30
SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description: 16” O.D 8 miles (~ 13km) Pipeline, HDD, lateral tie-ins Hot Tap by-Pass Total Installation Cost (TIC): CAD$ 16 Million Project Description: 16” O.D 10 miles (~ 16km) Pipeline and Lateral tie-ins Hot Tap by-Pass Total Installation Cost (TIC): CAD$ 25 Million Project Description: 12” O.D and 16” O.D Well Tie-in Total Installation Cost (TIC): CAD$ 12 Million

Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:

SELECTED PIPELINE HIGHLIGHTS

(ASME B31.4 AND B31.8)

Location: Alberta (Canada)

Project Description: ❑ 16” O.D

❑ 8 miles (~ 13km)

❑ Pipeline, HDD, lateral tie-ins

❑ Hot Tap by-Pass

Total Installation Cost (TIC): CAD$ 16 Million

Project Description: ❑ 16” O.D

❑ 10 miles (~ 16km)

❑ Pipeline and Lateral tie-ins

❑ Hot Tap by-Pass

Total Installation Cost (TIC): CAD$ 25 Million

Project Description: ❑ 12” O.D and 16” O.D

❑ Well Tie-in

Total Installation Cost (TIC): CAD$ 12 Million

Page 2: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:
Page 3: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:

SELECTED PIPELINE HIGHLIGHTS

(ASME B31.4 AND B31.8)

Location: Alberta (Canada)

Project Description: ❑ 42” O.D

❑ 10 miles (~ 16km)

❑ Pipeline, HDD, tie-ins

❑ Stress analysis

Total Installation Cost (TIC): CAD$ 35 Million

Project Description: ❑ 16” O.D

❑ Pipeline By-Pass

❑ Finite element (F.E) analysis

❑ Stress analysis

Total Installation Cost (TIC): CAD$ 4 Million

Project Description: ❑ Line Sizes 4” O.D to 8” O.D

❑ A/G facility piping

❑ F.E. analysis on vessel & pump nozzles

Total Installation Cost (TIC): CAD$ 10 Million

Page 4: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:
Page 5: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:

SELECTED PIPELINE HIGHLIGHTS

(ASME B31.4 AND B31.8)

Location: Alberta (Canada)

Project Description: ❑ Water and Product Pipeline

❑ 8” O.D and 10” O.D.

❑ Pipeline and storage

❑ 16 miles (~26km)

Total Installation Cost (TIC): CAD$ 35 Million

Project Description: ❑ 12” O.D. and 16” O.D. headers

❑ Steam injection Well Tie-Ins

❑ Stress analysis

Total Installation Cost (TIC): CAD$ 8 Million

Page 6: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:
Page 7: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:

KEY PROJECT EXPERIENCES

Location: Texas & New Mexico (US)

Project Type: Compressor Stations

Project Description:

FEED & Detailed Engineering • Templated design and engineering for four different

compressor stations in the Permian Basin, West Texas.• Fortress delivered on a very aggressive schedule.• Supported 3 separate contractors.• Facilities have capability for:

-three (3) compressor trains-three (3) TEG Glycol dehydration trains-60-70 MMSCF/D of pipeline spec. gas.

Total Installation Cost (TIC):

US$ 50 Million

Location: New Mexico (US)

Project Type: Central Distribution Point

Project Description:

FEED & Detailed Engineering • 200 MMscfd gas• 16,125 bpd condensate (NGL pipeline + condensate

from gas pipeline) • 104,000 bpd oil.

Total Installation Cost (TIC):

US$ 900 Million

Page 8: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:
Page 9: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:

KEY PROJECT EXPERIENCES

Location: Texas & New Mexico (US)

Project Type: As-building / 3D model and design optimization

Project Description:

• IFI 3D Model & IFC Isometric drawings• 10,000 bbl/day throughput• Design updated to include VRU, purge gas and other

process and operability improvements

Total Installation Cost (TIC):

US$ 12 Million

Page 10: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:
Page 11: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:

KEY PROJECT EXPERIENCES

Location: West Texas (US)

Project Type: Compressor Station

Project Description:

• Two train sour gas treating facility, 10% H2S, 7% CO2 • Design to include gas treatment & compression,

liquids separation, acid gas injection, VRU, and purge gas

• 50 MMSCF/day gas throughput• Pre-FEED complete

Total Installation Cost (TIC):

US$ 70 Million

Location: West Texas (US)

Project Type: H2S Treating Tower Addition

Project Description:

• Detailed Engineering Design, Procurement, H2S Treating Tower to produce sweet crude oil stream

• Treating up to 20,000 BBL/day of sour crude• 10% H2S Input, less than 10 ppm H2S output• Construction Management• Planning of larger start up and commissioning• Support for small capital projects

Total Installation Cost (TIC):

US$ 4 Million

Page 12: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:
Page 13: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:

KEY PROJECT EXPERIENCES

Location: Texas (US)

Project Type: Well Tie-in

Project Description:

FEED and Detailed Engineering

• Increased capacity of the Well #11E Propylene storage

cavern dehydrating system

• Added second molecular sieve dehydrator skid with a

capacity of 2800 bbls per hour

• Increased the overall dehydrating capacity to a total

of 4000 bbls per hour.

Total Installation Cost (TIC):

US$ 20 Million

Project Type: Tie-in and Metering Upgrade

Total Installation Cost (TIC):

US$ 30 Million

Page 14: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:
Page 15: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:

KEY PROJECT EXPERIENCES

Location: Alberta (Canada)

Project Type: Rail & Truck Loading Terminal

Project Description:

FEED & Detailed Engineering - full EPCM scope. • Inlet Metering for 7 new pipelines from a new

refinery. • Truck Loading Terminal for blending and loading

diesel into trucks and offloading biodiesel from trucks into a storage tank.

• Rail Loading Terminal for blending and loading diesel into railcars and offloading biodiesel from railcars into a tank.

• Approximately 2 km of new pipe racks and piping.

Total Installation Cost (TIC):

CAD$ 220 Million

Page 16: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:
Page 17: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:

Saskatchewan, Canada - Light Oil Tank Storage Addition $50M

❑ 3 x 160,000 bbl tanks added to existing site

Concept Model

Completed Project

Page 18: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:
Page 19: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:
Page 20: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:

KEY PROJECT EXPERIENCES

Location: Texas (US)

Project Type: Sour Gas Plant

Project Description:

FEED• Refrigeration/Amine/Acid Gas Injection/Water

Injection.

Total Installation Cost (TIC):

US$ 32 Million

Location: Pennsylvania (US)

Project Type: Truck Terminal

Project Description:

Detailed Engineering• Truck terminal to deliver propane and butane from

site spheres to trucks. • Bi-directional capability to deliver butane from trucks

to spheres.

Total Installation Cost (TIC):

US$ 12 Million

Page 21: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:
Page 22: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:

KEY PROJECT EXPERIENCES

Client: Texas (US)

Project Type: Terminal Pipeline Connection

Project Description:

FEED• Pipeline connecting Terminal with Phillips 66 Terminal

and Total’s Port Arthur Refinery.• Transport blended Heavy Oil to the Phillips 66

Terminal and the NPS 10 and NPS 8 Total lines• Receive light oil and diluent from the Phillips 66

Terminal and NPS 8 and NPS 10 Total lines.

Total Installation Cost (TIC):

US$ 23 Million

Client: Canada & US

Project Type: Various multi-discipline plants expansion and maintenance programs

Project Description:

FEED and Detailed Engineering

Total Installation Cost (TIC):

CAD$ 70 Million

Page 23: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:

Bloom Bullet Study Relief System Upgrade

Page 24: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:

KEY PROJECT EXPERIENCES BY

FORTRESS PRINCIPALS

Location: Alberta (US)

Project Type: Mildred Lake UE-1 Upgrader

Project Description:

Detailed Engineering• Upgrader Expansion• Increase production of sweet synthetic crude by

98,000 barrels per day • Process simulation and the design of hydroprocessing

reactors

Total Installation Cost (TIC):

Mega Project

Page 25: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:

KEY PROJECT EXPERIENCES BY

FORTRESS PRINCIPALS

Location: Texas

Project Name: Meraux Refinery Expansion and Optimization

Project Description:

Detailed Engineering• HYSYS modelling• P&ID update• Rating checks on equipment benchmarking• Integrating Sulphur-in-Gasoline feed into existing

atmospheric distillation unit and FCCU • Revamped existing Hydrotreater and Hydrocracker

Total Installation Cost (TIC):

Mega Project

Page 26: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:

KEY PROJECT EXPERIENCES

Location: Alberta

Project Type: Biogas Facilities / BioRefinery

Project Description:

FEED and Detailed Engineering• Anaerobic digestion of waste (cattle manure, sewage,

etc.) to produce biogas that would produce heat/power.

• Designed a Wheat Truck Offloading & Milling and Ethanol plant that would produce 2.5MW Power Generation and 40,000,000L Ethanol Production.

Total Installation Cost (TIC):

Confidential

Page 27: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:

ELECTRICAL INSTRUMENTATION

CONTROLPROJECT EXPERIENCE

Electrical, Instrumentation, & Controls Projects

Throne - MCC and control system upgrade

Stettler - MCC replacement project

Redwater -Electrical infrastructure upgrade

Redwater - Power upgrade of south quadrant

Kerrobert - Electrical and control system upgrade

Hardisty - Backup power generation

Hardisty - 5kV service upgrade

Langevin - MCC and RSView upgrade

Granum - 48OV MCC upgrade

Standard - 48OV MCC upgrade

Bloom - Electrical and control system upgrade

Various - Full pre-wired E-house design and pre-fabricated MCC buildings

Page 28: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:

TERMINAL PROJECT

HIGHLIGHTS

NWR TERMINALLING PROJECT ($170M)

Refinery terminal and blending project.

Our design scope included:

❑ Incoming pipelines from NWR.

❑ Custom blending facilities.

❑ Truck loading rack (North) - blended diesel.

❑ Rail car loading rack (South) - blended diesel and UCO.

❑ SCO cavern storage.

❑ Biodiesel rail car unloading (rail loading rack-South).

❑ Blend sample storage (at truck and rail rack areas).

❑New rail loading rack c/w railcar storage.

❑ 60,000 bbls/day rail & 30,000 bbls/day truck.

Page 29: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:

TERMINAL PROJECT

HIGHLIGHTS

KERROBERT TERMINAL - RAIL , TRUCK AND PIPELINE ($100M)

Unit Train terminal moving heavy and light products from pipeline into railcars using a new permanent above ground loading rack. Bitumen is trucked in from nearby oil sands facilities and pumped onto railcars.

❑ 70,000 bbl/day of crude by rail capacity.

❑ Rail loading facilities including 20 stations c/w loading arms and venting arms.

❑ Railcar Storage for approximately 250 inbound and outbound cars with additional storage for 60 railcars.

❑ Full Metering for Heavy Crude and Light crude from all Rail stations.

❑ 10 truck unloading bays c/w pumps.

❑ 16” pipeline connections.

❑ 3 x 80,000 BBL crude storage tanks, c/w small tank storage for blending.

❑ Process Skids, Pump skids & Metering skids.

Page 30: Total Installation Cost (TIC): CAD$ 16 Million 16” O.D SELECTED … · 2020. 5. 12. · SELECTED PIPELINE HIGHLIGHTS (ASME B31.4 AND B31.8) Location: Alberta (Canada) Project Description:

TERMINAL PROJECT

HIGHLIGHTS

CHEECHAM - RAIL , TRUCK AND PIPELINE TERMINAL ($110M)

❑ 50,000 bbl/day crude /condensate by rail capacity.

❑ Rail facilities for offloading propane, butane, or condensate and loading of crude oil.

❑ Flare System for rail car push gas.

❑ Product storage for condensate, diluted bitumen (Dilbit) complete with floating roofs and NGL bullets for propane and butane.

❑ Pipelines and transfer pumps for transporting condensate and Dilbit.

❑ Truck handling facilities for 20 truck stations handling propane, condensate and Dilbit.

❑Highly modernized and automated with a full PLC control system installed complete with an integrated truck/rail terminalling system and OMNI Flow Computer systems.

❑ Full custody transfer metering with integration back to accounting group in Calgary.