    For Green Surabaya

    The Surabaya Tram Project

    1

    Overview

  • 7/25/2019 The Surabaya Tram Project - Overview

    2/16

    For Green Surabaya

    Ministry of Transportation

    Directorate General of Railway

    The Municipality of Surabaya

    2

  • 7/25/2019 The Surabaya Tram Project - Overview

    3/16

    For Green Surabaya 3

    Bring back the tramto Surabaya

    Electric

    Tramway

    Workshops

    Pasar Turi

    Gubeng

    Kota

    Wonokromo

    Darmo

    Steamtram

    Workshop

    Sidotopo

    Prins Hendrik

    Tanjung

    Perak

  • 7/25/2019 The Surabaya Tram Project - Overview

    4/16

    For Green Surabaya

    Phase 1 17 km track

    30 Tram Stops

    1 Depot

    1 Stabling Yard 1 Night stay

    Phase 2

    5.5 km track

    Project Description

    4

    Phase 1

    17 km track

    Phase 2

    5.5 km track

  • 7/25/2019 The Surabaya Tram Project - Overview

    5/16

    For Green Surabaya

    Tram Operation Plan

    5

    PPHPD 4500

    Headway 6 min

    Tram Stops 30 nr

    Semi-Exclusive Traffic 15.6 km

    Crossing 9 nr

    Mixed Traffic 1.4 km

    U Turn 12 nr

    Line of sight

    Signaling

  • 7/25/2019 The Surabaya Tram Project - Overview

    6/16

    For Green Surabaya

    The Route

    6

    Mixed Traffic

    Traffic Direction

    Traffic Direction

  • 7/25/2019 The Surabaya Tram Project - Overview

    7/16

    For Green Surabaya

    Basic Vehicle Requirements

    100% Low Floor

    Width 2650 mm

    Double Cab

    Length 30-36 meter

    7

    Min 200 pax

    at 4 pax/m2

    Radius min 25 meter

    25 Tramset

  • 7/25/2019 The Surabaya Tram Project - Overview

    8/16

    For Green Surabaya

    Basic Vehicle Requirements

    20 80

    12

    Axle Loads

    8

    750 Vdc

    Partial Catenary

  • 7/25/2019 The Surabaya Tram Project - Overview

    9/16

    For Green Surabaya

    Powering Tram

    9

    Full Catenary 6 kmFree Catenary 11 km

    Incoming Voltage 20 KV PLN

    Tegangan Kerja 750 V DC

    Jumlah Gardu Traksi (TSS) 6

    Jumlah Charging Point (CP) 18

    Kapasitas TSS di Depo Joyoboyo1000 kW

    Kapasitas TSS di Full Catenary 1000 kW

    Kapasitas TSS Free Catenary 1000 kW

    FullCaten

    ary

    FreeCatenary

  • 7/25/2019 The Surabaya Tram Project - Overview

    10/16

    For Green Surabaya

    0+600

    Typical Cross Section

    10

    2+650

    Jl Darmo

    Jl Urip Sumohardjo

  • 7/25/2019 The Surabaya Tram Project - Overview

    11/16

    For Green Surabaya

    Typical Cross Section

    11

    3+550

    Jl Jendral Basuki Rahmat

    9+800

    Jl VeteranMixed Traffic

    Catenary Free

  • 7/25/2019 The Surabaya Tram Project - Overview

    12/16

    For Green Surabaya

    Typical Cross Section

    12

    Jl Darmo Jl Urip Sumohardjo

    With OCS

  • 7/25/2019 The Surabaya Tram Project - Overview

    13/16

    For Green Surabaya

    Tram Stops - Single Track

    13

  • 7/25/2019 The Surabaya Tram Project - Overview

    14/16

    For Green Surabaya

    Tram Stops Double Track

    14

  • 7/25/2019 The Surabaya Tram Project - Overview

    15/16

    For Green Surabaya

    Thank You

    15

  • 7/25/2019 The Surabaya Tram Project - Overview

    16/16

    For Green Surabaya

    Track Work

    Standard gauge 1435mm

    Grooved rail 59R2

    Grass Track

    Embedded Track

    Continuous Welding Rail

    Radius minimum 25 m

    Max gradient 4 Switch and crossing at main line 10 nr

    16