    THERMOGRAPHY REPORT

    Report No. :- 01

    MAIN LOCATION:- SWITCH YARD (400 KV), BAY-02

    Location Equipment Date Cursor-1 Cursor-2 Diff. Temp.

    ISOLATOR

    (402-89-AL)CT SIDE

    06.04.10 55.6 38.2 17.4

    Objective:- R

    Basic Observation:- . Ris over heated.

    Analysis & Recommendation:- Rtemp. is in semi critical range so close monitoring

    is needed. Should be attended in the next priority.

    Client Analysis by:- Client Representative:-

  • 8/12/2019 Thermography of Switchyard

    2/8

    THERMOGRAPHY REPORT

    Report No. :- 02

    MAIN LOCATION: - SWITCH YARD (400 KV), BAY-05

    Location Equipment Date Cursor 1 Cursor 2 Diff.

    Temp.

    Avg.

    Temp.

    ISOLATOR

    (405-89-TB)CT SIDE

    21.02.2011 53.2 35.2 35.3 44.2

    Objective:- B

    Basic Observation:- . Bis over heated.

    Analysis & Recommendation:- Btemp is in semi critical range and may createproblem in near future so it should be attended in next priority .

    Client Analysis by:- Client Representative:-

  • 8/12/2019 Thermography of Switchyard

    3/8

    THERMOGRAPHY REPORT

    Report No. :- 03

    MAIN LOCATION:- SWITCH YARD (400 KV), BAY-02

    Location Equipment Date Cursor-1 Cursor-2 Diff. Temp.

    ISOLATOR

    (402-89-AA)CENTRE

    06.04.10 69.2 43.4 25.8

    Objective:- B

    Basic Observation:- . Bis over heated.

    Analysis & Recommendation:- Btemp. is in semi critical range and may create

    problem in near future so close monitoring is needed.

    Client Analysis by:- Client Representative:-

  • 8/12/2019 Thermography of Switchyard

    4/8

    THERMOGRAPHY REPORT

    Report No. :- 04

    MAIN LOCATION:- SWITCH YARD (400 KV), BAY-03

    Location Equipment Date Cursor-1 Cursor-2 Diff. Temp.

    ISOLATOR

    (403-89-AT) 1BBUS 2 SIDE

    06.04.10 67.3 35.6 31.7

    Objective:- R

    Basic Observation:- . Ris over heated.

    Analysis & Recommendation:- :- Rtemp. is in semi critical range so it should be

    under regular monitoring .Check the loose connection .

    Client Analysis by:- Client Representative:-

  • 8/12/2019 Thermography of Switchyard

    5/8

    THERMOGRAPHY REPORT

    Report No. :- 05

    MAIN LOCATION: - SWITCH YARD (400 KV), BAY-07

    Location Equipment Date Cursor 1 Cursor 2 Diff.

    Temp.

    Avg.

    Temp.

    ISOLATOR

    (407-89-AA)

    BREAKER

    SIDE

    22.02.2011 53.3 34.8 18.5 44.05

    Objective:- Y

    Basic Observation:- . Yis over heated.

    Analysis & Recommendation: - Ytemp is in semi critical range and may createproblem in near future so it should be attended in next priority.

    Client Analysis by:- Client Representative:-

  • 8/12/2019 Thermography of Switchyard

    6/8

    THERMOGRAPHY REPORT

    Report No. :- 06

    MAIN LOCATION: - COOLING TOWER

    Location Equipment Date Max.

    Temp.

    Min.

    Temp.

    Diff.

    Temp.

    Avg.

    Temp.

    CT #3 SWITCH

    GEAR ROOMFAN G

    02.05.2011 103.2 52.8 50.4 64.3

    Objective:- R

    Basic Observation:- . Ris over heated.

    Analysis & Recommendation:- Rtemp is in semi critical range and may createproblem in near future so it should be attended in next priority .

    Client Analysis by:- Client Representative:-

  • 8/12/2019 Thermography of Switchyard

    7/8

    THERMOGRAPHY REPORT

    Report No. :-07

    MAIN LOCATION :- COOLING TOWER

    Location Equipment Date Cursor 1 Cursor 2 Diff.

    Temp.

    CT #2 SWITCH

    GEAR ROOMFAN - K

    22.12.2010 126.8 80.3 46.5

    Objective:- R,Y

    Basic Observation:- . R,Y is over heated.

    Analysis & Recommendation:- R,Y temp. is in critical range so it should beattended as soon as possible.

    Client Analysis by:- Client Representative:-

  • 8/12/2019 Thermography of Switchyard

    8/8

    THERMOGRAPHY REPORT

    Report No. :- 08

    MAIN LOCATION:- TRANSFORMERS

    Location Equipment Date Cursor-1 Cursor-2 Diff.

    Temp.

    GTG 1A GSU TRANSFORMER

    BUSHING

    30.01.10 55.5 42.9 12.6

    Basic Observation:- R is heated.

    Analysis & Recommendation:- R transformer bushing Temp is high so it should beattended with next priority .