For Green Surabaya
The Surabaya Tram Project
1
Overview
7/25/2019 The Surabaya Tram Project - Overview
2/16
For Green Surabaya
Ministry of Transportation
Directorate General of Railway
The Municipality of Surabaya
2
7/25/2019 The Surabaya Tram Project - Overview
3/16
For Green Surabaya 3
Bring back the tramto Surabaya
Electric
Tramway
Workshops
Pasar Turi
Gubeng
Kota
Wonokromo
Darmo
Steamtram
Workshop
Sidotopo
Prins Hendrik
Tanjung
Perak
7/25/2019 The Surabaya Tram Project - Overview
4/16
For Green Surabaya
Phase 1 17 km track
30 Tram Stops
1 Depot
1 Stabling Yard 1 Night stay
Phase 2
5.5 km track
Project Description
4
Phase 1
17 km track
Phase 2
5.5 km track
7/25/2019 The Surabaya Tram Project - Overview
5/16
For Green Surabaya
Tram Operation Plan
5
PPHPD 4500
Headway 6 min
Tram Stops 30 nr
Semi-Exclusive Traffic 15.6 km
Crossing 9 nr
Mixed Traffic 1.4 km
U Turn 12 nr
Line of sight
Signaling
7/25/2019 The Surabaya Tram Project - Overview
6/16
For Green Surabaya
The Route
6
Mixed Traffic
Traffic Direction
Traffic Direction
7/25/2019 The Surabaya Tram Project - Overview
7/16
For Green Surabaya
Basic Vehicle Requirements
100% Low Floor
Width 2650 mm
Double Cab
Length 30-36 meter
7
Min 200 pax
at 4 pax/m2
Radius min 25 meter
25 Tramset
7/25/2019 The Surabaya Tram Project - Overview
8/16
For Green Surabaya
Basic Vehicle Requirements
20 80
12
Axle Loads
8
750 Vdc
Partial Catenary
7/25/2019 The Surabaya Tram Project - Overview
9/16
For Green Surabaya
Powering Tram
9
Full Catenary 6 kmFree Catenary 11 km
Incoming Voltage 20 KV PLN
Tegangan Kerja 750 V DC
Jumlah Gardu Traksi (TSS) 6
Jumlah Charging Point (CP) 18
Kapasitas TSS di Depo Joyoboyo1000 kW
Kapasitas TSS di Full Catenary 1000 kW
Kapasitas TSS Free Catenary 1000 kW
FullCaten
ary
FreeCatenary
7/25/2019 The Surabaya Tram Project - Overview
10/16
For Green Surabaya
0+600
Typical Cross Section
10
2+650
Jl Darmo
Jl Urip Sumohardjo
7/25/2019 The Surabaya Tram Project - Overview
11/16
For Green Surabaya
Typical Cross Section
11
3+550
Jl Jendral Basuki Rahmat
9+800
Jl VeteranMixed Traffic
Catenary Free
7/25/2019 The Surabaya Tram Project - Overview
12/16
For Green Surabaya
Typical Cross Section
12
Jl Darmo Jl Urip Sumohardjo
With OCS
7/25/2019 The Surabaya Tram Project - Overview
13/16
For Green Surabaya
Tram Stops - Single Track
13
7/25/2019 The Surabaya Tram Project - Overview
14/16
For Green Surabaya
Tram Stops Double Track
14
7/25/2019 The Surabaya Tram Project - Overview
15/16
For Green Surabaya
Thank You
15
7/25/2019 The Surabaya Tram Project - Overview
16/16
For Green Surabaya
Track Work
Standard gauge 1435mm
Grooved rail 59R2
Grass Track
Embedded Track
Continuous Welding Rail
Radius minimum 25 m
Max gradient 4 Switch and crossing at main line 10 nr
16