICE - OPERATING SUBSIDY FOR ALL-DAY BUS SERVICE
BETWEEN THE ROUTE 9W CORRIDOR IN ROCKLAND COUNTY AND THE
PORT AUTHORITY OF NY & NJ BUS TERMINAL ON 41st STREET IN
MANHATTAN.
1.000 0.250 0.250 0.250 0.250 AQC:B1P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 32 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
1.280 FTA 5307 1.280 MISC2011
MISC 0.320 0.320 2011NFA
1.280 1.280 MISCFTA 5307 2012
MISC 0.320 0.320 2012NFA
1.280 1.280 MISCFTA 5307 2013
MISC 0.320 0.320 2013NFA
1.280 1.280 MISCFTA 5307 2014
MISC 0.320 0.320 2014NFA
WESTCHESTER
882223
REPLACE (20) PARATRANSIT VAN AS PART OF THE REGULAR LIFECYCLE
REPLACEMENT FOR THE BEE-LINE BUS SYSTEM.
6.400 1.600 1.600 1.600 1.600 AQC:B10P TOTAL 4YR COST :WESTCHESTER TPC : $12.5-$19 M
0.160 FTA 5307 0.160 MISC2011
MISC 0.040 0.040 2011NFA
0.200 0.200 MISCFTA 5307 2012
MISC 0.050 0.050 2012NFA
0.200 0.200 MISCFTA 5307 2013
MISC 0.050 0.050 2013NFA
0.200 0.200 MISCFTA 5307 2014
MISC 0.050 0.050 2014NFA
WESTCHESTER
882235
BEE-LINE PLANNING FUNDING FOR THE PLANNING ACTIVITIES OF THE
WESTCHESTER COUNTY BEE-LINE BUS SYSTEM. WESTCHESTER COUNTY
0.950 0.200 0.250 0.250 0.250 AQC:C3P TOTAL 4YR COST :WESTCHESTER TPC : $2-$4 M
0.240 STP FLEX 0.240 OPER2011
OPER 0.060 0.060 2011NFA
0.240 0.240 OPERSTP FLEX 2012
OPER 0.060 0.060 2012NFA
0.264 0.264 OPERSTP FLEX 2013
OPER 0.066 0.066 2013NFA
0.264 0.264 OPERSTP FLEX 2014
OPER 0.066 0.066 2014NFA
NYSDOT
882244
CROTON FALLS SHUTTLE: OPERATIONAL ASSISTANCE FOR FEEDER BUS
SERVICE BETWEEN CARMEL/MAHOPAC IN PUTNAM COUNTY AND
METRO-NORTH'S CROTON FALLS STATION IN NORTHERN WESTCHESTER
COUNTY.
1.260 0.300 0.300 0.330 0.330 AQC:B1P TOTAL 4YR COST :MULTI TPC : $2-$4 M
0.027 FTA 5311 0.027 MISC2011
MISC 0.027 0.027 2011NFA
0.027 0.027 MISCFTA 5311 2012
MISC 0.027 0.027 2012NFA
0.027 0.027 MISCFTA 5311 2013
MISC 0.027 0.027 2013NFA
0.027 0.027 MISCFTA 5311 2014
MISC 0.027 0.027 2014NFA
PUTNAM
882246
SECTION 5311 OPERATING ASSISTANCE TO HELP OFFSET COSTS AND
EXPENSES OF PUTNAM AREA RAPID TRANSIT (PART). PUTNAM COUNTY
0.216 0.054 0.054 0.054 0.054 AQC:B1P TOTAL 4YR COST :PUTNAM TPC : < $0.75 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 33 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.568 STP LG URBAN 0.568 OPER2011
OPER 0.171 0.171 2011NFA
0.464 0.464 OPERSTP LG URBAN 2012
OPER 0.116 0.116 2012NFA
0.464 0.464 OPERSTP SM URBAN 2013
OPER 0.116 0.116 2013NFA
0.464 0.464 OPERSTP LG URBAN 2014
OPER 0.116 0.116 2014NFA
NYSDOT
882264
DANBURY, CT TO BREWSTER, & RIDGEFIELD-KATONAH, NY TRAIN STATION
BUS SERVICE. WEEKDAY SHUTTLE BUS SERVICE CO-FUNDED BY NYSDOT
AND CONN DOT. OPERATED BY HOUSATONIC AREA TRANSIT (HART)
ORIENTED TO GRAND CENTRAL TERMINAL COMMUTERS.
2.479 0.739 0.580 0.580 0.580 AQC:B1P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
0.048 CMAQ 0.048 OPER2011
OPER 0.012 0.012 2011NFA
0.044 0.044 OPERCMAQ 2013
OPER 0.011 0.011 2013NFA
NYSDOT
882284
PUTNAM COUNTY PARK & RIDE LEASE AND BUS TRANSFER PROGRAM:
BIENNIAL CONTRACT ADMINISTERED BY NYSDOT.
0.115 0.060 0.000 0.055 0.000 AQC:C1P TOTAL 4YR COST :PUTNAM TPC : < $0.75 M
0.713 FTA 5309 0.713 MISC2011
MISC 0.178 0.178 2011NFA
0.400 0.400 MISCFTA 5307 2012
MISC 0.100 0.100 2012NFA
0.400 0.400 MISCFTA 5307 2013
MISC 0.100 0.100 2013NFA
0.400 0.400 MISCFTA 5307 2014
MISC 0.100 0.100 2014NFA
WESTCHESTER
882297
MODERNIZATION OF THE BEE-LINE MAINTENANCE FACILITIES AT THE
CENTRAL MAINTENANCE FACILITY IN YONKERS AND THE CERRATO
SATELLITE BUS GARAGE IN VALHALLA.
2.391 0.891 0.500 0.500 0.500 AQC:B8P TOTAL 4YR COST :WESTCHESTER TPC : $2-$4 M
1.524 STP FLEX 1.524 OPER2011
OPER 0.381 0.381 2011NFA
1.524 1.524 OPERSTP FLEX 2012
OPER 0.381 0.381 2012NFA
1.524 1.524 OPERSTP FLEX 2013
OPER 0.381 0.381 2013NFA
1.524 1.524 OPERSTP FLEX 2014
OPER 0.381 0.381 2014NFA
NYSDOT
882300
TAPPAN ZEE EXPRESS BUS (ROCKLAND - WESTCHESTER). BUS OPERATES 6
DAYS A WEEK (MONDAY- SATURDAY) BETWEEN ROCKLAND COUNTY AND
TARRYTOWN / WHITE PLAINS IN WESTCHESTER COUNTY.
7.620 1.905 1.905 1.905 1.905 AQC:B1P TOTAL 4YR COST :MULTI TPC : $12.5-$19 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 34 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.344 STP FLEX 0.344 OPER2011
OPER 0.086 0.086 2011NFA
0.344 0.344 OPERSTP FLEX 2012
OPER 0.086 0.086 2012NFA
0.344 0.344 OPERSTP FLEX 2013
OPER 0.086 0.086 2013NFA
0.344 0.344 OPERSTP FLEX 2014
OPER 0.086 0.086 2014NFA
NYSDOT
882303
ROUTE 77 BUS SERVICE (FORMERLY KNOW AS TACONIC EXPRESS BUS
SERVICE): COMMUTER BUS SERVICE BETWEEN SOUTHERN PUTNAM
COUNTY / NORTHERN WESTCHESTER COUNTY (FDR PARK) AND WHITE
PLAINS.
1.720 0.430 0.430 0.430 0.430 AQC:B1P TOTAL 4YR COST :MULTI TPC : $2-$4 M
0.480 0.480 MISCCMAQ 2012
MISC 0.120 0.120 2012NFA
ROCKLAND
882306
RAIL FEEDER BUSES IN ROCKLAND. PURCHASE OF 3 EXPANSION HYBRID
RAIL FEEDER SHUTTLE BUSES FOR TRANSPORT OF ROCKLAND ROUTE.
0.600 0.000 0.600 0.000 0.000 AQC:B10P TOTAL 4YR COST :ROCKLAND TPC : < $0.75 M
0.200 STP FLEX 0.200 OPER2011
OPER 0.050 0.050 2011NFA
0.200 0.200 OPERSTP FLEX 2012
OPER 0.050 0.050 2012NFA
0.200 0.200 OPERSTP FLEX 2013
OPER 0.050 0.050 2013NFA
0.200 0.200 OPERSTP FLEX 2014
OPER 0.050 0.050 2014NFA
NYSDOT
882323
FEDERAL/STATE FUNDING TO BE PROVIDED TO TRAILWAYS BY NYSDOT
UNDER THE CAPITAL COST OF CONTRACTING CONCEPT FOR COMMUTER
SERVICE BETWEEN KINGSTON AND MANHATTAN WITH STOPS IN
ROSENDALE & NEW PALTZ. TOTAL PROJECT COST INCLUDING FAREBOX
RECEIPTS IS $6.347M.
1.000 0.250 0.250 0.250 0.250 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
0.240 STP FLEX 0.240 OPER2011
OPER 0.060 0.060 2011NFA
0.200 0.200 OPERSTP FLEX 2012
OPER 0.050 0.050 2012NFA
0.200 0.200 OPERSTP FLEX 2013
OPER 0.050 0.050 2013NFA
0.200 0.200 OPERSTP FLEX 2014
OPER 0.050 0.050 2014NFA
NYSDOT
882326
ROUTE 17 - NYC ENHANCED BUS SERVICE. THIS SERVICE WILL PROVIDE
ADDED TRIPS TO AN EXISTING SERVICE BETWEEN ROUTE 17 IN ORANGE
COUNTY AND MANHATTAN.
1.050 0.300 0.250 0.250 0.250 AQC:B1P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 35 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.250 CMAQ 0.250 OPER2011
OPER 0.063 0.063 2011NFA
NYSDOT
882330
BEELINE/NORTH BRONX SHUTTLE. WESTCHESTER COUNTY WILL OPERATE
ADDITIONAL SERVICE BETWEEN SUBWAY STOPS IN THE NORTH BRONX
AND KEY TRIP GENERATORS IN THE LOWER PART OF THE COUNTY
PARTICULARLY CROSS COUNTY SHOPPING CENTER AND YONKERS
RACEWAY.
0.313 0.313 0.000 0.000 0.000 AQC:B1P TOTAL 4YR COST :WESTCHESTER TPC : < $0.75 M
1.368 1.368 MISCCMAQ 2012
MISC 0.342 0.342 2012NFA
ROCKLAND
882332
ROCKLAND COUNTY DIESEL RETROFITS: INSTALL MOST APPROPRIATE/BEST
AVAILABLE DIESEL RETROFIT TECHNOLOGY ON EVERY DIESEL POWERED,
COUNTY OWNED VEHICLE 8,500 POUNDS AND GREATER. (Formerly PIN:
8TRM85)
1.710 0.000 1.710 0.000 0.000 AQC:NON TOTAL 4YR COST :ROCKLAND TPC : $1.2-$2.5 M
0.306 FTA 5316 0.306 MISC2011
MISC 0.076 0.076 2011NFA
0.306 FTA 5317 0.306 MISC2011
MISC 0.076 0.076 2011NFA
LOCAL
882333
MOBILITY MANAGEMENT IMPLEMENTATION IN NORTHERN WESTCHESTER-
TO ADDRESS THE MOBILITY CHALLENGES FACED BY OLDER ADULTS,
PERSONS WITH DISABILITIES AND INDIVIDUALS WITH LOW INCOME IN THE
NORTHEASTERN SECTION OF COUNTY.
0.764 0.764 0.000 0.000 0.000 AQC:C3P TOTAL 4YR COST :WESTCHESTER TPC : $0.6-$1.5 M
0.832 FTA 5316 0.832 MISC2011
MISC 0.208 0.208 2011NFA
WESTCHESTER
882334
BEE-LINE ROUTE 4 WEEKDAY SERVICE INCREASE - INCREASE WEEKDAY
SERVICE BY 50% ON BEE-LINE ROUTE 4 BETWEEN 2:00 P.M. AND 9:00 P.M. TO
ACCOMMODATE THE RIDERSHIP GROWTH.
1.040 1.040 0.000 0.000 0.000 AQC:B1P TOTAL 4YR COST :WESTCHESTER TPC : $0.6-$1.5 M
0.040 FTA 5316 0.040 MISC2011
MISC 0.010 0.010 2011NFA
LOCAL
882335
VAN PURCHASE FOR FAMILY SERVICES OF WESTCHESTER-PROVIDE
TRANSPORTATION SEVICES TO CONNECT URBAN HOME HEALTH AIDES
WITH THE ELDERLY AND DISABLED SUBURBAN POPULATION.
0.050 0.050 0.000 0.000 0.000 AQC:B10P TOTAL 4YR COST :WESTCHESTER TPC : < $0.75 M
1.792 FTA 5316 1.792 MISC2011
MISC 0.448 0.448 2011NFA
LOCAL
882336
FAMILY SERVICES OF WESTCHESTER- PROVIDE TRANSPORTATION
SERVICES TO CONNECT URBAN HOME HEALTH AIDES WITH THE ELDERLY
AND DISABLED SUBURBAN POPULATION.
2.240 2.240 0.000 0.000 0.000 AQC:B1P TOTAL 4YR COST :WESTCHESTER TPC : $2-$4 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 36 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.248 STP RAIL 0.248 MISC2011
MISC 0.028 0.028 2011NFA
NYSDOT
893248
CSXT @ GILCREST ROAD, TOWN OF CLARKSTOWN, ROCKLAND COUNTY
0.276 0.276 0.000 0.000 0.000 AQC:A8P TOTAL 4YR COST :ROCKLAND TPC : < $0.75 M
0.248 STP RAIL 0.248 MISC2011
MISC 0.028 0.028 2011NFA
NYSDOT
893249
CSXT@ ORANGEBURG ROAD, TOWN OF CLARKSTOWN, ROCKLAND COUNTY
0.276 0.276 0.000 0.000 0.000 AQC:A8P TOTAL 4YR COST :ROCKLAND TPC : < $0.75 M
0.193 0.193 CONSTSTP RAIL 2013
CONST 0.021 0.021 2013NFA
NYSDOT
893256
AT-GRADE RAILROAD CROSSING ACTIVE WARNING DEVICE UPGRADES,
PUBLIC CROSSINGS, VARIOUS COUNTIES
0.214 0.000 0.000 0.214 0.000 AQC:A8P TOTAL 4YR COST :MULTI TPC : < $0.75 M
0.193 0.193 CONSTSTP RAIL 2013
CONST 0.021 0.021 2013NFA
NYSDOT
893257
AT-GRADE RAILROAD CROSSING ACTIVE WARNING DEVICE UPGRADES,
PUBLIC CROSSINGS, VARIOUS COUNTIES
0.214 0.000 0.000 0.214 0.000 AQC:A8P TOTAL 4YR COST :MULTI TPC : < $0.75 M
0.199 0.199 CONSTSTP RAIL 2014
CONST 0.022 0.022 2014NFA
NYSDOT
893260
AT-GRADE RAILROAD CROSSING ACTIVE WARNING DEVICE UPGRADES,
PUBLIC CROSSINGS, VARIOUS COUNTIES
0.221 0.000 0.000 0.000 0.221 AQC:A8P TOTAL 4YR COST :MULTI TPC : < $0.75 M
0.199 0.199 CONSTSTP RAIL 2014
CONST 0.022 0.022 2014NFA
NYSDOT
893261
AT-GRADE RAILROAD CROSSING ACTIVE WARNING DEVICE UPGRADES,
PUBLIC CROSSINGS, VARIOUS COUNTIES
0.221 0.000 0.000 0.000 0.221 AQC:A8P TOTAL 4YR COST :MULTI TPC : < $0.75 M
MISC 3.200 3.200 2011NFANYSDOT
894007
MAINTENANCE OF EXTERNAL ITS EQUIPMENT AS NEEDED IN COLUMBIA,
DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER
COUNTIES.
3.200 3.200 0.000 0.000 0.000 AQC:A7P TOTAL 4YR COST :MULTI TPC : $2-$4 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 37 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
1.024 STP FLEX 1.024 MISC2011
MISC 0.256 0.256 2011NFA
1.024 1.024 MISCSTP FLEX 2012
MISC 0.256 0.256 2012NFA
1.120 1.120 MISCSTP FLEX 2013
MISC 0.280 0.280 2013NFA
1.120 1.120 MISCSTP FLEX 2014
MISC 0.280 0.280 2014NFA
NYSDOT
895005
WHITE PLAINS SHUTTLE BUS NETWORK: EXTENSIVE SHUTTLE BUS
NETWORK SERVING REVERSE COMMUTERS TRAVEL TO EMPLOYMENT
CENTERS, DOWNTOWN WHITE PLAINS AND ALONG THE SUBURBAN
CORRIDORS IN & AROUND WHITE PLAINS. PART OF NYSDOT REGION 8'S BUS
NETWORK
5.360 1.280 1.280 1.400 1.400 AQC:B1P TOTAL 4YR COST :WESTCHESTER TPC : $7.5-$12 M
0.240 STP FLEX 0.240 OPER2011
OPER 0.060 0.060 2011NFA
0.240 0.240 OPERSTP FLEX 2012
OPER 0.060 0.060 2012NFA
0.240 0.240 OPERSTP FLEX 2013
OPER 0.060 0.060 2013NFA
0.240 0.240 OPERSTP FLEX 2014
OPER 0.060 0.060 2014NFA
NYSDOT
895009
COACH BUS MARKETING AND PARKING CONTRACT: COACH USA
PROMOTES ITS BUS SERVICES IN ORANGE AND ROCKLAND COUNTIES AS
WELL AS LEASES / MAINTAINS PARK & RIDE LOTS FOR TRAVELERS. COACH
USA PROVIDES THE NON-FEDERAL SHARE.
1.200 0.300 0.300 0.300 0.300 AQC:B1P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
0.840 HBRR 0.840 PRELDES2011
PRELDES 0.210 0.210 2011NFA
NYSDOT
8B1001
FFY 10 STATE FORCES BRIDGE INSPECTIONS AS NEEDED IN COLUMBIA,
DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER AND WESTCHESTER
COUNTIES.
1.050 1.050 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
PRELDES 5.940 5.940 2011NFANYSDOT
8B1002
FFY 10/11/12 BIENNIAL & INTERIM BRIDGE INSPECTIONS AS NEEDED IN
COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER AND
WESTCHESTER COUNTIES.
5.940 5.940 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
1.040 HBRR 1.040 PRELDES2011
PRELDES 0.260 0.260 2011NFA
NYSDOT
8B1101
FEDERAL FISCAL YEAR 11 STATE FORCES BRIDGE INSPECTIONS AS NEEDED
IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER AND
WESTCHESTER COUNTIES.
1.300 1.300 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 38 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
1.120 1.120 PRELDESHBRR 2012
PRELDES 0.280 0.280 2012NFA
NYSDOT
8B1201
FEDERAL FISCAL YEAR 2012 STATE FORCES BRIDGE INSPECTIONS, VARIOUS
COUNTIES
1.400 0.000 1.400 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
4.752 4.752 PRELDESHBRR 2013
PRELDES 1.188 1.188 2013NFA
NYSDOT
8B1202
FEDERAL FISCAL YEAR 12/13/14 BIENNIAL & INTERIM BRIDGE INSPECTIONS
AS NEEDED IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND,
ULSTER AND WESTCHESTER COUNTIES.
5.940 0.000 0.000 5.940 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
0.504 HBRR 0.504 MISC2011
MISC 0.126 0.126 2011NFA
NYSDOT
8B1203
FEDERAL FISCAL YEAR 12/13/14 BIENNIAL BRIDGE DIVING & FATHOMETER
SURVEY AS NEEDED IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM,
ROCKLAND, ULSTER AND WESTCHESTER COUNTIES.
0.630 0.630 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
0.200 0.200 PRELDESHBRR 2013
PRELDES 0.050 0.050 2013NFA
NYSDOT
8B1303
FEDERAL FISCAL YEAR 13/14 UNDERWATER BRIDGE INSPECTION
0.250 0.000 0.000 0.250 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : < $0.75 M
1.280 1.280 PRELDESHBRR 2014
PRELDES 0.320 0.320 2014NFA
NYSDOT
8B1401
FEDERAL FISCAL YEAR 2014 STATE FORCES BRIDGE INSPECTIONS, VARIOUS
COUNTIES
1.600 0.000 0.000 0.000 1.600 AQC:A19P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
0.100 REC TRAILS 0.100 MISC2011
MISC 0.025 0.025 2011NFA
0.100 0.100 MISCREC TRAILS 2012
MISC 0.025 0.025 2012NFA
0.100 0.100 MISCREC TRAILS 2013
MISC 0.025 0.025 2013NFA
0.100 0.100 MISCREC TRAILS 2014
MISC 0.025 0.025 2014NFA
NYSOPRHP
8RT107
RECREATIONAL TRAILS PROGRAM. THIS IS A STATE ADMINISTERED,
FEDERAL RECREATIONAL TRAILS FUNDING ASSISTANCE PROGRAM TO
PROVIDE AND MAINTAIN RECREATIONAL TRAILS. THIS IS A BLOCK
PROJECT TO ACCEPT FUTURE PROJECTS DETERMINED BY NYSOPRHP.
0.500 0.125 0.125 0.125 0.125 AQC:C2P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 39 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.100 SCBY 0.100 MISC2011
MISC 0.025 0.025 2011NFA
0.100 0.100 MISCSCBY 2012
MISC 0.025 0.025 2012NFA
0.100 0.100 MISCSCBY 2013
MISC 0.025 0.025 2013NFA
0.100 0.100 MISCSCBY 2014
MISC 0.025 0.025 2014NFA
NYSDOT
8SB001
BLOCK FOR FUTURE SCENIC BYWAY PROJECTS.
0.500 0.125 0.125 0.125 0.125 AQC:C2P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
DETLDES 0.020 0.020 2011NFA
CONINSP 0.300 0.300 2012NFA
CONST 3.000 3.000 2012NFA
NYSDOT
8T0076
STATE FISCAL YEAR 12/13 SPECIAL SURFACE TREATMENT, PAVEMENT
RESURFACING, ON STATE HIGHWAYS, VARIOUS COUNTIES
3.320 0.020 3.300 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $2-$4 M
DETLDES 0.250 0.250 2011NFA
1.080 1.080 CONINSPIM 2012
CONINSP 0.120 0.120 2012NFA
10.800 10.800 CONSTIM 2012
CONST 1.200 1.200 2012NFA
NYSDOT
8T0083
STATE FISCAL YEAR 12/13 BRIDGE MAINTENANCE BY CONTRACT (MBC) -
MINOR REHAB AND REPAIRS TO SELECTED STATE BRIDGES THROUGHOUT
REGION 8.
13.450 0.250 13.200 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $12.5-$19 M
DETLDES 0.014 0.014 2011NFA
CONINSP 0.270 0.270 2012NFA
CONST 2.250 2.250 2012NFA
NYSDOT
8T0108
STATE FISCAL YEAR 12/13 BRIDGE WASHING/DECK SEALING, BRIDGE
PREVENTIVE MAINTENANCE, ON STATE HIGHWAYS, VARIOIUS COUNTIES
2.534 0.014 2.520 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $2-$4 M
DETLDES 0.050 0.050 2012NFA
CONINSP 0.150 0.150 2013NFA
CONST 1.250 1.250 2013NFA
NYSDOT
8T0125
STATE FISCAL YEAR 12/13 CATCH BASINS, REHABILITATION/ REPLACEMENT
OF CATCH BASINS, ON STATE HIGHWAYS, VARIOUS COUNTIES
1.450 0.000 0.050 1.400 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
DETLDES 0.005 0.005 2011NFA
CONINSP 0.300 0.300 2012NFA
CONST 3.000 3.000 2012NFA
NYSDOT
8T0131
STATE FISCAL YEAR 11/12 CRACK SEALING. PREVENTIVE MAINTENANCE
CLEAN AND SEAL CRACK AS NEEDED IN REGION 8.
3.305 0.005 3.300 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $2-$4 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 40 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
DETLDES 0.005 0.005 2011NFA
CONINSP 0.300 0.300 2013NFA
CONST 3.000 3.000 2013NFA
NYSDOT
8T0132
STATE FISCAL YEAR 12/13 CRACK SEALING. PREVENTIVE MAINTENANCE
CLEAN AND SEAL CRACK AS NEEDED IN REGION 8.
3.305 0.005 0.000 3.300 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $2-$4 M
MISC 0.653 0.653 2013NFANYSDOT
8T0157
STATE FISCAL YEARS 14/15 AND 15/16 BIENNIAL HIGHWAY LIGHTING,
CORRECTIVE MAINTENANCE, ON STATE HIGHWAYS, VARIOUS COUNTIES
0.653 0.000 0.000 0.653 0.000 AQC:A18P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
DETLDES 0.010 0.010 2011NFA
CONINSP 0.060 0.060 2012NFA
CONST 0.500 0.500 2012NFA
NYSDOT
8T0163
STATE FISCAL YEAR 11/12 REST AREA IMPROVEMENTS, CORRECTIVE
MAINTENANCE, ON INTERSTATE ROUTES, VARIOUS COUNTIES
0.570 0.010 0.560 0.000 0.000 AQC:A15P TOTAL 4YR COST :MULTI TPC : < $0.75 M
0.600 CMAQ 0.600 OPER2011
OPER 0.150 0.150 2011NFA
NYSDOT
8T0186
TRAVEL DEMAND MANAGEMENT (TDM) PROGRAM TO DEVELOP PROJECTS
& STRATEGIES TO OPTIMIZE THE TRANSPORTATION SYSTEM
PERFORMANCE BY PROMOTING MODE CHOICES, DIRECTION/TIME OF
TRAVEL WHICH LEADS TO REDUCED CONGESTION & IMPROVED AIR
QUALITY IN MHSTCC COUNTIES.
0.750 0.750 0.000 0.000 0.000 AQC:C4P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
0.600 0.600 OPERCMAQ 2012
OPER 0.150 0.150 2012NFA
NYSDOT
8T0187
TRAVEL DEMAND MANAGEMENT (TDM) PROGRAM TO DEVELOP PROJECTS
& STRATEGIES TO OPTIMIZE THE TRANSPORTATION SYSTEM
PERFORMANCE BY PROMOTING MODE CHOICES, DIRECTION/TIME OF
TRAVEL WHICH LEADS TO REDUCED CONGESTION & IMPROVED AIR
QUALITY IN MHSTCC COUNTIES.
0.750 0.000 0.750 0.000 0.000 AQC:C4P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
0.600 0.600 OPERCMAQ 2013
OPER 0.150 0.150 2013NFA
NYSDOT
8T0188
TRAVEL DEMAND MANAGEMENT (TDM) PROGRAM TO DEVELOP PROJECTS
& STRATEGIES TO OPTIMIZE THE TRANSPORTATION SYSTEM
PERFORMANCE BY PROMOTING MODE CHOICES, DIRECTION/TIME OF
TRAVEL WHICH LEADS TO REDUCED CONGESTION & IMPROVED AIR
QUALITY IN MHSTCC COUNITES.
0.750 0.000 0.000 0.750 0.000 AQC:C4P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 41 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
DETLDES 0.100 0.100 2013NFANYSDOT
8T0207
STATE FISCAL YEAR 15/16/17 BIENNIAL SIGN CONTRACT:REPLACE SIGNS
AND/OR POSTS THAT ARE DAMAGED, MISSING AND/OR HAVE LOST
REFLECTIVITY AS NEEDED IN REGION 8.
0.100 0.000 0.000 0.100 0.000 AQC:C13P TOTAL 4YR COST :MULTI TPC : $2-$4 M
ROWINCD 0.100 0.100 2012NFA
DETLDES 0.050 0.050 2013NFA
ROWACQU 0.200 0.200 2013NFA
CONINSP 0.120 0.120 2014NFA
CONST 1.000 1.000 2014NFA
NYSDOT
8T0210
STATE FISCAL YEAR 13/14 SIGNAL REQUIREMENTS: INSTALL TRAFFIC
SIGNALS &/OR UPGRADE/MODIFY EXISTING SIGNALS WHERE WARRANTED
BY PRIORITY ORDER IN REGION 8.
1.470 0.000 0.100 0.250 1.120 AQC:D2P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
ROWINCD 0.100 0.100 2013NFA
DETLDES 0.050 0.050 2014NFA
ROWACQU 0.200 0.200 2014NFA
NYSDOT
8T0211
STATE FISCAL YEAR 14/15 SIGNAL REQUIREMENTS: INSTALL TRAFFIC
SIGNALS &/OR UPGRADE/MODIFY EXISTING SIGNALS WHERE WARRANTED
BY PRIORITY ORDER IN REGION 8.
0.350 0.000 0.000 0.100 0.250 AQC:D2P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
SCOPING 0.010 0.010 2011NFA
DETLDES 0.150 0.150 2012NFA
PRELDES 0.050 0.050 2012NFA
ROWACQU 0.200 0.200 2012NFA
ROWINCD 0.100 0.100 2012NFA
CONINSP 0.180 0.180 2014NFA
CONST 1.500 1.500 2014NFA
NYSDOT
8T0212
STATE FISCAL YEAR 14/15/16 SIGNAL IMPROVEMENTS INSTALL TRAFFIC
SIGNALS &/OR UPGRADE/MODIFY EXISTING SIGNALS WHERE WARRANTED
BY PRIORITY ORDER.
2.190 0.010 0.500 0.000 1.680 AQC:D2P TOTAL 4YR COST :MULTI TPC : $2-$4 M
SCOPING 0.010 0.010 2013NFA
DETLDES 0.150 0.150 2014NFA
PRELDES 0.050 0.050 2014NFA
ROWACQU 0.200 0.200 2014NFA
ROWINCD 0.100 0.100 2014NFA
NYSDOT
8T0213
STATE FISCAL YEAR 16/17/18 SIGNAL IMPROVEMENTS INSTALL TRAFFIC
SIGNALS &/OR UPGRADE/MODIFY EXISTING SIGNALS WHERE WARRANTED
BY PRIORITY ORDER.
0.510 0.000 0.000 0.010 0.500 AQC:D2P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 42 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
DETLDES 0.050 0.050 2012NFA
CONINSP 0.072 0.072 2013NFA
CONST 0.600 0.600 2013NFA
NYSDOT
8T0216
STATE FISCAL YEAR 13/14 SIGNAL UPGRADES: REPLACING OUTDATED OR
DEFECTIVE TRAFFIC AND PEDESTRIAN SIGNAL EQUIPMENT, EXCLUDING
SIGNAL POLES, IN MULTIPLE MUNICIPALITIES IN THE COUNTIES OF
COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM &
WESTCHESTER
0.722 0.000 0.050 0.672 0.000 AQC:D2P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
DETLDES 0.050 0.050 2013NFA
ROWACQU 0.214 0.214 2013NFA
ROWINCD 0.107 0.107 2013NFA
NYSDOT
8T0217
STATE FISCAL YEAR 14/15 SIGNAL REPLACEMENTS AS NEEDED IN
COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER, &
WESTCHESTER COUNTIES.
0.371 0.000 0.000 0.371 0.000 AQC:D2P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
DETLDES 0.050 0.050 2014NFANYSDOT
8T0218
STATE FISCAL YEAR 15/16 SIGNAL UPGRADES: REPLACING OUTDATED OR
DEFECTIVE TRAFFIC AND PEDESTRIAN SIGNAL EQUIPMENT, EXCLUDING
SIGNAL POLES, IN MULTIPLE MUNICIPALITIES IN THE COUNTIES OF
COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM &
WESTCHESTER
0.050 0.000 0.000 0.000 0.050 AQC:D2P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
DETLDES 0.020 0.020 2012NFA
CONINSP 0.240 0.240 2013NFA
CONST 2.000 2.000 2013NFA
NYSDOT
8T0222
STATE FISCAL YEAR 13/14 GUIDERAIL MAINTENANCE: REPAIRING OR
REPLACING DAMAGED OR NON-FUNCTIONAL GUIDERAIL AND MEDIAN
BARRIERS ON STATE HIGHWAYS, THUS IMPROVING ROADWAY SAFETY.
THIS WORK WILL TAKE PLACE IN VARIOUS MUNICIPALITIES IN THE
COUNTIES OF COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE,
PUTNAM AND WESTCHESTER.
2.260 0.000 0.020 2.240 0.000 AQC:A9P TOTAL 4YR COST :MULTI TPC : $2-$4 M
DETLDES 0.020 0.020 2013NFANYSDOT
8T0223
STATE FISCAL YEAR 14/15 GUIDERAIL MAINTENANCE. INSTALL NEW
GUIDERAIL & REPLACE DAMAGED, NON-FUNCTIONING OR SUB- STANDARD
GUIDERAIL, WHERE APPROPRIATE, ON STATE HIGHWAYS.
0.020 0.000 0.000 0.020 0.000 AQC:A9P TOTAL 4YR COST :MULTI TPC : $2-$4 M
DETLDES 0.020 0.020 2014NFANYSDOT
8T0224
STATE FISCAL YEAR 15/16 GUIDERAIL MAINTENANCE. REPAIRING OR
REPLACING DAMAGED OR NON-FUNCTIONAL GUIDERAIL AND MEDIAN
BARRIERS ON STATE HIGHWAYS, THUS IMPROVING ROADWAY SAFETY.
THIS WORK WILL TAKE PLACE IN VARIOUS MUNICIPALITIES IN THE
COUNTIES OF COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE,
PUTNAM AND WESTCHESTER.
0.020 0.000 0.000 0.000 0.020 AQC:A9P TOTAL 4YR COST :MULTI TPC : $2-$4 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 43 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
PRELDES 0.010 0.010 2012NFA
ROWINCD 0.030 0.030 2012NFA
SCOPING 0.010 0.010 2012NFA
DETLDES 0.050 0.050 2013NFA
ROWACQU 0.100 0.100 2013NFA
0.502 0.502 CONINSPNHS 2014
CONINSP 0.125 0.125 2014NFA
5.019 5.019 CONSTNHS 2014
CONST 1.255 1.255 2014NFA
NYSDOT
8T0228
STATE FISCAL YEAR 13/14 CULVERT REHABILITATION/REPLACEMENT:
REPLACE OR REPAIR MALFUNCTIONING CULVERTS IN COLUMBIA,
DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER
COUNTIES.
7.101 0.000 0.050 0.150 6.901 AQC:A2P TOTAL 4YR COST :MULTI TPC : $6-$9.4 M
PRELDES 0.010 0.010 2013NFA
ROWINCD 0.030 0.030 2013NFA
SCOPING 0.010 0.010 2013NFA
DETLDES 0.050 0.050 2014NFA
ROWACQU 0.100 0.100 2014NFA
NYSDOT
8T0229
STATE FISCAL YEAR 14/15 CULVERTS PREVENTIVE MAINTENANCE: PROVIDE
MAINTENANCE WORK FOR VARIOUS CULVERTS FOR COLUMBIA, DUTCHESS,
ULSTER, ROCKLAND, ORANGE, PUTNAM & WESTCHESTER COUNTIES. WORK
WILL ADDRESS EXISTING DRAINAGE DEFICIENCIES.
0.200 0.000 0.000 0.050 0.150 AQC:A2P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
PRELDES 0.010 0.010 2014NFA
ROWINCD 0.030 0.030 2014NFA
SCOPING 0.010 0.010 2014NFA
NYSDOT
8T0230
STATE FISCAL YEAR 15/16 CULVERT REHABILITATION/REPLACEMENT:
REPLACE OR REPAIR MALFUNCTIONING CULVERTS IN COLUMBIA,
DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER
COUNTIES.
0.050 0.000 0.000 0.000 0.050 AQC:A2P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
DETLDES 0.010 0.010 2012NFA
CONINSP 0.210 0.210 2013NFA
CONST 1.750 1.750 2013NFA
NYSDOT
8T0240
STATE FISCAL YEAR 13/14 MOWING; WESTCHESTER
1.970 0.000 0.010 1.960 0.000 AQC:A10P TOTAL 4YR COST :WESTCHESTER TPC : $1.2-$2.5 M
DETLDES 0.010 0.010 2014NFANYSDOT
8T0241
STATE FISCAL YEAR 15/16/17 BIENNIAL MOWING; DUTCHESS, ORANGE,
PUTNAM ALONG STATE HIGHWAYS
0.010 0.000 0.000 0.000 0.010 AQC:A10P TOTAL 4YR COST :MULTI TPC : $2-$4 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 44 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
DETLDES 0.031 0.031 2012NFA
CONINSP 0.440 0.440 2014NFA
CONST 4.400 4.400 2014NFA
NYSDOT
8T0243
STATE FISCAL YEAR 13/14/15 BIENNIAL LONG LINES. WORK WILL IMPROVE
TRAFFIC SAFETY BY ENSURING THAT THE MARKINGS MAINTAIN THEIR
PROPER DELINEATION AND REFLECTIVITY PROPERTIES AS NEEDED IN
COUNTIES IN REGION 8
4.871 0.000 0.031 0.000 4.840 AQC:A11P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
0.024 0.024 DETLDESSTP FLEX 2014
DETLDES 0.006 0.006 2014NFA
NYSDOT
8T0244
STATE FISCAL YEAR 15/16/17 BIENNIAL LONG LINE PAVEMENT MARKINGS.
WORK WILL IMPROVE TRAFFIC SAFETY BY ENSURING THAT THE MARKINGS
MAINTAIN THEIR PROPER DELINEATION AND REFLECTIVITY PROPERTIES AS
NEEDED IN COUNTIES OF REGION 8
0.030 0.000 0.000 0.000 0.030 AQC:A11P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
DETLDES 0.020 0.020 2012NFANYSDOT
8T0246
STATE FISCAL YEARS 14/15/16 STORM WATER POLLUTION DISCHARGE
ELIMINATION FACILITIES MAINTENANCE: PERFORMING ROUTINE
MAINTENANCE WORK ON FACILITIES & STRUCTURES DESIGNED TO
COLLECT, STORE & TREAT STORM WATER. AS NEEDED IN COUNTIES OF
REGION 8
0.020 0.000 0.020 0.000 0.000 AQC:A2P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
DETLDES 0.020 0.020 2014NFANYSDOT
8T0247
STATE FISCAL YEARS 16/17 AND 17/18 STORM WATER POLLUTION
DISCHARGE ELIMINATION FACILITIES MAINTENANCE: PERFORMING
ROUTINE MAINTENANCE WORK ON FACILITIES AND STRUCTURES
DESIGNED TO COLLECT, STORE AND TREAT STORM WATER. VARIOUS
COUNTIES IN REGION 8
0.020 0.000 0.000 0.000 0.020 AQC:A2P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
DETLDES 0.015 0.015 2012NFA
CONINSP 0.400 0.400 2013NFA
CONST 4.000 4.000 2013NFA
NYSDOT
8T0249
STATE FISCAL YEAR 13/14 BRIDGE WHERE & WHEN CONTRACT: TAKING
IMMEDIATE ACTION TO REPAIR AND PREVENT FURTHER DEGRADATION OF
STATE BRIDGES, LARGE CULVERTS, RETAINING WALLS AND OVERHEAD
STRUCTURES IN THE EVENT OF AN EMERGENCY. AS NEEDED IN REGION 8
4.415 0.000 0.015 4.400 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
DETLDES 0.016 0.016 2013NFA
CONINSP 0.442 0.442 2014NFA
CONST 4.416 4.416 2014NFA
NYSDOT
8T0250
STATE FISCAL YEAR 14/15 BRIDGE WHERE & WHEN CONTRACT: TAKING
IMMEDIATE ACTION TO REPAIR AND PREVENT FURTHER DEGRADATION OF
STATE BRIDGES, LARGE CULVERTS, RETAINING WALLS AND OVERHEAD
STRUCTURES IN THE EVENT OF AN EMERGENCY. AS NEEDED IN REGION 8
4.874 0.000 0.000 0.016 4.858 AQC:A19P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 45 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
DETLDES 0.015 0.015 2014NFANYSDOT
8T0251
STATE FISCAL YEAR 15/16 BRIDGE WHERE & WHEN CONTRACT: TAKING
IMMEDIATE ACTION TO REPAIR AND PREVENT FURTHER DEGRADATION OF
STATE BRIDGES, LARGE CULVERTS, RETAINING WALLS AND OVERHEAD
STRUCTURES IN THE EVENT OF AN EMERGENCY. AS NEEDED IN REGION 8
0.015 0.000 0.000 0.000 0.015 AQC:A19P TOTAL 4YR COST :MULTI TPC : $2-$4 M
DETLDES 0.015 0.015 2012NFA
CONINSP 0.400 0.400 2014NFA
CONST 4.000 4.000 2014NFA
NYSDOT
8T0255
STATE FISCAL YEAR 13/14 HIGHWAY WHERE & WHEN. TAKING IMMEDIATE
ACTION TO REPAIR AND PREVENT FURTHER DEGRADATION OF PORTIONS
OF STATE HIGHWAYS IN THE EVENT OF AN EMERGENCY. AS NEEDED IN
REGION 8
4.415 0.000 0.015 0.000 4.400 AQC:A10P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
DETLDES 0.015 0.015 2012NFANYSDOT
8T0256
STATE FISCAL YEAR 14/15 HIGHWAY WHERE & WHENL: TAKING IMMEDIATE
ACTION TO REPAIR AND PREVENT FURTHER DEGRADATION OF PORTIONS
OF STATE HIGHWAYS IN THE EVENT OF AN EMERGENCY. AS NEEDED IN
REGION 8
0.015 0.000 0.015 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
DETLDES 0.015 0.015 2013NFANYSDOT
8T0257
STATE FISCAL YEAR 15/16 HIGHWAY WHERE & WHENL: TAKING IMMEDIATE
ACTION TO REPAIR AND PREVENT FURTHER DEGRADATION OF PORTIONS
OF STATE HIGHWAYS IN THE EVENT OF AN EMERGENCY. AS NEEDED IN
REGION 8
0.015 0.000 0.000 0.015 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
DETLDES 0.015 0.015 2014NFANYSDOT
8T0258
STATE FISCAL YEAR 16/17 HIGHWAY WHERE & WHENL: TAKING IMMEDIATE
ACTION TO REPAIR AND PREVENT FURTHER DEGRADATION OF PORTIONS
OF STATE HIGHWAYS IN THE EVENT OF AN EMERGENCY. AS NEEDED IN
REGION 8
0.015 0.000 0.000 0.000 0.015 AQC:A10P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 46 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
DETLDES 0.100 0.100 2012NFA
1.223 1.223 CONINSPNHS 2013
CONINSP 0.306 0.306 2013NFA
11.520 11.520 CONSTNHS 2013
CONST 2.880 2.880 2013NFA
0.306 0.306 CONINSPSTP SM URBAN 2013
CONINSP 0.076 0.076 2013NFA
3.056 3.056 CONSTSTP SM URBAN 2013
CONST 0.764 0.764 2013NFA
NYSDOT
8T0261
STATE FISCAL YEAR 13/14 PREVENTIVE MAINTENANCE INITIATIVE PAVING
(PMI) PAVING AT VARIOUS LOCATIONS AS NEEDED IN REGION 8
20.231 0.000 0.100 20.131 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $15-$25 M
DETLDES 0.100 0.100 2013NFA
1.260 1.260 CONINSPNHS 2014
CONINSP 0.315 0.315 2014NFA
12.600 12.600 CONSTNHS 2014
CONST 3.150 3.150 2014NFA
NYSDOT
8T0262
STATE FISCAL YEAR 14/15 PREVENTIVE MAINTENANCE INITIATIVE PAVING
(PMI) PAVING AT VARIOUS LOCATIONS AS NEEDED IN REGION 8
17.425 0.000 0.000 0.100 17.325 AQC:A10P TOTAL 4YR COST :MULTI TPC : $15-$25 M
DETLDES 0.100 0.100 2014NFANYSDOT
8T0263
STATE FISCAL YEAR 15/16 PREVENTIVE MAINTENANCE INITIATIVE PAVING
(PMI) PAVING AT VARIOUS LOCATIONS AS NEEDED IN REGION 8
0.100 0.000 0.000 0.000 0.100 AQC:A10P TOTAL 4YR COST :MULTI TPC : $21-$31 M
DETLDES 0.014 0.014 2012NFA
CONINSP 0.270 0.270 2013NFA
CONST 2.250 2.250 2013NFA
NYSDOT
8T0273
STATE FISCAL YEAR 13/14 BRIDGE WASHING/DECK SEALING:
CLEANING/WASHING THE BRIDGES & SEALING THE DECKS, AS NEEDED.
WORK WILL REMOVE DEBRIS FROM THE BRIDGES AND PROTECT THEM
AGAINST CORROSIVE SUBSTANCES AND WILL TAKE PLACE IN VARIOUS
COUNTIES IN REGION 8
2.534 0.000 0.014 2.520 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $2-$4 M
DETLDES 0.014 0.014 2013NFA
CONINSP 0.270 0.270 2014NFA
CONST 2.250 2.250 2014NFA
NYSDOT
8T0274
STATE FISCAL YEAR 14/15 BRIDGE WASHING/DECK SEALING:
CLEANING/WASHING THE BRIDGES & SEALING THE DECKS, AS NEEDED.
WORK WILL REMOVE DEBRIS FROM THE BRIDGES AND PROTECT THEM
AGAINST CORROSIVE SUBSTANCES AND WILL TAKE PLACE IN VARIOUS
COUNTIES IN REGION 8
2.534 0.000 0.000 0.014 2.520 AQC:A19P TOTAL 4YR COST :MULTI TPC : $2-$4 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 47 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
DETLDES 0.014 0.014 2014NFANYSDOT
8T0275
STATE FISCAL YEAR 15/16 BRIDGE WASHING/DECK SEALING:
CLEANING/WASHING THE BRIDGES & SEALING THE DECKS, AS NEEDED.
WORK WILL REMOVE DEBRIS FROM THE BRIDGES AND PROTECT THEM
AGAINST CORROSIVE SUBSTANCES AND WILL TAKE PLACE IN VARIOUS
COUNTIES IN REGION 8
0.014 0.000 0.000 0.000 0.014 AQC:A19P TOTAL 4YR COST :MULTI TPC : $2-$4 M
DETLDES 0.005 0.005 2013NFA
CONINSP 0.240 0.240 2014NFA
CONST 2.000 2.000 2014NFA
NYSDOT
8T0279
STATE FISCAL YEAR 13/14 CRACK SEALING. CLEANING AND SEALING
PAVEMENT CRACKS ON VARIOUS STATE HIGHWAYS. THIS WORK WILL
IMPROVE AND PRESERVE THE INTEGRITY OF THE PAVEMENT BY
PREVENTING WATER INFILTRATION. AS NEEDED IN REGION 8
2.245 0.000 0.000 0.005 2.240 AQC:A10P TOTAL 4YR COST :MULTI TPC : $2-$4 M
DETLDES 0.005 0.005 2014NFANYSDOT
8T0280
STATE FISCAL YEAR 14/15 CRACK SEALING. CLEANING AND SEALING
PAVEMENT CRACKS ON VARIOUS STATE HIGHWAYS. THIS WORK WILL
IMPROVE AND PRESERVE THE INTEGRITY OF THE PAVEMENT BY
PREVENTING WATER INFILTRATION. AS NEEDED IN REGION 8
0.005 0.000 0.000 0.000 0.005 AQC:A10P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
DETLDES 0.020 0.020 2012NFA
CONINSP 0.120 0.120 2013NFA
CONST 1.000 1.000 2013NFA
NYSDOT
8T0285
STATE FISCAL YEAR 13/14 SPECIAL SURFACE TREATMENT, PAVEMENT
RESURFACING, ON STATE HIGHWAYS, VARIOUS COUNTIES
1.140 0.000 0.020 1.120 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
DETLDES 0.020 0.020 2013NFA
CONINSP 0.240 0.240 2014NFA
CONST 2.000 2.000 2014NFA
NYSDOT
8T0286
STATE FISCAL YEAR 14/15 SPECIAL SURFACE TREATMENT, PAVEMENT
RESURFACING, ON STATE HIGHWAYS, VARIOUS COUNTIES
2.260 0.000 0.000 0.020 2.240 AQC:A10P TOTAL 4YR COST :MULTI TPC : $2-$4 M
DETLDES 0.020 0.020 2014NFANYSDOT
8T0287
STATE FISCAL YEAR 15/16 SPECIAL SURFACE TREATMENT, PAVEMENT
RESURFACING, ON STATE HIGHWAYS, VARIOUS COUNTIES
0.020 0.000 0.000 0.000 0.020 AQC:A10P TOTAL 4YR COST :MULTI TPC : $2-$4 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 48 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
PRELDES 0.075 0.075 2012NFA
SCOPING 0.050 0.050 2012NFA
DETLDES 0.125 0.125 2013NFA
1.286 1.286 CONINSPHBRR 2014
CONINSP 0.322 0.322 2014NFA
12.862 12.862 CONSTHBRR 2014
CONST 3.215 3.215 2014NFA
NYSDOT
8T0291
STATE FISCAL YEAR 13/14 MAINTENANCE BY CONTRACT BRIDGE: PROVIDE
MAINTENANCE WORK TO CORRECT OR PREVENT PROBLEMS RELATED TO
THE DETERIORATION OF A VARIETY OF BRIDGE COMPONENTS AS NEEDED
IN REGION 8
17.935 0.000 0.125 0.125 17.685 AQC:A19P TOTAL 4YR COST :MULTI TPC : $15-$25 M
SCOPING 0.050 0.050 2011NFA
PRELDES 0.075 0.075 2012NFA
DETLDES 0.125 0.125 2013NFA
NYSDOT
8T0292
STATE FISCAL YEAR 14/15 MAINTENANCE BY CONTRACT BRIDGE: PROVIDE
MAINTENANCE WORK TO CORRECT OR PREVENT PROBLEMS RELATED TO
THE DETERIORATION OF A VARIETY OF BRIDGE COMPONENTS AS NEEDED
IN REGION 8
0.250 0.050 0.075 0.125 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $15-$25 M
PRELDES 0.075 0.075 2014NFA
SCOPING 0.050 0.050 2014NFA
NYSDOT
8T0293
STATE FISCAL YEAR 15/16 MAINTENANCE BY CONTRACT: PROVIDE
MAINTENANCE WORK TO CORRECT OR PREVENT PROBLEMS RELATED TO
THE DETERIORATION OF A VARIETY OF BRIDGE COMPONENTS AS NEEDED
IN REGION 8
0.125 0.000 0.000 0.000 0.125 AQC:A19P TOTAL 4YR COST :MULTI TPC : $15-$25 M
DETLDES 0.050 0.050 2013NFA
CONINSP 0.300 0.300 2014NFA
CONST 3.000 3.000 2014NFA
NYSDOT
8T0314
STATE FISCAL YEAR 13/14 GUIDERAIL REPLACEMENT: REPLACE DAMAGED
OR NON-FUNCTIONAL GUIDERAIL AND BRIDGE RAIL ON STATE HIGHWAYS
AS NEEDED IN REGION 8.
3.350 0.000 0.000 0.050 3.300 AQC:A10P TOTAL 4YR COST :MULTI TPC : $2-$4 M
DETLDES 0.050 0.050 2014NFANYSDOT
8T0315
STATE FISCAL YEAR 14/15 GUIDERAIL REPLACEMENT: REPLACE DAMAGED
OR NON-FUNCTIONAL GUIDERAIL AND BRIDGE RAIL ON STATE HIGHWAYS
AS NEEDED IN REGION 8.
0.050 0.000 0.000 0.000 0.050 AQC:A10P TOTAL 4YR COST :MULTI TPC : $2-$4 M
SCOPING 0.005 0.005 2014NFANYSDOT
8T0327
STATE FISCAL YEAR 16/17 SAFETY REQUIREMENTS CONTRACT, SPOT
SAFETY IMPROVEMENTS, ON STATE HIGHWAYS, VARIOUS COUNTIES
0.005 0.000 0.000 0.000 0.005 AQC:A6P TOTAL 4YR COST :MULTI TPC : $2-$4 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 49 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
DETLDES 0.010 0.010 2012NFA
CONINSP 0.060 0.060 2013NFA
CONST 0.500 0.500 2013NFA
NYSDOT
8T0330
STATE FISCAL YEAR 13/14 GRAFFITI PROJECT WILL REMOVE GRAFFITI FROM
NOISE BARRIERS, RETAINING WALLS, AND BRIDGES ON STATE HIGHWAYS
IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER, AND
WESTCHESTER COUNTIES.
0.570 0.000 0.010 0.560 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : < $0.75 M
DETLDES 0.010 0.010 2013NFANYSDOT
8T0331
STATE FISCAL YEAR 14/15 GRAFFITI REMOVAL PROJECT WILL REMOVE
GRAFFITI FROM NOISE BARRIERS, RETAINING WALLS, AND BRIDGES ON
STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM,
ROCKLAND, ULSTER, AND WESTCHESTER COUNTIES.
0.010 0.000 0.000 0.010 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : < $0.75 M
DETLDES 0.020 0.020 2011NFA
PRELDES 0.010 0.010 2011NFA
ROWACQU 0.050 0.050 2011NFA
ROWINCD 0.010 0.010 2011NFA
SCOPING 0.010 0.010 2011NFA
CONINSP 0.360 0.360 2013NFA
CONST 3.597 3.597 2013NFA
NYSDOT
8T0342
AMERICANS WITH DISABILITIES ACT SIDEWALK & RAMPS: ROCKLAND
COUNTY
4.057 0.100 0.000 3.957 0.000 AQC:C2P TOTAL 4YR COST :ROCKLAND TPC : $3.3-$5.6 M
DETLDES 0.020 0.020 2014NFA
PRELDES 0.010 0.010 2014NFA
ROWACQU 0.050 0.050 2014NFA
ROWINCD 0.010 0.010 2014NFA
SCOPING 0.010 0.010 2014NFA
NYSDOT
8T0344
AMERICANS WITH DISABILITIES ACT SIDEWALKS & RAMPS: NORTHERN
WESTCHESTER COUNTY
0.100 0.000 0.000 0.000 0.100 AQC:C2P TOTAL 4YR COST :WESTCHESTER TPC : $2-$4 M
DETLDES 0.010 0.010 2014NFANYSDOT
8T0345
STATE FISCAL YEAR 15/16/17 BIENNIAL VEGETATION CONTROL PROJECT
WILL CONSIST OF REMOVING OVERGROWN AND UNDESIRABLE
VEGETATION ALONG STATE HIGHWAYS, INCLUDING EXIT/ENTRANCE
RAMPS AND REST AREAS AS NEEDED IN REGION 8.
0.010 0.000 0.000 0.000 0.010 AQC:C11P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
DETLDES 0.010 0.010 2014NFANYSDOT
8T0349
STATE FISCAL YEAR 14/15 REST AREA IMPROVEMENTS, CORRECTIVE
MAINTENANCE, ON INTERSTATE ROUTES, VARIOUS COUNTIES
0.010 0.000 0.000 0.000 0.010 AQC:A15P TOTAL 4YR COST :MULTI TPC : < $0.75 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 50 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
DETLDES 0.050 0.050 2013NFANYSDOT
8T0354
STATE FISCAL YEAR 13/14 CATCH BASINS REPAIR OR REPLACE CATCH
BASINS OR DRAINAGE STRUCTURES THAT ARE DAMAGED OR HAVE
DETERIORATED.
0.050 0.000 0.000 0.050 0.000 AQC:A2P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
DETLDES 0.050 0.050 2014NFANYSDOT
8T0355
STATE FISCAL YEAR 14/15 CATCH BASINSPROJECT WILL REPAIR OR
REPLACE STORMWATER CATCH BASINS TO ENSURE THAT THE DRAINAGE
SYSTEM FUNCTIONS AS ORIGINALLY DESIGNED. COLUMBIA, DUTCHESS,
ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER COUNTIES
0.050 0.000 0.000 0.000 0.050 AQC:A2P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
PRELDES 0.010 0.010 2011NFA
ROWINCD 0.010 0.010 2011NFA
SCOPING 0.005 0.005 2011NFA
DETLDES 0.015 0.015 2012NFA
ROWACQU 0.020 0.020 2012NFA
CONINSP 0.024 0.024 2013NFA
CONST 0.200 0.200 2013NFA
NYSDOT
8T0361
STATE FISCAL YEAR 12/13 DRAINAGE, PREVENTIVE/CORRECTIVE
MAINTENANCE, ON STATE HIGHWAYS, VARIOUS COUNTIES
0.284 0.025 0.035 0.224 0.000 AQC:A2P TOTAL 4YR COST :MULTI TPC : < $0.75 M
SCOPING 0.005 0.005 2011NFA
DETLDES 0.015 0.015 2012NFA
PRELDES 0.010 0.010 2012NFA
ROWACQU 0.020 0.020 2012NFA
ROWINCD 0.010 0.010 2012NFA
CONINSP 0.024 0.024 2014NFA
CONST 0.200 0.200 2014NFA
NYSDOT
8T0362
STATE FISCAL YEAR 13/14 DRAINAGE, PREVENTIVE/CORRECTIVE
MAINTENANCE, ON STATE HIGHWAYS, VARIOUS COUNTIES
0.284 0.005 0.055 0.000 0.224 AQC:A2P TOTAL 4YR COST :MULTI TPC : < $0.75 M
SCOPING 0.005 0.005 2012NFA
DETLDES 0.015 0.015 2013NFA
PRELDES 0.010 0.010 2013NFA
ROWACQU 0.020 0.020 2013NFA
ROWINCD 0.010 0.010 2013NFA
NYSDOT
8T0363
STATE FISCAL YEAR 14/15 DRAINAGE, PREVENTIVE/CORRECTIVE
MAINTENANCE, ON STATE HIGHWAYS, VARIOUS COUNTIES
0.060 0.000 0.005 0.055 0.000 AQC:A2P TOTAL 4YR COST :MULTI TPC : < $0.75 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 51 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
SCOPING 0.005 0.005 2013NFA
DETLDES 0.015 0.015 2014NFA
PRELDES 0.010 0.010 2014NFA
ROWACQU 0.020 0.020 2014NFA
ROWINCD 0.010 0.010 2014NFA
NYSDOT
8T0364
STATE FISCAL YEAR 15/16 DRAINAGE, PREVENTIVE/CORRECTIVE
MAINTENANCE, ON STATE HIGHWAYS, VARIOUS COUNTIES
0.060 0.000 0.000 0.005 0.055 AQC:A2P TOTAL 4YR COST :MULTI TPC : < $0.75 M
SCOPING 0.005 0.005 2014NFANYSDOT
8T0365
STATE FISCAL YEAR 16/17 DRAINAGE, PREVENTIVE/CORRECTIVE
MAINTENANCE, ON STATE HIGHWAYS, VARIOUS COUNTIES
0.005 0.000 0.000 0.000 0.005 AQC:A2P TOTAL 4YR COST :MULTI TPC : < $0.75 M
CONINSP 0.060 0.060 2011NFA
CONST 0.500 0.500 2011NFA
NYSDOT
8T0377
STATE FISCAL YEAR 11/12 HIGHWAY JOB ORDER CONTRACT PREVENTIVE &
ROUTINE MAINTENANCE AS NEEDED IN REGION 8
0.560 0.560 0.000 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : < $0.75 M
DETLDES 0.010 0.010 2011NFA
CONINSP 0.060 0.060 2012NFA
CONST 0.500 0.500 2012NFA
NYSDOT
8T0378
STATE FISCAL YEAR 12/13 HIGHWAY JOB ORDER CONTRACT PREVENTIVE &
ROUTINE MAINTENANCE AS NEEDED IN REGION 8
0.570 0.010 0.560 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : < $0.75 M
DETLDES 0.010 0.010 2012NFA
CONINSP 0.060 0.060 2013NFA
CONST 0.500 0.500 2013NFA
NYSDOT
8T0379
STATE FISCAL YEAR 13/14 HIGHWAY JOB ORDER CONTRACT: PROJECT WILL
CONSIST OF MAKING REPAIRS AND PERFORMING OTHER
MAINTENANCE-RELATED ACTIVITIES, AS NEEDED, TO PRESERVE THE
SAFETY AND INTEGRITY OF THE HIGHWAYS AS NEEDED IN REGION 8
0.570 0.000 0.010 0.560 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : < $0.75 M
DETLDES 0.010 0.010 2013NFA
CONINSP 0.060 0.060 2014NFA
CONST 0.500 0.500 2014NFA
NYSDOT
8T0380
STATE FISCAL YEAR 14/15 HIGHWAY JOB ORDER CONTRACT PREVENTIVE &
ROUTINE MAINTENANCE AS NEEDED IN REGION 8
0.570 0.000 0.000 0.010 0.560 AQC:A19P TOTAL 4YR COST :MULTI TPC : < $0.75 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 52 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
DETLDES 0.010 0.010 2014NFANYSDOT
8T0381
STATE FISCAL YEAR 15/16 HIGHWAY JOB ORDER CONTRACT: PROJECT WILL
CONSIST OF MAKING REPAIRS AND PERFORMING OTHER
MAINTENANCE-RELATED ACTIVITIES, AS NEEDED, TO PRESERVE THE
SAFETY AND INTEGRITY OF THE HIGHWAYSAS NEEDED IN REGION 8
0.010 0.000 0.000 0.000 0.010 AQC:A19P TOTAL 4YR COST :MULTI TPC : < $0.75 M
DETLDES 0.100 0.100 2012NFA
PRELDES 0.086 0.086 2012NFA
SCOPING 0.066 0.066 2012NFA
0.480 0.480 CONINSPHBRR 2014
CONINSP 0.120 0.120 2014NFA
4.800 4.800 CONSTHBRR 2014
CONST 1.200 1.200 2014NFA
NYSDOT
8T0385
STATE FISCAL YEAR 13/14 BRIDGE PAINTING: PROJECT WILL CONSIST OF
PAINTING BRIDGE STEEL SURFACES THAT ARE CORRODED OR
DETERIORATED, OR THAT HAVE UNSATISFACTORY PAINT PROPERTIES.
COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER &
WESTCHESTER COUNTIES
6.852 0.000 0.252 0.000 6.600 AQC:A19P TOTAL 4YR COST :MULTI TPC : $6-$9.4 M
DETLDES 0.100 0.100 2013NFA
PRELDES 0.088 0.088 2013NFA
SCOPING 0.067 0.067 2013NFA
NYSDOT
8T0386
STATE FISCAL YEAR 14/15 BRIDGE PAINTING PROJECT WILL CONSIST OF
PAINTING BRIDGE STEEL SURFACES THAT ARE CORRODED OR
DETERIORATED, OR THAT HAVE UNSATISFACTORY PAINT PROPERTIES.
COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER &
WESTCHESTER COUNTIES
0.255 0.000 0.000 0.255 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
DETLDES 0.100 0.100 2014NFA
PRELDES 0.091 0.091 2014NFA
SCOPING 0.070 0.070 2014NFA
NYSDOT
8T0387
STATE FISCAL YEAR 15/16 BRIDGE PAINTING PROJECT WILL CONSIST OF
PAINTING BRIDGE STEEL SURFACES THAT ARE CORRODED OR
DETERIORATED, OR THAT HAVE UNSATISFACTORY PAINT PROPERTIES.
COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER &
WESTCHESTER COUNTIES
0.261 0.000 0.000 0.000 0.261 AQC:A19P TOTAL 4YR COST :MULTI TPC : $2-$4 M
0.600 0.600 OPERCMAQ 2014
OPER 0.150 0.150 2014NFA
NYSDOT
8T0401
FFY 13/14 TRAVEL DEMAND MANAGEMENT (TDM) PROGRAM TO DEVELOP
PROJECTS & STRATEGIES TO OPTIMIZE THE TRANSPORTATION SYSTEM
PERFORMANCE BY PROMOTING MODE CHOICES, DIRECTION/TIME OF
TRAVEL WHICH LEADS TO REDUCED CONGESTION & IMPROVED AIR
QUALITY
0.750 0.000 0.000 0.000 0.750 AQC:C4P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 53 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.233 0.233 SCOPINGIM 2012
SCOPING 0.026 0.026 2012NFA
NYSDOT
8T0409
I-684: SMRP & RTE 35 INTERCHANGE. INTERCHANGE RECONSTRUCTION.
TOWN OF BEDFORD, WESTCHESTER COUNTY
0.259 0.000 0.259 0.000 0.000 AQC:D3P TOTAL 4YR COST :WESTCHESTER TPC : $32-$50 M
SCOPING 0.061 0.061 2011NFANYSDOT
8T0414
PALISADES INTERSTATE PARKWAY (PIP) TRAILWAY, STAGE 3: WESTERN
HIGHWAY-NYS THRUWAY. NEW/IMPROVED PEDESTRIAN FACILITY. TOWN
OF CLARKSTOWN, ROCKLAND COUNTY
0.061 0.061 0.000 0.000 0.000 AQC:C2P TOTAL 4YR COST :ROCKLAND TPC : $7.5-$12 M
0.050 0.050 SCOPINGCMAQ 2012
SCOPING 0.012 0.012 2012NFA
0.262 0.262 PRELDESCMAQ 2014
PRELDES 0.066 0.066 2014NFA
0.022 0.022 ROWINCDCMAQ 2014
ROWINCD 0.005 0.005 2014NFA
NYSDOT
8T0415
PALISADES INTERSTATE PARKWAY (PIP) TRAILWAY STAGE 4: NYS
THRUWAY-RTE 202. NEW/IMPROVED PEDESTRIAN FACILITY. TOWNS OF
CLARKSTOWN & RAMAPO, ROCKLAND COUNTY
0.417 0.000 0.062 0.000 0.355 AQC:C2P TOTAL 4YR COST :ROCKLAND TPC : $6-$9.4 M
SCOPING 0.107 0.107 2014NFANYSDOT
8T0437
ROUTE 9A: ARDSLEY OPERATIONAL IMPROVEMENTS. VILLAGES ARDSLEY
& DOBBS FERRY, & TOWN GREENBURGH. WESTCHESTER COUNTY
0.107 0.000 0.000 0.000 0.107 AQC:D1P TOTAL 4YR COST :WESTCHESTER TPC : $12.5-$19 M
SCOPING 0.077 0.077 2014NFANYSDOT
8T0446
ROUTE 303: ORANGEBURG ROAD - ERIE STREET. NEW
CONSTRUCTION/RECONTRUCTION, HIGHWAY RECONSTRUCTION IN-KIND.
TOWN OF ORANGETOWN, ROCKLAND COUNTY
0.077 0.000 0.000 0.000 0.077 AQC:A10P TOTAL 4YR COST :ROCKLAND TPC : $9.5-15.5 M
1.350 1.350 MISCHSIP 2014
MISC 0.150 0.150 2014NFA
NYSDOT
8T0476
BIENNIAL ACCIDENT INVESTIGATIONS (HSIP). INVESTIGATION STUDIES AS
NEEDED.
1.500 0.000 0.000 0.000 1.500 AQC:A6P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
DETLDES 0.047 0.047 2013NFA
CONINSP 0.060 0.060 2014NFA
CONST 0.497 0.497 2014NFA
NYSDOT
8T0486
SFY 13/14/15 BIENNIAL STORM WATER POLLUTION DISCHARGE ELIMINATION
FACILITIES MAINTENANCE, PREVENTIVE AND CORRECTIVE MAINTENANCE,
ON STATE HIGHWAYS, VARIOUS COUNTIES
0.604 0.000 0.000 0.047 0.557 AQC:A2P TOTAL 4YR COST :MULTI TPC : < $0.75 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 54 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.132 0.132 PRELDESHBRR 2014
PRELDES 0.033 0.033 2014NFA
0.009 0.009 ROWINCDHBRR 2014
ROWINCD 0.002 0.002 2014NFA
0.086 0.086 SCOPINGHBRR 2014
SCOPING 0.021 0.021 2014NFA
NYSDOT
8T0503
HUTCHINSON RIVER PARKWAY(HRP)/HUTCHINSON RIVER &
HRP/MAMARONECK AVE. GENERAL BRIDGE REHABILITATION BINS 5500089
AND 5523362
0.283 0.000 0.000 0.000 0.283 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $6-$9.4 M
0.132 0.132 PRELDESHBRR 2014
PRELDES 0.033 0.033 2014NFA
0.009 0.009 ROWINCDHBRR 2014
ROWINCD 0.002 0.002 2014NFA
0.086 0.086 SCOPINGHBRR 2014
SCOPING 0.021 0.021 2014NFA
NYSDOT
8T0528
NORTH MIDDLETOWN ROAD/PIP BRIDGE REHABILITATION BIN 1068710
0.283 0.000 0.000 0.000 0.283 AQC:A19P TOTAL 4YR COST :ROCKLAND TPC : $6-$9.4 M
DETLDES 0.031 0.031 2013NFA
CONINSP 0.264 0.264 2014NFA
CONST 2.200 2.200 2014NFA
NYSDOT
8T0530
STATE FISCAL YEAR 13/14/15 BIENNIAL SPECIAL MARKINGS: WORK WILL
APPLY EPOXY & PREFORMED PAVEMENT MARKINGS (SUCH AS STOP BARS,
CROSSWALK LINES, ARROWS, ETC.) ON STATE HIGHWAYS. COLUMBIA
DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER
COUNTIES
2.495 0.000 0.000 0.031 2.464 AQC:A11P TOTAL 4YR COST :MULTI TPC : $2-$4 M
DETLDES 0.015 0.015 2011NFA
CONINSP 0.108 0.108 2012NFA
CONST 0.900 0.900 2012NFA
NYSDOT
8T0534
STATE FISCAL YEAR 11/12 GEOTECH SUBSURFACE EXPLORATIONS, PROJECT
WILL EXPLORE SUBSURFACE SOIL CONDITIONS TO PROVIDE DATA NEEDED
IN ADVANCE OF HIGHWAY AND BRIDGE DESIGN. COLUMBIA, DUTCHESS,
ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER.
1.023 0.015 1.008 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
DETLDES 0.010 0.010 2011NFA
CONINSP 0.060 0.060 2012NFA
CONST 0.500 0.500 2012NFA
NYSDOT
8T0535
STATE FISCAL YEAR 12/13/14 BIENNIAL MOWING: PROJECT WILL CONSIST OF
REMOVING LITTER AND MOWING VEGETATION ALONG STATE PARKWAYS
AND INTERSTATES, INCLUDING EXIT AND ENTRANCE RAMPS ROCKLAND
COUNTY.
0.570 0.010 0.560 0.000 0.000 AQC:A2P TOTAL 4YR COST :ROCKLAND TPC : < $0.75 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 55 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
DETLDES 0.010 0.010 2011NFA
CONINSP 0.120 0.120 2013NFA
CONST 1.000 1.000 2013NFA
NYSDOT
8T0536
STATE FISCAL YEAR 12/13 MOWING; DUTCHESS, ORANGE, AND PUTNAM
1.130 0.010 0.000 1.120 0.000 AQC:A2P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
DETLDES 0.010 0.010 2013NFA
CONINSP 0.240 0.240 2014NFA
CONST 2.000 2.000 2014NFA
NYSDOT
8T0537
STATE FISCAL YEAR 14/15/16 BIENNIAL MOWING; ROCKLAND AND
WESTCHESTER
2.250 0.000 0.000 0.010 2.240 AQC:A10P TOTAL 4YR COST :MULTI TPC : $2-$4 M
DETLDES 0.020 0.020 2011NFA
0.090 0.090 CONINSPHSIP 2013
CONINSP 0.410 0.410 2013NFA
0.900 0.900 CONSTHSIP 2013
CONST 4.100 4.100 2013NFA
NYSDOT
8T0549
RUSTIC RAIL REPLACEMENT ON TACONIC STATE PARKWAY; PUTNAM AND
WESTCHESTER COUNTIES
5.520 0.020 0.000 5.500 0.000 AQC:A9P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
CONINSP 0.240 0.240 2011NFA
CONST 2.000 2.000 2011NFA
NYSDOT
8T0551
STATE FISCAL YEAR 11/12 BRIDGE JOB ORDER CONTRACT
2.240 2.240 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $2-$4 M
DETLDES 0.020 0.020 2012NFA
0.309 0.309 CONINSPHSIP 2013
CONINSP 0.034 0.034 2013NFA
0.412 0.412 CONINSPNHS 2013
CONINSP 0.103 0.103 2013NFA
3.087 3.087 CONSTHSIP 2014
CONST 0.343 0.343 2014NFA
4.116 4.116 CONSTNHS 2014
CONST 1.029 1.029 2014NFA
NYSDOT
8T0552
RUSTIC RAIL REPLACEMENT ON SPRAIN BROOK PARKWAY; "RUSTIC",
SELF-OXIDIZING GUIDERAIL WILL BE REPLACED WITH GALVANIZED RAIL
ALONG THE SPRAIN BROOK PARKWAY IN WESTCHESTER COUNTY.
9.453 0.000 0.020 0.858 8.575 AQC:A9P TOTAL 4YR COST :WESTCHESTER TPC : $7.5-$12 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 56 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
DETLDES 0.020 0.020 2013NFA
0.099 0.099 CONINSPHSIP 2014
CONINSP 0.361 0.361 2014NFA
0.994 0.994 CONSTHSIP 2014
CONST 3.610 3.610 2014NFA
NYSDOT
8T0553
RUSTIC RAIL REPLACEMENT ON HUTCHINSON RIVER PARKWAY. "RUSTIC",
SELF-OXIDIZING GUIDERAIL WILL BE REPLACED WITH GALVANIZED RAIL
ON THE HUTCHINSON RIVER PARKWAY IN WESTCHESTER COUNTY.
5.084 0.000 0.000 0.020 5.064 AQC:A9P TOTAL 4YR COST :WESTCHESTER TPC : $4.6-$7.5 M
DETLDES 0.020 0.020 2014NFANYSDOT
8T0554
RUSTIC RAIL REPLACEMENT IN PUTNAM AND WESTCHESTER COUNTIES
0.020 0.000 0.000 0.000 0.020 AQC:A9P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
DETLDES 0.010 0.010 2011NFA
CONINSP 0.240 0.240 2012NFA
CONST 2.000 2.000 2012NFA
NYSDOT
8T0556
STATE FISCAL YEAR 12/13 BRIDGE JOB ORDER CONTRACT: PROJECT WILL
CONSIST OF MAKING REPAIRS & PERFORMING OTHER
MAINTENANCE-RELATED ACTIVITIES, AS NEEDED, TO PRESERVE THE
SAFETY & INTEGRITY OF BRIDGES. AS NEEDED IN REGION 8
2.250 0.010 2.240 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $2-$4 M
DETLDES 0.010 0.010 2012NFA
CONINSP 0.120 0.120 2013NFA
CONST 1.000 1.000 2013NFA
NYSDOT
8T0557
STATE FISCAL YEAR 13/14 BRIDGE JOB ORDER CONTRACT: PROJECT WILL
CONSIST OF MAKING REPAIRS & PERFORMING OTHER
MAINTENANCE-RELATED ACTIVITIES, AS NEEDED, TO PRESERVE THE
SAFETY & INTEGRITY OF BRIDGES. AS NEEDED IN REGION 8
1.130 0.000 0.010 1.120 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
DETLDES 0.011 0.011 2013NFA
CONINSP 0.240 0.240 2014NFA
CONST 2.000 2.000 2014NFA
NYSDOT
8T0558
STATE FISCAL YEAR 14/15 BRIDGE JOB ORDER CONTRACT: PROJECT WILL
CONSIST OF MAKING REPAIRS & PERFORMING OTHER
MAINTENANCE-RELATED ACTIVITIES, AS NEEDED, TO PRESERVE THE
SAFETY & INTEGRITY OF BRIDGES. AS NEEDED IN REGION 8
2.251 0.000 0.000 0.011 2.240 AQC:A19P TOTAL 4YR COST :MULTI TPC : $2-$4 M
CONINSP 0.359 0.359 2013NFA
CONST 2.994 2.994 2013NFA
NYSDOT
8T0559
AMERICANS WITH DISABILITIES ACT SIDEWALK & RAMPS: EASTERN
WESTCHESTER COUNTY
3.353 0.000 0.000 3.353 0.000 AQC:C2P TOTAL 4YR COST :WESTCHESTER TPC : $2-$4 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 57 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
CONINSP 0.278 0.278 2013NFA
CONST 2.316 2.316 2013NFA
NYSDOT
8T0561
AMERICANS WITH DISABILITIES ACT SIDEWALK & RAMPS: UPPER
WESTCHESTER COUNTY
2.594 0.000 0.000 2.594 0.000 AQC:C2P TOTAL 4YR COST :WESTCHESTER TPC : $2-$4 M
MISC 0.590 0.590 2011NFANYSDOT
8T0569
STATE FISCAL YEAR 11/12 TRAFFIC SIGNAL EQUIPMENT, CYCLICAL
MAINTENANCE, ON STATE HIGHWAYS, VARIOUS COUNTIES
0.590 0.590 0.000 0.000 0.000 AQC:A7P TOTAL 4YR COST :MULTI TPC : < $0.75 M
MISC 0.590 0.590 2012NFANYSDOT
8T0570
STATE FISCAL YEAR 12/13 TRAFFIC SIGNAL EQUIPMENT, CYCLICAL
MAINTENANCE, ON STATE HIGHWAYS, VARIOUS COUNTIES
0.590 0.000 0.590 0.000 0.000 AQC:A7P TOTAL 4YR COST :MULTI TPC : < $0.75 M
MISC 0.590 0.590 2013NFANYSDOT
8T0571
STATE FISCAL YEAR 13/14 TRAFFIC SIGNAL EQUIPMENT, CYCLICAL
MAINTENANCE, ON STATE HIGHWAYS, VARIOUS COUNTIES
0.590 0.000 0.000 0.590 0.000 AQC:A7P TOTAL 4YR COST :MULTI TPC : < $0.75 M
MISC 0.590 0.590 2014NFANYSDOT
8T0572
STATE FISCAL YEAR 14/15 TRAFFIC SIGNAL EQUIPMENT, CYCLICAL
MAINTENANCE, ON STATE HIGHWAYS, VARIOUS COUNTIES
0.590 0.000 0.000 0.000 0.590 AQC:A7P TOTAL 4YR COST :MULTI TPC : < $0.75 M
0.800 0.800 MISCFTA 5307 2012
MISC 0.200 0.200 2012NFA
0.800 0.800 MISCFTA 5307 2013
MISC 0.200 0.200 2013NFA
0.800 0.800 MISCFTA 5307 2014
MISC 0.200 0.200 2014NFA
WESTCHESTER
8T97XP
WESTCHESTER PROJECT ADMINISTRATION: FUNDING FOR PROJECT
ADMINISTRATION FOR THE WESTCHESTER COUNTY TRANSIT SYSTEM.
3.000 0.000 1.000 1.000 1.000 AQC:B1P TOTAL 4YR COST :WESTCHESTER TPC : $3.3-$5.6 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 58 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.650 FTA 5308 0.650 MISC2011
MISC 0.163 0.163 2011NFA
8.000 8.000 MISCFTA 5307 2012
MISC 2.000 2.000 2012NFA
8.000 8.000 MISCFTA 5307 2013
MISC 2.000 2.000 2013NFA
8.000 8.000 MISCFTA 5307 2014
MISC 2.000 2.000 2014NFA
WESTCHESTER
8TM012
BEE-LINE BUSES-REPLACE OR REHABILITATE 78 ARTICULATED BUSES AS
PART OF THE REGULAR CYLCE.
30.813 0.813 10.000 10.000 10.000 AQC:B10P TOTAL 4YR COST :WESTCHESTER TPC : $40-$60 M
0.576 0.576 MISCFTA 5307 2014
MISC 0.144 0.144 2014NFA
ROCKLAND
8TM013
REPLACEMENT OF BATTERIES ON HYBRID BUSES. ROCKLAND COUNTY
0.720 0.000 0.000 0.000 0.720 AQC:B5P TOTAL 4YR COST :ROCKLAND TPC : $0.6-$1.5 M
0.080 0.080 CONINSPFTA 5307 2012
CONINSP 0.020 0.020 2012NFA
0.720 0.720 CONSTFTA 5307 2012
CONST 0.180 0.180 2012NFA
0.080 0.080 CONINSPFTA 5307 2013
CONINSP 0.020 0.020 2013NFA
0.720 0.720 CONSTFTA 5307 2013
CONST 0.180 0.180 2013NFA
PUTNAM
8TM014
MAYBROOK BIKEWAY II (PHASE B) CONSTRUCTION & INSPECTION OF 2.92
MILES BIKE PATH FROM THE END OF PHASE A (RT 6 & RT 684) TO THE STATE
LINE. PUTNAM COUNTY
2.000 0.000 1.000 1.000 0.000 AQC:C2P TOTAL 4YR COST :PUTNAM TPC : $1.2-$2.5 M
0.640 FTA 5307 0.640 MISC2011
MISC 3.243 3.243 2011NFA
NYSDOT
8TM015
HAVERSTRAW-OSSINING FERRY: PEAK HOUR SERVICE BETWEEN
HAVERSTRAW-OSSINING, CONNECTING TO METRO NORTH SERVICE TO
GRAND CENTRAL TERMINAL
3.883 3.883 0.000 0.000 0.000 AQC:B1P TOTAL 4YR COST :WESTCHESTER TPC : $3.3-$5.6 M
0.500 0.500 MISCSAFE RT SCH 2012
0.500 0.500 MISCSAFE RT SCH 2013
0.500 0.500 MISCSAFE RT SCH 2014
LOCAL
8TM016
SAFE ROUTES TO SCHOOL. TO IMPROVE SAFETY, ENCOURAGE AND
ENABLE MORE CHILDREN TO SAFELY WALK AND BIKE TO SCHOOL
THROUGHOUT REGION 8. BLOCK PROJECT.
1.500 0.000 0.500 0.500 0.500 AQC:A6P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 59 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.080 0.080 MISCFTA 5316 2012
MISC 0.020 0.020 2012NFA
0.080 0.080 MISCFTA 5317 2012
MISC 0.020 0.020 2012NFA
0.080 0.080 MISCFTA 5316 2013
MISC 0.020 0.020 2013NFA
0.080 0.080 MISCFTA 5317 2013
MISC 0.020 0.020 2013NFA
0.080 0.080 MISCFTA 5316 2014
MISC 0.020 0.020 2014NFA
0.080 0.080 MISCFTA 5317 2014
MISC 0.020 0.020 2014NFA
LOCAL
8TM017
JARC/NEW FREEDOM PROGRAM FOR COUNTIES IN REGION 8.
0.600 0.000 0.200 0.200 0.200 AQC:B10P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
1.700 FTA 5307 1.700 MISC2011
MISC 0.426 0.426 2011NFA
0.900 0.900 MISCFTA 5307 2012
MISC 0.226 0.226 2012NFA
ROCKLAND
8TM018
CAPITAL COST OF CONTRACTING FOR THE OPERATIONS OF TRANSPORT OF
ROCKLAND (TOR). TO UTILIZE FTA 5307 FUNDS FOR THE OPERATIONS OF
TOR SERVICE. ROCKLAND COUNTY
3.252 2.126 1.126 0.000 0.000 AQC:B1P TOTAL 4YR COST :ROCKLAND TPC : $2-$4 M
1.600 1.600 MISCFTA 5307 2013
MISC 0.400 0.400 2013NFA
ROCKLAND
8TR212
MONSEY PARK AND RIDE LOT. THIS PROJECT WILL REPLACE 400
TEMPORARY PARKING SPACES AT THE OLD MONSEY DRIVE-IN, WITH A NEW
COUNTY OWNED FACILITY WITH 380 SPACES THAT WILL SERVE
COMMUTERS TO MANHATTAN. TOWN OF RAMAPO, ROCKLAND COUNTY.
2.000 0.000 0.000 2.000 0.000 AQC:K1P TOTAL 4YR COST :ROCKLAND TPC : $1.2-$2.5 M
1.080 1.080 MISCFTA 5307 2014
MISC 0.270 0.270 2014NFA
ROCKLAND
8TR213
ELECTRONIC BUS SIGNS AT VARIOUS LOCATIONS- ITS PROJECT. ROCKLAND
COUNTY.
1.350 0.000 0.000 0.000 1.350 AQC:C13P TOTAL 4YR COST :ROCKLAND TPC : $1.2-$2.5 M
0.400 FTA 5307 0.400 MISC2011
MISC 0.100 0.100 2011NFA
0.800 0.800 MISCFTA 5307 2012
MISC 0.200 0.200 2012NFA
1.200 1.200 MISCFTA 5307 2013
MISC 0.300 0.300 2013NFA
ROCKLAND
8TR218
DEPARTMENT OF PUBLIC TRANSPORTATION BUILDING EXPANSION. DESIGN,
ENGINEER AND CONSTRUCTION. ROCKLAND COUNTY
3.000 0.500 1.000 1.500 0.000 AQC:B8P TOTAL 4YR COST :ROCKLAND TPC : $2-$4 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 60 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.400 0.400 MISCFTA 5307 2012
MISC 0.100 0.100 2012NFA
0.400 0.400 MISCFTA 5307 2013
MISC 0.100 0.100 2013NFA
0.400 0.400 MISCFTA 5307 2014
MISC 0.050 0.050 2014NFA
WESTCHESTER
8TRM12
BEE-LINE MAINTENANCE FACILITY EQUIPMENT UPGRADES.
1.450 0.000 0.500 0.500 0.450 AQC:B4P TOTAL 4YR COST :WESTCHESTER TPC : $1.2-$2.5 M
0.240 FTA 5307 0.240 MISC2011
MISC 0.060 0.060 2011NFA
0.240 0.240 MISCFTA 5307 2012
MISC 0.060 0.060 2012NFA
0.240 0.240 MISCFTA 5307 2013
MISC 0.060 0.060 2013NFA
0.240 0.240 MISCFTA 5307 2014
MISC 0.060 0.060 2014NFA
ROCKLAND
8TRM18
FUNDING FOR ROCKLAND COUNTY INCLUDING PLANNING STUDIES,
GRANTS MANAGEMENT AND TRAINING.
1.200 0.300 0.300 0.300 0.300 AQC:B1P TOTAL 4YR COST :ROCKLAND TPC : $2-$4 M
0.080 FTA 5307 0.080 MISC2011
MISC 0.020 0.020 2011NFA
0.080 0.080 MISCFTA 5307 2012
MISC 0.020 0.020 2012NFA
0.080 0.080 MISCFTA 5307 2013
MISC 0.020 0.020 2013NFA
0.080 0.080 MISCFTA 5307 2014
MISC 0.020 0.020 2014NFA
ROCKLAND
8TRM20
CONSTRUCTION AND REPLACEMENT OF APPROXIMATELY 40 STANDARD
BUS SHELTERS FOR TRANSIT OPERATIONS.
0.400 0.100 0.100 0.100 0.100 AQC:B7P TOTAL 4YR COST :ROCKLAND TPC : $0.6-$1.5 M
0.480 FTA 5307 0.480 MISC2011
MISC 0.120 0.120 2011NFA
0.720 0.720 MISCFTA 5307 2012
MISC 0.180 0.180 2012NFA
0.720 0.720 MISCFTA 5307 2013
MISC 0.180 0.180 2013NFA
0.720 0.720 MISCFTA 5307 2014
MISC 0.180 0.180 2014NFA
ROCKLAND
8TRM21
PREVENTATIVE MAINTENANCE COST FOR TRANSPORT OF ROCKLAND (TOR)
& TAPPEN ZEE EXPRESS (TZX) BUSES. ROCKLAND COUNTY
3.300 0.600 0.900 0.900 0.900 AQC:B3P TOTAL 4YR COST :ROCKLAND TPC : $3.3-$5.6 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 61 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.025 FTA 5310 0.025 MISC2011
MISC 0.006 0.006 2011NFA
0.400 0.400 MISCFTA 5310 2012
MISC 0.100 0.100 2012NFA
0.400 0.400 MISCFTA 5310 2013
MISC 0.100 0.100 2013NFA
0.400 0.400 MISCFTA 5310 2014
MISC 0.100 0.100 2014NFA
NYSDOT
8TRM25
FUNDING BLOCK FOR FUTURE SECTION 5310 PROJECTS IN ALL COUNTIES IN
REGION 8.
1.531 0.031 0.500 0.500 0.500 AQC:B10P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
0.060 0.060 MISCFTA 5307 2012
MISC 0.015 0.015 2012NFA
0.060 0.060 MISCFTA 5307 2013
MISC 0.015 0.015 2013NFA
ROCKLAND
8TRM44
PURCHASE 2 REPLACEMENT ALTERNATE FUEL SUPPORT VEHICLES.
0.150 0.000 0.075 0.075 0.000 AQC:B2P TOTAL 4YR COST :ROCKLAND TPC : < $0.75 M
0.080 FTA 5307 0.080 MISC2011
MISC 0.020 0.020 2011NFA
0.080 0.080 MISCFTA 5307 2012
MISC 0.020 0.020 2012NFA
0.080 0.080 MISCFTA 5307 2013
MISC 0.020 0.020 2013NFA
0.080 0.080 MISCFTA 5307 2014
MISC 0.020 0.020 2014NFA
ROCKLAND
8TRM50
COUNTY-WIDE BUS STOP IMPROVEMENTS .
0.400 0.100 0.100 0.100 0.100 AQC:B7P TOTAL 4YR COST :ROCKLAND TPC : < $0.75 M
0.400 FTA 5307 0.400 MISC2011
MISC 0.100 0.100 2011NFA
0.400 0.400 MISCFTA 5307 2012
MISC 0.100 0.100 2012NFA
0.400 0.400 MISCFTA 5307 2013
MISC 0.100 0.100 2013NFA
0.400 0.400 MISCFTA 5307 2014
MISC 0.100 0.100 2014NFA
ROCKLAND
8TRM57
INTELLIGENT TRANSPORTATION SYSTEM CAPITAL UPGRADE FOR TRIPS
AND ITS FOR TOR AND TZX BUS SERVICES.
2.000 0.500 0.500 0.500 0.500 AQC:B6P TOTAL 4YR COST :ROCKLAND TPC : $1.2-$2.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 62 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.048 FTA 5307 0.048 MISC2011
MISC 0.012 0.012 2011NFA
0.048 0.048 MISCFTA 5307 2012
MISC 0.012 0.012 2012NFA
0.048 0.048 MISCFTA 5307 2013
MISC 0.012 0.012 2013NFA
0.048 0.048 MISCFTA 5307 2014
MISC 0.012 0.012 2014NFA
PUTNAM
8TRM61
SECTION 5307 PROGRAM ADMINISTRATION FOR PUTNAM AREA RAPID
TRANSIT (PART) BUS SERVICE.
0.240 0.060 0.060 0.060 0.060 AQC:B1P TOTAL 4YR COST :PUTNAM TPC : < $0.75 M
0.160 FTA 5307 0.160 MISC2011
MISC 0.040 0.040 2011NFA
0.160 0.160 MISCFTA 5307 2012
MISC 0.040 0.040 2012NFA
0.160 0.160 MISCFTA 5307 2013
MISC 0.040 0.040 2013NFA
0.160 0.160 MISCFTA 5307 2014
MISC 0.040 0.040 2014NFA
ROCKLAND
8TRM69
TRANSPORTATION PLANNING CONSULTANT FUNDING FOR VARIOUS
PROJECTS. ROCKLAND COUNTY
0.800 0.200 0.200 0.200 0.200 AQC:C7P TOTAL 4YR COST :ROCKLAND TPC : $0.6-$1.5 M
1.440 1.440 MISCFTA 5307 2013
MISC 0.360 0.360 2013NFA
ROCKLAND
8TRM73
THE TOWN OF ORANGETOWN WILL INSTALL A PARK & RIDE FACILITY TO
ACCOMODATE 70 VEHICLES IN SPARKILL, NY. THE PROJECT WILL INCLUDE:
PAVEMENT, SHRUBS, TREES, CURBING, DRAINAGE, LIGHTING, NEW BUS
SHELTER & APPROPRITATE STRIPING & SIGNAGE.
1.800 0.000 0.000 1.800 0.000 AQC:K1P TOTAL 4YR COST :ROCKLAND TPC : $1.2-$2.5 M
MISC 2.000 2.000 2011NFA
MISC 2.000 2.000 2012NFA
MISC 2.000 2.000 2013NFA
MISC 2.000 2.000 2014NFA
ROCKLAND
8TRM74
PURCHASE (4) 45' REPLACEMENT BUSES FOR COACH USA AND MONSEY
TRAILS COMMUTER BUSES OPERATING IN ROCKLAND COUNTY.
8.000 2.000 2.000 2.000 2.000 AQC:B10P TOTAL 4YR COST :ROCKLAND TPC : $7.5-$12 M
0.272 FTA 5307 0.272 MISC2011
MISC 0.068 0.068 2011NFA
PUTNAM
8TRM76
PURCHASE (2) 20 PASSENGER FIXED ROUTE BUSES FOR PUTNAM AREA
RAPID TRANSIT (PART) TO REPLACE EXISTING VEHICLES THAT WILL BE
REACHING THE END OF THEIR USEFUL LIFE.
0.340 0.340 0.000 0.000 0.000 AQC:B10P TOTAL 4YR COST :PUTNAM TPC : < $0.75 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 63 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
1.088 FTA 5307 1.088 MISC2011
MISC 0.272 0.272 2011NFA
ROCKLAND
8TRM82
PURCHASE (17) 22' CUTAWAY REPLACEMENT BUSES FOR TRIPS BUS
SERVICE. ROCKLAND COUNTY
1.360 1.360 0.000 0.000 0.000 AQC:B10P TOTAL 4YR COST :ROCKLAND TPC : $1.2-$2.5 M
0.424 0.424 MISCCMAQ 2012
MISC 0.106 0.106 2012NFA
LOCAL
8TRM86
ORANGETOWN DIESEL RETROFITS: INSTALL MOST APPROPRIATE/BEST
AVAILABLE DIESEL RETROFIT TECHNOLOGY ON EVERY DIESEL POWERED,
TOWN OWNED VEHICLE 8,500 POUNDS AND GREATER.
0.530 0.000 0.530 0.000 0.000 AQC:NON TOTAL 4YR COST :ROCKLAND TPC : < $0.75 M
4.000 4.000 MISCFTA 5309 2014
MISC 1.000 1.000 2014NFA
WESTCHESTER
8TRM88
WESTCHESTER COUNTY ACQUISITION OF OPERATING AUTHORITY OF
BEE-LINE BUS SERVICE
5.000 0.000 0.000 0.000 5.000 AQC:B1P TOTAL 4YR COST :WESTCHESTER TPC : $4.6-$7.5 M
0.068 HPP 0.068 DETLDES2011
DETLDES 0.017 0.017 2011NFA
0.028 HPP 0.028 PRELDES2011
PRELDES 0.007 0.007 2011NFA
0.004 HPP 0.004 ROWINCD2011
ROWINCD 0.001 0.001 2011NFA
LOCAL
8TROCH
STREETSCAPE, ROADWAY, PEDESTRIAN, AND PARKING IMPROVEMENTS AT
THE INTERSECTION OF MEADOW LANE, CHESTNUT LANE, WILLOW DRIVE
AND LIBERTY AVENUE FOR THE COLLEGE OF NEW ROCHELLE CAMPUS.
CITY OF NEW ROCHELLE. SECTION 1934 NY 686 HPP#309.
0.125 0.125 0.000 0.000 0.000 AQC:A10P TOTAL 4YR COST :WESTCHESTER TPC : < $0.75 M
CONST 0.500 0.500 2012NFANYSBA
B0001
BRIDGE REHABILITAION & PAVING: BEAR MOUNTAIN BRIDGE - TOLL PLAZA
TO EXTEND SERVICE LIFE. ROCKLAND & WESTCHESTER COUNTY
0.500 0.000 0.500 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : < $0.75 M
0.827 IM 0.827 CONINSP2011
CONINSP 1.873 1.873 2011NFA
6.977 IM 6.977 CONST2011
CONST 0.775 0.775 2011NFA
0.261 IM 0.261 DETLDES2011
DETLDES 0.589 0.589 2011NFA
CONST 15.048 15.048 2011NFA
NYSTA
B00122
BRIDGE PAINTING & STRIP, REPAIR, SEAL, OVERLAY (SRSO): I-95 BRIDGE
OVER BYRAM RIVER(MP 614.93) TO MAINTAIN A STATE OF GOOD REPAIR.
WESTCHESTER COUTNY.
26.350 26.350 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $21-$31 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 64 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
CONINSP 1.300 1.300 2014NFA
CONST 10.800 10.800 2014NFA
NYSTA
B02841
BRIDGE REPLACEMENT - NORTH AVE BRIDGE OVER I-95 (PHASE 3),(MP
605.76)TO ENSURE A STATE OF GOOD REPAIR. WESTCHESTER COUNTY.
12.100 0.000 0.000 0.000 12.100 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $9.5-15.5 M
CONINSP 0.400 0.400 2011NFA
CONST 4.000 4.000 2011NFA
NYSTA
B02843
NORTH AVENUE BRIDGE OVER I95 UTILITIES TRANSFER (PHASE 2),(MP
605.76)WESTCHESTER COUNTY
4.400 4.400 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $3.3-$5.6 M
CONINSP 0.240 0.240 2012NFA
CONST 1.500 1.500 2012NFA
NYSTA
B04621
PREVENTIVE MAINTENANCE:ROCKLAND AVE OVER THRUWAY - STRIP,
REPAIR, SEAL, OVERLAY(SRSO)TO MAINTAIN STATE OF GOOD REPAIR.(MP
608.80)WESTCHESTER COUNTY.(COMBINE WITH B923.1, B2225.1 AND B2238.1)
1.740 0.000 1.740 0.000 0.000 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $1.2-$2.5 M
CONINSP 0.085 0.085 2012NFA
CONST 0.700 0.700 2012NFA
NYSTA
B04671
2012 BRIDGE WASHING: NEW ENGLAND THRUWAY I-95 TO EXTEND SERVICE
LIFE. WESTCHESTER COUNTY
0.785 0.000 0.785 0.000 0.000 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $0.6-$1.5 M
CONINSP 0.900 0.900 2011NFA
CONST 7.000 7.000 2011NFA
NYSTA
B05811
SPOT / ZONE PAINT AND STEEL REPAIRS I-95 VIADUCT IN NEW ROCHELLE.
(MP 605.09)TO EXTEND SERVICE LIFE. WESTCHESTER COUNTY.
7.900 7.900 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $7.5-$12 M
CONINSP 0.042 0.042 2011NFA
CONST 0.300 0.300 2011NFA
NYSTA
B05881
INSTALL PROTECTIVE SCREENING ON 8 BRIDGES (MP\'S 16.75, 19.46, 20.93,
20.96, 26.37, 39.90, 41.57 AND 44.61) AS A SAFETY IMPROVEMENT. VARIOUS
COUNTIES
0.342 0.342 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : < $0.75 M
CONINSP 0.085 0.085 2013NFA
CONST 0.700 0.700 2013NFA
NYSTA
B06151
2013 BRIDGE WASHING: NEW ENGLAND THRUWAY(I-95) TO EXTEND
SERVICE LIFE. WESTCHESTER COUNTY.
0.785 0.000 0.000 0.785 0.000 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $0.6-$1.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 65 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
CONINSP 0.400 0.400 2014NFA
CONST 4.000 4.000 2014NFA
NYSTA
B06181
2014 BRIDGE PAINTING TO EXTEND SERVICE LIFE: NEW YORK DIVISION.
VARIOUS COUNTY
4.400 0.000 0.000 0.000 4.400 AQC:A19P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
CONINSP 0.090 0.090 2012NFA
CONST 0.750 0.750 2012NFA
NYSTA
B06591
BRIDGE REHAB: STEEL REPAIRS TO 6 BRIDGES: MP 4.0- I87/TUCKAHOE RD,
59.81-RT 17K/I87, 60.10-EXIT 17 RAMP/I-87, 67.86-RT 32/I87, 70.689-FREETOWN
RD/I-87,74.17-CLINTONDALE RD/I87. WESTCHESTER, ORANGE, & ULTER
COUNTIES
0.840 0.000 0.840 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
CONINSP 3.000 3.000 2013NFA
CONST 25.000 25.000 2013NFA
NYSTA
B09055
BRIDGE SUBSTRUCTURE REPAIRS PHASE 3: TAPPAN ZEE BRIDGE TO EXTEND
USEFUL LIFE. (MP 14.67)WESTCHESTER AND ROCKLAND COUNTIES
28.000 0.000 0.000 28.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $26-$40 M
CONINSP 1.400 1.400 2011NFA
CONST 12.500 12.500 2011NFA
NYSTA
B09201
BRIDGE DECK REHABS: I-95 BRIDGES OVER HUTCHINSON RIVER PARKWAY
TO ENSURE STATE OF GOOD REPAIR. (MP 600.55 / 56). (COMBINE WITH B426.1,
B933.1, B934.1 AND B935.1)
13.900 13.900 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $12.5-$19 M
CONINSP 1.000 1.000 2013NFA
CONST 9.000 9.000 2013NFA
NYSTA
B09221
I-95 / KINGS HIGHWAY(MP 604.80) & I-95 OVER CROSS COUNTY
CONNECTION,(MP 606.04). STRIP, REPAIR, SEAL, OVERLAY (SRSO)TO EXTEND
SERVICE LIFE. WESTCHESTER COUNTY
10.000 0.000 0.000 10.000 0.000 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $7.5-$12 M
CONINSP 0.180 0.180 2012NFA
CONST 1.500 1.500 2012NFA
NYSTA
B09231
PREVENTATIVE MAINTENANCE SUBSTRUCTURE & DECK JOINT REPAIR: I-95
BRIDGE OVER FENIMORE RD. TO ENSURE STATE OF GOOD REPAIR. (MP
609.14) (COMBINE WITH B462.1, B2225.1 AND B2238.1. WESTCHESTER
COUNTY
1.680 0.000 1.680 0.000 0.000 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $1.2-$2.5 M
CONINSP 0.075 0.075 2012NFA
CONST 0.600 0.600 2012NFA
NYSTA
B09252
2012/2013 ON-DEMAND BRIDGE REPAIR CONTRACT TO MAINTAIN STATE OF
GOOD REPAIR: VARIOUS COUNTIES
0.675 0.000 0.675 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 66 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
CONINSP 0.300 0.300 2011NFA
CONST 2.500 2.500 2011NFA
NYSTA
B09461
BRIDGE REHABILITATION, REPAIR GUSSET PLATES: TAPPAN ZEE BRIDGE.TO
EXTEND SERVICE LIFE. (MP 14.67) WESTCHESTER AND ROCKLAND
COUNTIES
2.800 2.800 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $2-$4 M
CONINSP 0.080 0.080 2011NFA
CONST 0.650 0.650 2011NFA
NYSTA
B09541
2011 BRIDGE WASHING: NEW ENGLAND THRUWAY (I-95): TO EXTEND
SERVICE LIFE. WESTCHESTER COUNTY
0.730 0.730 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $0.6-$1.5 M
DETLDES 0.400 0.400 2011NFA
CONINSP 0.480 0.480 2014NFA
CONST 4.000 4.000 2014NFA
NYSTA
B09851
BRIDGE REHAB-ELECTRICAL UPGRADE TO CAISSON PUMPS & CONTROLS.
TAPPAN ZEE BRIDGE.TO EXTEND SERVICE LIFE. (MP 14.67) WESTCHESTER
AND ROCKLAND COUNTIES
4.880 0.400 0.000 0.000 4.480 AQC:A19P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
CONINSP 0.205 0.205 2012NFA
CONST 1.725 1.725 2012NFA
NYSTA
B22251
BRIDGE DECK REHABILITATION: WEST STREET OVER NET I95, TO EXTEND
SERVICE LIFE.(MP 610.52) WESTCHESTER COUNTY. (COMBINE WITH B462.1,
B923.1 AND B2238.1)
1.930 0.000 1.930 0.000 0.000 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $1.2-$2.5 M
DETLDES 1.600 1.600 2012NFANYSTA
B22301
BRIDGE REHABILITATION: I87 BRIDGES OVER CONRAIL, NYS ROUTE 17 &
RAMAPO RIVER. TO EXTEND SERVICE LIFE. ROCKLAND COUNTY. (MP 31.78
& MP 31.79)
1.600 0.000 1.600 0.000 0.000 AQC:A19P TOTAL 4YR COST :ROCKLAND TPC : $15-$25 M
CONINSP 0.348 0.348 2011NFA
CONST 1.900 1.900 2011NFA
NYSTA
B22371
PREVENTATIVE MAINTENANCE-STRIP, REPAIR, SEAL, OVERLAY(SRSO):
GARDEN STATE PARKWAY CONNECTOR BRIDGES OVER WILLIAMS ROAD.
TO MAINTAIN STATE OF GOOD REPAIR. ROCKLAND COUNTY.(MP 641.64 &
641.65)
2.248 2.248 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :ROCKLAND TPC : $2-$4 M
CONINSP 0.120 0.120 2012NFA
CONST 1.000 1.000 2012NFA
NYSTA
B22381
BRIDGE REHABILITATION & STRIP, REPAIR, SEAL, OVERLAY (SRSO):
CENTRAL AVENUE BRIDGE OVER I95. TO EXTEND USEFUL LIFE.
WESTCHESTER COUNTY.(MP 612.94)(COMBINE WITH B462.1, B923.1 AND
B2225.1)
1.120 0.000 1.120 0.000 0.000 AQC:A19P TOTAL 4YR COST :WESTCHESTER TPC : $0.6-$1.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 67 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
DETLDES 2.900 2.900 2012NFANYSTA
H00141
PAVEMENT REHABILITATION ON I-95 FROM I287 TO CONN. STATE LINE,
(PORTCHESTER/RYE), WESTCHESTER COUNTY (MP 614.1-615.0) COMBINED
W/B13.1, B877.1, & H2182.1
2.900 0.000 2.900 0.000 0.000 AQC:A10P TOTAL 4YR COST :WESTCHESTER TPC : $32-$50 M
DETLDES 2.500 2.500 2011NFA
CONINSP 4.900 4.900 2013NFA
CONST 42.150 42.150 2013NFA
NYSTA
H08531
CONCRETE PAVEMENT REPAIR AND SEAL JOINTS: I-95 INCLUDING NEW
ROCHELLE PAVEMENT AND PLAZA REPAIRS DUE TO EXCESSIVE WEAR.
WESTCHESTER COUNTY. (MP 600.0 - 614.1)
49.550 2.500 0.000 47.050 0.000 AQC:A10P TOTAL 4YR COST :WESTCHESTER TPC : $40-$60 M
CONINSP 0.354 0.354 2012NFA
CONST 2.950 2.950 2012NFA
NYSTA
H09991
TRAFFIC OPERATIONAL IMPROVEMENT: I-95 NB BARTOW AVENUE (EXIT11) -
RAMP. AS A SAFETY IMPROVEMENT. BRONX COUTNY. (MP 601.11)
3.304 0.000 3.304 0.000 0.000 AQC:A19P TOTAL 4YR COST :BRONX TPC : $3.3-$5.6 M
CONINSP 0.080 0.080 2011NFA
CONST 0.700 0.700 2011NFA
NYSTA
H10702
2011 PAVEMENT STRIPING AS A SAFETY IMPROVEMENT: VARIOUS
COUNTIES
0.780 0.780 0.000 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
DETLDES 1.700 1.700 2012NFA
CONINSP 2.100 2.100 2013NFA
CONST 17.500 17.500 2013NFA
NYSTA
H10851
PAVEMENT REHAB 1R MILL AND INLAY: I-87 BRIDGE OVER MAHWAH RIVER
TO I-87 BRIDGE OVER CR 106.(MP 29.4 - 38.7)DUE TO EXCESSIVE WEAR.
ORANGE AND ROCKLAND COUNTIES
21.300 0.000 1.700 19.600 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $15-$25 M
CONINSP 0.078 0.078 2012NFA
CONST 0.650 0.650 2012NFA
NYSTA
H10971
2012 PAVEMENT STRIPING AS A SAFETY IMPROVEMENT: VARIOUS
COUNTIES
0.728 0.000 0.728 0.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
CONINSP 0.078 0.078 2013NFA
CONST 0.650 0.650 2013NFA
NYSTA
H11171
2013 PAVEMENT STRIPING AS A SAFETY IMPROVEMENT: VARIOUS
COUNTIES
0.728 0.000 0.000 0.728 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 68 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
CONINSP 0.084 0.084 2014NFA
CONST 0.700 0.700 2014NFA
NYSTA
H11191
2014 PAVEMENT STRIPING AS A SAFETY IMPROVEMENT: VARIOUS
COUNTIES
0.784 0.000 0.000 0.000 0.784 AQC:A10P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
CONINSP 0.250 0.250 2013NFA
CONST 2.500 2.500 2013NFA
NYSTA
H11251
CONCRETE PAVEMENT REPAIRS: I-287 CONNECTOR, EXIT 15 (MP 31.35)TO
EXTEND SERVICE LIFE. ROCKLAND COUNTY
2.750 0.000 0.000 2.750 0.000 AQC:A10P TOTAL 4YR COST :ROCKLAND TPC : $2-$4 M
CONINSP 2.000 2.000 2014NFA
CONST 16.500 16.500 2014NFA
NYSTA
H11261
PAVEMENT REHAB 1R MILL/INLAY: I-87 BRIDGE OVER HUDSON RIVER
(TAPPAN ZEE BR) TO I-87 BRIDGE OVER SR 45.(MP 16.00 - 24.00)DUE TO
EXCESSIVE WEAR. ROCKLAND COUNTY
18.500 0.000 0.000 0.000 18.500 AQC:A10P TOTAL 4YR COST :ROCKLAND TPC : $15-$25 M
CONINSP 0.500 0.500 2013NFA
CONST 4.200 4.200 2013NFA
NYSTA
H11271
PAVEMENT REHAB 1R MILL & INLAY: TAXTER ROAD BRIDGE OVER I-87 TO
ROUTE 9 BRIDGE OVER I-87. (MP 11.00 - 13.00).DUE TO EXCESSIVE WEAR.
WESTCHESTER COUNTY
4.700 0.000 0.000 4.700 0.000 AQC:A10P TOTAL 4YR COST :WESTCHESTER TPC : $3.3-$5.6 M
CONINSP 0.011 0.011 2011NFA
CONST 0.088 0.088 2011NFA
NYSTA
I00822
TRAFFIC COUNT STATIONS: SOUTH OF I-95 BRIDGE OVER BYRAM RIVER TO
MONITOR FACILITY USAGE.(MP 614.1 SB, 614.1) WESTCHESTER COUNTY.
(COMBINE W/ H14.2, B12.20)
0.099 0.099 0.000 0.000 0.000 AQC:C3P TOTAL 4YR COST :WESTCHESTER TPC : < $0.75 M
MISC 24.969 24.969 2011NFAMETRO-NORTH
M601-01-01
ELECTRIC MULTIPLE UNITS (EMU) REPLACEMENT WITH 30 NEW M-9 CARS,
HUDSON & HARLEM LINE
24.969 24.969 0.000 0.000 0.000 AQC:B10P TOTAL 4YR COST :MULTI TPC : $21-$31 M
MISC 220.500 220.500 2011NFAMETRO-NORTH
M601-01-02
ELECTRIC MULTIPLE UNITS (EMU) REPLACEMENT WITH 300 NEW M-8 CARS
TO REPLACE EXISTING FLEET AND 56 TO MEET RIDERSHIP DEMAND, NEW
HAVEN LINE (FORMERLY M501-01-07)
220.500 220.500 0.000 0.000 0.000 AQC:B10P TOTAL 4YR COST :SYSTEM-WIDE TPC : $0.9-1.9 B
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 69 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
MISC 13.100 13.100 2012NFAMETRO-NORTH
M601-01-03
LOCOMOTIVE REPLACEMENT WITH 5 SHUTTLE/YARD SWITCHER
LOCOMOTIVES, SYSTEM WIDE
13.100 0.000 13.100 0.000 0.000 AQC:B2P TOTAL 4YR COST :SYSTEM-WIDE TPC : $12.5-$19 M
MISC 8.500 8.500 2011NFA
8.200 8.200 MISCFTA 5307 2012
MISC 8.031 8.031 2012NFA
3.360 3.360 MISCFTA 5307 2013
MISC 0.840 0.840 2013NFA
0.880 0.880 MISCFTA 5307 2014
MISC 0.220 0.220 2014NFA
METRO-NORTH
M602-01-01
GRAND CENTRAL TERMINAL TRAINSHED/PARK AVENUE TUNNEL-
COMPREHENSIVE INSPECTION OF TRAINSHED AND PARK AVENUE TUNNEL
AND DESIGN OF REPAIRS
30.031 8.500 16.231 4.200 1.100 AQC:B9P TOTAL 4YR COST :NEW YORK TPC : $26-$40 M
MISC 7.500 7.500 2011NFAMETRO-NORTH
M602-01-02
PARK AVE TUNNEL RENEWAL - REPAIR SELECT AREAS DETERMINED BY
INSPECTION UNDER M602-01-01
7.500 7.500 0.000 0.000 0.000 AQC:B9P TOTAL 4YR COST :NEW YORK TPC : $6-$9.4 M
MISC 3.000 3.000 2012NFAMETRO-NORTH
M602-01-04
GRAND CENTRAL TERMINAL TRAINSHED TRACK STRUCTURE PILOT
PROJECT TO DEVELOP METHODS FOR THE REPLACEMENT OF THE EXISTING
TRACK STRUCTURE IN GRAND CENTRAL TERMINAL. TWO TRACKS WILL BE
REPLACED UNDER THE PILOT PROJECT.
3.000 0.000 3.000 0.000 0.000 AQC:B9P TOTAL 4YR COST :NEW YORK TPC : $2-$4 M
MISC 13.000 13.000 2012NFAMETRO-NORTH
M602-01-05
GRAND CENTRAL TERMINAL LEAKS REMEDIATION - REPAIR LEAK
INFILTRATION FROM SURROUNDING BUILDINGS, STREETS AND SIDEWALKS
INTO GCT COMPLEX.
13.000 0.000 13.000 0.000 0.000 AQC:B8P TOTAL 4YR COST :NEW YORK TPC : $9.5-15.5 M
1.200 1.200 MISCFTA 5307 2012
MISC 0.300 0.300 2012NFA
4.800 4.800 MISCFTA 5307 2013
MISC 1.200 1.200 2013NFA
METRO-NORTH
M602-01-06
GCT ELEVATOR RENEWAL PH.4 - CONTINUE ELEVATOR REHABILITATION IN
GCTL WITH THE DESIGN THE REMAINING FIVE FREIGHT ELEVATORS AND
REHABILITATION OF FREIGHT ELEVATORS SE-01 AND SE-02 INCLUDING
POWER SUPPLY IMPROVEMENTS IN SUPPORT OF HIGHER CAPACITY CARS.
7.500 0.000 1.500 6.000 0.000 AQC:B8P TOTAL 4YR COST :NEW YORK TPC : $6-$9.4 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 70 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
2.480 2.480 MISCFTA 5307 2012
MISC 0.620 0.620 2012NFA
METRO-NORTH
M602-01-07
GRAND CENTRAL TERMINAL PLATFORM IMPROVEMENTS WILL
REHABILITATE NINE DETERIORATED PLATFORM EDGES AND REPLACE FIVE
MALFUNCTIONING EXPANSION JOINTS
3.100 0.000 3.100 0.000 0.000 AQC:B8P TOTAL 4YR COST :NEW YORK TPC : $2-$4 M
MISC 2.000 2.000 2012NFA
7.689 7.689 MISCFTA 5307 2013
MISC 17.697 17.697 2013NFA
METRO-NORTH
M602-01-08
GCT WATER CONVEYANCE SYSTEMS - THIS PROJECT WILL REPAIR WATER
CONVEYANCE UTILITIES (FIRE PROTECTION SYSTEMS, SANITARY SEWER
PIPING SYSTEM, ETC.) INSIDE THE GRAND CENTRAL TERMINAL COMPLEX
27.386 0.000 2.000 25.386 0.000 AQC:B8P TOTAL 4YR COST :NEW YORK TPC : $26-$40 M
1.600 1.600 MISCFTA 5307 2012
MISC 0.400 0.400 2012NFA
METRO-NORTH
M602-01-09
GRAND CENTRAL TERMINAL CUSTOMER COMMUNICATIONS - REPLACE THE
CURRENT VISUAL INFORMATION SYSTEM NEW CUSTOMER
COMMUNICATIONS NETWORK INFRASTRUCTURE
2.000 0.000 2.000 0.000 0.000 AQC:B6P TOTAL 4YR COST :NEW YORK TPC : $1.2-$2.5 M
6.000 6.000 MISCFTA 5307 2014
MISC 1.500 1.500 2014NFA
METRO-NORTH
M602-01-10
GCT RECYCLING FACILITY - DESIGN AND CONSTRUCT A JOINT
METRO-NORTH/LONG ISLAND RAIL ROAD TRASH FACILITY TO COLLECT
AND TRANSPORT GARBAGE FROM GRAND CENTRAL TERMINAL.
7.500 0.000 0.000 0.000 7.500 AQC:B8P TOTAL 4YR COST :NEW YORK TPC : $6-$9.4 M
6.000 FTA 5307 6.000 MISC2011
MISC 7.000 7.000 2011NFA
METRO-NORTH
M602-02-02
FORDHAM STATION IMPROVEMENTS - THIS PROJECT WILL ENHANCE
PEDESTRIAN CONDITIONS ON AND TO THE NORTHBOUND PLATFORM AT
FORDHAM STATION.
13.000 13.000 0.000 0.000 0.000 AQC:B8P TOTAL 4YR COST :BRONX TPC : $9.5-15.5 M
2.160 2.160 MISCFTA 5309 2012
MISC 0.540 0.540 2012NFA
20.000 20.000 MISCFTA 5309 2013
MISC 4.000 4.000 2013NFA
METRO-NORTH
M602-02-03
HARLEM LINE STATION RENEWAL AT SELECT STATIONS INCLUDING
ELEMENTS SUCH AS PLATFORMS, CANOPIES, LIGHTING AND PLATFORM
AMENITIES IN ORDER TO EXTEND THE USEFUL LIFE.
26.700 0.000 2.700 24.000 0.000 AQC:B8P TOTAL 4YR COST :SYSTEM-WIDE TPC : $21-$31 M
0.800 0.800 MISCFTA 5309 2012
MISC 0.200 0.200 2012NFA
3.160 3.160 MISCFTA 5309 2013
MISC 0.790 0.790 2013NFA
METRO-NORTH
M602-02-04
STATION BUILDING RENEWAL - THE PURPOSE OF THIS PROJECT IS TO
PROVIDE CRITICAL IMPROVEMENTS TO STATION BUILDING ELEMENTS TO
BRING TO A STATE OF GOOD REPAIR.
4.950 0.000 1.000 3.950 0.000 AQC:B8P TOTAL 4YR COST :SYSTEM-WIDE TPC : $4.6-$7.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 71 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
16.610 FTA 5307 16.610 MISC2011
MISC 9.850 9.850 2011NFA
8.390 FTA 5316 8.390 MISC2011
METRO-NORTH
M602-02-06
NEW HAVEN LINE STATIONS-PH II - THIS PROJECT WILL REHABILITATE
IDENTIFIED STATION ELEMENTS AT MOUNT VERNON EAST, PELHAM, NEW
ROCHELLE, LARCHMONT, MAMARONECK AND HARRISON IN ORDER TO
BRING THESE FACILITIES TO A STATE-OF-GOOD REPAIR.
34.850 34.850 0.000 0.000 0.000 AQC:B8P TOTAL 4YR COST :SYSTEM-WIDE TPC : $32-$50 M
MISC 4.380 4.380 2011NFA
MISC 4.700 4.700 2012NFA
METRO-NORTH
M602-02-07
SMART CARD IMPROVEMENTS - SUPPORT MTA-WIDE FARE COLLECTION
STRATEGY TO INSTITUTE SMART CARD USAGE ACROSS AGENCIES.
9.080 4.380 4.700 0.000 0.000 AQC:B5P TOTAL 4YR COST :SYSTEM-WIDE TPC : $7.5-$12 M
MISC 5.371 5.371 2011NFA
MISC 55.146 55.146 2012NFA
METRO-NORTH
M602-02-08
STATION COMMUNICATIONS INFRA - THIS PROJECT WILL PROVIDE FOR THE
NECESSARY INFRASTRUCTURE (DISPLAYS, CONDUIT AND WIRING) TO
PROVIDE “REAL-TIME, NON-EXCEPTION BASED” TRAIN INFORMATION TO
EAST OF HUDSON OUTLYING STATIONS.
60.517 5.371 55.146 0.000 0.000 AQC:B6P TOTAL 4YR COST :SYSTEM-WIDE TPC : $50-$85 M
MISC 2.500 2.500 2012NFAMETRO-NORTH
M602-03-01
PARKING RENEWAL - REHABILITATE SELECT EXISTING PARKING FACILITIES
AND RESTORE CONDITION TO A STATE OF GOOD REPAIR.
2.500 0.000 2.500 0.000 0.000 AQC:B8P TOTAL 4YR COST :SYSTEM-WIDE TPC : $2-$4 M
MISC 2.700 2.700 2011NFA
MISC 11.100 11.100 2012NFA
MISC 27.600 27.600 2013NFA
MISC 4.100 4.100 2014NFA
METRO-NORTH
M602-03-02
STRATEGIC FACILITIES - PROVIDE IMPROVED STATION ACCESS AND
EXPAND EXISTING RAILROAD PARKING FACILITIES AT SELECT STATIONS
(LOCATIONS TO BE DETERMINED).
45.500 2.700 11.100 27.600 4.100 AQC:NON TOTAL 4YR COST :SYSTEM-WIDE TPC : $40-$60 M
16.800 CMAQ 16.800 MISC2011
MISC 4.100 4.100 2011NFA
16.000 16.000 MISCCMAQ 2013
MISC 4.000 4.000 2013NFA
METRO-NORTH
M602-03-NW
PARKING EXPANSION AT THE NORTH WHITE PLAINS STATION (FORMERLY
M502-03-01)
40.900 20.900 0.000 20.000 0.000 AQC:NON TOTAL 4YR COST :WESTCHESTER TPC : $32-$50 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 72 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
9.875 FTA 5307 9.875 MISC2011
MISC 1.537 1.537 2011NFA
13.690 FTA 5309 13.690 MISC2011
16.080 16.080 MISCFTA 5307 2012
MISC 4.020 4.020 2012NFA
12.800 12.800 MISCFTA 5307 2013
MISC 3.200 3.200 2013NFA
6.080 6.080 MISCFTA 5307 2014
MISC 1.520 1.520 2014NFA
METRO-NORTH
M603-01-02
TURNOUTS: MAINLINE/HIGH SPEED REHABILITATION. PROVIDES FOR THE
REPLACEMENT OF INTERLOCKING SWITCHES THROUGHOUT THE ENTIRE
METRO-NORTH TERRITORY IN NYS AT THE END OF THEIR USEFUL LIFE.
THIS PROJECT CONTINUES THE REHAB PROGRAM UNDERTAKEN 1987-2004.
68.802 25.102 20.100 16.000 7.600 AQC:B9P TOTAL 4YR COST :MULTI TPC : $50-$85 M
1.000 FTA 5309 1.000 MISC2011
MISC 0.235 0.235 2011NFA
3.173 3.173 MISCFTA 5309 2012
MISC 0.793 0.793 2012NFA
2.200 2.200 MISCFTA 5309 2013
MISC 0.550 0.550 2013NFA
2.310 2.310 MISCFTA 5309 2014
MISC 0.577 0.577 2014NFA
METRO-NORTH
M603-01-03
GRAND CENTRAL TERMINAL TURNOUT/SWITCH RENEWAL: IDENTIFIES AND
REPLACES SWITCHES AND TURNOUTS AS THEY REACH THE END OF THEIR
USEFUL LIFE ENSURING THAT THE TERMINAL OPERATION DOES NOT
DETERIORATE.
10.838 1.235 3.966 2.750 2.887 AQC:B9P TOTAL 4YR COST :NEW YORK TPC : $12.5-$19 M
1.404 FTA 5307 1.404 MISC2011
MISC 0.800 0.800 2011NFA
0.472 0.472 MISCFTA 5307 2012
MISC 0.118 0.118 2012NFA
0.633 0.633 MISCFTA 5307 2013
MISC 0.158 0.158 2013NFA
0.664 0.664 MISCFTA 5307 2014
MISC 0.167 0.167 2014NFA
METRO-NORTH
M603-01-04
TURNOUTS: YARDS/SIDINGS REHABILITATION. PROVIDES A CONTINUATION
FOR THE NORMAL REPLACEMENT OF TURNOUTS AT VARIOUS
METRO-NORTH YARDS AND SIDING LOCATIONS AS THESE TURNOUTS WILL
HAVE REACHED THE END OF THEIR USEFUL LIFE. MAINTAINING A STATE OF
GOOD REPAIR.
4.416 2.204 0.590 0.791 0.831 AQC:B9P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
MISC 4.000 4.000 2011NFA
MISC 2.000 2.000 2012NFA
MISC 2.000 2.000 2013NFA
MISC 2.000 2.000 2014NFA
METRO-NORTH
M603-01-05
MAINTENANCE-OF-WAY EQUIPMENT/ROLLING STOCK - ANNUAL PURCHASE
OF HEAVY MAINTENANCE-OF-WAY EQUIPMENT AND ROLLING STOCK THAT
MUST BE REPLACED DUE TO EQUIPMENT HAVING REACHED THE END OF ITS
NORMAL, USEFUL LIFE.
10.000 4.000 2.000 2.000 2.000 AQC:B9P TOTAL 4YR COST :MULTI TPC : $7.5-$12 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 73 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
0.500 FTA 5307 0.500 MISC2011
MISC 0.500 0.500 2011NFA
0.400 0.400 MISCFTA 5307 2012
MISC 0.100 0.100 2012NFA
0.400 0.400 MISCFTA 5307 2013
MISC 0.100 0.100 2013NFA
0.400 0.400 MISCFTA 5307 2014
MISC 0.100 0.100 2014NFA
METRO-NORTH
M603-01-06
CYCLICAL REPLACEMENT OF INSULATED JOINTS IN NEW YORK STATE ON A
20 YEAR CYCLE. INSULATED JOINTS ARE USE TO SEPARATE TRACK
CIRCUITS SO THE MOVEMENT OF TRAINS CAN BE EFFECTIVELY TRACKED
AND MONITORED. APPROXIMATELY 100 INSULATED JOINTS WILL BE
INSTALLED.
2.500 1.000 0.500 0.500 0.500 AQC:B9P TOTAL 4YR COST :MULTI TPC : $2-$4 M
MISC 1.735 1.735 2011NFA
4.000 4.000 MISCFTA 5307 2012
MISC 1.000 1.000 2012NFA
METRO-NORTH
M603-01-07
ROCK SLOPE REMEDIATION - REMEDIATE PRIORITY ROCK SLOPE
LOCATIONS BY STABILIZATION OF THE ROCK FACE BY CLEARING AND
SCALING, INSTALLATION OF ROCK BOLTS, AND CABLE MESH, AVALANCHE
FENCE, AND SHOT-CRETE.
6.735 1.735 5.000 0.000 0.000 AQC:B9P TOTAL 4YR COST :SYSTEM-WIDE TPC : $6-$9.4 M
8.000 8.000 MISCFTA 5307 2012
MISC 2.000 2.000 2012NFA
METRO-NORTH
M603-01-08
DRAINAGE AND UNDERCUTTING - WILL UPGRADE EXISTING DRAINAGE
SYSTEMS AND PROVIDE NEW DRAINAGE SYSTEMS TO ADDRESS PROBLEMS
OF TRACKBED DRAINAGE AND FLOODING, ELIMINATE MUD PUMPING AND
SOFT SPOTS.
10.000 0.000 10.000 0.000 0.000 AQC:B9P TOTAL 4YR COST :SYSTEM-WIDE TPC : $7.5-$12 M
MISC 4.850 4.850 2011NFAMETRO-NORTH
M603-01-09
REBUILD RETAINING WALLS - REBUILD / REPLACE OF STONE, CONCRETE,
TIMBER OR OTHER TYPES OF RETAINING WALLS LYING ADJACENT TO AND
ON THE FIELD SIDE OF THE OUTSIDE TRACKS AT VARIOUS PLACES ON
MNR\'S RIGHT-OF-WAY IN NYS.
4.850 4.850 0.000 0.000 0.000 AQC:B9P TOTAL 4YR COST :SYSTEM-WIDE TPC : $4.6-$7.5 M
10.000 FTA 5309 10.000 MISC2011
3.338 STP FLEX 3.338 MISC2011
METRO-NORTH
M603-01-11
CYCLICAL TRACK REHABILITATION PROGRAM - EAST AND WEST OF
HUDSON . ANNUAL REPLACEMENT OF THE TIES AND RAIL ALONG WITH
CYCLICAL SURFACING REQUIRED THROUGHTOUT THE ENTIRE
METRO-NORTH TERRITORY IN NEW YORK STATE TO MAINTAIN A
CONSTANT STATE OF GOOD REPAIR
13.338 13.338 0.000 0.000 0.000 AQC:B9P TOTAL 4YR COST :MULTI TPC : $12.5-$19 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 74 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
10.400 10.400 MISCFTA 5309 2012
MISC 2.600 2.600 2012NFA
METRO-NORTH
M603-01-12
CYCLICAL TRACK REHABILITATION PROGRAM - EAST AND WEST OF
HUDSON . ANNUAL REPLACEMENT OF THE TIES AND RAIL ALONG WITH
CYCLICAL SURFACING REQUIRED THROUGHTOUT THE ENTIRE
METRO-NORTH TERRITORY IN NEW YORK STATE TO MAINTAIN A
CONSTANT STATE OF GOOD REPAIR
13.000 0.000 13.000 0.000 0.000 AQC:B9P TOTAL 4YR COST :MULTI TPC : $9.5-15.5 M
10.880 10.880 MISCFTA 5309 2013
MISC 2.720 2.720 2013NFA
METRO-NORTH
M603-01-13
CYCLICAL TRACK REHABILITATION PROGRAM - EAST AND WEST OF
HUDSON . ANNUAL REPLACEMENT OF THE TIES AND RAIL ALONG WITH
CYCLICAL SURFACING REQUIRED THROUGHTOUT THE ENTIRE
METRO-NORTH TERRITORY IN NEW YORK STATE TO MAINTAIN A
CONSTANT STATE OF GOOD REPAIR
13.600 0.000 0.000 13.600 0.000 AQC:B9P TOTAL 4YR COST :MULTI TPC : $12.5-$19 M
11.424 11.424 MISCFTA 5309 2014
MISC 2.856 2.856 2014NFA
METRO-NORTH
M603-01-14
CYCLICAL TRACK REHABILITATION PROGRAM - EAST AND WEST OF
HUDSON . ANNUAL REPLACEMENT OF THE TIES AND RAIL ALONG WITH
CYCLICAL SURFACING REQUIRED THROUGHTOUT THE ENTIRE
METRO-NORTH TERRITORY IN NEW YORK STATE TO MAINTAIN A
CONSTANT STATE OF GOOD REPAIR
14.280 0.000 0.000 0.000 14.280 AQC:B9P TOTAL 4YR COST :MULTI TPC : $12.5-$19 M
0.900 FTA 5307 0.900 MISC2011
MISC 0.450 0.450 2011NFA
MISC 0.950 0.950 2012NFA
MISC 0.650 0.650 2013NFA
MISC 0.683 0.683 2014NFA
METRO-NORTH
M603-02-01
STRUCTURES REHABILITATION PROGRAM : REPLACES TIMBERS ON OPEN
DECK BRIDGES IN NEW YORK STATE THAT HAVE EXCEEDED THEIR USEFUL
LIFE AND REQUIRE REPLACEMENT.
3.633 1.350 0.950 0.650 0.683 AQC:B9P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
1.200 FTA 5307 1.200 MISC2011
MISC 0.600 0.600 2011NFA
MISC 0.600 0.600 2012NFA
MISC 0.600 0.600 2013NFA
MISC 0.630 0.630 2014NFA
METRO-NORTH
M603-02-02
RENEW CULVERTS/RAILTOP CULVERT - REPLACE RAILTOP CULVERTS ON
THE HARLEM AND HUDSON LINE THAT HAVE EXCEEDED THEIR USEFUL
LIFE. THESE STRUCTURES SUPPORT THE TRACKS OVER STREAMS, SEWERS
OR OTHER PIPE WAYS
3.630 1.800 0.600 0.600 0.630 AQC:B9P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 75 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
MISC 0.160 0.160 2011NFA
MISC 0.150 0.150 2012NFA
MISC 0.150 0.150 2013NFA
MISC 0.150 0.150 2014NFA
METRO-NORTH
M603-02-03
RIGHT-OF-WAY FENCING - INSTALL RIGHT OF WAY FENCING AT VARIOUS
LOCATIONS INCLUDING YARDS, STATIONS, SHOPS, AND ALONG THE RIGHT
OF WAY ON HUDSON, HARLEM AND NEW HAVEN LINES IN NEW YORK
STATE.
0.610 0.160 0.150 0.150 0.150 AQC:B9P TOTAL 4YR COST :SYSTEM-WIDE TPC : $0.6-$1.5 M
MISC 0.350 0.350 2011NFA
MISC 0.350 0.350 2012NFA
MISC 0.350 0.350 2013NFA
MISC 0.350 0.350 2014NFA
METRO-NORTH
M603-02-04
DC SUBSTATION/SIGNAL HOUSE - REPLACE DETERIORATED ROOFING
SYSTEMS AT SUBSTATIONS AND SIGNAL HOUSES ON THE HARLEM,
HUDSON, AND NEW HAVEN LINES IN NYS.
1.400 0.350 0.350 0.350 0.350 AQC:B6P TOTAL 4YR COST :SYSTEM-WIDE TPC : $1.2-$2.5 M
MISC 0.375 0.375 2011NFA
MISC 0.425 0.425 2012NFA
MISC 0.475 0.475 2013NFA
MISC 0.499 0.499 2014NFA
METRO-NORTH
M603-02-05
BRIDGE WALKWAYS INSTALLATION - CONSTRUCT EMPLOYEE WALKWAYS
ATTACHED TO VARIOUS UNDERGRADE BRIDGES ON THE HARLEM, HUDSON
AND NEW HAVEN LINES IN NYS.
1.774 0.375 0.425 0.475 0.499 AQC:B9P TOTAL 4YR COST :SYSTEM-WIDE TPC : $1.2-$2.5 M
MISC 0.524 0.524 2011NFA
MISC 0.625 0.625 2012NFA
MISC 0.675 0.675 2013NFA
MISC 0.725 0.725 2014NFA
METRO-NORTH
M603-02-06
REMOVE OBSOLETE FACILITIES ALONG THE RIGHT OF WAY IN NYS. THIS
INCLUDES STRUCTURES, SMALL AND LARGE BUILDINGS, ABANDONED
STATION BUILDINGS, SIGNAL CASES AND BUNGALOWS, SWITCH MACHINES,
TRACK AND SIGNAL FIELD EQUIPMENT AND MATERIALS.
2.549 0.524 0.625 0.675 0.725 AQC:B9P TOTAL 4YR COST :SYSTEM-WIDE TPC : $2-$4 M
MISC 0.920 0.920 2011NFAMETRO-NORTH
M603-02-07
SPECIALIZED STRUCTURES EQUIPMENT - PURCHASE HEAVY
CONSTRUCTION EQUIPMENT TO MEET THE DEPARTMENT’S SPECIALIZED
WORK REQUIREMENTS.
0.920 0.920 0.000 0.000 0.000 AQC:B2P TOTAL 4YR COST :SYSTEM-WIDE TPC : $0.6-$1.5 M
MISC 3.000 3.000 2011NFA
MISC 2.500 2.500 2012NFA
MISC 2.500 2.500 2013NFA
MISC 2.000 2.000 2014NFA
METRO-NORTH
M603-02-09
EMPLOYEE WELFARE & STORAGE FACILITY - THE PURPOSE OF THIS
PROJECT IS TO UPGRADE EMPLOYEE WELFARE FACILITIES, INCLUDING
LOCKER ROOMS, BATHROOMS, MEAL AND REST AREAS, AND STORAGE AND
WORKSHOP SYSTEMWIDE IN NYS.
10.000 3.000 2.500 2.500 2.000 AQC:B8P TOTAL 4YR COST :SYSTEM-WIDE TPC : $7.5-$12 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 76 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
MISC 7.500 7.500 2011NFA
5.845 5.845 MISCFTA 5309 2012
MISC 5.355 5.355 2012NFA
12.400 12.400 MISCFTA 5309 2013
MISC 3.100 3.100 2013NFA
1.840 1.840 MISCFTA 5309 2014
MISC 0.460 0.460 2014NFA
METRO-NORTH
M603-02-10
REPLACE/REPAIR UNDERGRADE BRIDGES - THIS PROJECT WILL PROVIDE
FOR THE CONTINUED REHABILITATION OF SELECTED UNDERGRADE
BRIDGES LOCATED IN NEW YORK STATE TO MAINTAIN THE BRIDGE
STRUCTURES IN A STATE OF GOOD REPAIR.
36.500 7.500 11.200 15.500 2.300 AQC:B9P TOTAL 4YR COST :SYSTEM-WIDE TPC : $32-$50 M
8.000 FTA 5307 8.000 MISC2011
MISC 2.100 2.100 2011NFA
MISC 0.200 0.200 2013NFA
MISC 0.200 0.200 2014NFA
METRO-NORTH
M603-02-11
HARLEM RIVER LIFT BRIDGE CABLE REPLACEMENT - THIS PROJECT IS FOR
THE REPLACEMENT OF ALL 128 LIFT CABLES CONNECTING THE LIFT SPANS
TO THE COUNTERWEIGHTS LOCATED AT EACH END OF THE BRIDGE.
10.500 10.100 0.000 0.200 0.200 AQC:B9P TOTAL 4YR COST :MULTI TPC : $9.5-15.5 M
MISC 2.000 2.000 2011NFA
MISC 4.500 4.500 2012NFA
MISC 2.700 2.700 2013NFA
MISC 7.000 7.000 2014NFA
METRO-NORTH
M603-02-12
OVERHEAD BRIDGE PROGRAM-E OF H - THIS PROJECT PROVIDES FOR THE
DESIGN, CONSTRUCTION, REHABILITATION AND CONSTRUCTION
SUPERVISION SERVICES FOR THE CONSTRUCTION OF IDENTIFIED
OVERHEAD BRIDGES IN NEW YORK STATE.
16.200 2.000 4.500 2.700 7.000 AQC:B9P TOTAL 4YR COST :MULTI TPC : $15-$25 M
MISC 0.500 0.500 2011NFA
MISC 3.500 3.500 2012NFA
METRO-NORTH
M603-02-13
CATENARY PAINTING/REHAB CATENARY STRUCTURES - THIS PROJECT IS
PART OF MNR PROGRAM TO MAINTAIN THE CATENARY STRUCTURES IN A
STATE OF GOOD REPAIR. THIS PROGRAM IDENTIFIES THE NEED FOR THE
REHABILITATION OF INDIVIDUAL COMPONENTS OF EACH TOWER.
4.000 0.500 3.500 0.000 0.000 AQC:B9P TOTAL 4YR COST :SYSTEM-WIDE TPC : $3.3-$5.6 M
MISC 1.800 1.800 2011NFAMETRO-NORTH
M603-02-14
PARK AVE VIADUCT DIRECT FIXATION - PREPARE A DESIGN FOR THE REHAB
OF THE DIRECT FIXATION SYSTEM THAT SUPPORTS THE RUNNING RAILS
AND THE THIRD RAILS ATOP THE PARK AVENUE VIADUCT FROM EAST
110TH STREET TO EAST 131ST STREET.
1.800 1.800 0.000 0.000 0.000 AQC:B9P TOTAL 4YR COST :NEW YORK TPC : $1.2-$2.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 77 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
4.000 FTA 5309 4.000 MISC2011
MISC 0.234 0.234 2011NFA
3.478 3.478 MISCFTA 5309 2012
MISC 0.869 0.869 2012NFA
3.200 3.200 MISCFTA 5309 2013
MISC 0.800 0.800 2013NFA
3.560 3.560 MISCFTA 5309 2014
MISC 0.890 0.890 2014NFA
METRO-NORTH
M603-03-01
WEST OF HUDSON CYCLICAL TRACK IMPROVEMENT. TO ENSURE A STATE
OF GOOD REPAIR ON THE PORT JERVIS LINE. INCLUDES INSTALLATION OF
APPROXIMATELY 15,000 TIES AND SURFACING OF APPROX. 20 MILES OF
RAIL. A REPLACEMENT OF TURNOUTS AT HUDSON JUNCTION & CP
HOWELLS.
17.031 4.234 4.347 4.000 4.450 AQC:B9P TOTAL 4YR COST :MULTI TPC : $15-$25 M
MISC 0.750 0.750 2011NFA
MISC 0.750 0.750 2012NFA
MISC 0.750 0.750 2013NFA
MISC 0.788 0.788 2014NFA
METRO-NORTH
M603-03-02
WEST OF HUDSON IMPROVEMENTS - THIS PROJECT WILL CONTRIBUTE TO
THE ATTAINMENT AND MAINTENANCE OF THOSE FACILITIES IN A STATE OF
GOOD REPAIR OR PROVIDE FOR THEIR REPLACEMENT WHEN NECESSARY
TO MAINTAIN THEM IN SOUND, OPERATING CONDITION.
3.038 0.750 0.750 0.750 0.788 AQC:B9P TOTAL 4YR COST :SYSTEM-WIDE TPC : $3.3-$5.6 M
MISC 26.955 26.955 2011NFA
MISC 89.600 89.600 2012NFA
MISC 8.890 8.890 2013NFA
MISC 60.900 60.900 2014NFA
METRO-NORTH
M604-01-01
SIGNAL SYSTEM IMPROVEMENTS -STUDY/DESIGN FOR SIGNAL
IMPROVEMENTS AND REPLACE OUTDATED SIGNALS ON MAINLINE TRACKS
TO PREVENT TRAIN -TO-TRAIN COLLISIONS, OVERSPEED DERAILMENTS,
INCURSIONS INTO WORK ZONE LIMITS, AND MOVEMENTS OF A TRAIN
THROUGH A SWITCHES.
186.345 26.955 89.600 8.890 60.900 AQC:B6P TOTAL 4YR COST :MULTI TPC : $175-$385 M
12.630 FTA 5307 12.630 MISC2011
MISC 37.210 37.210 2011NFA
17.760 FTA 5309 17.760 MISC2011
METRO-NORTH
M604-01-02
UPGRADE THE PORT JERVIS LINE SIGNAL SYSTEM TO BRING WITHIN A
STATE OF GOOD REPAIR IN CONJUNCTION WITH THE POSITIVE TRAIN
CONTROL SYSTEM (PTC) PROJECT
67.600 67.600 0.000 0.000 0.000 AQC:B6P TOTAL 4YR COST :MULTI TPC : $70-$130 M
MISC 0.900 0.900 2011NFA
3.115 3.115 MISCFTA 5309 2012
MISC 0.779 0.779 2012NFA
3.115 3.115 MISCFTA 5309 2013
MISC 0.779 0.779 2013NFA
METRO-NORTH
M604-01-03
REPLACE FIBER / C&S CABLES - REPLACE FIBER OPTIC CABLE INSTALLED
AT 6 LOCATIONS ON THE HUDSON LINE IN NYS. THE CABLE IS
APPROACHING 30 YEARS OF AGE AND NEEDS TO BE REPLACED.
8.688 0.900 3.894 3.894 0.000 AQC:B6P TOTAL 4YR COST :SYSTEM-WIDE TPC : $7.5-$12 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 78 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
MISC 0.879 0.879 2011NFA
MISC 0.529 0.529 2012NFA
MISC 0.350 0.350 2013NFA
METRO-NORTH
M604-01-04
REPLACE FIELD CODE SYSTEM - REPLACE THE SINGLE FIELD CODE SYSTEM,
LOCAL CONTROL PANEL AND NON-VITAL RELAY SYSTEMS AT MOTT HAVEN
WITH A DISTRIBUTED CODE SYSTEM COMPRISING OF FOUR NEW CODE
SYSTEMS, LOCAL CONTROL PANELS AND FIBER OPTIC CABLE.
1.758 0.879 0.529 0.350 0.000 AQC:B6P TOTAL 4YR COST :SYSTEM-WIDE TPC : $1.2-$2.5 M
MISC 0.512 0.512 2011NFAMETRO-NORTH
M604-01-05
CROSSING UPGRADES - PH2 - UPGRADE THE EXISTING HARDWARE
EQUIPMENT AT THE HIGHWAY GRADE CROSSINGS WITHIN NYS THAT ARE
PRESENTLY PROTECTED WITH FLASHING WARNING LIGHTS OR FLASHING
GATE LIGHTS W CROSSING GATES. (FORMERLY LISTED AS M604-01-04)
0.512 0.512 0.000 0.000 0.000 AQC:A1P TOTAL 4YR COST :SYSTEM-WIDE TPC : $0.6-$1.5 M
MISC 0.366 0.366 2011NFA
MISC 0.366 0.366 2012NFA
METRO-NORTH
M604-01-06
CTC/SCADA INTRUSION TESTING - PERFORM A SERIES OF TESTS, WHICH
WILL IDENTIFY SECURITY VULNERABILITIES IN TWO OF MNR’S CRITICAL
COMPUTER BASED OPERATING SYSTEMS.
0.732 0.366 0.366 0.000 0.000 AQC:B6P TOTAL 4YR COST :SYSTEM-WIDE TPC : $0.6-$1.5 M
MISC 0.105 0.105 2011NFA
MISC 0.100 0.100 2012NFA
MISC 0.100 0.100 2013NFA
MISC 0.100 0.100 2014NFA
METRO-NORTH
M604-01-07
REFURB/REPLACE ELEC. SW MACHINE - REFURBISH ELECTRIC SWITCH
MACHINES AT INTERLOCKINGS IN NYS SWITCH MACHINES ROUT TRAINS TO
VARIOUS TRACKS.
0.405 0.105 0.100 0.100 0.100 AQC:B6P TOTAL 4YR COST :SYSTEM-WIDE TPC : < $0.75 M
MISC 0.600 0.600 2011NFA
MISC 0.200 0.200 2012NFA
MISC 0.200 0.200 2013NFA
MISC 0.210 0.210 2014NFA
METRO-NORTH
M604-01-08
DESIGN/REPLACE TRACK RELAY H&H -REPLACE HARLEM AND HUDSON
VANE TRACK RELAYS, WHICH HAVE REACHED THE END OF THEIR USEFUL
LIFE WITH NEW SOLID-STATE TYPE RELAYS.
1.210 0.600 0.200 0.200 0.210 AQC:B6P TOTAL 4YR COST :SYSTEM-WIDE TPC : $0.6-$1.5 M
MISC 0.130 0.130 2011NFA
MISC 0.125 0.125 2012NFA
MISC 0.125 0.125 2013NFA
MISC 0.125 0.125 2014NFA
METRO-NORTH
M604-01-09
REPLACE HIGH CYCLE RELAYS - REPLACE HIGH CYCLE RELAYS, WHICH
HAVE REACHED THE END OF THEIR USEFUL LIFE WITH NEW SOLID-STATE
TYPE RELAYS.
0.505 0.130 0.125 0.125 0.125 AQC:B6P TOTAL 4YR COST :SYSTEM-WIDE TPC : $0.6-$1.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 79 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
MISC 0.879 0.879 2011NFAMETRO-NORTH
M604-01-10
C&S MAINTENANCE MANAGEMENT SYSTEM - DEVELOP A SOFTWARE
SYSTEM THAT WILL EFFECTIVLY MANAGE COMMUNICATIONS AND
SIGNALS SYSTEM MAINTENANCE.
0.879 0.879 0.000 0.000 0.000 AQC:B6P TOTAL 4YR COST :SYSTEM-WIDE TPC : $0.6-$1.5 M
MISC 1.465 1.465 2011NFA
MISC 1.464 1.464 2012NFA
METRO-NORTH
M604-01-11
PBX REPLACE/UPGRADE - THIS SYSTEM PROVIDES TELEPHONE
INTERCONNECTION BETWEEN THE PUBLIC TELEPHONE NETWORK AND ALL
METRO-NORTH PROPERTIES LOCATED IN NEW YORK.
2.929 1.465 1.464 0.000 0.000 AQC:B6P TOTAL 4YR COST :SYSTEM-WIDE TPC : $2-$4 M
MISC 0.091 0.091 2012NFA
MISC 0.092 0.092 2013NFA
METRO-NORTH
M604-01-12
MOBILE/PORTABLE RADIOS - REPLACE EXISTING MOBILE (VEHICLE AND
HIGH RAIL) AND PORTABLE (HANDHELD) RADIOS THAT HAVE EITHER
REACHED OR EXCEEDED THEIR USEFUL LIFE.
0.183 0.000 0.091 0.092 0.000 AQC:B6P TOTAL 4YR COST :SYSTEM-WIDE TPC : < $0.75 M
MISC 0.050 0.050 2011NFA
MISC 0.125 0.125 2012NFA
MISC 0.075 0.075 2013NFA
METRO-NORTH
M604-01-13
ROLLING STOCK RADIOS & PA'S -REPLACE ROLLING STOCK RADIOS AND P.A.
(PUBLIC ADDRESS) EQUIPMENT THAT HAVE REACHED THE END OF THEIR
USEFUL LIFE.
0.250 0.050 0.125 0.075 0.000 AQC:B6P TOTAL 4YR COST :SYSTEM-WIDE TPC : < $0.75 M
MISC 0.500 0.500 2011NFAMETRO-NORTH
M604-01-14
RADIO BASE STATION REPLACEMENT - BEGIN THE REPLACEMENT OF RADIO
TRANSMITTERS THROUGHOUT ITS SERVICE TERRITORY THAT HAVE
REACHED THE END OF THEIR LIFE.
0.500 0.500 0.000 0.000 0.000 AQC:B6P TOTAL 4YR COST :SYSTEM-WIDE TPC : $0.6-$1.5 M
MISC 1.580 1.580 2011NFA
MISC 1.580 1.580 2012NFA
METRO-NORTH
M604-01-16
RADIO FREQ REBANDING (INCL CT) - REPLACE RADIO COMMUNICATION
SYSTEMS IN METRO-NORTH’S FLEET THAT ARE NOT COMPLIANT WITH THE
NEW MANDATED FCC SPECTRUM USAGE RULES FOR RAILROADS.
3.160 1.580 1.580 0.000 0.000 AQC:B6P TOTAL 4YR COST :SYSTEM-WIDE TPC : $3.3-$5.6 M
MISC 28.000 28.000 2011NFAMETRO-NORTH
M605-01-01
SUBSTATION BRIDGE 23 - CONST - THIS PROJECT WILL REPLACE THE
EXISTING SUBSTATION WITH A NEW FACILITY INCL REPLACING THE AGING
ELECTRICAL EQUIPMENT AND TAKE ADVANTAGE OF ENERGY SAVINGS
FROM THE REGENERATIVE BRAKING CAPABILITIES OF THE UPCOMING M-8
FLEET
28.000 28.000 0.000 0.000 0.000 AQC:B6P TOTAL 4YR COST :MULTI TPC : $26-$40 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 80 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
MISC 7.750 7.750 2011NFAMETRO-NORTH
M605-01-02
RENEWAL HARLEM AND HUDSON SUBSTATIONS - CONSTRUCTION - THIS
PROJECT PROVIDES FOR THE INSTALLATION OF ENHANCED,
DISCRIMINATING, HIGH-SPEED RELAY PROTECTION FOR D.C. THIRD RAIL
CIRCUIT BREAKERS AT SELECT EXISTING HARLEM & HUDSON TRACTION
POWER SUBSTATIONS.
7.750 7.750 0.000 0.000 0.000 AQC:B6P TOTAL 4YR COST :SYSTEM-WIDE TPC : $7.5-$12 M
4.500 FTA 5307 4.500 MISC2011
23.200 23.200 MISCFTA 5307 2012
MISC 6.000 6.000 2012NFA
MISC 2.000 2.000 2013NFA
METRO-NORTH
M605-01-03
HARLEM AND HUDSON LINES POWER IMPROVEMENTS -DESIGN AND
CONSTRUCT UP TO TEN ADDITIONAL DC TRACTION POWER SUBSTATIONS
ON THE UPPER HARLEM LINE. VARIOUS LOCATIONS
35.700 4.500 29.200 2.000 0.000 AQC:B6P TOTAL 4YR COST :SYSTEM-WIDE TPC : $32-$50 M
MISC 1.000 1.000 2012NFA
MISC 7.000 7.000 2013NFA
METRO-NORTH
M605-01-04
REPLACE MOTOR ALTERNATORS - PHASED REPLACEMENT OF MOTOR
ALTERNATORS AND CONTROL CIRCUITS, REACHING THE END OF THEIR
USEFUL LIVES SYSTEMWIDE.
8.000 0.000 1.000 7.000 0.000 AQC:B6P TOTAL 4YR COST :SYSTEM-WIDE TPC : $7.5-$12 M
MISC 0.400 0.400 2011NFA
MISC 0.200 0.200 2012NFA
MISC 0.200 0.200 2013NFA
MISC 0.200 0.200 2014NFA
METRO-NORTH
M605-01-05
REPLACE SUBSTATION BATTERIES - CONTINUE THE SCHEDULED
REPLACEMENT OF SUBSTATION CONTROL BATTERIES AND CHARGERS
THAT HAVE REACHED THE END OF THEIR USEFUL LIFE SYSTEMWIDE.
1.000 0.400 0.200 0.200 0.200 AQC:B6P TOTAL 4YR COST :SYSTEM-WIDE TPC : $0.6-$1.5 M
MISC 1.000 1.000 2012NFAMETRO-NORTH
M605-01-06
PARK AVE TUNNEL & VIADUCT ALARM - REPLACE THE SAFETY ALARM
NOTIFICATION SYSTEM THAT AUTOMATICALLY DE-ENERGIZES THE 3RD
RAIL POWER IN PARK AVENUE TUNNEL AND VIADUCT.
1.000 0.000 1.000 0.000 0.000 AQC:B6P TOTAL 4YR COST :SYSTEM-WIDE TPC : $0.6-$1.5 M
11.000 FTA 5307 11.000 MISC2011
MISC 2.600 2.600 2011NFA
METRO-NORTH
M605-01-07
REPLACE HARLEM RIVER LIFT BRIDGE BREAKER HOUSES. REPLACEMENT
OF THE ELECTRICAL CONTROL SYSTEM THAT RAISES AND LOWERS THE
HARLEM RIVER LIFT BRIDGE (HRLB) ON THE HUDSON LINE FOR RIVER
TRAFFIC ON THE EAST RIVER.
13.600 13.600 0.000 0.000 0.000 AQC:B6P TOTAL 4YR COST :MULTI TPC : $12.5-$19 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 81 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
MISC 6.000 6.000 2011NFAMETRO-NORTH
M605-01-09
REPLACE 3RD RAILBRACKETS-PARK AVENUE TUNNEL- PROCURE AND
INSTALL NEW FIBERGLASS 3RD RAIL BRACKETS IN THE PARK AVENUE
TUNNEL THAT HAVE REACHED THE END OF THEIR USEFUL LIFE.
6.000 6.000 0.000 0.000 0.000 AQC:B6P TOTAL 4YR COST :SYSTEM-WIDE TPC : $4.6-$7.5 M
25.508 FTA 5307 25.508 MISC2011
25.415 25.415 MISCFTA 5309 2012
MISC 10.000 10.000 2012NFA
39.387 39.387 MISCFTA 5307 2013
MISC 15.000 15.000 2013NFA
5.615 5.615 MISCFTA 5309 2013
MISC 26.678 26.678 2013NFA
66.736 66.736 MISCFTA 5307 2014
MISC 17.000 17.000 2014NFA
43.246 43.246 MISCFTA 5309 2014
MISC 11.000 11.000 2014NFA
METRO-NORTH
M606-01-01
HARMON SHOP - PHASE IV CONST. - THIS PROJECT WILL PROVIDE FOR THE
DESIGN AND CONSTRUCTION OF PHASE IV- NEW SUPPORT SHOP BUILDING.
285.585 25.508 35.415 86.680 137.982 AQC:B9P TOTAL 4YR COST :WESTCHESTER TPC : $175-$385 M
MISC 9.300 9.300 2011NFA
8.720 8.720 MISCFTA 5307 2012
MISC 2.180 2.180 2012NFA
3.100 3.100 MISCFTA 5307 2013
MISC 0.800 0.800 2013NFA
METRO-NORTH
M606-01-03
OTHER SHOPS/YARDS RENEWAL - PROJECT ALLOCATION FOR VARIOUS
PRIORITY SHOPS AND YARDS NEEDS AT MULTIPLE METRO-NORTH
FACILITIES.
24.100 9.300 10.900 3.900 0.000 AQC:B8P TOTAL 4YR COST :SYSTEM-WIDE TPC : $21-$31 M
MISC 1.000 1.000 2011NFA
MISC 2.000 2.000 2012NFA
MISC 1.000 1.000 2013NFA
MISC 1.000 1.000 2014NFA
METRO-NORTH
M608-01-01
SYSTEMWIDE LEAD/ASBESTOS ABATEMENT
5.000 1.000 2.000 1.000 1.000 AQC:A2P TOTAL 4YR COST :SYSTEM-WIDE TPC : $4.6-$7.5 M
MISC 0.400 0.400 2011NFA
MISC 0.800 0.800 2012NFA
MISC 0.400 0.400 2013NFA
MISC 0.400 0.400 2014NFA
METRO-NORTH
M608-01-02
ENVIRONMENTAL REMEDIATION - ADDRESS UNANTICIPATED
ENVIRONMENTAL CONDITIONS
2.000 0.400 0.800 0.400 0.400 AQC:A2P TOTAL 4YR COST :SYSTEM-WIDE TPC : $1.2-$2.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 82 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
MISC 1.644 1.644 2011NFA
MISC 0.822 0.822 2012NFA
MISC 0.822 0.822 2013NFA
MISC 0.863 0.863 2014NFA
METRO-NORTH
M608-01-03
RAILROAD PROTECTIVE LIABILITY
4.151 1.644 0.822 0.822 0.863 AQC:B1P TOTAL 4YR COST :SYSTEM-WIDE TPC : $3.3-$5.6 M
MISC 2.811 2.811 2011NFA
MISC 1.300 1.300 2012NFA
MISC 1.280 1.280 2013NFA
MISC 1.375 1.375 2014NFA
METRO-NORTH
M608-01-04
INDEPENDENT ENGINEER - PROVIDES OVERSIGHT AND PROGRAM
OVERSIGHT FOR THE CAPITAL PROGRAM OVERSIGHT COMMITTEE OF THE
MTA
6.766 2.811 1.300 1.280 1.375 AQC:C3P TOTAL 4YR COST :SYSTEM-WIDE TPC : $6-$9.4 M
MISC 8.500 8.500 2011NFA
MISC 9.000 9.000 2012NFA
MISC 9.500 9.500 2013NFA
MISC 9.975 9.975 2014NFA
METRO-NORTH
M608-01-06
PROGRAM ADMINISTRATION
36.975 8.500 9.000 9.500 9.975 AQC:B1P TOTAL 4YR COST :SYSTEM-WIDE TPC : $40-$60 M
MISC 2.320 2.320 2011NFA
MISC 2.320 2.320 2012NFA
MISC 2.320 2.320 2013NFA
MISC 2.320 2.320 2014NFA
METRO-NORTH
M608-01-07
PROGRAM SCOPE DEVELOPMENT
9.280 2.320 2.320 2.320 2.320 AQC:B1P TOTAL 4YR COST :SYSTEM-WIDE TPC : $9.5-15.5 M
MISC 5.000 5.000 2012NFAMETRO-NORTH
M608-01-09
SYSTEMWIDE SECURITY INITIATIVES
5.000 0.000 5.000 0.000 0.000 AQC:A2P TOTAL 4YR COST :SYSTEM-WIDE TPC : $4.6-$7.5 M
CONST 0.390 0.390 2011NFA
CONST 0.260 0.260 2012NFA
CONST 0.410 0.410 2013NFA
CONST 0.275 0.275 2014NFA
NYSBA
S0001
BIENNIAL BRIDGE INSPECTION - GENERAL CONSULTANT: DETAILED
INSPECTION OF APPROACHES, STRUCTURES, AND DECKS WITH HANDS ON
INSPECTION OF ALL FRACTURE CRITICAL MEMBERS TO MAINTAIN STATE OF
GOOD REPAIR. ODD YEAR: KRB & NBB(S) EVEN YEAR: RVWB, MHB AND
BMB
1.335 0.390 0.260 0.410 0.275 AQC:A19P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 83 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
PRELDES 0.100 0.100 2012NFANYSBA
S0002
PERIODIC UNDERWATER BRIDGE INSPECTIONS: DIVER AND, VIDEO TAPE
INSPECTIONS OF ALL AUTHORITY IN WATER PIERS BELOW THE WATER
SURFACE TO INCLUDE ANALYSIS & RECOMMENDATIONS BY PROFESSIONAL
ENGINEERS, 5 YR CYCLE TO MAINTAIN STATE OF GOOD REPAIR
0.100 0.000 0.100 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : < $0.75 M
CONST 0.300 0.300 2011NFA
DETLDES 0.250 0.250 2011NFA
MISC 0.319 0.319 2011NFA
CONST 0.200 0.200 2012NFA
DETLDES 0.250 0.250 2012NFA
MISC 0.321 0.321 2012NFA
CONST 0.200 0.200 2013NFA
DETLDES 0.250 0.250 2013NFA
MISC 0.323 0.323 2013NFA
CONST 0.200 0.200 2014NFA
DETLDES 0.250 0.250 2014NFA
MISC 0.325 0.325 2014NFA
NYSBA
S0003
SYSTEMWIDE MISCELLANEOUS MAINTENANCE: POTHOLE REPAIRS, SPOT
RESURFACING, GUIDE RAIL REPLACEMENT AND REPAIR, DRAINAGE AND
SHOULDER UPGRADES WHERE AND WHEN NEEDED TO MAINTAIN STATE OF
GOOD REPAIR. VARIOUS COUNTIES
3.188 0.869 0.771 0.773 0.775 AQC:A19P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M
DETLDES 0.015 0.015 2011NFA
DETLDES 0.015 0.015 2012NFA
DETLDES 0.015 0.015 2013NFA
DETLDES 0.015 0.015 2014NFA
NYSBA
S0004
SYSTEMWIDE SITE MAPPING: DEVELOPMENT OF SITE MAPS AND PHYSICAL
FACILITY DATABASE FOR EACH BRIDGE, TO BE COMPATIBLE WITH BRIDGE
AUTHORITY CADD TECHNOLOGY. TO BE USED AS INITIAL DATA FOR ALL
FUTURE CAPITAL PROJECTS. VARIOUS COUNTIES
0.060 0.015 0.015 0.015 0.015 AQC:A19P TOTAL 4YR COST :MULTI TPC : < $0.75 M
MISC 0.550 0.550 2011NFA
MISC 0.550 0.550 2012NFA
MISC 0.550 0.550 2013NFA
MISC 0.550 0.550 2014NFA
NYSBA
S0005
SYSTEMWIDE - EQUIPMENT PURCHASES, MAINTENANCE: ACQUISITION OF
MAJOR EXTRAORDINARY VEHICLES AND EQUIPMENT
NECESSARY TO OPERATE AND MAINTAIN THE BRIDGE SYSTEM. VARIOUS
COUNTIES
2.200 0.550 0.550 0.550 0.550 AQC:A19P TOTAL 4YR COST :MULTI TPC : $2-$4 M
CONST 0.250 0.250 2013NFA
CONST 0.250 0.250 2014NFA
NYSBA
S0008
SYSTEMWIDE - EXISTING METAL MAINTENANCE BUILDING RENOVATIONS:
RVW, KRB & NBB - RAISE BLDG AND INSTALL NEW EXTERIOR PANEL &
ROOF; NBB INSTALL NEW BAY EXPANSION. VARIOUS COUNTIES
0.500 0.000 0.000 0.250 0.250 AQC:A19P TOTAL 4YR COST :MULTI TPC : < $0.75 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 84 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
MISC 0.120 0.120 2011NFA
MISC 0.098 0.098 2012NFA
MISC 0.110 0.110 2013NFA
MISC 0.110 0.110 2014NFA
NYSBA
S0009
SYSTEMWIDE - EQUIPMENT PURCHASES, OPERATIONS: 1) OFFICE
EQUIPMENT (COPIER, PRINTERS, PLOTTER); ID CARD SYSTEM 2010; 2) PC
UPGRADE (SYSTEM HARDWARE); 3) SYSTEMWIDE PROJECTS: A. MHB -
NECKLACE LIGHTS, B. SYS - GASBOY (FUEL DISPENSING) UPGRADE; 4)
FIREWALL/V
0.438 0.120 0.098 0.110 0.110 AQC:B4P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
MISC 0.775 0.775 2011NFA
MISC 0.210 0.210 2012NFA
MISC 0.255 0.255 2013NFA
MISC 0.225 0.225 2014NFA
NYSBA
S0011
IT UPGRADES: ELECTRONIC DATA PROCESSING (EDP) UPGRADE: 1)
WINDOWS FILE SERVER; 2) CONSULTING (ITS); 3) DATA CABLING; 4) TOLL
SYSTEM ENHANCEMENTS TO MAINTAIN STATE OF GOOD REPAIR. VARIOUS
COUNTIES
1.465 0.775 0.210 0.255 0.225 AQC:B4P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M
MISC 0.072 0.072 2011NFA
MISC 0.085 0.085 2012NFA
MISC 0.133 0.133 2013NFA
MISC 0.135 0.135 2014NFA
NYSBA
S0012
IT UPGRADES: LANE USE SIGNALS (LUS), CAMERAS, AND MISCELLANEOUS
ITS COMPONENTS REPLACEMENT TO MAINTAIN STATE OF GOOD REPAIR.
VARIOUS COUNTIES
0.425 0.072 0.085 0.133 0.135 AQC:A19P TOTAL 4YR COST :MULTI TPC : < $0.75 M
MISC 0.050 0.050 2011NFA
MISC 0.010 0.010 2012NFA
MISC 0.010 0.010 2013NFA
MISC 0.010 0.010 2014NFA
NYSBA
S0013
IT UPGRADES: UPS (UN-INTERRUPTABLE POWER SYSTEM) SYSTEMWIDE
MAINTENANCE & BATTERIES - MAIN UPS BATTERY REPLACEMENT TO
MAINTAIN STATE OF GOOD REPAIR. VARIOUS COUNTIES.
0.080 0.050 0.010 0.010 0.010 AQC:A19P TOTAL 4YR COST :MULTI TPC : < $0.75 M
MISC 1.500 1.500 2011NFA
MISC 1.500 1.500 2012NFA
MISC 0.100 0.100 2013NFA
NYSBA
S0014
SYSTEMWIDE SECURITY SYSTEMS & TRAFFIC CAMERAS: INSTALLATION OF
PASSIVE AND ACTIVE SECURITY FOR FACILITIES, TOLL PLAZAS, AND
ADJACENT PROPERTY AREAS. VARIOUS COUNTIES.
3.100 1.500 1.500 0.100 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M
MISC 0.025 0.025 2013NFA
MISC 0.025 0.025 2014NFA
NYSBA
S0015
PHONE SYSTEM UPGRADE: 2009 - BEAR MTN., 2010 - MID-HUDSON, 2013 - RIP
VAN WINKLE, 2014 - KINGSTON RHINECLIFF, 2015 - NEWBURGH-BEACON TO
MAINTAIN STATE OF GOOD REPAIR. VARIOUS COUNTIES.
0.050 0.000 0.000 0.025 0.025 AQC:A19P TOTAL 4YR COST :MULTI TPC : < $0.75 M
COUNTY
AGENCY
PIN
PROJECT DESCRIPTION
FUND SOURCES FFY
TOTAL
4-YEAR
PROGRAM
in millions
of dollars
PHASE
AQ CODE
FFY
2013
FFY
2014
FFY
2012
FFY
2011
4-YEAR PROGRAM (FFY)
Starting October 01, 2010
Friday, August 26, 2011 Page 85 of 85
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program
for MHSTCC
TOTAL PROJECT COST
MISC 0.168 0.168 2011NFA
MISC 0.005 0.005 2012NFA
MISC 0.005 0.005 2013NFA
MISC 0.005 0.005 2014NFA
NYSBA
S0016
2011 ANNUAL MAINTENANCE: SUICIDE CALL BOXES REPLACEMENT &
UPGRADE TO MAINTAIN STATE OF GOOD REPAIR. VARIOUS COUNTIES.
0.183 0.168 0.005 0.005 0.005 AQC:A19P TOTAL 4YR COST :MULTI TPC : < $0.75 M
0.280 FTA 5316 0.280 MISC2011
MISC 0.070 0.070 2011NFA
NYSDOT
S73701
NYSDOT ADMINISTRATIVE CONTRACT (REGION-WIDE) TO PROVIDE
ADMINISTRATIVE SUPPORT FOR THE OVERSIGHT AND DEVELOPMENT OF
THE NYSDOT JARC AND NEW FREEDOM PROGRAM IN THE NYMTC AREA.
0.350 0.350 0.000 0.000 0.000 AQC:B1P TOTAL 4YR COST :MULTI TPC : < $0.75 M
MISC 0.020 0.020 2011NFA
MISC 0.020 0.020 2012NFA
MISC 0.020 0.020 2013NFA
MISC 0.020 0.020 2014NFA
NYSBA
SA001
SYSTEMWIDE - EQUIPMENT PURCHASES, ADMINISTRATION: OPERATING
FUND EQUIPMENT PURCHASES (FURNITURE, ETC.)TO MAINTAIN STATE OF
GOOD REPAIR. VARIOUS COUNTIES.
0.080 0.020 0.020 0.020 0.020 AQC:B4P TOTAL 4YR COST :MULTI TPC : < $0.75 M
MISC 0.150 0.150 2011NFANYSBA
SA002
SYSTEMWIDE - BUSINESS APPLICATION ENHANCEMENT: 1) DOCUMENT
IMAGING & WORK FLOW; AND 2) BUSINESS APPLICATION ENHANCEMENT
UPGRADE. VARIOUS COUNTIES
0.150 0.150 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : < $0.75 M
MISC 0.225 0.225 2011NFA
MISC 0.500 0.500 2013NFA
NYSBA
SO-001
SYSTEMWIDE - E-Z PASS: 1) HARDWARE, POSSIBLE MARK IV CHANGE IN
2013; AND, 2) CASH-LESS TOLLING FEASIBILITY STUDY IN 2010 - 2011 AET
(ALL ELECTRONIC TOLLS. VARIOUS COUNTIES
0.725 0.225 0.000 0.500 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M
CONST 4.000 4.000 2014NFANYSBA
SO-002
SYSTEMWIDE - ALL ELECTRONIC TOLLING (AET): CONVERSION TO AET WITH
ELECTRONIC TOLLING HARDWARE AND PLAZA MODIFICATIONS
(ELIMINATION OF TOLL PLAZA AND LANES). VARIOUS COUNTIES
4.000 0.000 0.000 0.000 4.000 AQC:J1P TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M