7
Page 1 of 7 SANDEEP A. PATIL Plot No. 154, Email: [email protected] Friends Colony, Email: [email protected] Nagpur, MS-440013. Current no: - +91 84466 08850 Objective To obtain a position as Project Manager that utilize my 11 years experience in water supply turnkey projects and Oil & Gas Refinery projects which emphasize with my MBA degree in Construction Management and My Bachelor degree in Mechanical Engineering in support with NEBOSH & IOSH Certification pays off for the companies’ improvement. Experience Highlights Role - Domain Responsibility Supervise team Discipline Technical Expertise Al-Matar Trading & Contracting LLC. Oman Sep/12 to Present Project Manager Also Perform as a 1) Plumbing/ Fire 2) Planning Engr. 3) HSE Engineer 6 Engineers, 8 supervisors, 124 Labors, 14 Omani Labors 1) Complete 5 EPC Water Pipeline/Cross country pipeline Projects. 2) Complete 7 MEP Commercial and Industrial Projects. 3) Design & Calculation for Water transmission & Distribution line. 4) Design of OIL, GAS, Fire Hydrant Line, Fire Pump Station and its execution. Bharat Petroleum Corp. Ltd. Mumbai, India Feb/11 - Aug/12 Site Incharge in as 1) Fire Fighting/ Plumbing Engineer 2) Commissioning/ Hydrotest Engineer Contractors 4 Engineers 7 supervisors, 84 Labors, 1) Complete Total 8 MEP Oil & Gas Refinery Projects. 2) Complete Total 6 EPC Oil & Gas Refinery Projects. 3) Major Shutdown throughout Refinery from “4 th Nov 11 to 20 th Dec 11”. 4) Calculate & Execute horizontal and vertical deflection (alignment) of fittings. Hassan Juma Backer Trading & Contracting Co. LLC. Oman Nov/08 – Nov/10 Project Engineer Also Perform as a 1)MEP Engineer 2) Planning Engineer 3 Jr. Engineers, 5 supervisors, 62 Labors, 12 Omani Labors 1) Complete Total 21 MEP/EPC Projects site of 21 cities. 2) Compute head loss of water flowing through a pressurized pipeline. 3) Draw Flow Chart for surge control in water distribution system. 4) Fire Water Requirement for different zone and its Hydraulic calculations Gannon Dunkerly and Co. Ltd. Gujarat, Reliance Refinery India May/08 - Oct/08 Pipeline Engineer Also Perform as a Fire Fighting/ Plumbing Engineer 1 Jr. Engineers, 2 supervisors, 31 Labors 1) Complete Total 4 EPC Oil & Gas Refinery Projects 2) Complete Total 2 MEP Oil & Gas Refinery Projects 3) Executed Fire hose reel/Hydrant/CO2/FM 200 system for power plants/LPG bottling station/industries etc. Educational Qualification Degree Institute University Year MBA in Construction Management Indian School of Management Mumbai University 2014 BE in Mechanical Engineering PCEA College of Engineering RYMNU, Nagpur University 2008 Professional Software Software: - Primavera MS- Project Auto CAD MS-Office Computer Aided Design (CAD)/ (CAM) Version : - 6 2010-2013 2010 2013 NX-4 Personal Info Passport No. Driving License GCC Date of birth Nationality Language Proficiency Marital status R-2386784 78652754 26-10-1985 Indian Hindi, English, Arabic Unmarried

Discipline Technical Expertise Patil BE MBA IOSH... · Structural welding codes, also Familiar with application of ASME B31.4, ASME B31.8, ASTM D86, ANSI Z49.1 etc. Inspect & approves

  • Upload
    others

  • View
    14

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Discipline Technical Expertise Patil BE MBA IOSH... · Structural welding codes, also Familiar with application of ASME B31.4, ASME B31.8, ASTM D86, ANSI Z49.1 etc. Inspect & approves

Page 1 of 7

SANDEEP A. PATIL

Plot No. 154, Email: [email protected]

Friends Colony, Email: [email protected]

Nagpur, MS-440013. Current no: - +91 84466 08850

Objective

To obtain a position as Project Manager that utilize my 11 years experience in water supply turnkey

projects and Oil & Gas Refinery projects which emphasize with my MBA degree in Construction

Management and My Bachelor degree in Mechanical Engineering in support with NEBOSH & IOSH

Certification pays off for the companies’ improvement.

Experience Highlights

Role - Domain Responsibility

Supervise team Discipline Technical Expertise

Al-Matar Trading & Contracting LLC. Oman Sep/12 to Present

Project Manager Also Perform as a 1) Plumbing/ Fire 2) Planning Engr. 3) HSE Engineer

6 Engineers, 8 supervisors, 124 Labors, 14 Omani Labors

1) Complete 5 EPC Water Pipeline/Cross country pipeline Projects.

2) Complete 7 MEP Commercial and Industrial Projects.

3) Design & Calculation for Water transmission & Distribution line.

4) Design of OIL, GAS, Fire Hydrant Line, Fire Pump Station and its execution.

Bharat Petroleum Corp. Ltd. Mumbai, India Feb/11 - Aug/12

Site Incharge in as 1) Fire Fighting/ Plumbing Engineer 2) Commissioning/ Hydrotest Engineer

Contractors 4 Engineers 7 supervisors, 84 Labors,

1) Complete Total 8 MEP Oil & Gas Refinery Projects.

2) Complete Total 6 EPC Oil & Gas Refinery Projects.

3) Major Shutdown throughout Refinery from “4th Nov 11 to 20th Dec 11”.

4) Calculate & Execute horizontal and vertical deflection (alignment) of fittings.

Hassan Juma Backer Trading & Contracting Co. LLC. Oman Nov/08 – Nov/10

Project Engineer Also Perform as a 1)MEP Engineer 2) Planning Engineer

3 Jr. Engineers, 5 supervisors, 62 Labors, 12 Omani Labors

1) Complete Total 21 MEP/EPC Projects site of 21 cities.

2) Compute head loss of water flowing through a pressurized pipeline.

3) Draw Flow Chart for surge control in water distribution system.

4) Fire Water Requirement for different zone and its Hydraulic calculations

Gannon Dunkerly and Co. Ltd. Gujarat, Reliance Refinery India May/08 - Oct/08

Pipeline Engineer Also Perform as a Fire Fighting/ Plumbing Engineer

1 Jr. Engineers, 2 supervisors, 31 Labors

1) Complete Total 4 EPC Oil & Gas Refinery Projects

2) Complete Total 2 MEP Oil & Gas Refinery Projects

3) Executed Fire hose reel/Hydrant/CO2/FM 200 system for power plants/LPG

bottling station/industries etc.

Educational Qualification

Degree Institute University Year

MBA in Construction Management Indian School of Management Mumbai University 2014

BE in Mechanical Engineering PCEA College of Engineering RYMNU, Nagpur University 2008

Professional Software

Software: - Primavera MS- Project Auto CAD MS-Office Computer Aided Design (CAD)/ (CAM) Version : - 6 2010-2013 2010 2013 NX-4

Personal Info

Passport No. Driving License GCC Date of birth Nationality Language Proficiency Marital status

R-2386784 78652754 26-10-1985 Indian Hindi, English, Arabic Unmarried

Page 2: Discipline Technical Expertise Patil BE MBA IOSH... · Structural welding codes, also Familiar with application of ASME B31.4, ASME B31.8, ASTM D86, ANSI Z49.1 etc. Inspect & approves

Page 2 of 7

Project Manager (Water Transmission/Distribution Network Supply)

As a Project Manager completed 5 [five] large multidiscipline EPC projects from concept design (P&ID), Detailed

Planning, Procurement, purchasing, vendor and subcontractor selection to complete turnkey construction,

installation, commissioned, FAT, SAT and handover to client.

More than 5 years of professional experience in drawings & designs of internal and external plumbing, i.e. External

drainage layout, external water supply layout, storm water layout, AG Concrete Tanks / Pits, toilet details, over headed

storage tank, drainage tank, u. g. tank, septic tank, Water and wastewater conveyance systems, duct details, Pipe sizing,

Pump head calculation for water pump, other section & detailing for commercial and industrial environment.

Able to manage & coordinate with Civil, Electrical, Instrumentation & Mechanical engineers form best team using own

initiative to articulate & deliver specific functional requirements for all aspects of project with budget control for BOQ.

Check and inputs to HSE report, Welding control sheets, Weld-Log sheet, FDT Log sheet, Monthly Diesel Record,

Aggregate delivery record, Daily Vehicle Maintenance, Mitering of specials, internal & external coating etc. detailed

reports for projects inventory till end of contract and documented properly.

Ensure the applicability of International Standards for design, engineering, construction and operation of Multi

discipline projects e.g. BS, DIN, ASTM, ASME – B31.1 & B31.3; ASME Sec IX – Welder qualifications & AWS D1.1

Structural welding codes, also Familiar with application of ASME B31.4, ASME B31.8, ASTM D86, ANSI Z49.1 etc.

Inspect & approves contractor’s deliverables for FEED and detailed Design/Engineering as follows: pipe routing study,

stress and flexibility analysis, piping GA, ISO drawings, pipe support drawings, valve data sheets, piping material

specification and other pertinent documents related to piping and pipeline.

Prepare, supervise and approves the development of PEP[from construction point of view], and its implementation

plus ensuring Lessons Learned are properly documented throughout the life of the project including Project Close-out.

Manage to have adaptation in Project planning, Histogram, Project design, Costing, MIS reporting and system

software’s such as M.S projects, and to ensure the goods and services are produced efficiently.

Provide Electrical assistance (like ensuring the sufficient Plant lighting, cabling, power distribution boards and

earthing of equipment) as per project requirement.

Reconciliation of Fitting Materials for the whole project: Ordered, Received quantity as per BOQ, required Qty's list

given to purchase Dept.; if required any urgent materials put MR for the same.

Preparing/Sign MOM by attending all meetings such as Kick offs, technical, progress, review, pre-commissioning &

commissioning with client, consultants, sub-contractors, team members and superiors.

To sign (within the limits of assigned Technical Authority) the test-pack after completion of job according to PDO

standards and regulations and Site is cleaned of any scrap.

Design & Execute Yard Piping, Pump header support, pipe supports, overhead crane system, exhaust system, Air intake

system & fuel system for generator.

Check, calculate and submit all contractor and subcontractor bills for clearance.

Build, Own, Operate and Transfer (BOOT) contracts for cross country pipeline and terminals.

Verify quantities and specification before placing the orders and development of vendors list.

Owner of the Action Log, Risk Register, WBS, Project Management Plan & Communication Plan.

Follow-up with supplier for compliance statement, test reports, technical data sheet for approval.

Retain contact with client for warranty period and thereafter when retention monies are collected.

Liaise with sub-contractor in designing of SCADA systems which link with numerous Instrumentation.

Escalate Risk & Constraints to the project and work stream leads and participate in the mitigation strategy.

Witness and verify commissioning activities and Compile BCAR, LEED and BREEAM certificates as required.

Monitor project progress by Review and Preview of Daily, Weekly and Monthly Plan with GM and Consultant.

Surveil project achieve its objectives in Health, Safety, Security, Environment (HSSE), quality, cost and schedule.

Review and evaluate technical submittals such as MAS and drawings prior to submission for consultant’s approval.

Manage infrastructure installation of pile caps, surveying of driven & auger piles, until building come out of the OGL.

Preparation of the Integrity Management Plan (IMP), and develop of different Integrity Activities in Pipelines like ILI,

CIS, ECDA, Hydro-test, and definition of technologies and tools to be applied.

HDPE & DI Pipe: Line Preparation of the Profile, Execution like Route survey, Trenching, Bedding, Laying,

Surrounding, Concrete Encasement for Wadi with Wadi Gabion, Road cutting Otherwise Thrust Boring, Partial

Backfilling, Hydro Testing, FOC Laying, Thrust Block, 2nd stage Backfilling, Warning Tape & Final Backfilling,

Disinfection of Pipeline, Pre-commissioning, Final Commissioning, Handover etc.

MS Pipe Line: All activities same as other pipeline except Stringing, Welding & its Inspection, External & Internal

Coating, Holiday Test, Tie - in Joint Welding etc.

Page 3: Discipline Technical Expertise Patil BE MBA IOSH... · Structural welding codes, also Familiar with application of ASME B31.4, ASME B31.8, ASTM D86, ANSI Z49.1 etc. Inspect & approves

Page 3 of 7

Project Manager (Plumbing / Fire fighting)

Superintends to site staff’s leaves & dues forms approval, requisitions, daily manpower reports, grading/ screening of

site staffs, monthly reconciliation statements of all construction consumable materials, monthly evaluations,

certification of vendor/suppliers invoices, issuance of letters to client or subcontractors etc.

Conduct inspections and testing on the installed fire protection systems, including heat and smoke detection systems,

fire alarm systems, or special hazard protection equipment.

Specified and locate fire extinguisher, sprinkler heads, piping, hose connections, fire/smoke detection, alarm systems

and related equipment (fittings, valves, supports) in accordance to NFPA 13 and 14.

Club electrical engineer (control, power, wiring) and HVAC engineer (detectors, dampers, equipment) demands for

smooth incorporation of all project items.

Prepare designs for the fire fighting system, fire alarm, fire sprinklers, fire suppression system, plumbing system like

plumbing equipment, drains and fixtures and conduct tests on the same for commercial and industrial projects.

Finalization of all sub-contractor such as Kitchen equipment/Swimming pool/Fire fighting/LPG system/Fuel system

etc., and preparation of contract agreements for the same.

Aware of single line riser diagram for Low current system such as Fire Alarm, Voice evacuation system , Layout

diagram for Multimedia Network system such as Public Address, Access control, CCTV system, Hotel lock system, Fire

fighter telephone system , Builders work drawings etc.

Aware of single line riser diagram for medium voltage, low voltage, Layout of cable routing, Feeder data, Lighting,

power, Panel board schedule drawings, Builders work drawings etc...

Aware of Package Equipments: Fire Heater Package with APH systems, Thickner Package, Chemical Dosing and

Injection Package, Cooling Tower, Electric Hoist, EOT Crane, Instrument and Utility Package.

Knowledge of NDT Inspections like visual inspection, eddy current, Ultrasonic, Dye Penetrate test, Magnetic Particle,

Radiography, Thermography, laser shearography, microwaves and acoustics also Holiday Test.

Aware of Architectural drawing, Furniture layout, Elevation & sections, Interior design, Reflected ceiling drawings etc.

Raise stage-wise RFI’s to consultant for checking and completion of works and approved RFI's handover to QS Dept. for

billing of Materials, Fitting, Pipes & Execution works etc.

Basic knowledge of FEA and CFD process is an added advantage.

Typically manages the project involving RTF (Risk Triggering Factors).

Preserve and control the Fire Protection and the Safe Shutdown Analysis database.

Prepare safety briefing submit to the Fire Department’s Safety committee for trails and approval system.

Develop Equipment List, Valve List, Piping material list, Scope matrix list, Utilities list, Part lists in ERP system.

Participate in PHA and LOPA reviews and audits of completed LOPA's for compliance with newly developed standards.

Evaluate apartment for water supply as well as check the possible entrance or fire exit system for emergency situations

Act as Planning Engineer

Collaborate with other project management team member involved in development of the work breakdown structure

(WBS), to support the project deliverables.

Monitor schedule deviation for assigned disciplines or specialties & recommends corrective action / workaround

solutions for project considerations.

Review; manage man-hours & duration forecast to complete construction, hookup with resource requirement.

Develop, manage, update, and monitor individual project schedules & integrated overall master program schedule to

ensure it includes appropriate definition, content and extent of time control coverage.

Create / Maintain Project schedules of over 2000 activity lines items.

(A) Project Time Management: 1. Scheduling: Development of Base Line Schedule using Planning Software (P6).

2. Preparation of Weekly; Monthly & Quarterly look-ahead Schedule.

3. Updates actual Progress and all related information & comparison analysis.

(B) Project Scope Management: 1. Tracking and maintain scope changes of mechanical items for piping; structural

steel; piping & Mechanical equipments and its effect on the overall project schedule.

(C) Resource Management:1. Resources Estimation and Loading in P6 plan. 2. Budget Monitoring & estimation of CTC.

3. Estimation of Manpower requirement for Project based on standard productivity norms.

4. Monitoring of actual resources availability & analysis using Histogram.

(D) Project Communications Management: 1. Progress Measurement using S Curves.

2. MIS: Preparing progress % calculation systems, earned man-hours, productivity & Trend analysis.

3. Preparation of executive progress summary report / presentations shown to the Top

Management on Project Status for periodical review.

Page 4: Discipline Technical Expertise Patil BE MBA IOSH... · Structural welding codes, also Familiar with application of ASME B31.4, ASME B31.8, ASTM D86, ANSI Z49.1 etc. Inspect & approves

Page 4 of 7

Perform Role as a HSE Engineer

Lead, Manage and coordinate to site HSE team composed of 4 HSE supervisor & 20 HSE members from all sites

performing the works for implementation of HSE System to achieve zero accidents/ incidents.

Responsible for the implementation of all specific HSE programs on site such as site inspections, motivational

activities, disciplinary action, and qualification of Subcontractor's HSE performance, statistics and reports etc.

Participation in HAZOP/HAZID/SIL/RAM/Quantitative Risk Assessment/CSA and etc. meetings and studies.

Preparation of E.P.C Package for HSE, Fire Fighting, Water & Waste Water Treatment and Utility Systems.

Site In-charge (CDU Blocks & UTL/OS Block and CBDC) during Shut-Down

Being client representative manage and co-coordinate 7 departments over 17 B-2-B EPC contractor for preparation

of all internal and external project documentation to reflect construction reality and make smooth transition from

plant construction to pre-commissioning, from commissioning to plant operations and maintenance.

Fabricate Spool piece, Flange SW, Flange WN, Flange SO, Flange Blind, Elbow 900/450/22&1/20, T-equal, T-Red,

Concentric & Eccentric Reducer, concentric & eccentric swage etc.

Supervision of temporary & permanent Cathodic protection, Sand blasting, Internal & External Painting / linings /

coatings fabrication of pipes like Electric Resistance Welded (ERW) pipes, Seamless pipes etc.

Ensures all Staff aware of Permit to Work system (Confined Space, Vehicle entry permit, Cold Work, Hot Work etc.)

with valid TRAs attached for related jobs also need to be extend as required to ensure job continuity and responsible

for any permit violation which kept in Permit box to the respective equipment work areas.

Ensure Inspection Work Lists (IWLs) are quantified, feedback and approval received from Planning Dept. before starts

work. All IWLs issued against equipment shall be immediately, effectively & safely implemented after obtaining

approvals & any discrepancy should be brought to the notice of respective representative.

Ensure competent & adequate manpower and equipment (resources) are mobilized on site to complete work by

coordinating with all subcontractor and give them support as per established MoU.

List down all the flanges, fill in Flange Assembly Tightening Record (FTR) which compiled and maintained by the

Supervisors (or Bolt torque/tension Supervisors) during the execution of Turnaround.

Communicate with TEM, PDM, Safety Manager, QA/QC Manger to prioritize all works within quality & safety.

Ensures Planning Manager develops Level–4 plan in consultation with TAPM & show report in daily progress meeting.

Aware of roads that need road closure permits if any equipment/crane/work is obstructing flow of traffic in that road.

Act as a Hydro-test & commissioning Engineer

Plan, Execution, Control and Supervise all activities like Test pack and Test equipment preparation, Pneumatic testing,

Hydro testing, Watering, Dewatering, pressurizing, Depressurizing etc. of different pipeline material like, SS, CS, DI, MS

in compliance with Project specification, International codes and HSE plan for oil & gas processing industries.

Identify all Gate valves; Fire Hydrants, AV’s, WO’s and related appurtenances shall be closed properly & Leak proof;

Confirm all spectacle blinds and temporary commissioning spades are in the pre-test position shown in the system P &

ID limits; Line checking, Punch list preparation and clear punch list from client side.

Instruct all concrete thrust block and anchor blocks shall be allowed to cure in accordance with Section 03000; Check

pipeline hangers and supports for any damages and possibility for sliding supports.

Develop BCAR, LEED and BREEAM Plan in line with ITP also Lead TPI walk-downs and commissioning plan.

Supervise Commissioning (cleaning, gauging, hydro-testing) and Pre-commissioning (swabbing, Drying, Nitrogen

Purging) of different pipeline in various projects.

Act as a Fire Protection/ Plumbing Engineer

Received RED-LINED copies of original Plumbing drawings after the Model-Homes were built, used them to apply

required changes, made new revised drawings, and kept all related job files up-to-date accordingly.

Preparation of preliminary Process design for: Pretreatment (includes Lamella, DAF, Media filters, Ultra-filtration, etc.),

Reverse Osmosis (includes Brackish water, Sea water and Wastewater), Chemical dosing system, Sludge treatment

(includes Centrifuge, Filter press, Thickener, etc.) and Post treatment (includes lime reactor, silo, etc.), designs

comprise the selection of process and process calculations, membrane selection, filters selection etc.

Preparation of layout, PFD, P&ID, HFD, electrical load list and power consumption at different at different conditions

with respect to tender guaranteed parameters.

Performed hydraulic calculations for fire protection system, including hydraulic analysis of water hose, fire pumps,

battery calculations, voltage drop fluctuations, sprinklers, standpipes, water tanks, water supply, Domestic transfer

Pump and Booster pump Head Calculation, and drainage pipe sizing.

Extensive knowledge of building regulatory guidelines and codes such as ASPE, OSHA, NFPA, NFDA, Life Safety codes.

Page 5: Discipline Technical Expertise Patil BE MBA IOSH... · Structural welding codes, also Familiar with application of ASME B31.4, ASME B31.8, ASTM D86, ANSI Z49.1 etc. Inspect & approves

Page 5 of 7

Detailed Technical works on Site / Office: QA/QC works Pipeline Engineer Supervise Commissioning engineer Works

Qualified Welder and Welding

Electrode certification

Make all required preparation for the trial run of plant

Accurate reports of inspection for

passive fire protection applications

“R” Stamping works/Certify Pump Testing at all locations Close-out of commissioning snags

Documented NDT, FDT, Cube test,

Hydro-test etc. certificate

RAMS (Risk Assessment & Method Statement) documentation

Isolation & Purging done for repair or

maintenance in system or unit.

Documented RFI, Survey sheets,

Transmittals, Approval sheets.

Right Gasket & materials used for

respective Equipment and site.

Testing protocol’s for execution of SAT’s

& FAT’s as dictated in the ITP.

Submit VO for variations and

follow-up to get approval

Tightness test on each line system and

verify the occurrence of leaks.

Design Deviation Log to aware the

teams for latest updates.

Prepare IPC and get approval Knowledge of GIS & CAD software Send water sample to lab for analysis.

Ensure Scaffolding with TPI Maintain site/Day book Demonstrate system to Client

Al-Matar Trading & Contracting L.L.C., Oman

Project Name Project Client Consultant Project Description

Water

Distribution

Network

Expansion at

SEZAD

Special

Economic Zone

Authority

Department

1) Special

Economic Zone

Authority

Department

2)RAECO

A) Supply & Lay: - 17000 m DN 355 mm Ø HDPE

B) Constr. of GVs, AVs, WOs, BVs, ICCs, CCs to the Existing Mains.

C) Constr. of Structure:- BPS & EWT (500m3) – 2 Nos.

D) Constr. of FCVs, FVs, PRVs, FMCs, ICCs. in Structure.

E) Supply & Lay:- Fire Hydrant Line within Structure.

F) Constr. of Fire fighting pump station (500 m3).

Water

Distribution

Network for

Duqm Port

1) Public

Authority of

Electricity &

Water

2)SEZAD

3) POD

4)Oman Dry-

dock Company

Atlas International

Engineering

Consultant

A) Supply & Lay: - 7825 m DN 400 mm Ø DI

- 2770 m DN 355 mm AND 21065 m DN 225 mm Ø HDPE

B) Constr. of GVs, AVs, WOs, BVs, ICCs, CCs to the Existing Mains.

C) Constr. of Strctr:-BPS with Reservoir (20 X 11 X 4 = 880 m3).

GSR 1(30 X 18 X 6 = 3240 m3) AND GSR8 (32 X15 X 5 = 2400m3).

Guard House, Pumping station, Fire Fighting Pump Station and

Chlorination facilities with SCADA System.

D) Constr. of FCVs, FVs, PRVs, FMCs, ICCs. in Structure.

E) Supply & Lay:- Fire Hydrant Line within Structure.

Extension of

Potable Water

Pipelines

(Pn16) In

Duqm

Special

Economic Zone

Authority

Department

1) Special

Economic Zone

Authority

Department

2)RAECO

A) Supply & Lay: - 250 m DN 400 mm Ø UPVC

- 100 m DN 100 mm, DN 300 mm AND DN 400 mm Ø DI

- 9200 m DN 355 mm AND 400 m DN 110 mm Ø HDPE

B) Construction of GVs, AVs, WOs, ICCs, CCs to the Existing Mains.

C) Installation of Fire Hydrants

Construction of

Water Tanker

Filling station

with EWT at

Barzaman

Wilayat Al

Mudaybi

Public

Authority of

Electricity &

Water

Public Authority of

Electricity & Water

A) Supply & Lay: - 8000 m DN 200 mm Ø DI

B) Constr. of GVs, AVs, WOs, PRVs, FMCs, CCs to Existing Mains.

C) Construction of Structures

- Elevated Water Tank (1500 m3).

- Tanker Filling Station 2-Bay with Guard House,

D) Construction of Chambers in TFS: GVs, PRVs, FMCs, ICCs

E) Supply & Lay:- Fire Hydrant Line within Structure.

Extension of

Water

Distribution

Networks in

Buraimi

Public

Authority of

Electricity &

Water

Parsons

International &

Company LLC

A) Supply and lay pipe:

- 16901 m DN 160 mm & 5316 m DN 225 mm Ø HDPE

- 4970 m DN 350 mm & 1747 m DN 600 mm Ø DI

B) Cnstr. of GVs, AVs, WOs, PMCs, DMCs, ICCs, CCs to Existing pipe. C) Installation of Fire Hydrants.

Install Fire

fighting,

Plumbing,

Sewerage sys.

Al Matar Group

Al Matar Architectural Design & Consulting Engg.

B + G + 4 + Roof Gym, AMTC Building @ Ruwi

G + 1 (4 Luxury Villa) @ Duqm

Page 6: Discipline Technical Expertise Patil BE MBA IOSH... · Structural welding codes, also Familiar with application of ASME B31.4, ASME B31.8, ASTM D86, ANSI Z49.1 etc. Inspect & approves

Page 6 of 7

Bharat Petroleum Corporation Ltd. Refinery Mumbai, India

Contractor Project Name Client / Consultant

Project Description

Trilok

Fabrication &

Equipment Pvt.

Ltd.

Erection of VGO Line Client: ONGC /

EPIL

LPG pumps, LPG compressors, Conveyors, Blowers, Cold

repair facilities including painting, Transformer, air

drying units, Air compressors, Loading and unloading

facilities, MCC & DG sets, Installation of Variable Speed

Drive (VSD

Installation of equipment

for Additional LPG

Bottling Plant

Engineers India

Ltd.

Execution of 16” Vacuum Gas Oil Pipeline to boiler

avoiding condenser which aims to increases efficiency of

boiler and condenser at HCU

Gopal

Engineering

Hot Tapping in Flare Unit

& LPG Plant

Engineers India

Ltd. (EIL)

Hot Tapping of Ø 46” to Ø 3” in Flare unit at a height of 10

mtr. & Ø 12” at LPG Plant.

Main

Contractor:

Engineering

Projects (I) Ltd.

Sub-

Contractor:

Newton

Engineering &

Chemicals Ltd.

Supply of 3 Kms long

Under Ground C.S. Spiral

welded Cooling Water

Pipeline.

Client: Oil and

Natural Gas

Corporation

Ltd. / EPIL

Consultant:

Engineers India

Ltd.

Design, Engineering, Fabrication, Execution of 72” Ø x

12m Long Pipes & 90° (L/S radius), 68.2°, 55.5°,45°, 30°

29.2°, 20.2°, 19.5° Miter Bends.

Fabrication and Erection of 32"Ø Manholes.

Fabrication and supply of 72ӯ Flanges.

Internal Painting of pipeline with 2-part Epoxy paint of

500 microns. External Wrapping of pipeline with 2

layers of 2mm Coal tar tape and coal tar enamel.

All weld joints are 100% Radio-graphically examined

using Panoramic X-ray machine.

Various Sub-

contractors

several replacements,

erections & maintenance BPCL Refinery Coordinator of Major Shutdown Project from

“4th Nov 11 to 20th Dec 11”

Hasan Juma Backer Trading & Contracting Co. LLC, Oman

Project Name

Project Client Consultant Project Description

Water

Supply

Schemes to

Al Rustaq,

Al Awabi,

Nakhal,

Wadi Al

Maawil &

Al

Musanaah

Wilayats

(Tender

No.

191/2005)

1) Public

Authority of

Electricity &

Water

2)Petroleum

Development

Oman

3)Ministry of

Housing,

Electricity &

Water

4) Ministry of

Defense

Nippon

Jogesuido

Sekki Co.

(NJS)

/ Al-Abraj

A) Supply & Lay: - 100 Km DN (500 to 800) mm Ø MS

- 350 Km DN (150 to 800) mm Ø DI

B) Supply & Lay Fire Hydrant Line: - 18 Km DN (100 to 500) mm Ø MS.

B) Cnstr. of GVs, AVs, WOs, BVs, PRVs, FMCs, ICCs, CCs to Existing Mains. C) Installation of Fire Hydrants. D) Construction of. Distribution Facility Centre (DFC) - 21 nos. includes:

-EWT 5 nos. (1500 m3), 8 nos. (1000 m3), 8nos. (500 m3).

-7 nos. Ground Reservoir (55 X32 X 5 = 8800 m3).

-4 nos. Ground Reservoir (65 X35 X 5 = 11375 m3).

-11 nos. Pumping station

-Construction of guard House, Pumping Station, Chlorination Bldg., Admin Bldg.,

Generator Bldg., Sub Station, Workshop, Yard Piping, Tanker Filling Station.

E) Constr. Of:- PRVs, FMCs, BVs, FCVs, FVs, ICCs. AVs, WOs, BVs in Structure:

F) SCADA system: Detail Design review of ICA system including PLCs, SCADA,HMI, Large

Screens, FO Networking, NMS, VOIP Telephony, Process Instruments & Analyzers and AC

Drives etc. The facilities include Batinah Master Control Center, Local Control Centers,

Pump Stations, Water Reservoirs, Water Towers, Pipeline Surge Protection, Chemical

Dosing (Chlorination), Generator and Electrical Bldg.

Gannon Dunkerly & Co. Ltd, Reliance Refinery Jamnagar Gujarat, India

Project Name Client Consultant Project Description

Erection of MS

Pipeline

Phenix Construction

Technologies OEMS

Execution of 48” MS Pipeline with Gate Valve at Inlet of Cooling

tower.

Fire Water System M & B Engineering

Limited EIL

An EPC project of Fixed Water Spray System, Foam System for

fire fighting and Fire Hydrant Line around Aromatic Plant.

Execution of Piping

of crude oil Tanks EHS Engineers OEMS

Replacement - Condensers 3 nos. (Ht=19 m)

Installation - Ejectors 9 nos.(Ht=43m &wt=15 ton.

Page 7: Discipline Technical Expertise Patil BE MBA IOSH... · Structural welding codes, also Familiar with application of ASME B31.4, ASME B31.8, ASTM D86, ANSI Z49.1 etc. Inspect & approves

Page 7 of 7

Cumulative Supervision work in Oil & Gas Refineries for various projects

1) BPCL

Refinery Mahul

Mumbai,

2)Reliance

Refinery

Gujarat

CS Piping (25NB to 500NB) 447740.6 In-m. C.S. Piping (Galv.) 2,500 In-m.

SS Piping 43670 In-m. AS Piping 25972 In-m. GI Pipes ( 25 NB to 500NB) 13921 In-m.

Radiography 77000 Inch-Dia.

Stress Relieving 39209 Inch-Dia.

Fire Water Piping (Hydrant Line) 40,000 In-m.

MS Piping 30,000 In-m.

Fire Proofing 1200 Cu. m.

Site fabricated pipes from IS 2062 Plate (72”, 48” ) 106320 In-m.

Steam Tracing 28050 m.

Equipment erection 2691 MT

Structural Work 1500 MT

Painting 30198 Sq. m.

Insulation 54170 Sq. m.

Coating & Wrapping work for underground piping 10000 Sq. m.

Supply and installation of Lighting Fittings 1400 Nos.

Supply and installation of Lighting Poles 550 Nos.

Supply and installation of Cable Trays 28000 m.

Excavation & backfilling 20000 Cu. m.

Detailed HSE works on Site:

Preliminary Works On-Job Responsibility Ancillary Works

Safety induction training to everyone

before start work or entre site

Ensure Contractors / Staffs have

appropriate PPE for particular jobs

Make Report & Close out for Sub

standard, Incident, Near miss

Conduct Gas Testing Safety & Hole watches on job Prepare Risk assessment

Train Safety Watchman Take TOOL Box Talk & STARRT Talk Attend Various Meetings

Provide First –aid Training Established Assembly point on site Maintain Good Housekeeping

Ensure warning and caution Sign

Boards properly implemented on site

Ensure Emergency Procedure are

significantly displayed and known

Stop activity non compliance with

safety regulation and procedure

Training & Certifications:

Achieved Institute Authority Year

National Examination Board in

Occupational Safety & Health

(NEBOSH)

Safety Training India Pvt Ltd. /

SHEilds (UK) NEBOSH 2014

Institute of Occupational Safety

and Health (IOSH)

Safety Training India Pvt Ltd. /

SHEilds (UK) IOSH 2014

Extensive Professional Training in

the area of “Small Scale Industry”

Maharashtra Centre for

Entrepreneurship Development

Maharashtra Industrial

Development Corporation (MIDC) 2008